Poster 1
Objectives 1A
1.5 A
1.003 A
1.506 A
1.009 A
1.511 A
.598%
.332%
Final Design
Our main objective is to build
a small-scale battery management Emergency protocols went
system. Our project will provide a into effect when over current,
development platform that can be temperature or voltage was
used to test different battery detected. The response time was
management methods before within msec of detection.
implementation on the main car.
Requirements Budget
• Detect the following events The team had a $500 budget to
• Over voltage build the battery management
• Under voltage system. The table below shows
• Over current that our final product.
• Over temperature
• Display the following Products Cost
• Cell voltage
Electrical Components $224.90
• System current
• Take action to prevent Controller $55.75
damage to the system
Mechanical Parts $22.91
Total $303.56
The Team
Dr. Binseng Wang Matt Gilbert-Eyres Gerald Saumier Albert Ware Auez Ryskhanov Mike Buch
MSU Facilitator Electrical Engineer Computer Engineer Electrical Engineer Electrical Engineer Electrical Engineer