% TIME BY PROBLEM
WELLHEAD PRO BS.
WELL CO NTRO L PRO BLEMS
BO P EQ UIP PRO BLEMS
EQ UIP.FAILURE-DRLG
CASING PRO BLEMS
DIR RELATED PRO BLEMS
LO ST CIRCULATIO NS
RIG REPAIR
CEMENT PRO BLEMS
MISC.
DRILL STRING FAILURE
WEATHER
EQ UIP FAILURE-EVAL.
HO LE PRO BLEMS/RMG
STUCK PIPE
0 1 2 3 4 5 6
% OF TOTAL TIME
130 WELLS IN 15 COUNTRIES 25.9% avg.
Lost circulation
•Hole cleaning.
•Loss of monitoring.
•Hole collapse.
•Stuck pipe.
•Well control.
Causes of lost circulation.
•Cuttings load.
•Surge pressures.
•Trapped pressures.
LCM Guidelines
• After connections, rotate pipe slowly to break the Gel strength, stop rotation
and break circulation with max. 10 SPM.
• When reaming stands reduce RPM to 50 and flow rate to 1000 l/min.
• If lag depth becomes too high, stop drilling and circulate out cuttings.
• Control ROP.
Stop Drilling
Observe well
Drilling in objective,
Drilling in objective, Drilling above objective, no further sealing Drilling above objective, Flow is less than Flow is more than
no further sealing and/or further sealing formations and/or further sealing Volume lost volume lost
formations expected Formations expected expected Formations expected
Circulate bottoms Close in
Continue drilling (with Take RFTs to establish up at reduced rate
Attempt to improve (No static O/B
Take RFTs to establish LCM) until in the seal. overbalance (O/B) to minimise losses
overbalance (O/B) formation strength
Establish presence/thick-
by cement squeeze
Ness of seal by VSP When “influx” is Record Pressures
O/B excessive O/B correct at 3000ft – circulate
O/B excessive O/B correct Attempt to improve over chokes
formation strength Drill out Squeeze back influx
Reduce mud gradient Set cement plug
Continue drilling by cement squeeze (to avoid contamin-
(through bit)
(with LCM) until After “influx” has ation of complete
Reduce mud and squeeze
losses become un- Continue drilling Leak-off or limit test been circulated out, system)
gradient Drill out cement
acceptable due to go to “No flow”
increasing O/B Drill out until losses Circulate at reduced
Continue drilling Leak-off or limit test Formation rate to mudgradient
become unacceptable. Formation
Set cement plug strength to kill well
Repeat until O/B strength
(through bit) and sufficient to
Formation becomes too large too low
squeeze Formation cater for
strength to cure losses for expected Go to “No flow”
strength expected
sufficient to too low pressure
Drill out until losses pressure
cater for for expected Set drilling liner
become unacceptable.
expected pressure pressure Continue drilling
Repeat until O/B Continue drilling
Reduce mud gradient until in seal
becomes too large to
Continue drilling Set drilling and continue drilling (log VSP)
cure losses.
liner in seal
Set drilling liner Set drilling liner
Total Losses,
Partial Losses
level drops
Fill up annulus with
Continue RIH at
light fluid
reduced speed
(see note 1)
to last casing shoe
Flow check
Establish circulation
whilst rotating string Well flowing
(note 2)
No flow
Dynamic losses only Severe or total Close in
losses
Go to Interface light fluid/
“losses while drilling” Spot LCM or cement Yes Mud in riser? No
and squeeze until Spot LCM through Squeeze LCM down
losses are reduced to bit and squeeze into annulus to reduce
dynamic losses only loss zone losses
Go to (note 3)
“Losses while drilling”
Losses reduced to
Yes acceptable level No
Clean out
Losses reduced
to dynamic only
Go to
“Losses while drilling”
Questions