INTRODUCTIO
N
• Allegiant stadium is home to the
raiders an

• NFL football team and the


university of Nevada.

• It is commonly known as the death


star. It is located adjacent to the Las
Vegas strip.

2
CONTENT
• ARCHITECTURE

• STRUCTURE

• MECHANICAL

• ELECTRICAL

• SAFETY

• SUSTAINABILITY

• INNOVATION

• LEARNING POINTS
3
INFORMATION BOX

DESIGN ARCHITECT COST


MANICA Architecture 1.9 Billion Dollars.

EXECUTIVE ARCHITECT LOCATION


HNTB Architect. Paradise, Nevada, Las Vegas USA.

CONTRACTOR LAND SIZE


A joint venture with Mortenson and 62 Acres..
McCarthy Construction.
STRUCTURAL AND MEP STADIUM SIZE
ENGINEER 167,225.472 square meters.
Kimley-Horn

YEAR OF CONSTRUCTION CAPACITY


November 13th 2017 65000

YEAR OF COMPLETION HEIGHT


July 31st 2020 68.9m
ARCHITECTURE
1. C O N C E P T

2. D E S I G N

3. P L A N N I N G

4. L A N D S C A P E

5. W A Y F I N D I N G

6. P A R K I N G

5
TITLE:

CONCEPT
A seamless black sports car to represent
the death star.

6
DESIGN
Allegiant stadium is a design build made up of
these key features:

1. T h e E T F E r o o f
2. T h e l a n a i d o o r s
3. T h e r o l l o u t g r a s s t u r f .
4. E x t e r i o r c u r t a i n w a l l
5. T h e 2 6 m m e m o r i a l t o r c h d e d i c a t e d t o A l
Davis.
6. I t s s i l v e r a n d b l a c k e x t e r i o r
7. A n 1 1 3 2 . 7 s q m l a r g e v i d e o s c r e e n
8. A 2 5 1 4 . 5 s q m m e d i a m e s h s c r e e n o n t h e
exterior
LANAI
DOORS

• The lanai doors are retractable doors that open on


game and event days, if the weather allows, giving
the 65,000-seat arena an open feel.
• They are 4 in number and produce an opening of 24m
by 65.5 m.
• It provides a view of the las Vegas strip from within
EXTERIOR CURTAIN
WALLS

•Contractor: Enclos.
•This makes up the envelope of the
stadium, with dark, tinted glass panels.
It is made up of 2400 panel sets that
weigh up to 3900 pounds each.
•It was assembled off site.
•3D modelling is used to ensure the sets
are made to precision.
PLANNING
Allegiant stadium is designed to have:

• 5 floors and 6 levels


• 2 concourses
• 46 escalators
• A horseshoe seating arrangement
LANDSCAPE
• Attanasio
Landscape
Architecture was
in charge of
landscape of
allegiant stadium.
• The stadium has
427 trees
recorded.
WAYFINDING

• Contractor: Infinite Scale

• They were in charge of the signage

around allegiant stadium.

• There are three primary entrances to Allegiant


Stadium, two on the south side and one very
large entry gate on the north side the north gate
is the one facing the Strip and Hacienda
Avenue.
PARKING
• There are more than
25,000 parking spaces
near Allegiant
Stadium, including
15,000 spaces within
walking distance.

• There is a minimum of
7,000 spaces for
tailgating including
5,000 spaces within
walking distance of the
Stadium and an
additional 1,700 spaces
a t t h e Wa r m Spr i ng s
Park & Shuttle lot.

20
STRUCTURE

• SUBSTRUCTURE

• SUPERSTRUCTURE

• ROOF
SUB
STRUCTURE
PRELIMINARIES

• Divert the box culvert that sits


in the middle of the stadium.
• Contractor: Sahara Concrete

• Dirt and caliche excavation by


trenching it and use of
explosives.
• Mass excavation.
• The lower bowl is submerged
below grade.
BLASTING OF THE GROUND FOR EXCAVATION
SUB
STRUCTURE
• Auger cast piling is used.
• Drilling commences for the piles.
Some 30ft, 65ft Deep.
• The piles are filled with concrete and
covered with a pile cap.
• Contractor: Malcom
SUPER
STRUCTURE
• Rebars are placed for vertical
structures and shear walls etc.
• Formwork is applied next
• Casting is then done.
SUPER
STRUCTURE
• The cores are then assembled with
rebar and formwork is placed on
them.
• The cores are 8 in total and they
are stair and elevator towers.
• They act as the backbone of the
stadium
• They are also needed to start
erection of steel which will
be tied to it.
• Over a 100,000 cubic yards of
concrete is used in Allegiant
Stadium
SUPER
STRUCTURE
• Suspended floor plan is next
• Scaffolding is used for creating
pan and joist deck. It holds the
form and rebars for the floor.
• It is flexible to use and was used
for the first 2 floors instead of
steel.
• It is then casted and smoothened
with a range and a trowel pan.
• Contractor : Gateway
concrete forming.
SUPER
STRUCTURE
• There are 2 individual parts of the
stadium which are : the bowl and
the vessel.
• Spherical bearings are used to
connect the vessel to the steel roof
canopy truss modules.
• In placing the steel canopy, staged
construction is used to ensure that
the cable net and the curtain wall
are supported.
• The stadiums 8 cores are also used
to create the outer shell for the
vessel.
ROOF
A cable net structure was used and covered with a
semi translucent ETFE domed roof.

CABLE NET STRUCTURE


It is a 300 ton cable net grid comprising of
two layers of cables in tension with a strut
separating them. Each cable strand is
tensioned to even the load.

ETFE
This is a thin layer of plastic used like a pillow
cushion. It is light in weight and takes little
structure to hold it up.
PROCESS OF INSTALLING THE
ROOF

STEP 1 STEP 2 STEP 3 STEP 4


All the custom made The cable net system is The entire structure is then Installation of
gears to lift the cables are laid out on the ground lifted by a system of pull and • Safety lines and netting.
fixed on the edge of the both top and bottom and stretch. • 107 Panels
roof attached to nodes which You are pulling in both • Pool floaties on top of the
have struts in between. longitudinal and trans axial netting to keep the ETFE roo
Contractor: freyssient direction. Stretching each up
cable to evenly distribute load. • The ETFE, panel by panel
and inflate it.
Contractor : vector foiltec
MECHANICAL SERVICES
HVAC SYSTEM

• The stadium uses a chilled waste system for its


HVAC.

The Air condition is provided by :

• 8 air handlers on the lower bowl

• 4 air handlers on the mid bowl

• 8 air handlers on the upper bowl.


AIR-CONDITION DISTRIBUTION

• Direct Airflow is provided by high-level air


distribution through a duct system .

DUCT SOX
This is a duct solution used to address indoor air
quality, acoustics, and customization for the stadiums.

• It’s serves as a decorative piece that provides air


and A.C.
• It looks like a black cloth with tiny holes and it
acts as the pipes to push cool air to the upper deck
of the stadium. It serves
THE PROCESS OF COOLING THE STADIUM
FIELD MECAHNISATION SYSTEM

• The retractable Field when not in use is rolled


out where the natural grass is irrigated .

• The field is supported by 540 wheels on 13


parallel rails. :

• 72 of the wheels are powered with one


horsepower motors have sufficient traction to
move the field
PLUMBING SERVICES

• There are 297 Numbers restrooms equipped


with 1,430 toilets and urinals

FEATURES OF THE RESTROOM


• Single Stalls toiles
• Partitioned mirrors
• Water efficient flush control.
LEPC SYTSTEM

• There are 44 escalators and elevators


provisions in various spaces within the
stadium to provide vertical transport for
people between different levels of buildings
ELECTRICAL SERVICES
ELECTRICAL (POWER)
• Allegiant uses 3 feeds (solar, natural gas
and wind) from Nevada (NV) Energy and
at any time they can support the stadium
with 2 of those feeds.

• It is also equipped with 3 diesel


generators in case of a blackout

• On a normal day the stadium uses 2 mega


watts of electricity but on game day they
use about 9 mega watts of electricity

• Lighting alone uses 1MW.

• Stadium was design for 20-25MW


consumption
ACOUSTICS
• SFA (Sports Facility Acoustics) did the
acoustic design and installation.

• They used a combination of


Lapendary Panels and Cloud-Lite
Baffles.
ELECTRICAL
(LIGHTING)
EXTERIOR
Team
The light up strips were installed by YESCO

INTERIOR
Team
WSP
They are the lead stadium light designer and work in tandem
with:
• SJ lighting
• Zone club lighting designer
• Luminii
LIGHTING
• 21,000 Light Fixtures
SAFETY

Within the stadium


• They have an alarm system that goes
of if evacuation is needed.
• They also have 1 first aid station on
the 100 and 300 level.

Safety during construction.


“Mortenson-McCarthy made worker safety a
priority throughout construction and in doing
so achieved a remarkable safety record with a
total recordable incident rate of 0.98, which is
less than one-third the national average,”
SIGNS AND ALARMS
These are placed on site to inform.
This may be in form of pictures and
sounds.
ZERO INJURY PPE WEAR
OBJECTIVE This includes the site jackets,
boots, helmets, hand gloves,
suspension trauma straps etc.
THESE ARE THE
MEASURES EXERCISE
TAKEN DURING Stretching before work commences
CONSTRUCTION is done by every staff to increase
productivity and reduce injuries.

MEETINGS
A variety of meetings are held to
communicate information properly and
avoid any form of accident.
SUSTAINABILITY
• 11,000 pounds of food scraps are
collected per large stadium event,
diverted away from landfills, and
turned into livestock feed for a local
farm.

• The stadium is committed to reducing


water usage in various ways including
its touchless water fixtures throughout
the venue as well as using
groundwater dewatering stations
which redistribute water collected
from the exterior of the stadium and
send to planter beds, subsidizing
irrigation.
SUSTAINABILITY
• The Allegiant Stadium makes use of
recyclable aluminum cups.

• Allegiant Stadium is the first stadium


in the U.S. to divert cigarette waste
and convert it into energy.

• The stadium practices Green


Purchasing including an office
rechargeable battery program that
mitigates the need for single-use
batteries, thus reducing hazardous
waste as well as the purchase of
cleaning products in bulk to reduce
single-use plastics, when possible.
SUSTAINABILITY
• There are 700 trash and
recycling receptacles.
• 32 tons of trash is generated at
each event on average.
• 21 tons of this is recycled.

• The receptacles are connected to a drop


chute that takes the rash to a big whale
bin and workers will sort and compile
the trash for disposal and recycling.

• The drop chute is also automatically


cleaned every event through a trash
chute cleaning system.
INNOVATIONS
CASH TO CARD KIOSKS
Allegiant stadium is a cashless venue. Guest
may convert their cash to debit cards using
these kiosks and this will suffice for any
purchasing done.

APPS
Allegiant has provided an online service for
ordering and delivery of food from and to your
seat.
INNOVATIONS
RETRACTABLE FIELD
• The mobile field rolls on 13 rails with 76
electric motors through an opening 14 feet
high and 240 feet wide.
• The stadium crew brings the motorized field
into the stadium 48 hours before the game.

WIFI
• The stadium makes use a 5ghz frequency
• They have a lot of data centers around the
stadium.
• They use an overhead array system
• The Allegiant stadium has been provided 227
miles of fiber-optic cables and 1,700 Wi-Fi
access points
LEARNING POINTS
F I R S T A I D L O C AT I O N S
There are three (3) Intermountain
Healthcare First Aid locations at
Allegiant Stadium. They are
located at sections 120, 142, and
332. This is something that will
be useful in the Ark Legacy
Project because of the need for
first aid when the need arises.

50
REFERENCES
• https://www.google.com/s
• https://www.kimley-horn.com/project/las-vegas-stadium/
• https://www.allegiantstadium.com/plan-your-visit/stadium-maps
• https://www.allegiantstadium.com/search?cx=014420022621253808966%3A68mzqitocze&cof=FORID%3A9&ie=UTF-8&q
=first+aid
• https://wasteadvantagemag.com/allegiant-stadium-building-a-robust-sustainability-program/
• https://www.powermag.com/raiders-will-roll-with-renewables-at-new-vegas-stadium/
• https://www.powermag.com/can-corporate-america-ensure-a-clean-energy-future/
• https://www.mccarthy.com/projects/allegiant-stadium
• https://sustainability.sport/sports-sustainability-behind-allegiant-stadiums-energy-efficient-building-systems/
• https://www.spglobal.com/marketintelligence/en/news-insights/trending/M1Mb_PqqeoKlAXpKHRAJAQ2
• https://www.reviewjournal.com/business/stadium/allegiant-stadium-to-be-powered-by-renewable-sources-1945942/
• https://www.digitaltrends.com/sponsored/the-technologies-powering-allegiant-stadium/#:~:text=Allegiant%20boasts%20
over%202%2C200%20screens,augmented%20and%20virtual%20reality%20replays
.
• https://www.reviewjournal.com/business/stadium/raiders-natural-grass-field-moves-inside-ahead-of-game-day-2106572/
• https://www.raiders.com/photos/retractable-field-tray-moves-into-allegiant-stadium
•Addhttps://jmawireless.com/innovation-and-experience-leads-the-technology-deployment-at-raiders-allegiant-stadium/
a Footer 51
THANK YOU

52

You might also like