You are on page 1of 12

Integration New RBS Field End

1.TND ,CIQ,IP –PLAN


2.Check Node installation and cable connection.
3.Power On and login Node through LAN cable.
4.login Hyperterminal used IP 169.254.0.0
5.Format C & D drive and Upload SW package dump
6.RUN HW and O&M XMLscript
Integration New RBS through Remote

1.MOP Details Plan


2.TND,CIQ,IP –PLAN
3.RNC ,RBS SCRIPTS
Integration New RBS
Integration Step Process

1.login Software tool:-


FTP
Winfiol
F-Secure
Ultra Edit
Cygwin
Citrix
Integration New RBS
Integration Step Process

2.Pre Check list:-


a)Confirm external hardware scripts & software updated load in
RBS in local end.
b)Alarm listed HW reported to SPOC.
c)Health check up RNC th command alt,strt.
d)check ip connectivity & trace route.
e)Taken finger print for Node
Integration New RBS
Integration Step Process

3.Scripts loading in RBS & RNC:-


a)Relation & site Merge scrips loaded in OSS through ftp.
b)site merge scripts loaded In RNC for Iub connectivity
c)Relation(2G&3G) scripts loaded in RNC.
d)Check basic package(R9CS01) in RBS.
Integration New RBS
Integration Step Process

4.Parameter set in RBS & RNC-


a)parameter set in RNC &RBS according to customer.
CPICH
Rbsid
Rxdiversity
Traffic delay
Cell range
Integration New RBS
Integration Step Process

5)License Loading in RBS- Two way for loading license


a)Command line by Moshell.
b)SMO by OSS.
license file merge in zip format & load
(/var/opt/ericsson/nms_smo_srv/smo_file_store/Delivery)
Integration New RBS
Integration Step Process

6)Upgrade RBS :- According to current software package &


customer requirement
a)Command line by Moshell.
b)SMO by OSS.
Integration New RBS

Integration Step Process

7)Post Check :- Make sure all channel in RNC & RBS up


a. Configuration alarms.

b. Hw alarms.

c. Radio Units state.

d. Synchronization state.

e. ROE (VSWR)
Integration New RBS
Integration Step Process

8)CV Creations :-
Site is integration when creating CV has no hardware &
configration problem.
Command:-cvms
Integration New RBS
Integration Step Process
Command Details Command
Health Check Up (pre check) > alt all/strt
>pr
IpAccessHostEt
ip connectivity
Disable all Mo >st all mo
Site details(Channel, sector) >lst site name
lock cell >bl
Read CM/FM attribute >get/lget
Display CM/FM attribute >kget/lkget
unlock cell >deb
Delete MO >del
Delete MO with children >rdel
Handling undo mode for (del,rdel,set command) >u+/u-/u!
run command file In EMAS/Mo tester format >turni
backup handling listing, creating >cvls/cvms/
Parameter & mo comparisons >diff
logging to file >l+
log close >l-
Integration New RBS
Integration Step Process

8)CV Creations :-
Site is integration when creating CV has no hardware &
configration problem.
Command:-cvms

You might also like