You are on page 1of 11

ME-3200

Case Study in Mechanical Engineering

Presentation on Case study


Tentative Title

Supervised by Presented by
Supervisor Name Name 1 (Roll No.)
Designation, Department
Name 2 (Roll No.)

Department of Mechanical Engineering


Rajshahi University of Engineering & Technology 1
Outline
 Introduction
 Literature Review
 Objectives
 Proposed Methodology
 Conclusions
 Future Work Timeline
 References

Department of Mechanical Engineering


Rajshahi University of Engineering & Technology 2
1. Introduction:
1.1 Motivation

 Start your presentation with a Figure/Video/Animation


 Briefly explain what’s the problem
 Why you are interested to solve the problem
 There should be 3 to 4 sentences in each slide

Department of Mechanical Engineering


Rajshahi University of Engineering & Technology 3
2. Literature Review:

Title
Author Methodology Limitations/Future Work
Year
Garbage monitoring  Interfacing the devices with
and management google maps to find the
using internet of optimal(shortest) path
things  The collected waste can
also be recycled for future
use
M. S. Rajesh, M. R.
Aishwarya, M. R. B.
Lakshmi

February, 2018

Department of Mechanical Engineering


Rajshahi University of Engineering & Technology 4
Research Gap

Material Costing

Research
Gap

Design
Time constraint
Constraint

Department of Mechanical Engineering


Rajshahi University of Engineering & Technology 5
3. Objectives:
 To make an interfacing the garbage monitoring device with google maps
 To find the optimal(shortest) path for garbage collection
 To recycle the collected waste

Department of Mechanical Engineering


Rajshahi University of Engineering & Technology 6
4. Proposed Methodology:
4.1 Tentative Process Flow Diagram
• Sketch or animations

4.2 Required instruments/Softwares (if any)


Department of Mechanical Engineering
Rajshahi University of Engineering & Technology 7
5. Conclusions:
 Different literatures regarding garbage collection and management have been
studied which shows that garbage is collected manually, not separated and
monitored properly
 The proposed methodology will collect the garbage automatically, separate using
sensors and monitor using IoT based technology

Department of Mechanical Engineering


Rajshahi University of Engineering & Technology 8
6. Future work Time Line:

Tasks 4th year Odd Semester (weeks)


1 2 3 4 5 6 7 8 9 10 11 12 13 14
Methodology development                        

Design of setup                        

Construction of the setup                      

Trial run                        

Report writing                      
 

Department of Mechanical Engineering


Rajshahi University of Engineering & Technology 9
References:

1. Rajesh, M.S., M.R. Aishwarya, and M.R.B. Lakshmi, Garbage monitoring and
management using internet of things, International Research Journal of Engineering
and Technology (IRJET), Feb-2018, 05(02): p. 286-290
2. Chavan, M., T.J.I.R.J.o.E. Pattanshetti, and Technology, Survey on Municipal Waste
Collection Management in Smart City. 2018. 5(1): p. 248-251
3. Kumar, S.V., et al. Smart garbage monitoring and clearance system using internet of
things. in 2017 IEEE International Conference on Smart Technologies and
Management for Computing, Communication, Controls, Energy and Materials
(ICSTM), 2017
4. Monika, K., et al., Smart dustbin-an efficient garbage monitoring system. 2016. 6(6): p.
7113-7116.
5. Navghane, S., et al., IoT based smart garbage and waste collection bin. 2016, 5(5): p.
1576-1578

Department of Mechanical Engineering


Rajshahi University of Engineering & Technology 10
Department of Mechanical Engineering
Rajshahi University of Engineering & Technology 11

You might also like