Professional Documents
Culture Documents
Proiect Engleza
Proiect Engleza
CRISTUTIU RAUL-OVIDIU
TCM RO
Project Card
Project Summary:
In this project, i will present the testing of a new mould, which is one of the daily activities of my job. This includes the injection process, building
the gripper for the robot and programming it to give a flow to the whole process.
In order to proceed to the next step, starting the mould, we need to perform a number of tasks for the process to
run smoothly:
-Turning on the water circuits mounted on the mould and also turning on the water distribution system;
-Turning on the thermoregulators;
- Turning on the cylinder heating (on the injection unit);
- - Turning on the hot runner;
- The material to be prepared;
- Clean the cylinder with cleaning material;
2023 Academy Program
Project Card
Machine and mould calibrations are an important step in the start-up process. The following tasks must be done:
- Adjust the 0-point of the extractor and set its stroke (marked in the plate on the mould);
- Determinate the height of the mold (automatically with the machine function);
- Set the 0-point of the injection unit;
Project Card
Before making the first injections, it is necessary to set properly the opening and closing speeds, forces and strokes to
prevent damage of the mould. In the pictures below you can see the diagrams of the opening/closing process of the mold.
Project Card
After the proper filling of the part, the picking and palletizing of the parts with the robot will be
programmed; In the pictures below you can see the robot remote control interface where the picking and
palletizing points will be set.
Project Card
Project Coordinator: CRISTUTIU RAUL-OVIDIU