M o n th lyM a n a g em en tR ep o rt

CTJV-NFE-1 PROJECT
PREPARED BY PIONEER CAMP
MAINTENANCE
MAINTENANCE DEPARTMENT MMR REPORT-
OCTOBER
Préventive Maintenance Work Order

Preventive Maintenance Summary


Building Electrical Fire Gym HVAC Kitchen Laundry
121 717 2378 62 1381 385 18

Total PM Received 5062 Completed 4697

Comparison Chart
Microsoft Excel
2378 Worksheet
1381

717
385
Electrical Fire 62 Gym HVAC Kitchen 18Laundry

121 Total PM Received 5062 Completed 4697


Réactive Maintenance Work Ordre
Comparison Chart
Reactive Maintenance Summary

Reactive Main-
tenance Sum-
Electrical HVAC Building
Microsoft Excel
mary Electrical
Reactive Main-
27%
tenance Sum-

Worksheet
mary HVAC
Reactive Main-
57% tenance Sum-
15% mary Building 466 259 974

Total RM Received 1699 Completed 1408


Pioneer Camp Internal Daily & Weekly Checklist report
File Name Attached File
Emergency Diesel Generator & Fire Diesel Pump -1&2

Laundry Equipment check list - Labour & Junior EDG and FDP Checklist.pdf

Kitchen critical Equipment Daily check list Laundry Checklist.pdf

Kitchen water filter weekly cleaning check list Kitchen daily checklist.pdf

Telecom Weekly check list Water filter weekly checklist.pdf

PRV & Air vessel monthly check list


Telecom Checklist.pdf

Fire alarm & Fire Fighting Check list


PRV & Air vessel monthly checklist.pdf

Street/Sport Light weekly check list


Fire Alarm-Checklist.pdf Fire Fighting Checklist.pdf

Potable & LPG daily record Street Light weekly checklist.pdf

Mechanical Checklist(Potable & Sls) Microsoft Excel


Worksheet

HVAC Checklist Mechanical-Pumps-Checklist.pdf

Waste Management grease removal report HVAC checklist.pdf

Wastewater Analysis Report Waste Management grease removal.pdf

Water lab test report.pdf


FIRE ALARM -DETAILS

Sl.no Location Description Tag.No

North security guard Fire Alarm Troubles FACP 1 (1


1 troubles) POC/FACP1
house(1U-12)

Fire Alarm Troubles FACP 2 (1


2 Camp office (2U-15) POC/FACP2
troubles)
Fire Alarm Trouble FACP 3 (0
3 Multipurpose hall (3R-42) POC/FACP3
troubles)
Fire Alarm Trouble FACP 4 (1
4 Multipurpose hall (4R-71) POC/FACP4
troubles)
Fire Alarm Trouble FACP 5 (0
5 Recreation hall (5R-87) POC/FACP5
troubles)
SEWAGE & POTABLE WATER LAB
REPORTS-OCTOBER-23

TEYSEER POTABLE WATER-GL-G-RP-23-038875RO.pdf TEYSEER SERVICES-PIONEER-GL-G-RP-23-040619RO.pdf


GENERATOR RECORDS
DIESEL
RUNNING KILO WATTS BULK DIESEL
DESCRIPTION HOURS HOUR TANK DAY TANK
EMERGENCY GENERATOR-
01 14.2HRS/MIN 321KWH 4.7KL 86%
EMERGENCY GENERATOR-
02 13.4HRS/MIN 285KWH 4.6KL 92%
FIRE DIESEL GENERATOR-
DUTY 5.4HRS/MIN - - 75%
FIRE DIESEL GENERATOR-
STANDBY 3.9HRS/MIN - - 75%
Note: Every week Thursday All the four generators trail run will be taken
Maintenance Activities
 ACCOMMODATION STAIRCASE PAINTING WORK WAS COMPLETED FROM D1 TO D7.

 DAMAGED NORTH GATE BOOM BARRIER ARM WAS NEWLY FIXED.

 VINYL CARPET WAS FIXED AT ALL THE THREE-MESS HALL FOOD WASTE AREA FOR PARTITION AND TABLE.

 FRAMED WIRE MESH WAS FIXED FOR THE DRAINAGE TRENCHES AT ALL THE KITCHEN AREA

 FOOD COURT AREA AT MESS HALL 1&2 ACOUSTIC PANEL PARTITION WAS FIXED.

 ALL THE COVER PARTITIONS IN THE FOOD WASTE AREA FLOOR MATE WAS FIXED.

 KITCHEN EQUIPMENT-NEW RICE BOILER WAS INSTALLED BY PARAMOUNT VENDOR AT MAIN KITCHEN

 REPLACED THE BROKEN BACKBOARD IN JUNIOR BASKETBALL COURT WITH A NEW ONE.

 SEWAGE LIFTING STATION 1TO 5 PITS AND PUMPS DEEP CLEANING ACTIVITY WAS DONE.

 ACCOMMODATIONS NUMBER STICKERING WORK FOR D1 TO D27 AND E1 TO E12 FRONT AND BACK SIDE HAS BEEN COMPLETED.

 WATER COOLERS WAS NEWLY PLACED AT ALL THE THREE GYM AND CTJV MESS HALL WITH NEW WATER LINE AND POWER SUPPLY ARRANGEMENT.

 WATER LEAKAGE RECTIFICATION WORK WAS DONE AT ACCOMMODATION D1,D5,D6&D11

 KITCHEN STAFF BATHROOM FLOOR PAINTING WAS DONE.

 ARRANGING NEW WOODEN WEATHER PROOF BOX FOR THE EXTERNAL FIRE EXTINGUISHER AT GENERATOR AREAS.

 ACCOMMODATION D9&D10,D11 GROUND FLOOR BROKEN SHOWER TRAY WAS NEWLY FIXED.