BY UNIT CAPACITY
2 /16
UNIT I ON
UCT
D
PRO
Small Class Training - Estimating Production by Unit Capacity – 22 Jan 2010
4 /16
Small Class Training - Estimating Production by Unit Capacity – 22 Jan 2010
Fill Factor
Condition Remark Bucket fill factor
Easy Excavating natural ground of clayey soil, clay, or soft soil 1.1 ~ 1.2
Average Excavating natural ground of soil such as sandy soil and dry soil 1.0 ~ 1.1
Rather difficult Excavating natural ground of sandy soil with gravel 0.8 ~ 0.9
Difficult Loading blasted rock 0.7 ~ 0.8
Cycle Time
PC 300 15 - 18 18 - 21
PC 400 16 - 19 19 - 22 1800
5 /16
Small Class Training - Estimating Production by Unit Capacity – 22 Jan 2010
6 /16
Small Class Training - Estimating Production by Unit Capacity – 22 Jan 2010
Cycle Time
Hauling
Time
Loading Dumping
Time Time
7 /16
ILI TY
I LA B
AVA
Small Class Training - Estimating Production by Unit Capacity – 22 Jan 2010
AVAILABILITY
MA = Machine Availability
MA = (Work Time)
(Work Time + Repair)
Factors that show availability for doing activities by determining lost time
because mechanical reason.
PA = Physical Availability
Factors that show availability for doing activities by determining lost time
because several factor beside mechanical reason.
9 /16
Small Class Training - Estimating Production by Unit Capacity – 22 Jan 2010
AVAILABILITY
UA = Use of Availability
UA = (Work Time)
(Work Time + Standby Time)
Factors that show rate of time utilized by machines for operating in its time
utilization.
EU = Effective Utilization
EU = (Work Time)
(Time Scheduled)
Factors that show rate of time utilized by machines for operating in its
entire time utilization.
10 /16
S IN G ON
U CTI
D U
PRO E
A BL
T
Small Class Training - Estimating Production by Unit Capacity – 22 Jan 2010
W1 W2 W3 W4 W5
PLAN TARGET AS WEEKLY TOTAL
1 -7 8 - 14 15 - 21 22 - 28 29-31
Total of days 7 7 7 7 3 31
Holiday 0 0 0 0 0 0
Available days 7 7 7 7 3 31
13 /16
Small Class Training - Estimating Production by Unit Capacity – 22 Jan 2010
W1 W2 W3 W4 W5
PRODUCTION TABLE - ALLOCATION
1 - 7 FLEET 8 - 14 15 - 21 22 - 28 29-31
7 7 7 7 3 31
0 0 0 0 0 0
W1 W2 W3 W4 W5
7 7 7 7 3 TOTAL
31
1 -7 8 - 14 15 - 21 22 - 28 29-31
LOCATION OVER BURDEN 7 7 7 7 3 31
PC 400 0 2 0 2 0 2 0 2 0 2 0
Hy SL 450 7 1 7 1 7 - 7 - 3 - 31
OB (BCM) 47.643 47.643 32.300 32.300 13.260 173.145
P7000 Bk07
LOCATION OVER BURDEN
COAL WINNING
PC 400 2 2 2 2 2
PCSL300
Hy 450 1
1 1
1 - 1 - 1 - 1
COAL (TON)
OB (BCM) 10.498
47.643 10.498
47.643 10.498
32.300 10.498
32.300 4.310
13.260 46.300
173.145
OVERWINNING
COAL BURDEN
PC 400 7 7 7 7 7
PC 300 1 1 1 1 1
SL DAEWOO
COAL (TON) 10.4982 2
10.498 2
10.498 2
10.498 4.3102 46.300
Hy SL 450 1 1 2 2 2
OVER BURDEN
P8500 Bk06 OB (BCM) 143.735 143.735 143.735 143.735 59.007 633.947
PC 400 7 7 7 7 7
COAL WINNING
SL DAEWOO 2 2 2 2 2
CAT 330
Hy SL DL
450 1 1 1
2 1
2 21
PCOB (BCM)
200 (coal) 143.735
0,5 143.735
0,5 143.735
0,5 143.735
0,5 59.007
0,5 633.947
COAL
COAL (TON)
WINNING 13.728 13.728 13.728 13.728 5.636 60.546
CASE - PROBLEM
CT loader : 30 detik/swing
Capacity : 6.3 m3 CT Hauler : 20 menit
Fill Factor : 0.95 Capacity hauler : 55 LCM
FK loader : 0.7 FK hauler : 0.75
?
PA : 90 %
UA : 65 %
?
Schedule time : 720 jam/bulan
% swell : 1.25
CASE - TIPS
PH = vessel capacity x 60 x FK
cycle time
CASE - SOLUTION