80 Constant Period
C
60 B D
De
c rea
g
sin
s in
40 ea
cr g Demoulding
In
A
20 Pre Steaming
0
2 4 6 8 10 12 14 16
TIME AFTER PLACING OF CONCRETE (HOURS)
Steam Cycle Chart
• Steam cycle: Generally
11-12 hrs for M55 & 13-15 hrs for M60
grade of concrete and Max temp. not
more than 600
Steam Chambers
• The chambers then covered with tarpaulin
or steel plates to avoid leakage of steam.
• The compressive strength of steam cubes
be checked after completion of cycle i.e.
40 N/mm2 is must otherwise duration is
increased by 1 or 2 Hrs.
Transfer of Prestress
• The benches/moulds removed from steam
chamber after desire cube strength for
demoulding of sleepers. Pre-stress to be
transfer to sleepers by cutting of wires.
Demoulding & Water Curing
• Sleepers to be demoulded from the
moulds and put in water curing tank. It
should be ensure that clean water is must
in water curing tank and also ensured that
sleeper must be completely submerge in
water for 14 days.
• https://youtu.be/SzJp39ci8BE
Testing and Dimension
Checking
• Then sleeper to be tested as per specified
procedure for moment of cracking at rail
seat and sleeper top and also checked the
dimension of sleeper as specified.
Stacking & Despatch
• Sleepers to be stacked and dispatch as
per requirement of zonal railway, sleeper
to be loaded in wagons/truck by sleeper
manufacturer as specify.
Inspecting Authority
• For inspection of concrete sleepers,
officials having competency certificate
issued after due test by RDSO/Chief Track
Engineer only shall be posted.
Inspection & Testing
• Compressive strength of concrete at
transfer (release) of prestress:
• These cubes shall be steam cured along
with sleepers in the same manner and
tested for transfer of prestress to concrete
(at least one cube for every steam
chamber but not less than a total of 3 in
any case).
Test for 15 day compressive
strength of concrete
• These cubes shall not be steamed but
shall be water cured for 14 days after de-
moulding. Two samples of (3cubes in each
sample) per lot shall be tested for 15 days
compressive strength of concrete.
Contd…
1 Existing BG 2750 210 250 150 180 220 150 22.1 t &
(RT2496) & 25T 24.5t
Sleeper (RT-
7008)
2 Wider sleeper 2750 230 280 210 200 230 180 24.5t
Design of Rail Seat Assembly
for Wider sleeper RT 8527
• Rail seat assembly- Drg no- T-8529
• ERCMK V – RT 5919
• GFN 66 Liner- RT-6938 & 6939 (with 60kg
UIC rail & RT-6937(with 136RE Rail)
• Metal Liners - RT-8616(GS) & 8617(NGS)
(with 60kg UIC rail. & RT-8618(with 136RE
Rail)
• 10mm thick CGRSP- RT-8528(wider rubber
pad)
Various Types of PSC Sleepers
S No Component DRG. No DESCRIPTION
1 T-2495 PSC Sleeper for 52 kg Rail designed for 22.9 t Axle load
2 Ordinary PSC T-2496 PSC Sleeper for 60kg / 52 kg Rail designed for 22.9 t Axle load
sleepers
T-8527 PSC Sleeper for 60kg /136 RE Rail designed for 25.0 t Axle load
3
T- 8746 PSC Sleeper for 60kg /52 kg Rail designed for 25.0 t Axle load
4 RT-4183-4186 PSC Sleeper for Curve with Check Rail for 60Kg Rail
5 Slack Gauge RT-8621-8624 PSC Sleeper for Curve with Check Rail for 136RE / 60 Kg rail for 25T
Sleeper Axle load
6 RT-5738 –5740 PSC Sleeper for Curve with Check Rail for 52Kg Rail
7 Guard rail & RT-4088-4097 PSC Sleeper for Bridge and approach
8 Bridge PSC Sleeper for Bridge and approach for 25T axle load
RT-8672-8680
approaches
9 RT-4148/4148A PSC sleeper for LC for 60/52 kg running rail & 52 kg check rail
Sleeper for LC
10 RT-8671 (25t) PSC sleeper for LC for 25T axle load
11 Sleeper for RT-4149 PSC sleeper for SEJ
12 SEJ PSC sleeper for SEJ (with 300 mm max: gap) 60kg (UIC) rail on bridge
RT-6253
approaches.
13 RT- 4865 Sleeper Set for 1 in 8 ½ Fan shaped layout
Sleeper for
14 RT- 4218 Sleeper Set for 1 in 12 Fan shaped layout
P&C
15 RT- 6068 Sleeper Set for Derailing switch
16 Shallow Depth (RT-4852) PSC shallow sleeper (160 mm) deep
17 Sleeper RT-8326 PSC shallow sleeper with Guard Rail
18 Sleeper for RT-6420-6440 PSC Sleeper for Re-Railing Ramp On 52 Kg Running Rail
19 Re-Railing RT-8265-8291 PSC Sleeper for Re-Railing Ramp On 60 Kg Running Rail
Bridge Approach Sleepers
Curve Sleepers
L-Xing Sleeper
PRECAUTION FOR HANDLING OF
PSC SLEEPERS
• Concrete sleeper has been designed for the
maximum bending moment under rail seat
which is close to anchor zone of pre-stress. Any
damage to anchor zone may lead to reduction in
pre-stress as well as eccentricity of pre-stress.
The concrete sleepers therefore should be
handled carefully preferably by mechanical
means.
• In case of manual unloading of concrete
sleepers become unavoidable, adequate care
must be taken to ensure that the ends are not
damaged to safe guard anchor zone located
towards sleeper ends.
• Always do the work of sleeper unloading in
traffic block.
• While handling these sleepers by mechanical
means it shall be ensured that sleepers are not
damaged and develop cracks exposing HTS
wire and thus may result into their corrosion.
• While unloading the concrete sleepers should
be placed perpendicular to the length of BFR .
• In unavoidable situation, if concrete sleeper is
required to be unloaded manually, it should be
done with great precautions to ensure that
sleepers are not damaged while unloading the
sleeper from wagon.
• All the PSC sleepers are tested for electrical
resistance at the time of manufacture, and
sleepers are marked by paint with “FTC” to
indicate Fit for Track Circuiting and “NFTC”
to indicate not fit for track Circuited location.
This shall be noted while using the sleepers
at site. On PSC sleepers track, availability of
insulated liners upto a minimum level of 97%
shall be ensured.