PRESENTATION ON

ANALYSIS AND DESIGN OF G+10


RESIDENTIAL BUILDING IN ZONE-III
OF
BACHELOR OF ENGINEERING
IN
CIVIL ENGINEERING
BY
V.MADHU SHALINI(19FE1A0144) G.ROHITH KUMAR(19FE1A0114)
SK.MOHAMMAD YUSOOF(20FE5A0108) Y.JOTHSNA PRIYA(19FE1A0147)
UNDER THE GUIDENCE OF
MR.SJ BASHA Asst.prof
CONTENTS

• ABSTRACT
• JOURNALS
• OBJECTIVE
• METHODOLOGY
• CONCLUSION
• REFERENCE
ABSTRACT

The primary goal of structural engineer is to built


structure for safe computing technology, But structural engineers can
take on far larger and more sophisticated structures that are subjected
to various loading conditions.

Now-a-days large number of application software’s are


available in the civil engineering field . All the software’s are
developed as the basis of advanced. The analysis which include the
effect of dynamic loads such as wind load ,seismic load etc. In the
present work an attempt has been made to study the efficiency of
certain civil engineering application software’s.
.
The project involves analysis and design of multi-
storey G+10 Residential building using STAAD Pro which
includes forces, moments and deflections. All the drafting and
detailing was done by using Auto Cad . In this project the design
of beams, columns , slabs , stair case , shear wall calculated by
limit state method using IS:456 code. Different loads acting on
member are consider according to IS:875(part – I,II,III) and
IS:1893 for seismic load.
J1
SESIMIC ANALYSIS AND DESIGN OF G+10 MULTISTORY
RESIDENTIAL BUILDING USING STAAD PRO.

Author name: Lalit S. Choudhary, Rishikesh p. Jadhav, Rahul S.


Bagalkoti, Tushar m. Gaikwad.
Year of publication : April 2022
Reference : Journal of emerging technologies and innovative
research (JETIR)

OBJECTIVES:
• To perform seismic analysis on building in different zones.
• To observe and analysis how various loads acts on the structure.
• To observe how the variations of beam and column changes as per
the seismic zones.

METHODOLOGY:
Two methods is used :
a) Equivalent static analysis :
In this only one mode is considered for each direction .
b) Response spectrum analysis :
This approach permits the multiplier modes of response
of a building to be taken into account.

SOFTWARE USED :
• Auto cad
• Staad-pro
• Excel

CONCLUSION :
1. The structure is not falling in compression but falling in tension
due to earthquake load imposed on a structure in various zones.
2. Variations are drastically higher in zone II to zone V .
J2
ANALYSIS AND DESIGN OF A RESIDENTIAL
BUILDING BY USING STAAD PRO
Authors : Kunal Wailkar , pranay Chide , Manthan Shende ,
Jinendra Ralekar
Year of publication: May 2021
Reference : Interntional journal of modern agriculture

OBJECTIVES :
1. Generation of structural framing plan
2. Analysis and design of structure
3. Application of various load combinations on the member.

METHODOLOGY :
Design of one way slab , two way slab , beams , columns ,
footings , staircase taken as the minimum requirements as
suggested by the Indian standard codes .
SOFTWARE USED :
STAAD Pro

CONCLUSION :

• The structural elements of building are safe in flexure and shear.


• Quantity of steel provided for building is economical and
adequate.
• Proposed sizes of structural elements can be in building as it is.
• The design of rcc elements are comparatively similar to that of
the requirements.
J3
ANALYSIS AND DESIGN OF G+10 RESIDENTIAL
BUILDING USING STAAD PRO

Authors : Shruti Dixit , Vasudha Patil , Mayuri Tanpure ,


Dr.Basavaraj Balapgol
Year of publication : 05/may/ 2021
Reference : International Research journal of Modernization in
Engineering Technology and science

OBJECTIVES :
• To study complete analysis and design of building using
software’s.
• To study the effect of earthquake loads on the structure.

METHODOLOGY :
Seismic zone V ie. Zone factor 0.36
Type of construction : Rcc Framed Structures
Type of wall : AAC blocks wall
Apartment type : 2BHK
Plot size : 38.5m x 25.35m

SOFTWARES USED :
• AUTO CAD
• STAAD PRO CONNECT EDITION
Staad pro CONNECT Edition includes seismic analysis
features which enables user to perform detailed calculation as
well as new physical modelling workflow.
CONCLUSION :
 Reinforcement details for each member can be obtained directly
after the process of analysis is carried out.
 While designing some of the column ,beam section, the
reinforcement percentage exceeds the maximum limit of
reinforcement percentage.
J4
DESIGN OF G+10 STOREY RESIDENTIAL
USING STAAD PRO

Authors : Mohammad Maaz Ansari , Mohd Tashif Khan , Faisal


Sami , Farhan , S.K. Parmar
Year of publication: 07| July 2021
Reference :International Research Journal of Engineering and
Technology (IRJET)
SOFTWARE USED :
AUTO CAD
STAAD PRO
METHODOLYGY :
Modelling of structure
Loads Assigning
Analysis & interpret the result
Design
Input data
Assigning of loads
Analysis & interpret the result

CONCLUSION :
• This project has given an opportunity to re-collect and
coordinate the various methods of designing and engineering
principles .
• Analysis and designing were done by using STAAD PRO
software and successfully verified manually as per IS 456-2000.
• Calculation by both manually as well as software analysis ,
gives almost same result.
J5 ANALYSIS AND DESIGN OF G+3
RESIDENTIAL BULIDING IN ZONE – III

AUTHOR : Nilendu Chakrabortty, Akshit Lamba.


Year of Publication: AUG 2020
Reference : International Research Journal of Engineering and Tech.

OBJECTIVES :
1. The process for the seismic evaluation of a
building should be carried out.
2. Also is to study the behaviour of a building under the
action of seismic loads and wind loads.
3. To match various analysis results of building under
Zone III using E-tabs software.
4. To design residential building as per code provision
5. To prepare detail schedule of project
METHODOLOGY :
1. Preparation of building layout using Auto Cad
2. Analysis and design of Residential Building manually
3. Analysis and design of (G+3) residential building by E-tabs
4. Comparison Between manual and software Results
5. After this detailing is done
CONCLUSION :
6. Comparison between manual calculation and E-tabs . Software
Analysis sustaining , conclude that the analysis is same but
design is some different.
7. Using E-tabs .., analysis and design of multi-storey building has
completed much easier than manual calculation .
8. Building plan was develop and draft in Auto-CAD with required
dimensions.
9. During designing G+3 stored residential building structure is
capable to sustain all load acting on building.
J6
DESIGN AND ANAYSIS OF RESIDENTIAL BUILDING

Author : Md Arfuzamam, Sk Ibrahim, jisan ali mondal.


Year of Publication : Apr 2019
Reference : International research journal of engineering &tech

OBJECTIVES :

1. Different load active on the member are considered according


to the code IS:875(part1,par2,part3)
2. All structure member are designed using Limit state method
using IS:456:2000
3. Analysis and design of G+4 residential building structure by
using IS code
METHODOLOGY :
1. Data collection
2. Planning and drawing in auto cad
3. Design of concrete member
4. Analysis in Staad pro
5. Detailing of residential building
CONCLUSION :
6. After analysis the G+4 storey building structure , concluded
that structure is safe in loading like dead load , wind load and
seismic load.
7. Member dimension are assigns by calculation the loa d type and
it’s quality applied on it.
8. Staad pro has capability to calculate reinforcement needed for
any concrete section.
J7
DESIGN OF RESIDENTIAL BUILDING USING STAAD PRO

Authors : Dhanavath seva, Bhukya Chandrasekhar , Faria Aseem


Year of publication: November,2017
Reference : International Journal of Engineering Science and
Computing
OBJECTIVES :
• Applications of different load combinations on the structural
members.
• Design of the residential building
• To observe the impact of various loads.

METHODOLYGY:
 Design of residential towers along with other necessary utilities.
 The design parameters considered are IS codes. Of practise.
The loads are considered as dead loads , imposed loads, wind loads, special loads and
combinations.

CONCLUSION:

The project is mainly concentrated with the analysis and design of multi-
storied residential building with all possible cases of loading used software STAAD
pro.
The deflection of various members under the given loading combinations are
also verified.
STAAD.Pro V8i advanced software which provides us a fast, efficient , easy
to use and accurate platform for analysing and designing of the structures.
J8
ANALYSIS AND DESIGN OF G+10 APARTMENTS
BUILDING USING STAAD PRO

Authors : Aman , Nalwadgi M , Vishal T , Gajendra


Year of publication : June 2016
Reference : International Journal of Engineering Science and
Computing

OBJECTIVES :

• Generating structural framing plan


• Creating model in staad pro.
• Application of loads on the member.
• Analysis of the structure.
• Design of the structure.
METHODOLOGY :
1.Drafting plan in Auto Cad .
2. Preparing building layout by using Staad pro.
3.Analysis and design of G+10 apartment building using Staad pro.
4. The design parameters are IS codes of practise.

CONCLUSION :
The analysis and design were done according to standard
specifications using staad pro for static and dynamic loads.
The dimensions of structural members are specified and
the loads are dead load, live load , seismic load , floor finishing ,
wind load and earthquake loads are applied .
J9
OPTIMIZATION OF PLANNING, SCHEDULING, AND
CONTROL OF HIGH RISE CONSTRUCTION PROJECTS

Authors: S.M.Jaswanth & P.Sundara Kumar


Year of publication: April 2018
Reference : International Journal of Civil Engineering and
Technology

OBJECTIVES :
1. To identify scheduling method used by the organization in developing
plan and scheduling.
2. To develop a schedule and determine the CPM using Primavera software.
3. To investigate faults in the planning and scheduling procedure.
4. To follow and optimize the project and estimation is done.
NEED FOR STUDY
Using P6 software is done, delays can be identified and optimization is done
for each activity, corrective events have been suggested.

METHODOLYGY
Literature review Selection of study area

Data collection and data analysis


Study primavera software
Define work break down structure

List out all the activities in


detail
With the help of Critical path method prepare detail planning & scheduling

Develop scheduling by primavera software

Optimizing of duration

Budget is Prepared
SOFTWARE USED
Primavera

CONCLUSION

• This research helps to identify the defects in planning, scheduling process


of the organization.
• A perfectly planned project helps in reducing the loss of cost and time.
• Primavera software is a user-friendly which provides user to perform any
type of task, the cost of any individual work break down a structure can be
known along with duration.
• With help of Primavera software, 6% of the schedule has been optimized
compared to the originally planned schedule.
• After optimization of cost, there is a variance of 2.9% in the cost
compared to the originally planned budget.
J10
PROJECT PLANNING, SCHEDULING AND PREPARATION
OF OUALITY ASSURANCE CONTROL DOCUMENTS

Authors: J.Sharanyasreenivas, G.Gajalakshmi, k.Ravi teja


Year of publication: Nov,2017
Reference : International Research journal of Engineering and Technology

OBJECTIVES
• To study an on-going construction project with focus on project planning,
Scheduling and preparing and preparing Quality assurance documents.

• To identify scheduling technique used in developing planning and scheduling.

• Use of computer software like Microsoft project software, which is most widely
and globally used.
PROJECT PLANNING
• Make a detailed list of activities
• Prepare a network diagram
• Identify the critical path
• Allocate the resources or juggle the schedule.
• Consider reported original plan
• Compare reported original plan

SCHEDULING METHODS
a. Bar chart
b. Line of balance chart
c. Network-based diagrams
CONCLUSION :
The construction planning and scheduling was done using the project
management software known as Microsoft Project and was found effective
in scheduling, allocation of resources and tracking of project.
• The schedule which was prepared here involves periodical as well as day to
day observation in scheduling and tracking of the project.
• Scheduling using computer software as a tool was found to be easy and
accurate. The project schedule and project track generation was its main
highlight. The schedule report helps in identifying start date, finish date, also
the duration of the project as a whole.
• Quality construction assurance documents were prepared
to maintain the quality aspects in such a manner that the
standards set by BIS are maintained
J 11

ESTIMATING, COSTING AND SCHEDULING


ON MICROSOFT PROJECT

Authors: Alok sharma, Rohan kumar singh, Shaik Muktar


Year of publication: May 2021
Reference : Journal of Emerging Technologies and innovative Research

OBJECTIVES :
• Use of computer software like Microsoft project software, which is
most widely and globally used.
• To identify scheduling method used by the organization in developing
plan and scheduling.
• To identify scheduling technique used in developing planning and
scheduling.
METHODOLOGY :
In this project various methodology adopted for the elution of the project. In
this some of them which are used mostly are :
• Planning
• Auto cad
• Microsoft Excel
• Microsoft Project

CONCLUSION :
• The following project involves the use of Microsoft project software for
estimating and costing although it requires a very detail scheduling.
• This project will provide a vast knowledge about the software as well as
how planning and scheduling is done in the construction industry for a big
project.
• The study of Microsoft Project software is very great platform for the
detailed estimation, costing and scheduling.
J 12

PLANNING AND SCHEDULING OF MULTISTOREY


RCC BUILDING USING MICROSOFT PROJECT

Authors: Pooja Tripathi, Vinay Kumar Singh, J.P.Gupta


Year of publication : May 2018
Reference: International Journal of Engineering Science Research &
Development
OBJECTIVES :
The objectives of the present work are:
1. To study the construction sequence of work for a multi storey RCC
building.
2.To study the scheduling techniques using critical path method.
3.Application of Microsoft project software in planning and scheduling of a
multi storey RCC building.
PROJECT PLANNING :

• Make a thorough inventory of your activities


• Construct a network diagram.
• Determine the critical path
• Change the timetable or allocate the resources.
• Think about the alleged initial plan Review the stated initial plan.

PLANNING OR SCHEDULING METHODS :


• Bar chat
• line-of-balance diagram
• Diagrams based on networks
CONCLUSION :

Within the scope of present work following conclusions are drawn:

1. Microsoft project software works on Gantt chart concept. This gives the
easy understanding of the progress of work with scheduled time.
2. Many project managers suffer to finish the project within the duration and
estimated cost. They may add more resources or increase working hours to
finish the project within the duration.
3. Schedule crunching is most effective technique in optimization of time
and cost. But quality is not guaranteed in this technique because the efforts
are done quickly in order to finish the project.
J 13
ANALYSIS, DESIGN & ESTIMATION OF
G+4 RESIDENTIAL BUILDING

Author : Aradhana Charan,Kranthi Pawar,Anagha Ahire,Hrithik Rathod,Janmejay


Year of publication : June 2021
Reference : International Journal of Engineering Research & Technology (IJERT)

OBJECTIVES :

• The aim of the research is to study and analysis, design of g + 4 building using
stand pro and cost estimation using MS excel
• To study analysis and design of G+4 building on STAAD PRO software.
• To make building Estimation and costing using MS excel
• To study the results of various parameters such as static and dynamic loads,
displacement and deflection
METHODOLOGY :

1. Preparation of Building Plan and Column Plan Layout Using Auto Cad
2. Analysis and Design of G+4 Residential Building Using Staad Pro
3. Input Geometry, Property, Material and Support Condition
4. Input Specifications and Load Case Details for Mass, Self-Weight, Dead
Load, Live Load, Seismic Load Condition
5. Analysis Command and Run Analysis
6. View Output File and Verify the Results
7. Generation Of Report
8. Building Estimation and Costing Using Microsoft Excel
9. Preparation of Quantity Measurement and Abstract Sheet for Start to the End
of the Building Process by using Excel
CONCLUSION :

1. This project includes G +4 building with parking at ground floor and rest of
the floors occupied with 2BHK flats. The response of a RCC high rise
building under dead load, live load and seismic load is studied as per IS
875(Part 1):1987, IS 875(Part 2):1987and IS 1893: Part 1: 2016
respectively.
2. Reinforcement details for each member i.e., beams and columns can be
obtained directly after the process of analysis is carried out.
3. Estimation and Costing is done using MS Excel to know the building
Appropriate cost using Long Wall and Short Wall Method.
4. Over all project helped us to understand the Building Process and use of
different software for easy and timely completion of work.
J 14
SEISMIC & WIND EVALUATION OF G+10
RESIDENTIAL BUILDING

Author : B. Shankar, T. Abhiram Reddy


Year of Publication : May 2018
Reference : International Journal of Civil Engineering and Technology (IJCIET)

OBJECTIVES :
 
• Generating structural framing plan
• Creating model in STAAD PRO 
• Application of loads on the member
• Analysis of the structure
• Design the structure (manual design)
• Seismic and wind design of multi storey building [G+10 (3-D frame)] using
STAAD Pro
METHODOLOGY :

1.Drafting plan in Auto Cad .


2. Preparing building layout by using Staad pro.
3.Analysis and design of G+10 apartment building using Staad pro.
4. The design parameters are IS codes of practise.

CONCLUSION :

• Complicated and high-rise structures need very time taking and calculations
using conventional manual methods.
• STAADPRO provides us a fast, efficient, easy to use and accurate platform
for analyzing and designing structures.
• As the height of the structure increases its deflection is also increases.
• For improving lateral stability provide expansion joints and shear walls.
J15
Analysis and Design of G+19 Storied Building Using Staad-Pro

Author : D.R. Deshmukh , A.K. Yadav , S. N Supekar , A. B. Thakur , H. P


Sonawane .
Year of Publication : July 2016
Reference : Journal of Engineering Research and Application

OBJECTIVES :

• To develop, design and analysis model of the High rise structure in STAAD-Pro.
• Study of seismic and wind load applied to the structure as per IS 875 and IS
1893.
• Comparison of results of earthquake load applied on the structure by STAAD-
Pro and manual calculations both by seismic coefficient method.
• To verify deflection obtained by STAAD-Pro with IS codal Limit..
METHODOLOGY :

A Model of G+19 storeyed is developed, analysis and design using STAAD-Pro


software. Building plan size is 33.6m × 18.8m. The building is situated in Pune
in earthquake zone ǀǀǀ. eismic zone coefficient is taken as 0.06 as per IS code.
Following specifications are given to the structure:

Column 0.3m x 0.6 m


Beam 0.45m x 0.45m
Slabs 0.15 thick
Parapet wall 0.1m
Live load 2KN/M2
Floor load 1KN/M2
Grade of concrete M30
Grade of steel Fe 415

These values are provided as a input to the staad pro software for
drawing, analysis and designing purposes
CONCLUSION :

STAAD PRO is a versatile software has the capability to calculate the


reinforcement needed for any concrete section, to find lateral deflection due to
earthquake load . The program contains a number of parameters which are
designed as per IS: 456(2000) , IS 1893:2002. Various structural action is
consider on members such as axial, flexure, torsion etc according to their
response.
SCHEDULING AND LABOUR MANAGEMENT FOR
RESIDENTIAL BUILDING PROJECT USING PRIMAVERA
Author : Abhishek G.B, R.M Mahalingegowda.
Year of Publication : July 2019
Reference : International Research Journal of Engineering and Technology
(IRJET)

OBJECTIVES :

• Estimate the time required for each activity.


• Time required for completion of project is estimated.
• Defining interval of the time in each activity i.e., when to start and finish.
METHODOLOGY :

In the present scenario construction projects have become wide and complex
so the companies started developing the software for project management such as
Microsoft project, primavera P3, P6 etc. The study involves scheduling and labour
management. The following steps are involved in the methodology.

CONCLUSION :

• Project management software like Primavera helps to plan, schedule, monitor


and control the activities involved in the construction project more effectively
and efficiently.
• The graphical representation of various activities provides information about
the critical path and delay of the project.
• Labour management acts as a tool to optimize the various types of labours
involved in various activities.
• An effective and efficient usage of labour management improves the
productivity of the project so as to achieve the organization goal.
Planning and Scheduling Residential Building Using
Primavera Software

Author : K. Suresh Kannan, M. G. Ranjith Kumar


Year of Publication : march 2019
Reference : Journal of Transportation Systems Volume 4 Issue 1

OBJECTIVES :

• To identify construction sequence for a residential building construction.


• To work out the practical duration required to carry out the activities.
• To identify scheduling techniques used by the organization in developing
plan and scheduling.
• To identify construction sequence for a residential building construction.
• To work out the practical durations required to carry out the activities.
• To achieve success.
• To track the project and analyze the reasons for delays, and increase in
estimated budget etc.
METHODOLOGY :
1. Literature Review
2. Data collection and analysis for two storey residential building
3. Study the contract document
4. Study the primavera p6 software
5. Prepare the detail planning, scheduling by CPM
6. Develop schedule and using
7. Optimization of time, cost and other type of resources

CONCLUSION :
• The main objective of this project is to prepare the proper planning and
scheduling and timely completion of two stories residential building work
construction at Dindugal.
• All activities and their sequence of occurrence, duration, and resources and
their planning, scheduling of two story residential building work construction
was completed.
• It involves choice of technology, the definition of work tasks the estimation of
the required resources and durations for individual tasks, and to find
interactions among the different work tasks.
• This project can be completed before the contract duration and reduced time
cost and all resources.
Analysis and Design of G+6 Residential Building
using STAAD PRO
Author :M. Durga Rao,Ch. Pavan Sai,K. Ravi Teja,K. K Nagendram,B. Ram Jaswanth
Year of Publication : Sep 2020
Reference : International Journal for Research in Applied Science & Engineering Tech

OBJECTIVES :

• Design G+6 residential building using staadpro


• Manual calculation is done by Kani’s method
• Behaviour of structure is going to study
• Application of various loading condition on member
• Seismic load are consider from IS : 1893
• Combination of loading are taken from IS : 875(part-1,part-2,part-3)
METHODOLOGY :

1)Step 1 - Collection of data


2) Step 2- Planning and drawing in AUTOCAD
3) Step 3 – Manual analysis of structure
4) Step 4 – Design of concrete members
5) Step 5 – Analysis in STAAD PRO
6) Step 6 – Conclusion

CONCLUSION :

• It was observed that the bending moment values obtained from manual
calculation is differ maximum of 2% percent of the bending moment values
obtained from STAAD PRO.
• It was observed that the Area of steel obtained from manual calculation is
differ maximum of 3% percent of the Area of steel obtained from STAAD Pro.
Analysis and Design of a Residential Building
By Using STAAD PRO
Author : Kunal Wailkar, Pranay Chide, Manthan Shende, Jinendra
Ralekar, Dhanashree Walke, Dhanashree Tayde, Atul Kurzekar
Year of Publication : Apr 2021
Reference : International Journal of Modern Agriculture

OBJECTION :

• Generation of structural framing plan 2.


• Creation of model of structure in STAAD PRO
• Application of various load combinations on the member
• Analysis of the structure
• Design of the structure
METHODOLOGY :

1. To model the residential building using the STAAD Pro software and analyse
the same structure using STAAD Pro.
2. To analyse the residential building and structural elements like beams, stairs,
columns, slabs.
3. To design the residential building using STAD Pro - To design the structural
elements like beams, stairs, columns, slabs using software
CONCLUSION :

• The structural elements of building are safe in flexure and shear.


• Quantity of steel provided for building is economical and adequate.
• Proposed sizes of structural elements can be used in building as it is.
• The design of beam, slab, column, footing and stair case are safe in deflection,
bending, shear and other aspects.
• On comparison of the manual design and geometrical model using STAAD
Pro, the area of steel required for beam, column, footing, slab, staircase are
comparatively similar to that of the requirement.
ANALYSIS AND DESIGN OF G+6 BUILDING IN
DIFFERENT SEISMIC ZONES BY USING SOFTWARE

Author : Shubham Borkar, G.D. Awchat.


Year of Publication : May 2019
Reference : International Research Journal of Engineering and Technology

OBJECTIVES :
• To study the behaviour of a building under the action of seismic loads.
• How the seismic evaluation of a building should be carried out.
• To compare various analysis results of building under zone II, III, IV, and V
using ETAB Software.
• To calculate the types of loads acting on such kinds of buildings.
• To study the seismic analysis technique, like, response spectrum analysis,
and its application by using the software.
METHODOLOGY :

As discussed in the previous chapters, a structure must be analyzed and designed


to resist the lateral earthquake forces. In this chapter, the analysis and design
procedure of the G+6 storey commercial building is discussed with the help of
ETABS Software by response spectrum method. There are computational
advantages in using the response spectrum method of seismic analysis for the
prediction of displacements and member forces in structural systems. The
method involves the calculation of only the maximum values of the
displacements and member forces in each mode using smooth design spectra
that is the average of several earthquake motions. In these different seismic zones
and soil types are taken to get the results of building, how it reacts to different
zones as well to different soil types.
CONCLUSION :

• As from table 1, it can easily see that base shear varies from zone to zone
and from soil to soil.
• In table 1 the base reaction forces in the global xdirection are increasing
from zone- II to zone- V, in zone-II the value is 723.5497 and in zone-V, the
value is 3727.7996 means as the zone is increased the values also get
increased.
• In the figures of base shear, the values are changing according to the soil as
in soil-I the values are low & in the soil-III the values are high, so from this
it is understood that soil-I has a low base shear as compare to the soil-II &
soil-III.
• In table 2 the base shear values in the global ydirection are acting the same
as in x-direction because in y-direction the values are high in zone-V as
compare to zone-II & the soil-III values are high as compare to the soil-I &
soil-II.
PLANNING AND SCHEDULING OF G+3 BUILDING
CONSTRUCTION USING PRIMAVERA P6

Author : S. Rajkumaar, P. Ram Pramoth, J. Sankaranarayanan, R. Kalaivannan


Year of Publication : Aug 2020
Reference: International Research Journal of Engineering and Technology

OBJECTIVES :

The primary objective of this project is


• To schedule the G+3 building construction project using primavera.
• To optimize the resources utilized in the project.
METHODOLOGY :
1. The plans and technical details of project building is studied
2. Activity network is created in primavera
3. The resource is sequenced according to the activity network
4. Finally the resource optimization is achieved

CONCLUSION :

Primavera is an ideal tool for anyone who is involved in planning, monitoring


and reporting on the progress of projects both large and small. It also means that
all parties can be kept updated within one system, reducing duplicate
information and keeping everyone in the loop. This project emphasizes the use
of project management software precisely primavera on construction. By
tracking a stimulating project, the various interpretations of activities and
resource relation using software were explained in detail.