ii) The buyer might have given a broad trend or theme to the merchandiser and
designer to develop a garment.
In both the cases, at a given situation the designer can work on de- veloping
different aspects of forecasting process, developing mood board, silhouettes,
colour board and requirement.
But it is merchandiser’s role to coordinate with the designer about the needs and
requirements of the buyer based on his previous experience. Hence, the
influence of the merchandiser in the apparel designing plays a vital role in the
acceptance of the developed design.
Roles of a fashion merchandiser
iii) In the third category, the manufacturing company itself may own some
brand. So, for their market, while designer develops products, the
merchandiser’s role is essential in exploiting the firms target sector and
marketing region. This will help them in developing prototypes at the design
development stage. The typical process flow of a fashion merchandiser is
given in
Role of a production merchandiser
Product development
It is one of the important jobs of the merchandiser. Once the ‘Tech Pack’ is
received, the merchandiser will arrange the tech pack details in a format by
dividing various styles and its de- tails of the garment
• He advises the junior merchandisers regarding the specifica- tion details
and requirements of the buyer
• This will help the junior merchandisers to assist the sampling department
manager / coordinator
• The sample is developed based on the requirements of the customer. The
effective communication between the different levels of people plays a vital
role in sample development
Approval of development samples
After the sample development, 2–3 samples are sent to the buyer for approval of
the style
• The main objective of the development sample is, the buyer will understand
how the garment style looks with the specific details / they will estimate the
manufacturer’s capacity and ability to pro- duce the sample for their line
• The samples are prepared with the available fabric in store which closely
resembles the exact requirement. This will help the buyer to understand the
manufacturer’s ability. Sometimes, to receive the order, the merchandiser also
develops the sample with original fabric
• In sample development, surface ornamentations and fit are fol- lowed as per the
tech pack. If some correction is to be done then the buyer will send the correction
details and again the samples are reworked / developed again and sent to the
buyer. This process will be continued till the sample gets approved
Costing
Once the sample approval is received from the buyer, then the merchandiser
will perform the garment costing
• It is done by calculating various costs incurred to make a gar- ment style. It
consists of various factors like:
• Fabric cost
• Trims and accessories cost
• CMT
• Washing or finishing cost
• Bank charges
• Buffer value
• Miscellaneous costs like rejection cost, wastage, etc.
Order Placement
Based on the finalised pricing value, the costing “quote” will be sent to
buyer. The price quote provided by the company is not necessary to be
accepted by the buyers and there will be a negotiation between both the
parties
Once final costing or re-costing is done and the same is accept- ed by the
buyer, the buyer will place the order with the required order quantity and
other main details to the merchant
Fabric and trim ordering
The first process after the order acceptance is lab dip where the
merchandiser will send the samples of dyed fabric to the buyer for colour
analysis
The submission of fabric/ lab dip includes many shades of the colour which
the buyer has asked for the garment
The lab dip approval is the critical process, this process will be continued till
the shades get approved from the buyer. This approved shade will be used for
the bulk dyeing of fabric for final garment production
Fit sample
After the approval of lab dip from the buyer, the first sample for the provided
specification is developed by the company which is known as FIT sample
This sample generally developed with the actual fabric or available fabric
close to the buyer requirement will be used. The sample generally will be
developed for a medium size. The main objective of this sample is to check
the fitOnce the sample is submitted, the buyer evaluates the sample
measure- ments, fit aspects and they will give feedback to the merchan- diser
for revision
Fit sample
The buyer returns fit approvals sheet which contains all the ac- tual
measurements and required measurements and how much deviation has
occurred for the purpose of correction
Totally three pieces are made, all of which are sent to the buyer and sent
back to merchandiser after approval. Once this is ap- proved, the order is
confirmed
Pre-production sample
Once the fit samples are approved, then the pre-production (PP) samples or
the red seal samples are made. PP sample will have all the specific details of
the style with the exact fabric, colour, trims, surface, ornamentations, etc.
The sample developed plays a vital role in the order confirma- tion process
because this is the main step where the sample has to look exactly as per the
buyer’s requirement. Around 2–3 samples (in four sizes each) are sent to
buyer for the approval and buyer can advise any corrections if required
Size Set Sample
Till the pre-production sample, the sample may be prepared in the sample
department of the company. But after this stage for the size set sample,
mostly the buyer recommends the mer- chandiser to produce in the actual
manufacturing unit
• Size set samples are made for the purpose of checking the dif- ferent sizes
of the same style in terms of fit, measurements, styling, etc.
• It is also made to check whether the assigned unit is able to produce that
style as per the specs. Three sets are made for all sizes. It is done in original
fabric
Pre-Production Meeting
Once all the samples are approved and all raw materials are ready in the
store to start the bulk production, the pre-produc- tion meeting will be
arranged by the merchandiser
• Pre-production meeting will be conducted with all the depart- ment heads
and important personnel of the company to plan the process, so that delay
can be avoided
• Here the merchants will discuss with the production heads on how the
production can be scheduled and done within the required time. So this
meeting is important and inevi- table
Forwarding of production file to
production planning and control
Production file is a document which includes all the details of a particular style. This document is
prepared by the merchandiser. Production file is forwarded to PPC (production planning and
control) once the PP sample is approved, along with the file, merchandiser will forward the
approved PP sample also. Some of the details in the production file include the following items:
• Measurements
• Export order sheet
• Colour details
• Style description
• Packing type
• Print/embroidery instructions, material requirement sheet
category, item, position, colour, size, consumption, unit in
kilograms, quantity, total quantity
• Job details for computer aided patter making (lectra) and
fabric order • Marker plan
• TNA order sheet
• 2D style diagram and trims • Packing information
Checking the availability of fabrics and trims
Once the file is received by the PPC, they will check and study each and
every detail in the file and they will also check the availability status of the
fabric and trims in the store. They will follow-up on the same if it’s not yet
reached in the house
Checking the surface ornamentation of the
particular style
Stitching materials are those which are used for sewing like threads and
accessories which assist production so in parallel they will do the
arrangement for the stitching materials in-house
Checking patterns with master ji
Production file includes all the details about the patterns and merchants will
forward the original patterns along with the production file to the PPC
Once they receive the patterns, they will forward the patterns to the pattern
master and master will cross check the pattern with the actual and confirm
Grading and final • cross check
Once everything is checked and confirmed by the master then, the pattern is
forwarded to the CAD (computer aid design) de- partment for grading.
Grading is a process of making different sizes from a basic size
When the file is forwarded to PPC, only one size pattern will be provided and
grading is done for other sizes. Finally, the graded pattern will be cross
checked and confirmed with the master
Laying and cutting
Laying is a process in which a huge lot of fabric lots are laid flat in several
plies as per the marker plan’s length
• In this process, based on the order quantity, the length of the lay, the
number of lays and the type of the lay to be spread will be instructed by the
production planning department. After laying the pattern, the developed
pattern lay-out obtained from the marker plan is used to cut the materials
TIME AND ACTION PLAN
TNA PLAN
T&A or TNA is a Time and action calendar plan, a project management tools
for Garments merchandiser and production team, process involve from
receiving order to delivery to customer.
It’s setting a time calendar to execute whole export order starting to closing.
Once TNA calendar is made, then it can be easy for merchandiser list down
their daily ‘to do list’ and taking it one by one.
As per TNA schedule processes can be executed on timely basis to track
whether an order is on track or it will get delayed.
In order to make TNA below mentioned information must be available
Process flow of an order with the list of task which need to be performed.
Production capacity of cutting, sewing, washing and finishing.
For sewing – batch wise and product wise capacity (production per day per
batch).
Lead time of activities, e.g. raw material lead time, sampling lead time, etc.
Shipment date or planned ex-factory date.
The main advantage of the time and action plan is its graphical
representation (Gantt chart). Hence, anyone can understand the information
out of it without any technical background.
Normally TNA does not depend on fabric used in merchandise like woven or
knits.
TNA is largely depends on the particular process flow of an order, machine
requirement and available production capacity. In TNA planned cutting date
(PCD) and ex-factory date these are the two most critical dates.
EXAMPLE:
LF – Latest Finish time: - The latest time at which the activity can be
completed without delaying the project.
LS – Latest Start time: - It is equal to the latest finish time minus the time
required to complete the activity.
LS = LF–activity duration
To calculate slack time: The slack time for an activity is the time between
its earliest and latest start time, or between its earliest and latest finish
time.
EXAMPLE
Advantages of critical path method:
Makes dependencies visible between the project activities.
Enables the calculation of the float (slack) of each activity. The float tells you
exactly how long an activity can come in late without it impacting the project
schedule.
Organises large and complex projects.
Encourages the merchandiser to reduce the order duration by optimising the
critical path.
Provides opportunities to respond to the negative risk of going over-schedule
by identifying the activities that are most critical.
Disadvantages of critical path method:
For large and complex projects, there’ll be thousands of activities and
dependency relationships. Without software, it can be mighty difficult
managing.
Activity durations must be fixed and well known. Unfortunately, there is
uncertainty associated with certain activities.
Activities in partial completions not accounted.
Successive activities can be considered into action (start work) only after the
completion of predecessor activity. In some situations, on the partial
completion, we can start work.
For example, after the first day of cutting production the bundling process
can be started, there is no necessity to wait until the whole production
completion in cutting.
PERT (Program Evaluation and Review
Technique):
In critical path method (CPM), it was assumed that the activity duration
estimates, and the derived values for the earliest start, latest start, earliest
finish and latest finish were all deterministic.
In reality, this is seldom true and durations are often not known in advance.
PERT has extended this deterministic approach in the face of uncertainty
about activity times and employs a special formula for estimating activity
durations.
The approach of PERT assumes that the activity duration estimates are done
by someone who is familiar with the activity, and has enough insight into the
characteristics of the activity.
PERT
Hence, the technique requires three duration estimates for each
individual activity, as follows:
Optimistic time estimate (To): This is the shortest possible time in which the
activity can be completed, and assumes that everything has to go perfect
Realistic time estimate (Tm): This is the most likely time in which the
activity can be completed under normal circumstances
Pessimistic time estimate (Tp): This is the longest possible time the activity
might need, and assumes a worst-case scenario.
Steps to solve a PERT question
Step 1: Calculate the “expected time” for the activity,
Pert Estimate = (Optimistic + (4 X Most Likely) + Pessimistic)/6
Step 2: Calculate the variance of the activity’s duration estimate.
Sigma = (Pessimistic – Optimistic) / 6
Step 3: Identify the critical path
Step 4: Calculate the probability of finishing the order XYZ in given time or
less than that time.
Z = D – Te/σ
Where: Z = Number of standard deviations D is from Te
Te = Expected time
D = Activity duration
Step 5: Use Z chart to know the percentage of probability
Step 6: Estimation of possible completion time with higher probability
Example: A small project consisting of eight activities has the following
characteristics:
i. Draw the PERT network for the project.
ii. Prepare the activity schedule for the project.
iii. Determine the critical path.
iv. If a 30- week deadline is imposed, what is the probability that the project
will be finished within the time limit?
If the project manager wants to 99% sure that the project is completed on the
schedule date, how many weeks before that date should he start the project
work?
SOLUTION: -
i. The network diagram for the given data is shown in fig. below. The earliest
time and variance of each activity is computed by using the formula.
ii. Calculation activity duration and scheduling times.
iii. The critical path of the project is 1-2-4-5 -6, critical activities being A, D, G & H.
The expected project length is the sum of duration of each critical activity. Expected
project length = 5 + 15 + 4 + 5 = 29 weeks.
Variance project length is obtained by summing variance of each critical activity.
iv. The required probability can be determined by finding the area under the
normal curve to the left of X = 30
Now, the probability of completing the project within the 30 week deadline is
v. If the project start T weeks before the due date, the X will represent the
ordinate under normal curve to the left of which 99% of area lies.
The area between n and X- being 99-50 or 49% and Z – value corresponding to this
is 2033 (From table)
RAW MATERIAL CONSUMPTION
ESTIMATIONS
Raw material consumption estimations
After order scheduling process is completed, next important job for the
merchandiser is to estimate the average consumption of various raw materials
for that particular style and also for the order quantity.
Various consumption calculations details like,
1. Weight of the yarn or fabric per garment (grams per square metre)
2. Yarn or fabric consumption per garment and for order quantity
3. Sewing thread consumption
4. Other raw materials consumption.
Fabric and yarn weight calculations
The method of estimating the GSM of woven fabric is provided here.
However, these factors are not constant with the different style preferences.
Hence, thread consumption is never standard for sewn product categories such as
shirts, trousers and footwear.
SEWING THREAD CONSUMPTION CALCULATION
There are two methods generally used to calculate the amount of thread in a
seam and hence the thread consumption in the sewn product:
By measuring the actual amount of thread consumed
A specified length of a given seam is measured and then the thread is pulled
out of this length.
We can use the amount pulled out of this specified length to calculate the
ratio of thread consumed in the entire seam.
By dividing the amount of thread by the seam length, we get the ratio of
thread consumed.
If we multiply this factor times the total length of seam, we can determine
the total thread consumed for that seam
Example1
Calculate the sewing thread consumption in a 15 cm length 2 thread chain stitch (402).
ii. By calculation using Thread consumption ratios
The easier method is to use the generally applicable thread consumption
ratios for the various stitch types that are listed below.
By relating these ratios to the length of seams using each stitch type, total
thread consumption can be calculated.
Here, the above ratios are arrived at with a stitch density of 7
stitches per cm (18 stitches per inch).
These ratios are the prescribed minimum in regular conditions
and marginally vary with the factors affecting thread
consumption. A
certain percentage of wastage is to be added to the above ratios
as per shop floor conditions. It may vary from 5% to 15%.
SEWING THREAD NUMBER SYSTEM
Thread sizes are communicated through various numbers and numbering systems
which are derived by relating its unit length and weight.
Fixed Weight Systems
In this system, unit weight is taken as fixed and its length is measured
Systems under fixed weight:
English Count (Ne) = Number of hanks of 840 yards/lb
Metric Count (Nm) = Number of hanks of 1,000 meters/kg
In fixed weight systems, the yarn becomes finer as the count number increases.
Fixed Length Systems
In this system, unit length is taken as fixed and its weight is measured
Systems under fixed length:
Denier = Weight in grams of 9,000 meters
Tex = Weight in grams of 1,000 meters
Decitex = Weight in grams of 10,000 meters
In fixed length systems, the yarn becomes coarser / heavier as the count number
increases.
Generally, Metric count is used to describe synthetic, spun and core spun thread
while English count is used to specify cotton thread.
Filament threads are normally expressed with Decitex or Denier.
Factors affecting sewing thread consumption
Thickness of fabrics
Plies of fabrics to be sewn
Stitch type
Stitch density
Width of seam
Garment size
Design of the apparel
Automatic thread trimmer of that machine
Skill of the operator
Quality of thread
OTHER RAW MATERIAL
CONSUMPTIONS
Other raw material consumptions
Generally the following raw materials used in the garment manufacturing, for
which the merchandiser needs to calculate the total requirement for a single
garment or for an order.
Buttons
Labels
Inter lining materials like nonwoven, canvas, etc.
Hooks
Zippers
Tapes
Elastics
Tags, Poly bags, stickers and other packing materials
Cartoon boxes, etc.
Raw materials – Key instructions
The merchandiser will receive information from buyer regarding the quality
and requirement specification.
With the sample one can understand how many numbers of particular raw
materials particular product is required per garment and
Thus he or she can estimate the total numbers for the order quantity.
The merchandiser should aware of the company efficiency either from
previous history or from similar order situations in past.
Based on that merchandiser should include certain amount of waste
percentage to the particular raw material.
Raw material and their unit of measurements
S.No Raw Materials Unit of measurement
1 Label, Zipper, Hang Tag, Carton Per Unit
box, Rivets, Hanger
2 Laces, Elastics In meters (50 meter or 100 meter roll)
3 Tape, Velcro In meters (roll) or m/Kg
4 Buttons Gross (12 Dozens – 144 units )
5 Shanks Gross
6 Polybag Unit (Based on GSM
7 Sewing thread Cone (2000 or 5000 meter)
Differeence between trims and accessories
TRIMS ACCESSORIES
Technical Definition The materials which are attached The materials which are not
with the body of garments by attached with the body of
sewing are termed as trimmings garments by sewing, only
used for garments finishing
and packing are termed as
accessories
Non-Technical Trimmings are the ultimate Accessories are the ultimate
Definition materials that are attached with materials that are not
the garments while using by the attached with the garments
end users. while using by the end user
Key Point Trimmings are used as functional Accessories are used as
purposes decorative purposes
Example Buttons, Waistband Interlining, etc.
Carton, Gum Tape, Poly
bag, etc.
FACTORY CAPACITY PLANNING
Factory capacity planning
Merchandiser must have some knowledge about the factory available capacity, labour
skill level and machine capacity along with factories technology up gradation details.
The general formula used for the calculations are provided below.
Line Planning
Line planning is another important task for merchandiser and production
planning department.
It is a process of scheduling and allocating of orders to production lines
according due dates of production completion.
A line planning process tells
when a style is going to be loaded to the line?
how many pieces to be expected (target) from the line
when order has to be completed
It is mandatory to know the capacity details and skill level of the line or
factory or plant.
This will help the merchandiser during booking orders or allocating orders to
the production line.
Example1
Consider that a company has
received an order with
target date = 20 days from today
order quantity =25,000
SMV is 6.74.
line efficiency – 65%,
each line has 15 operators.
Calculate number of lines required to
complete the order within the target
date.
Capacity calculation for other departments
Departments like cutting, checking, finishing and packing, also the actual
capacity of any operation can be computed based on the SMV of that
particular operation.
Most of the time the SMV values of these department activities will be
provided to the merchandiser.
CHECKING, FINISHING AND PACKING DEPT.
The garment checking, finishing and packing process are performed
individually for every garment. Thus no confusion like the cutting
department.
Thus the capacity can be calculated like sewing department.
CUTTING DEPARTMENT
The operations involved are spreading, marking, cutting, fusing, re-laying, re-
cutting, sorting, enumeration and bundling.
The critical issue in this process is calculation of Standard Allowable Minutes
(SAM) for one piece of garment or component.
Primary variables influences the calculation of cutting SMV are layer number
during a lay, range of markers during a lay.
SMV Calculation
The general steps involved in the calculation of SMV for cutting, checking,
finishing and packing operations,
Do cycle time of jobs (time study for five – ten cycles)
Do performance rating ( Assess how fast or slow the operator doing the task in
1–100 scale)
Calculate basic time (Basic time = cycle time × performance rating)
Add allowances (machine allowance + personal fatigue)
Calculate standard minutes (SAM = Basic time + Allowance percentages).
The basic time is actually SMV.
Sr. No. Operations Units for cutting operation SAM
1 Spreading Calculate the total SMV for a spread and identify the SMV for a layer
2 Marker making Marking SMV / marker; in case of CAD marker SMV/ lay
3 Cutting Calculate SMV / lay
4 Fusing SMV / garment
5 Re-cutting SMV/ Lay based on number of layers
6 Sorting SMV / lay
7 Number stickering SMV / component and multipy by number of components to get SMV/
garment
8 Bundling SMV / Marker
FABRIC UTILISATION PERCENTAGE
To calculate utilisation percentage in cutting, the details regarding
Lay length
Lay width
GSM and
Numbers of plies in a lay are required.
Here, total lay weight is = Lay length × lay width × GSM × Number of plies used
To calculate the weight of the cut panes, measure the weight of the waste from the lay and
minus the waste weight from the total lay weight.
GENERAL SEWING DATA
It is a PTS (Pre-determined Time Standards) based time measuring system.
GSD provides a scientific, ethical and auditable approach to quantifying
manufacturing methods, times and costs and accurately and consistently
establishes International Standard Time for complete products (styles), or
individual product components (features).
GSD provides fast, accurate rates in a fraction of the time compared with other
systems. For every facility and style change option, GSD allows pre-costing of
various stages of manufacturing.
The system provides reliable, measurable information on:
Optimum Standard Allowed Minute values
Production-run efficiency (overall & component)
Costing per style
Performance related indices
BREAKDOWN OF OPERATIONS
At the initial stage most of the time its merchandisers solo
responsibility. That decision whatever he or she makes based on
her / his knowledge going to decide few things like,
Is this order can be performed in our factory? – By considering
style complications and technical or technological facility
requirement
Can we able to deliver the product quantity on time? – Capacity
of the department and factory
Will the company get the expected level of profit out of the
order? – considering style complication and cost factors.
BREAKDOWN OF OPERATIONS
Ultimately these questions will lead the
merchandiser to a situation whether to
accept the order or to reject the order.
It is a huge decision for the company and
for himself.
But this decision most of the time based
on merchandisers own assessment of the
garments requirements and their
companies skill set.