FACILITY
QASR SHAMS
FACILITY FACILITY
TAREK
FACILITY
SALAM
FACILITY
NPCS
AKIK
FACILITY
HOME
SOL
HOME
PHASE 1
PHASE 2
COMPRESSION STATION
HOME
EXISTING OVERVIEW
HOME
QASR Compression
NEW Project
HOME
4*33% 2*50%
7 MW Shaft
Power Each
Spare
Spare
HOME
HOME
HOME
Gas
CO2 Content 3 mol% max.
Water Dew Point 0 oC @ 70 Bar
H.C. Dew Point 5 oC max.
GHV 1040 BTU/SCF min.
Hg 10 ng/SM3
Condensate
RVP 11 Psia max.
Pour Point 45 F
HOME
Feed Sales
Separation MRU Dehydration Dewpointing Sweetening Exporting
Gas Gas
Recycle
Comp.
Condensate
Stabilization Storage Exporting Condensate
Water To
Degasing Oil Recovery Evaporation
Pond
HOME
• A 24’’ pipeline (40 KM long) to QSOL to SHAMS and 18’’ pipeline (43 KM long)
delivers the well fluid to Obayied.
• Remotely actuated line block valves are installed along the pipelines; one on the
Qasr to shams pipeline and another one on shams to Obayied pipeline.
• Gas flows via a slug catcher to even out any fluctuations in liquid flow, and then
enters one of five trains.
• Each train starts with a 3 phase separator which split the incoming fluid into gas
that is sent to the mercury removal system and following fiscal metering,
condensate which is metered and water which is sent to water treatment unit and
then to the evaporation pond.
The gas and condensate combined after being metered for heating by two water bath
heater up to 80 C, and then exported to Bapetco.
HOME
Design conditions
• The inlet pressure 91 barg, Temperature 35 C
WELCOME TO TAREK
GAS PLANT
HOME
Tarek Philosophy
110MMSCF/D
EXPORT GAS
WELLS
MMSCF/D 4
FLARED GAS
HOME
Condensate
Condensate
Water
evaporation pond
HOME
2nd STAGE 2nd STAGE
H.P. H.P. PERMEAT MEMBRANE MEMBRANE
FLARE FLARE COMPRESSOR PRETREATMENT
TO FUEL
GAS TO FLARE
SYSTEM EXPORT GAS
INLET INLET ”COMPRESSOR “A
MANIFLOD SEPARATOR TURBOEXPANDER 1st STAGE
MERCURUY 1ST STAGE
TAREK MEMBRANE
REMOVAL UNIT MEMBRANE
WELLS PRETREATMENT
TEST EXPORT GAS
MANIFOLD COMPRESSOR
”“B
TEST
SEPARATOR
GLYCOL
CONTRACTOR
SALES GAS
STABILIZATION
CONDENSATE
EXPORT GAS
METERING
NLG FLUSH
DRUM
TAREK PLANT
PROCESS BLOCK DIAGRAM
HOME
HOME
Sales gas
CO2 Content =30.15 CO2 Content =70%
Original
Design
CO2 Content =9.77
Fuel gas to GTGs
Sales gas
Actual
Operating CO2 Content =11%
Fuel gas to GTGs
Parameters
Recycle gas to 1st Membrane
HOME
The END
Thanks
HOME
NPCP - Schematic
”km, 34 233
63km Tarek
42km 22km Ameriya
22” 18”
18” 1.5km, 24”
430 mmscfd
Shams
M SGT1,2 220 mmscfd
38km 131km
24” Salam 24”
SGT3 105 mmscfd
Qasr 21
2 km
, 18
” 68km, 16”
68km, 20”
24” Feed pipeline 68km
14”
Abu
260km, 24”
Bed 3 Gharadig
25km, 8”
Dashour
Abu Sanan
Feed Sales
Separation Dehydration Dewpointing Exporting
Gas
Gas
Recycle
Comp.
Condensate
Stabilization Condensate
Water To
Oil Recovery Evaporation
Pond
HOME