You are on page 1of 36

PENGIRAAN KOS &

ANGGARAN
PENDAPATAN
PENANAMAN ROCK
MELON BAGI
1000 POKOK
PELAN TAPAK PENANAMAN
KOS-KOS YANG TERLIBAT:
1. KOS TETAP
2. KOS PENGELUARAN
KOS TETAP

PENANAMAN 1000 POKOK


ROCK MELON
NAMA BAJA KIMIA BERAT (kg) KOS SEUNIT (RM) JUMLAH (RM)
TELAGA TIUB 1 5000.00
WEED CONTROL MAT 2M X 200M 2 650.00 1300.00
PAKU WEED CONTROL MAT 500 0.20 100.00
TANGKI HDPE 600 GALLON 2 1100.00
TONG DRUM 200L 2 120.00 240.00
POLYPIPE 32mm X 100m 1 115.00 115.00
POLYPIPE 16mm X 300m 3 100.00 300.00
BATU BATA MERAH 2000 0.35 700.00
CLAMP SADDLE 32mm X ¾ FEMALE THREADED 30 5.40 162.00
QUICK ACTION VALVE 16mm X ¾ MALE THREADED 30 2.50 75.00
ELBOW CONNECTOR 16mm 120 1.00 120.00
END CAP 16mm 30 1.00 30.00
HDPE COMPRESSION END CAP 32mm 1 5.00 5.00
HDPE COMPRESSION EQUAL ELBOW 32mm 4 6.00 24.00
HDPE MALE THREADED ADAPTER 32mm X 1” 1 5.00 5.00
LEO CENTRIFUGAL WATER PUMP 1HP 1 550.00 550.00

TANK CONNECTOR 1” 2 3.00 6.00


PVC 1” BALL VALVE 3 9.00 27.00
PVC P/T SOCKET 1” MALE THREADED 2 1.00 2.00
NAMA BAJA KIMIA BERAT (kg) KOS SEUNIT (RM) JUMLAH (RM)
PVC P/T SOCKET 1” FEMALE THREADED 3 1.00 3.00
AZUD 1” DISC FILTER 1 50.00 50.00
TEE SOCKET PVC 1” 1 1.50 1.50
PVC EQUAL ELBOW 1” 2 1.00 2.00
PVC 1” X 20’ 1 32.00 32.00
MICTOTUBE 3mm X 200 meter 3 120.00 360.00
NIPPLE 3mm 50pcs 20 10.00 200.00
DRIPPER 3mm 50pcs 20 15.00 300.00
FITTING & SAMBUNGAN DARI PAM TELAGA TIUB 100.00
KOS BAHAN PEMASANGAN 100.00 100.00
RUMAH PAM 2000.00 2000.00
TIANG SOKONGAN 300 15.00 4500.00
CHAIN TENSIONER 60 5.00 300.00
DAWAI SOKONGAN 4OKG/GULUNG 5 255 1275.00
SIMEN KONKRIT TIANG SOKONGAN 1000.00 1000.00
EC METER, 1 300.00 300.00
pH METER 1 300.00 300.00
DIGITAL TIMER 1 50.00 50.00
KOS TETAP
(TELAGA TIUB & ALATAN
LADANG)
1000 POKOK
PENANAMAN ROCK MELON
KOS TELAGA TIUB DAN ALATAN LADANG

NAMA BAJA KIMIA JUMLAH DIPERLUKAN KOS SEUNIT (RM) JUMLAH (RM)
TELAGA TIUB 1 5000.00
FITTING & SAMBUNGAN DARI PAM TELAGA TIUB 100.00
RUMAH PAM 2000.00 2000.00
EC METER, 1 300.00 300.00
pH METER 1 300.00 300.00
PAM PENYEMBUR 20L (BATTERY) 2 170.00 340.00
JUMLAH 8040.00
KOS TETAP
(SISTEM PENGAIRAN)
1000 POKOK
PENANAMAN ROCK MELON
KOS SISTEM PENGAIRAN
NAMA PERALATAN / KOMPONEN JUMLAH DIPERLUKAN KOS SEUNIT (RM) JUMLAH (RM)
TANGKI HDPE 600 GALLON 2 550.00 1100.00
TONG DRUM 200L 2 120.00 240.00
POLYPIPE 32mm X 100m 1 115.00 115.00
POLYPIPE 16mm X 300m 3 100.00 300.00
CLAMP SADDLE 32mm X ¾ FEMALE THREADED 30 5.40 162.00
QUICK ACTION VALVE 16mm X ¾ MALE THREADED 30 2.50 75.00
ELBOW CONNECTOR 16mm 120 1.00 120.00
END CAP 16mm 30 1.00 30.00
HDPE COMPRESSION END CAP 32mm 1 5.00 5.00
HDPE COMPRESSION EQUAL ELBOW 32mm 4 6.00 24.00
HDPE MALE THREADED ADAPTER 32mm X 1” 1 5.00 5.00
LEO CENTRIFUGAL WATER PUMP 1HP 1 550.00 550.00

TANK CONNECTOR 1” 4 3.00 12.00


PVC 1” BALL VALVE 5 9.00 45.00
PVC P/T SOCKET 1” MALE THREADED 2 1.00 2.00
NAMA PERALATAN / KOMPONEN JUMLAH DIPERLUKAN KOS SEUNIT (RM) JUMLAH (RM)
PVC P/T SOCKET 1” FEMALE THREADED 3 1.00 3.00
AZUD 1” DISC FILTER 1 50.00 50.00
TEE SOCKET PVC 1” 3 1.50 4.50
PVC EQUAL ELBOW 1” 6 1.00 6.00
PVC 1” X 20’ 1 32.00 32.00
MICTOTUBE 3mm X 200 meter 3 120.00 360.00
NIPPLE 3mm 50pcs 20 10.00 200.00
DRIPPER 3mm 50pcs 20 15.00 300.00
KOS BAHAN PEMASANGAN (GAM PVC + PTFE TAPE + MATA GERUDI) 100.00 100.00
DIGITAL TIMER 1 50.00 50.00
JUMLAH 3890.50
KOS TETAP
(TAPAK TANAMAN)
1000 POKOK
PENANAMAN ROCK MELON
KOS TAPAK TANAMAN
NAMA BAJA KIMIA BERAT (kg) KOS SEUNIT (RM) JUMLAH (RM)
WEED CONTROL MAT 2M X 200M 2 650.00 1300.00
PAKU WEED CONTROL MAT 500 0.20 100.00
BATU BATA MERAH 2000 0.35 700.00
TIANG SOKONGAN 300 15.00 4500.00
CHAIN TENSIONER 60 5.00 300.00
DAWAI SOKONGAN 4OKG/GULUNG 5 255.00 1275.00
SIMEN KONKRIT TIANG SOKONGAN 1000.00 1000.00
JUMLAH 9175.00
JUMLAH KOS TETAP
JUMLAH (RM)
KOS TELAGA TIUB DAN ALATAN LADANG 8040.00
KOS SISTEM PENGAIRAN 3890.50
KOS TAPAK TANAMAN 9175.00
JUMLAH 21105.00

*PENGIRAAN KOS TETAP TIDAK TERMASUK UPAH PEMASANGAN, PERALATAN PEMASANGAN, PENDAWAIAN ELEKTRIK
KOS PENGANGKUTAN, PENYEDIAAN TAPAK
KOS PENGELUARAN

PENANAMAN 1000 POKOK


ROCK MELON
KOS PENGELUARAN:
• KOS BAJA FERTIGASI (SET A & SET B)
• KOS PEMBAJAAN FOLIAR
• RACUN KULAT DAN RACUN SERANGGA
• KOS POLIBEG, COCOAPEAT DAN TALI RAFIA
• KOS SEMAIAN (PEAT MOSS & SEED TRAY)
• KOS BIJI BENIH
• KOS ELEKTRIK
KOS BAJA FERTIGASI SET A &
SET B BAGI PENANAMAN 1000
POKOK
JUMLAH PENGGUNAAN DAN KOS BAJA KIMIA
BAGI PENANAMAN 1000 POKOK ROCK MELON
NAMA BAJA KIMIA BERAT (kg) KOS (RM)
YARA CALCIUM NITRATE 125.96 282.14
YARA POTASSIUM NITRATE 71.33 348.11
YARA MAGNESIUM SULPHATE 96.97 131.88
YARA MKP 44.41 355.30
YARA SOP 36.71 143.90
Ag Zn EDTA 0.512 21.50
Ag Mn-EDTA 0.581 25.56
Ag Hibor 1.221 43.96
Ag Fe-EDTA 1.548 54.18
Ag Cu-EDTA 0.0492 2.36
Ag Ammonium Molybdate 0.059 18.17
JUMLAH 1426.50

PURATA KOS BAJA 1 POKOK = RM1.43


JUMLAH PENGGUNAAN DAN KOS BAJA KIMIA BAGI
PENANAMAN 1000 POKOK ROCK MELON
(BAJA ALTERNATIF)
NAMA BAJA KIMIA BERAT (kg) KOS (RM)
ICL CALCIUM NITRATE 125.96 241.84
KEMAPCO POTASSIUM NITRATE 71.33 299.59
ICL MAGNESIUM SULPHATE 96.97 116.36
ICL MKP 44.41 319.75
SOLUPOTASSE 36.71 136.56
Ag Zn EDTA 0.512 21.50
Ag Mn-EDTA 0.581 25.56
Ag Hibor 1.221 43.96
Ag Fe-EDTA 1.548 54.18
Ag Cu-EDTA 0.0492 2.36
Ag Ammonium Molybdate 0.059 18.17
JUMLAH 1279.83
PURATA KOS BAJA 1 POKOK = RM1.28
KOS BAJA FOLIAR & BAJA
TAMBAHAN
BAJA KIMIA JUMLAH/ KADAR HARGA (RM)
DIGUNAKAN
Ag-ABC 1kg 1 45.00
*1g dicampur 1 Liter air = 10 pokok
1000 pokok = 100g (100g X 3 kali semburan = 300g)

Ag Cabor 500g 1 35.00


*1g dicampur 1 Liter air = 10 pokok
1000 pokok = 100g (100g X 4 kali semburan = 400g)

SO-TONO Hijau 1Liter 1 30.00


*18ml dicampur 10Liter
*10Liter = 100 pokok
1000 pokok = 18ml x 10 = 180ml(180ml x 3 minggu semburan = 540ml)
SO-TONO Biru 1Liter 2 60.00
*18ml dicampur 10Liter
*10Liter = 100 pokok
1000 pokok = 18ml x 10 = 180ml(180ml x 7 minggu semburan = 1260ml)

Hormon Baja dan buah 1 25.00

JUMLAH 195.00
KOS RACUN SERANGGA &
RACUN KULAT
NAMA RACUN KULAT / SERANGGA HARGA / PAKET / JUMLAH JUMLAH
BOTOL DIPERLUKAN
ANTRACOL 1KG 36.00 1 36.00

AVISTA 500ML 90.00 1 90.00

5ML DICAMPUR 10L AIR


10L AIR = 100 POKOK
1000 POKOK = 50ML RACUN KULAT X 10 SEMBURAN = 500 ML
RACUN SERANGGA CYPER 1L 50.00 1 50.00
5ML DICAMPUR 10L AIR
10L AIR = 100 POKOK
1000 POKOK = 50ML RACUN KULAT X 10 SEMBURAN = 500 ML
RACUN SERANGGA DECIS 250 1L 69.00 1 69.00
11ML DICAMPUR 10 LITER
11ML X 10 = 110ML X 5 SEMBURAN = 550ML
500ML Solomon Beta-cyfluthrin 110.00 1 110.00
2.5 ML DICAMPUR 10LITER (100POKOK) =25ML
25ML X 10 = 250ML
250ML X 2 KALI SEMBURAN = 500ML SEMUSIM
JUMLAH KOS 355.00
KOS POLIBEG,COCOAPEAT DAN
TALI RAFIA
NAMA BAHAN HARGA / GUNI / JUMLAH JUMLAH
GULUNG / UNIT DIPERLUKAN
POLIBEG 16 X 16 0.48 / UNIT 1000 480.00

COCOAPEAT 5.00 / GUNI 334 1670.00

TALI RAFIA NYLON STRING 1KG 10.00 / GULUNG 15 150.00

KOS UNTUK DUA MUSIM PENANAMAN 2300.00

KOS SEMUSIM 1150.00


KOS BIJI BENIH
JENAMA / VARIETI BIJI BENIH HARGA / PAKET / JUMLAH JUMLAH
BIJI DIPERLUKAN
SAKATA GLAMOUR 100 SEEDS 24.00/PAKET 12 PAKET 264.00

MADESTA F1 0.30/BIJI 1200 BIJI 360.00

LECKAT 118 MAHSURI 0.40/BIJI 1200 BIJI 480.00


KOS BEKAS & MEDIA SEMAIAN
JENAMA / VARIETI BIJI BENIH HARGA / UNIT / JUMLAH JUMLAH
GUNI DIPERLUKAN
MULTI SEEDS TRAY 104 5.00 12 60.00

PEAT MOSS 70L 40.00 3 120.00

KOS SEMUSIM 180.00


BIL ELEKTRIK
JENAMA / VARIETI BIJI BENIH HARGA / UNIT / JUMLAH JUMLAH
GUNI DIPERLUKAN
TEMPOH PENGGUNAAN ELEKTRIK SEMUSIM 33.00 3 BULAN 100.00

KOS SEMUSIM 100.00


JUMLAH KOS PENGELUARAN
JUMLAH (RM)
KOS BAJA FERTIGASI 1426.50
KOS BAJA FOLIAR DAN BAJA TAMBAHAN 195.00
KOS RACUN KULAT DAN RACUN SERANGGA 355.00
KOS POLIBEG, COCOAPEAT DAN TALI RAFIA 2300.00
KOS SEMAIAN 180.00
KOS BIJI BENIH 264.00
KOS ELEKTRIK 100.00

JUMLAH 4820.50

*PENGIRAAN KOS PENGELUARAN TIDAK TERMASUK UPAH PEKERJA, KOS PENGANGKUTAN BELIAN DAN JUALAN, KOS
SEWAAN
ANGGARAN PENDAPATAN
MUSIM 1 MUSIM 2 MUSIM 3 MUSIM 4

ANGGARAN HASIL 6400.00 6400.00 6400.00 6400.00


HARGA JUALAN GRED A RM4.00 / KG
*SATU POKOK = SEBIJI BUAH = 2KG
*RM4.00/KG X 2KG = RM8.00
RM8.00 X 1000 POKOK = RM8,000.00
RM8,000 X 80% KEJAYAAN PENANAMAN =
RM6400.00

TOLAK

KOS PENGELUARAN SEMUSIM 4820.50 2520.50 4820.50 2520.50

TOLAK

MODAL / KOS TETAP 1000.00 1000.00 1000.00 1000.00


ANGGARAN PENDAPATAN / MUSIM 579.50 2879.50 579.50 2879.50
ANGGARAN PENDAPATAN / TAHUN 6918.00
• KOS PERMULAAN PROJEK = KOS TETAP + KOS PENGELUARAN MUSIM PERTAMA
= RM 21,105.00 + RM 4820.50
= RM 25,925.50

• ANGGARAN PENDAPATAN / TAHUN / POKOK = RM 25.60


• KOS PENGELUARAN / TAHUN / POKOK = RM14.68
• PULANGAN MODAL / TAHUN / POKOK = RM 4.00
*KIRAAN PENGEMBALIAN MODAL (KOS TETAP) 5 TAHUN

• ANGGARAN PENDAPATAN / TAHUN / POKOK = RM 6.92


• ANGGARAN PENDAPATAN / MUSIM / POKOK = RM 1.73
• ANGGARAN PENDAPATAN / MUSIM / POKOK = RM 6.40
• KOS PENGELUARAN / MUSIM / POKOK = RM 3.67
• PULANGAN MODAL = RM 1.00

• PULANGAN BERSIH / MUSIM / POKOK = RM 1.73

*PENGUSAHA PERLU PASTIKAN HASIL PENGELUARAN / MUSIM BAGI PENANAMAN 1000 POKOK IALAH
RM4800.00 SUPAYA TIDAK MENGALAMI KERUGIAN.

You might also like