Professional Documents
Culture Documents
ANGGARAN
PENDAPATAN
PENANAMAN ROCK
MELON BAGI
5000 POKOK
PELAN TAPAK PENANAMAN
NAMA BAJA KIMIA JUMLAH DIPERLUKAN KOS SEUNIT (RM) JUMLAH (RM)
TELAGA TIUB 1 5000.00
FITTING & SAMBUNGAN DARI PAM TELAGA TIUB 200.00
RUMAH PAM DAN SETOR BAJA 2 2000.00 4000.00
EC METER, 1 300.00 300.00
pH METER 1 300.00 300.00
PAM PENYEMBUR 20L (BATTERY) 2 170.00 340.00
JUMLAH 10140.00
KOS TETAP
(SISTEM PENGAIRAN)
PENANAMAN 5000 POKOK
ROCK MELON
KOS SISTEM PENGAIRAN
NAMA PERALATAN / KOMPONEN JUMLAH DIPERLUKAN KOS SEUNIT (RM) JUMLAH (RM)
TANGKI HDPE 600 GALLON 4 550.00 2200.00
TONG DRUM 200L 4 120.00 480.00
POLYPIPE 50mm X 100m 4 230.00 960.00
POLYPIPE 16mm X 300m 14 100.00 1400.00
CLAMP SADDLE 50mm X ¾ FEMALE THREADED 200 6.30 1260.00
QUICK ACTION VALVE 16/20mm X ¾ MALE THREADED 200 2.50 500.00
ELBOW CONNECTOR 16mm 800 1.00 800.00
*PENGIRAAN KOS TETAP TIDAK TERMASUK UPAH PEMASANGAN, PERALATAN PEMASANGAN, PENDAWAIAN ELEKTRIK
KOS PENGANGKUTAN, PENYEDIAAN TAPAK
KOS PENGELUARAN
*PENGIRAAN KOS PENGELUARAN TIDAK TERMASUK, KOS PENGANGKUTAN BELIAN DAN JUALAN, KOS SEWAAN
ANGGARAN PENDAPATAN
MUSIM 1 MUSIM 2 MUSIM 3 MUSIM 4
TOLAK