Professional Documents
Culture Documents
2023-05-05 Twin Tank W610 Open Points Rev 3
2023-05-05 Twin Tank W610 Open Points Rev 3
(Description)
1 || Confidential ||
SI NO Interface open point Image Remarks
description
2 || Confidential ||
SI NO Interface open point Image Remarks
description
3 || Confidential ||
SI NO Interface open point Image Remarks
description
4 || Confidential ||
SI NO Interface open point Image Remarks
description
5 || Confidential ||
EPT functional volumes (with 0.9 bar cap, coolant system volume = 8.14L)
08/01/2023 6
EPT slopping conditions Acceleration 15°
at min level
Breaking 15°
08/01/2023 7
Battery functional volumes (with 0.9 bar cap, coolant system volume = 6,56L)
08/01/2023 8
Battery slopping conditions
at min level
Acceleration 15°
Breaking 15°
08/01/2023
9
Post VP1 changes
10 || Confidential ||
SI NO Interface open point Image Remarks
description
11 || Confidential ||
Degassing tank interface