SRT95 Off-Highway Truck

Frame Introduction

Part1 Structure Introduction


Part2 Frame Features
Part3 Installation and Connecting
Part4 Cautions
Part1 Structure Introduction
1.1 Frame Components

Right lengthening beam


Platform ladder
Longitudinal pull rod
Rear platform
Right front support

Tie rod units Frame assembly

Bottom board
Left lengthening beam
Guard-engine
Outer longitudinal pull rod
Left front support Cab lower guard board
1.2 Base Frame
 Seven components.
 Important parts.
 Steel castings (red color) used in high stress areas.

Torque tubes
Rear longitudinal beam

Front longitudinal beam


Bumper
Rear mounting rack

Hoist seat
Closed-loop
crossmember
Part2 Frame Features
Longitudinal pull rod increases the stiffness of Body limit on the front of the frame, improves
front part of the frame, enhances vehicle the vehicle harshness and the frame stress.
stability.

The frame, being used steel


castings
in high stress areas, has
good bending, torsion and resistance
to impact loads, longer lifetime.
Hoisting cylinder outside the frame:
Box structure with variable-section provides 1 ) Improves frame stress;
resistance to bending and torsion. 2 ) Enhances stability when raising body;
3 ) Simply to dismounting and repair hoisting
cylinder .
Part3 Installation and Connecting

Tie rod units installation Longitudinal pull rod installation Lengthening beam installation

Front support installation


Outer longitudinal pull rod installation
Part3 Installation and Connecting
Rear platform and platform
Lower guard installation ladder installation Damping pad installation

Guard-engine front installation Guard-engine back installation


Part3 Installation and Connecting

Driveline guard
installation

Fixed seat installation

Fuel tank installation Bottom board installation


Part3 Installation and Connecting

Hoisting cylinder clamp installation

Hoisting cylinder pressure plate installation

Hydraulic oil tank installation


Hoisting Cylinder Installation

Washer Washer

Bolt Bearing baffle Hoisting cylinder Sleeve Hoist seat

Animation
Part4 Cautions
1 、 Inspection
Inspect the frame and attached parts at intervals not exceeding 250
hours for cracked or broken welds and bending/twisting of the frame. Any defects found
should be repaired before they progress into major failures.
2 、 Painting
A check of the condition of the paint should be made approximately twice a year and
chassis repainted if necessary.
3 、 Welding
In principle, it is not allowed to weld anything to frame casually. Particularly, it is
prohibited to weld anything on the upper and lower flanges of the front and rear
longitudinal beams and it is strictly forbidden to splash any weld slag on them.

Damping pad should be replaced


Body
in case of damage or wearing.

NO OVERLOAD ! Damping pad


Thanks !
Hoisting cylinder installation

Back