You are on page 1of 13

2020-S5S1-0001

Daily Work instruction


For adjusting steam and power operating condition
Rev00
7-Feb-2020

Prepared by Reviewed by Approved by Checked and Confirmed by


Section 5 Section 5 Section 5 Shift A Shift B Shift C Shift D
Advisor Manager
AO_SSV  
SSV
AO_PO
Nguyen Tan Luc Nguyen Trong Ha Le Ngoc Loan
7-Feb-2020 7-Feb-2020 7-Feb-2020 POs
 This daily instruction is still in effect until next days if steam and power demand and Utilities operating conditions are not changed.
 If in a day, there is any changing in steam and power demand or Utilities operating conditions, the revised instruction will be released
Equipment’s current condition Confidential
Equipment’s current condition
Design Available capacity Current status
Capacity
Boiler#1 295 t/h - Plan shutdown from 5th to 7th Feb-2020

U110 Boiler#2 295 t/h 295t/h RFO+UFO/ Cascade


Boiler Boiler#3 295 t/h 295t/h RFO+UFO/ Cascade
Boiler#4 295 t/h 240t/h RFO+FG
GTG#1 77 MW 70MW DO operation without WI (70MW with DO/LPG and WI)
Plan shutdown after Boiler#1 normal operation
U112
HRSG#1 165 t/h 165t/h Duct burner ON
GTG/
HRSG GTG#2 77 MW 70MW LPG operation WI (75MW with DO/70MW with LPG)
HRSG#2 165 t/h 165t/h Duct burner ON
STG#1 41.4 MW 41.4MW Normal operation with MPS extraction
STG#2 41.4 MW 41.4MW Normal operation without MPS extraction
U113
STG#3 41.4 MW 41.4MW Normal operation with HPS extraction
STG
STG#4 41.4 MW 41.4MW Normal operation with HPS extraction
STG#5 41.4 MW 41.4MW Normal operation with LPS admission
7-Feb-2020 Steam and power balance Confidential
Power demand Steam demand (Ton/h) Fuel consumption (ton/day) HHPS quality
MW STG 292 RFO UFO LPG FG B#1 B#2 B#3 B#4
UTILITY 53 Utility 149 7-Feb 526 632 355 296 Ph - 9.50 9.42 9.46
PROCESS 134 PROCESS 451 6-Feb 531 576 357 293 Cond µS/cm - 0.09 0.12 0.08
Total 187 Total 892 5-Feb 426 803 403 247 SiO2 ug/l 5*

195t/h 195t/h 165t/h


No.1 t No.2 No.3 No.4
M ain
Boiler Boiler Boiler Boiler
PI
5UFO+1RFO 5UFO+1RFO 5FG+1RFO

0t/h 192t/h 192t/h


GTG1 GTG2
DO LPG 120t/h 40t/h 270t/h
34t/h G STG3 G STG4 No.WI G G
WI
~12% 18MW 52MW 55MW
18MW HRSG Fixed Mode HRSG Fixed Mode
Sharing Mode 146t/h Sharing Mode 146t/h
HPS 165t/h 165t/h
81t/h 50t/h 50t/h 583t/h
110-P-002A&B
0t/h
Process ~0%
G STG1 G STG2 G STG5 102-P-001A&B
121-A-001A&B
UNIT 18MW 12MW 12MW 103-P-001B&C
Fixed Mode
Sharing Mode 19t/h 0t/h Fixed Mode 354t/h
MPS

0t/h 110-P-001A&B
0t/h 34t/h IDF/FDF
~0% 0t/h
77t/h
LPS
Boiler#1 Start-up steam and power balance Confidential
Total HHPS 651 153t/h 153t/h 153t/h 193t/h
No.1 No.2 No.3 No.4
Total Power 187 PI Boiler Boiler Boiler Boiler
5UFO+1RFO 5UFO+1RFO 5UFO+1RFO 5FG+1RFO

0t/h 226t/h 226t/h


GTG1 GTG2
DO LPG 120t/h 40t/h 270t/h
34t/h G STG3 G STG4 No.WI G G
WI
~12% 18MW 30MW 70MW
18MW HRSG Fixed Mode HRSG Fixed Mode
Sharing Mode 185t/h Sharing Mode 185t/h
HPS 96t/h 165t/h
90t/h 70t/h 55t/h 593t/h
110-P-002A&B
0t/h
Process ~0%
G STG1 G STG2 G STG5 102-P-001A&B
121-A-001A&B
UNIT 18MW 12MW 14MW 103-P-001B&C
Fixed Mode
Sharing Mode 28t/h 0t/h Fixed Mode 344t/h
MPS

0t/h 110-P-001A&B
0t/h 29t/h IDF/FDF
~0% 0t/h
83t/h
LPS

  Actual Condition
Guidelines for Boiler#1 re-start up after maintenance completed:
Target Unit of Load Shedding
- Reduce GTG#1 load to 30MW Status Actual load
shed
- Increase GTG#1 to 70MW
Group A Offsite ; Ship Load Stop Enable 1,726 KW
- Keep Boiler#1 operate with 05 burners UFO and one RFO burner
Group B PPU ; Pelletizing Section Stop Enable 10,731 KW
- Minimize MPS excess letdown to LPS by adjust MPS extraction from STG#1 Group C PPU ; Polymer Finishing Section Stop Disable 10,731 KW
- Disable FLS for STG#1 and GTG#1 Group D RFCC ; PP-SPL Heat pump compressor Enable 20,361 KW
- Disable steam shedding for all Boilers (Activated OOS for Boiler#1,#2,#3,#4)
- Keep monitoring Boiler#1 operation until 9 th Feb 2020 (Sunday) and prepare to shutdown GTG#1
- Target FG consumption at Boielr#4 is 10000Nm3/h (110FI6310)
- As per decision from GRM and related Section to minimize Utilities cost, GTG#2 should keep at maximum load with LPG (base load) and load shedding
will be applied as below:
1. FLS will be applied for GTG#2 during GTG#2 high load
2. Pre-select from Gr.A to Gr.D excluded Gr.C
GTG#1 shutdown 9th Feb 2020 Confidential
Total HHPS 820 205t/h 205t/h 205t/h 205t/h
No.1 No.2 No.3 No.4
Total Power 187 Boiler Boiler Boiler Boiler
PI
3UFO+3RFO 5UFO+1RFO 5UFO+1RFO 5FG+1RFO

0t/h 284t/h 284t/h


GTG1 GTG2
LPG 120t/h 40t/h 270t/h
34t/h G STG3 G STG4 G G
t WI
~12% 25MW 25MW Main 70MW
HRSG HRSG Fixed Mode
Sharing Mode 236t/h Sharing Mode 236t/h
HPS 165t/h
106t/h 106t/h 63t/h 593t/h
110-P-002A&B
0t/h
Process ~0%
G STG1 G STG2 G STG5 102-P-001A&B
121-A-001A&B
UNIT 25MW 25MW 16MW 103-P-001B&C
Sharing Mode
Sharing Mode 22t/h 22t/h Fixed Mode 344t/h
MPS

0t/h 110-P-001A&B
0t/h 20t/h IDF/FDF
~0% 0t/h
83t/h
LPS

Guidelines:
- Reduce GTG#1 load and ready to shutdown on 7:00PM of 9 th Feb   Actual Condition
2020 Target Unit of Load Shedding Actual load
Status shed
- After GTG#1 shutdown, Load shedding will be applied as a GTG
Group A Offsite ; Ship Load Stop Enable 1,726 KW
maintenance case: Group B Enable 9,611 KW
PPU   ; Pelletizing Section Stop
1. Steam shedding by STG#1 auto shutdown when a Boiler trip Group C PPU; Polymer Finishing Section Stop Enable 9,837 KW
2. Steam shedding for 121A001B incase STG#3/#4 TRIP when Group D RFCC; PP-SPL Heat pump compressor Stop Enable 19,357 KW
121A001D motor driven standby is available Group E RHDS; H2 Make-up compressor Stop (1 of 3) Enable 25,827 KW
3. FLS shedding will be enable for STG#1 and GTG#2 Group F SRU ; Air Bower Stop (086-KM001A and 093-KM-030A) Enable 27,124 KW
Group G KHDS/GOHDS ; S/D Enable 32,924 KW
4. Pre-selecte FLS from Gr.A to Gr.K except Gr.H Group H RHDS ; S/D Disable 32,924 KW
5. Always disable FLS for two running compressors 020K301 Group I PPU ; S/D Enable 38,144 KW
- Start MPS extraction from STG#2 (both MPS extraction are required Group J AROMA Unit Enable 52,944 KW
for emergency action) Group K NHDS/PENEX/CCR Unit Enable 77,694 KW
- Keep GTG#2 load as high as possible
A Boiler Trip during GTG#1 maintenance Confidential
Total HHPS 703 210t/h 234t/h 234t/h 234t/h
Total Power 160 Trip
No.1 No.2 No.3 No.4
PI Boiler Boiler Boiler Boiler
5UFO+1RFO 5UFO+1RFO 6RFO

0t/h 276t/h 276t/h


GTG1 GTG2
LPG 120t/h 40t/h 270t/h
G G
34t/h G STG3 G STG4
int WI
~12% 24MW 24MW Ma 70MW
HRSG HRSG Fixed Mode
Sharing Mode 234t/h Sharing Mode 234t/h
HPS 165t/h
106t/h 112t/h 65t/h 573t/h
110-P-002A&B
0t/h Auto
Process ~0%
G STG1 G STG2 G STG5 102-P-001A&B
121-A-001A&B
SD+FLS 24MW
UNIT 25MW 16MW 103-P-001B&C
Sharing Mode
Sharing Mode 22t/h 22t/h Fixed Mode 337/h
MPS

0t/h 110-P-001A&B
0t/h 15t/h IDF/FDF
~0% 0t/h
68t/h
LPS

Guidelines:   Actual Condition


Target Unit of Load Shedding Actual load
- A Boiler TRIP from Gr.A to Gr.F (Gr.G may be effected) will auto Status shed
shutdown Group A Offsite ; Ship Load Stop Enable 1,726 KW
- Switch all FG burners to RFO burners Group B PPU   ; Pelletizing Section Stop Enable 9,611 KW
- Incase total power is more than 163MW If extruders in Gr. B or Group C PPU; Polymer Finishing Section Stop Enable 9,837 KW
heat pump compressor in Gr. D restart before tripped Boiler re- Group D RFCC; PP-SPL Heat pump compressor Stop Enable 19,357 KW
Group E RHDS; H2 Make-up compressor Stop (1 of 3) Enable 25,827 KW
start, keep STG#2 in fixed mode as 35MW (reduce STG#5 to Group F SRU ; Air Bower Stop (086-KM001A and 093-KM-030A) Enable 27,124 KW
10MW) to enough power load to shedding when a additional Group G KHDS/GOHDS ; S/D Enable 32,924 KW
Boiler trip Group H RHDS ; S/D Disable 32,924 KW
- Prepare STG#1 ready to start-up when a tripped Boiler re-start Group I PPU ; S/D Enable 38,144 KW
Group J AROMA Unit Enable 52,944 KW
Group K NHDS/PENEX/CCR Unit Enable 77,694 KW
Confidential
A Boiler Trip after a Boiler tripped during GTG#1 maintenance
Total HHPS 539 270t/h 270t/h
Total Power 135 No.1 No.2 No.3 No.4
Trip
PI Boiler Boiler Boiler Boiler
5UFO+1RFO 5UFO+1RFO 6RFO

0t/h 250t/h 250t/h


GTG1 GTG2
LPG 120t/h 40t/h 270t/h
G G
34t/h G STG3 G STG4
int WI
~12% 25MW 25MW Ma 70MW
HRSG HRSG Fixed Mode
Sharing Mode 189t/h Sharing Mode 189t/h
HPS 165t/h
112t/h 51t/h 458t/h
110-P-002A&B
49t/h Auto
Process ~18% G STG1 G STG2 G STG5 102-P-001A&B
SD+FLS
23.5MW
121-A-001A&B
UNIT 10MW 103-P-001B&C
Sharing Mode
22t/h Fixed Mode 254t/h
MPS

7t/h 110-P-001A&B
0t/h 0t/h IDF/FDF
~3% 0t/h
70t/h
LPS

  Actual Condition
Guidelines: Target Unit of Load Shedding
Status Actual
shed
load
- A Boiler TRIP after a Boiler tripped during GTG#1 maintenance 
from Gr.A to Gr.J (target) will auto shutdown Group A Offsite ; Ship Load Stop Enable 1,726 KW
Group B PPU   ; Pelletizing Section Stop Enable 9,611 KW
- PO/SSV5.2 Stop one cooling water turbine driven pump (if two
Group C PPU; Polymer Finishing Section Stop Enable 9,837 KW
turbines are running) Group D RFCC; PP-SPL Heat pump compressor Stop Enable 19,357 KW
- Incase the remaining Boilers have difficulties to increase load to Group E RHDS; H2 Make-up compressor Stop (1 of 3) Enable 25,827 KW
expected load or HHPS pressure can not recover, PO/SSV5.1 Group F SRU ; Air Bower Stop (086-KM001A and 093-KM-030A) Enable 27,124 KW
enable FLS for STG#5 and Emergency shutdown STG#5 to activate Group G KHDS/GOHDS ; S/D Enable 32,924 KW
Group H RHDS ; S/D Disable 32,924 KW
FLS Group I PPU ; S/D Enable 38,144 KW
Group J AROMA Unit Enable 52,944 KW
Group K NHDS/PENEX/CCR Unit Enable 77,694 KW
Confidential
HRSG#2 TRIP after a Boiler tripped during GTG#1 maintenance
Total HHPS 703 234t/h 234t/h 234t/h
Total Power 160 No.1 No.2 No.3 No.4
PI Boiler Boiler Boiler Boiler
5UFO+1RFO 5UFO+1RFO 6RFO

0t/h 300t/h 300t/h


GTG1 GTG2
LPG 120t/h 40t/h 270t/h
G G
89t/h G STG3 G STG4
int WI
~31% 27MW 27MW Ma 70MW
HRSG HRSG Fixed Mode
Sharing Mode 252t/h Sharing Mode 252t/h Trip
HPS 165t/h
51t/h 431t/h
110-P-002A/B
92t/h
Process ~34% G STG1 G Auto
STG2 G STG5 102-P-001A&B
121-A-001A&B
UNIT SD+FLS 10MW 103-P-001B/C
Fixed Mode 210t/h
MPS

8t/h 110-P-001A&B
0t/h 0t/h IDF/FDF
~3% 0t/h
68t/h
LPS

Guidelines:   Actual Condition


- HRSG#2 TRIP after a Boiler tripped during GTG#1 maintenance  Target Unit of Load Shedding Actual load
Status shed
from Gr.A to Gr.J (target) will auto shutdown (Same as A Boiler Group A Offsite ; Ship Load Stop Enable 1,726 KW
TRIP after a Boiler tripped during GTG#1 maintenance case) Group B PPU   ; Pelletizing Section Stop Enable 9,611 KW
- PO/SSV5.1 Stop one HP BFW 110P002 (if two turbines are Group C PPU; Polymer Finishing Section Stop Enable 9,837 KW
running) Group D RFCC; PP-SPL Heat pump compressor Stop Enable 19,357 KW
- POS/SSV5.1 emergency shutdown STG#2 to activated FLS Group E RHDS; H2 Make-up compressor Stop (1 of 3) Enable 25,827 KW
Group F SRU ; Air Bower Stop (086-KM001A and 093-KM-030A) Enable 27,124 KW
- PO/SSV5.2 Stop one cooling water turbine driven pump (if two Group G KHDS/GOHDS ; S/D Enable 32,924 KW
turbines are running) Group H RHDS ; S/D Disable 32,924 KW
Group I PPU ; S/D Enable 38,144 KW
Group J AROMA Unit Enable 52,944 KW
Group K NHDS/PENEX/CCR Unit Enable 77,694 KW
Confidential
GTG#2 TRIP after Boiler Tripped during GTG#1 maintenance
Total HHPS 795 265t/h 265t/h 265t/h
Total Power 114 No.1 No.2 No.3 No.4
PI Boiler Boiler Boiler Boiler
5UFO+1RFO 5UFO+1RFO 6RFO

0t/h 304t/h 304t/h


GTG1 GTG2
LPG 120t/h 0t/h 270t/h
G G
34t/h G STG3 G STG4
int WI
~12% 35MW 35MW Ma Trip 75MW
HRSG HRSG Fixed Mode
Sharing Mode 220t/h Sharing Mode 220t/h
HPS 165t/h
148t/h 51t/h 436t/h
110-P-002A/B
0t/h
Process ~0% G STG1 G STG2 G STG5 102-P-001A&B
121-A-001A&B
UNIT 35MW 10MW 103-P-001B/C
Sharing Mode
35t/h Fixed Mode 203t/h
MPS

49t/h 110-P-001A&B
0t/h 0t/h IDF/FDF
~20% 0t/h
62t/h
LPS

Guidelines:   Actual Condition


Target Unit of Load Shedding Actual load
- GTG#2 TRIP after Boiler Tripped during GTG#1 maintenance Status shed
-  from Gr.A to Gr.K will auto shutdown Group A Offsite ; Ship Load Stop Enable 1,726 KW
- PO/SSV5.2 Stop one cooling water turbine driven pump (if two Group B PPU   ; Pelletizing Section Stop Enable 9,611 KW
turbines are running) Group C PPU; Polymer Finishing Section Stop Enable 9,837 KW
- PO/SSV5.1 Stop one HP BFW 110P002 (if two turbines are Group D RFCC; PP-SPL Heat pump compressor Stop Enable 19,357 KW
Group E RHDS; H2 Make-up compressor Stop (1 of 3) Enable 25,827 KW
running) Group F SRU ; Air Bower Stop (086-KM001A and 093-KM-030A) Enable 27,124 KW
Group G KHDS/GOHDS ; S/D Enable 32,924 KW
Group H RHDS ; S/D Disable 32,924 KW
Group I PPU ; S/D Enable 38,144 KW
Group J AROMA Unit Enable 52,944 KW
Group K NHDS/PENEX/CCR Unit Enable 77,694 KW
GTG#2 Trip during GTG#1 maintenance Confidential
Total HHPS 857 214t/h 214t/h 214t/h 214t/h
Total Power 126 No.1 No.2 No.3 No.4
PI Boiler Boiler Boiler Boiler
5UFO+1RFO 5UFO+1RFO 5UFO+1RFO 6RFO

0t/h 295t/h 295t/h


GTG1 GTG2
LPG 120t/h 0t/h 270t/h
G G
34t/h G STG3 G STG4
int WI
~12% 28MW 28MW Ma Trip 75MW
HRSG HRSG Fixed Mode
Sharing Mode 234t/h Sharing Mode 234t/h
HPS 165t/h
114t/h 114t/h 65t/h 450t/h
110-P-002A&B
0t/h
Process ~0%
G STG1 G STG2 G STG5 102-P-001A&B
121-A-001A&B
UNIT 28MW 28MW 15MW 103-P-001B&C
Sharing Mode
Sharing Mode 17t/h 17t/h Fixed Mode 198t/h
MPS

43t/h 110-P-001A&B
0t/h 0t/h IDF/FDF
~17% 0t/h
68t/h
LPS

Guidelines:   Actual Condition


Target Unit of Load Shedding Actual load
- GTG#2 TRIP From Gr.A to Gr.K will be auto shutdown Status shed
- Switch all FG burners to RFO burners Group A Offsite ; Ship Load Stop Enable 1,726 KW
- PO/SSV5.2 Stop one cooling water turbine driven pump (if two Group B PPU   ; Pelletizing Section Stop Enable 9,611 KW
turbines are running) Group C PPU; Polymer Finishing Section Stop Enable 9,837 KW
- PO/SSV5.1 Stop one HP BFW 110P002 (if two turbines are Group D RFCC; PP-SPL Heat pump compressor Stop Enable 19,357 KW
Group E RHDS; H2 Make-up compressor Stop (1 of 3) Enable 25,827 KW
running) Group F SRU ; Air Bower Stop (086-KM001A and 093-KM-030A) Enable 27,124 KW
Group G KHDS/GOHDS ; S/D Enable 32,924 KW
Group H RHDS ; S/D Disable 32,924 KW
Group I PPU ; S/D Enable 38,144 KW
Group J AROMA Unit Enable 52,944 KW
Group K NHDS/PENEX/CCR Unit Enable 77,694 KW
Confidential
A Boiler TRIP after GTG#2 Tripped during GTG#1 maintenance
Total HHPS 802
Total Power 116
267t/h 267t/h 267t/h
No.1
Trip No.2 No.3 No.4
PI Boiler Boiler Boiler Boiler
5UFO+1RFO 5UFO+1RFO 6RFO

0t/h 309t/h 309t/h


GTG1 GTG2
120t/h 0t/h 270t/h
G G
34t/h G STG3 G STG4
int
~12% 34MW 34MW Ma
HRSG HRSG
Sharing Mode 230t/h Sharing Mode 230t/h
HPS
136t/h 65t/h 450t/h
110-P-002A&B
0t/h
Process ~0%
G Auto
STG1 G STG2 G STG5 102-P-001A&B
121-A-001A&B
SD+FLS 34MW
UNIT 15MW 103-P-001B&C
Sharing Mode
36t/h Fixed Mode 198t/h
MPS

43t/h 110-P-001A&B
0t/h 0t/h IDF/FDF
~17% 0t/h
68t/h
LPS

Guidelines:
- A boiler TRIP STG#1 auto shutdown FLS activated
STG#3/STG#4 TRIP during GTG#1 maintenance Confidential
Total HHPS 800 200t/h 200t/h 200t/h 200t/h
Total Power 187 No.1 No.2 No.3 No.4
PI Boiler Boiler Boiler Boiler
3UFO+3RFO 5UFO+1RFO 5UFO+1RFO 5FG+1RFO
328t/h
GTG1 GTG2
LPG 120t/h 40t/h 270t/h
131t/h G Trip
STG3 G STG4 G G
t WI
~46% 34MW Main 70MW
HRSG HRSG Fixed Mode
Sharing Mode 252t/h
HPS 165t/h
169t/h 169t/h 43t/h 433t/h
110-P-002A&B
56t/h
Process ~21%
G STG1 G STG2 G STG5 102-P-001A&B
121-A-001A/B
UNIT 34MW 34MW 10MW 103-P-001B/C
Sharing Mode
Sharing Mode 67t/h 67t/h Fixed Mode 179t/h
MPS

0t/h 110-P-001A&B
0t/h 20t/h IDF/FDF
~0% 0t/h
73t/h
LPS

Guidelines:
- STG#3/STG#4 TRIP 121A001B auto shutdown
- PO/SSV5.2 switch one cooling water turbine driven pump to motor driven (if two turbines are running)
- Put letdown HHPS-HPS bypass station to service about 100t/h to avoid 110PV0031 over capacity when STG#4/STG#3 TRIP
- Apply FLS for STG#2, STG#4/STG#3
Load_shedding_philosophy (Temporary Solution)
Case Steam Load Power Load Shedding
Shedding
Trigger TRIP : GTG1, GTG2
Normal Operation (Both Not applied *Input Dummy parameter to Gr-A. in order to avoid unnecessary
GTGs operate with LPG) Process Unit S/D by single GTG trip.
Preselected Shedding Gr. : A-G, I-K, RHDS (Group H) is excluded.(*)
Boiler Maintenance (after Applied Trigger : STG1, GTG1, GTG2
TRIP/shutdown) (STG1/2 Trip) Preselected Shedding Gr. : A-G, I-K, RHDS (Group H) is excluded.(*)
Applied
GTG Maintenance Trigger : STG1, GTG1/GTG2
(after TRIP/shutdown) (STG1/2 Trip) Preselected Shedding Gr. : A-G, I-K, RHDS (Group H) is excluded.(*)
(121A001B Trip)*
STG Maintenance Trigger TRIP : GTG1, GTG2
Not applied
(after TRIP/shutdown) Preselected Shedding Gr. : A-G, I-K, RHDS (Group H) is excluded.(*)

  Actual Condition
Target Unit of Load Shedding
Status Actual load shed
• Apply steam shedding for 121A001B Group A Offsite ; Ship Load Stop Enable 1,726 KW
incase STG#3/#4 TRIP when 121A001D Group B PPU   ; Pelletizing Section Stop Enable 9,611 KW
motor driven standby is available Group C PPU   ; Polymer Finishing Section Stop Enable 9,837 KW
Group D RFCC   ; PP-SPL Heat pump compressor Stop Enable 19,357 KW
• Always disable FLS for two running Group E Enable 25,827 KW
RHDS   ; H2 Make-up compressor Stop (1 of 3)
Compressors 020K301 in Gr.E Group F SRU   ; Air Bower Stop Enable 27,124 KW
Group G KHDS/GOHDS Unit Enable 32,924 KW
Group H RHDS Unit Disable 32,924 KW
Group I PPU Unit Enable 38,144 KW
Group J AROMA Unit Enable 52,944 KW
Group K NHDS/PENEX/CCR Unit Enable 77,694 KW