You are on page 1of 12

CAE Results

1. 560B_SIDE VISOR FRONT_Option1

2023.05.22
560B_SIDE VISOR FRONT_Option1
Material Part Thickness
Data Grade Trade Name MI Filler Max Shear
Main T
(mm)
2.8 Max T (mm) 4.430 Min T (mm) 2.805
Injection

CAE PMMA - -

Volume 3& Machine Part Volume ( ㎤ ) 758.069

Machine Clamp Part Weight (g, 제품


- 415.6
Force 도)
Input & Results
Input Data Result Data

Flow Rate ( ㎤ ) - Injection Time (s) 3.519


or
Max. Pressure
Flow time (s) 3 135.2
(㎫)

Packing Time (s) 3.350 Clamp force (ton) 2202.8

Pack Pressure
(㎫)
108.1 Mpa Melt Temp (℃) 250

V/P Switchover (%) 97& Mold Temp (℃) 60


or
Mesh Type DUAL DOMIAN Cooling Temp (℃) -

Mesh Matching (%) 86& Cooling Time (s) 20


Flow System
YUDO Cold Runner
Sprue (Φ) 8 Sprue (Φ) -

Manifold (Φ) 16 -
Runner
Nozzle (Φ) 22 (Φ) 12

Valve pin (Φ) 10 50 X 1.5


Gate
Gate (Φ) 8 (Φ) -

2/12
560B_SIDE VISOR FRONT_Option1
Hot runner
YUDO Cold Runner
Sprue (Φ) 8 Sprue (Φ) -

Manifold (Φ) 16 -
Runner
Nozzle (Φ) 22 (Φ) 12

Valve pin (Φ) 10 50 X 1.5


Gate
(Φ)
Gate (Φ) 8 -

3/12
560B_SIDE VISOR FRONT_Option1
Gate location

X= 0
Y= 0

4/12
560B_SIDE VISOR FRONT_Option1
Fill animation

5/12
560B_SIDE VISOR FRONT_Option1
Fill pattern

6/12
560B_SIDE VISOR FRONT_Option1
Pressure Max pressure : 135.2 MPa

7/12
560B_SIDE VISOR FRONT_Option1
Clamp force Max Clamp force : 2202.8 tonne

8/12
560B_SIDE VISOR FRONT_Option1
Air trap

9/12
560B_SIDE VISOR FRONT_Option1
Weld line

10/12
560B_SIDE VISOR FRONT_Option1
SinkMark

11/12
560B_SIDE VISOR FRONT_Option1
Warp

12/12