Professional Documents
Culture Documents
Introduction
Why learn about LTE UE Tuning
Pre-test
Pre-Test - Introduction
Good luck!
Skip Pre-test
PROPERTIES
Click this button to go to the first topic Click on this button to skip the course
in the course. and go to EriColl to register your
attempt.
Cell Trace
UE Trace
HO
problems
UL/DL
KPIs throughput
latency
Dropped
calls
Events
Alarms /
counters
Key Performance Indicators
KPIs for Network Drive Test
Recommended KPIs
Accessibility
Accessibility
ERAB Establishment Success Rate
DL User Throughput
UL User Throughput
Integrity
Integrity
DL Peak User Throughput
eNodeB
Initial E-RAB
Establishment
Success Rate
Added E-RAB
Establishment
Success Rate
Retainability KPIs
Session Release Success
Dropped call
Failure
MME
IP Networks
RRC_
CONNECTE
D
SGW PGW
eNodeB
Session
Abnormal #Abnormal_Session_Releases
SARR = x100[%]
Release Rate #Succesful_Session_setups
Minutes per
Abnormal MPAR=
Measurement_Period_minutes x Average_No_Users
[minutes]
Release #RAB_Abnormal_Release
Integrity KPIS
DLUT= Download_File_size_in_kbits kbps
Downlink and Session_End_time(s) – Session_start_time_seconds
Uplink user data
throughput ULUT= Download_File_size_in_kbits kbps
Session_End_time(s) – Session_start_time_seconds
MME
PCRF Server
SGW PGW
RRC_
CONNECTE
D
RRC_
CONNECTE
D
S
LTE LTE
Combined
Handover
#Successful_HOs
HOSR= x100[%]
Success Rate #Attempted_HOs
(Intra, Inter LTE
and IRAT to
WCDMA
handovers)
Parameters subjected to tuning
System Information
Power control
Measurement report
(eA2, eA5, eB2) ANR
LTE LTE
DSCP
MME SGW
IP Networks
PGW
Summary
Summary
Check:
› UE call flows,
› dropped calls and dropped calls maps,
› blocked calls and blocked call maps,
› handover failures and handover failure maps,
› throughput maps,
› alarms,
› counters.
Common problems:
› missing neighbor relations,
› poor radio conditions,
› badly tuned parameters,
› high system load,
› High UL interference.
Key Performance Indicators
E-RAB Establishment
Success Rate
Quiz
PROPERTIES
.
”When clicking ”next” you will be directed to an
EriColl page.
It is important that you fill in the form and click
OK. This will register your successful attempt.
Finish by clicking on the “next” button.”
Feedback