You are on page 1of 8

Condensate Recovery / Effluent

Treatment Plant

Presented By:

ENVERGY PROJECTS LTD


Turnkey Solutions in Environment & Energy
ISO 9001, 14001 & OHSAS 18001 Certified Company
To - Gokul Mauli Sugars Limited.
ABOUT
ABOUT USUS
Envergy Projects Ltd. (EPL) is a ISO 9001:2008,ISO
14001:2004 & OHSAS 18001:2007 Certified ,
leading Turnkey Projects suppliers to provide end-
to-end solutions right from the stage of concept to
execution in the field of Environmental
Engineering and Energy.
Areas where EPL is involved are:
1. Treatability study,
2. Feasibility study,
3. Detailed Engineering,
4. Designing, and Manufacturing,
5. Supply, Erection, Commissioning,
6. Operation and Maintenance of environmental
engineering services / solutions.
A well established NABL approved R&D centre
equipped with advance and sophisticated
instruments is the backbone of our capabilities.

www.envergy.co.in
www.envergy.co.in EnvergyThink
ProjectsGreen
Ltd Envergy Projects Ltd.
EPL PORTFOLIO

WTP,

www.envergy.co.in Think Green Envergy Projects Ltd.


SCOPE OF SERVICES

We Are Your Partner In Every Project Phase……………….

Project Development

Design & Engineering


• Treatability & Feasibility Study
• Environmental Impact Studies
• Lab & Pilot Studies • Process Design
• Basic Design
• Design Review Project Execution
• Detailed Engineering
• Turnkey
• EPC
• Equipment Supply Operation & Maintenance
• Project Management
 Our services start from consultancy • Procurement
& engineering to turnkey project Assistance • Operation
• Inspection • Troubleshooting
implementation as well as pollution
• Supervision • De-bottlenecking
control equipment delivery. •O&M

think green
www.envergy.co.in Think Green Envergy Projects Ltd.
DETAILS REQUIRED !!

• What is the hydraulic Load ?


• Water analysis including ionic load.
• Incoming Water Temperature ? If temperature is height then need to consider
heat exchangers/trim coolers etc to lower down temperature of condensate and
thus condensate will be made available at the inlet of our system with below 35
degree C temperature by client.  
• Scope of quote on turnkey basis (including all civil, mechanical, interconnecting
piping, electrical, C&I, engineering , procurement, supply, erection, commissioning)
?
• Parameters expected in treated water  
PROCESS FLOW DIAGRAM
BATTERY LIMIT

• Battery limits shall be as per below:


• a.     Raw effluent: Will be made available by client at the inlet to our system
(at <35 degree C temperature)
• b.     Utilities: All utilities such as power, service air, instrument air, service water,
potable water etc will be made available at the consumption point at free of cost
by client during both construction & commissioning phase.   
• c.     Chemicals/consumables: Apart from first fill, all chemicals/consumables will
be made available at the respective consumption point.
Thank you