Professional Documents
Culture Documents
ANGGARAN
PENDAPATAN
PENANAMAN ROCK
MELON BAGI
1000 POKOK
PELAN TAPAK PENANAMAN
KOS-KOS YANG TERLIBAT:
1. KOS TETAP
2. KOS PENGELUARAN
KOS TETAP
NAMA BAJA KIMIA JUMLAH DIPERLUKAN KOS SEUNIT (RM) JUMLAH (RM)
TELAGA TIUB 1 5000.00
FITTING & SAMBUNGAN DARI PAM TELAGA TIUB 100.00
RUMAH PAM 2000.00 2000.00
EC METER, 1 300.00 300.00
pH METER 1 300.00 300.00
PAM PENYEMBUR 20L (BATTERY) 2 170.00 340.00
JUMLAH 8040.00
KOS TETAP
(SISTEM PENGAIRAN)
1000 POKOK
PENANAMAN ROCK MELON
KOS SISTEM PENGAIRAN
NAMA PERALATAN / KOMPONEN JUMLAH DIPERLUKAN KOS SEUNIT (RM) JUMLAH (RM)
TANGKI HDPE 600 GALLON 2 550.00 1100.00
TONG DRUM 200L 2 120.00 240.00
POLYPIPE 32mm X 100m 1 115.00 115.00
POLYPIPE 16mm X 300m 3 100.00 300.00
CLAMP SADDLE 32mm X ¾ FEMALE THREADED 30 5.40 162.00
QUICK ACTION VALVE 16mm X ¾ MALE THREADED 30 2.50 75.00
ELBOW CONNECTOR 16mm 120 1.00 120.00
END CAP 16mm 30 1.00 30.00
HDPE COMPRESSION END CAP 32mm 1 5.00 5.00
HDPE COMPRESSION EQUAL ELBOW 32mm 4 6.00 24.00
HDPE MALE THREADED ADAPTER 32mm X 1” 1 5.00 5.00
LEO CENTRIFUGAL WATER PUMP 1HP 1 550.00 550.00
*PENGIRAAN KOS TETAP TIDAK TERMASUK UPAH PEMASANGAN, PERALATAN PEMASANGAN, PENDAWAIAN ELEKTRIK
KOS PENGANGKUTAN, PENYEDIAAN TAPAK
KOS PENGELUARAN
JUMLAH 195.00
KOS RACUN SERANGGA &
RACUN KULAT
NAMA RACUN KULAT / SERANGGA HARGA / PAKET / JUMLAH JUMLAH
BOTOL DIPERLUKAN
ANTRACOL 1KG 36.00 1 36.00
JUMLAH 4820.50
*PENGIRAAN KOS PENGELUARAN TIDAK TERMASUK UPAH PEKERJA, KOS PENGANGKUTAN BELIAN DAN JUALAN, KOS
SEWAAN
ANGGARAN PENDAPATAN
MUSIM 1 MUSIM 2 MUSIM 3 MUSIM 4
TOLAK
TOLAK
*PENGUSAHA PERLU PASTIKAN HASIL PENGELUARAN / MUSIM BAGI PENANAMAN 1000 POKOK IALAH
RM4800.00 SUPAYA TIDAK MENGALAMI KERUGIAN.