Site Survey Document

For Connected Factories

Ganesh R

ABSTRACT
This document is an initial questionnaire for the site study for the Scope of Implementation of
SmartSense in Connected Factories

Confidential Ecolibrium Energy


Page 2

Table of Contents

Overview 3
Project Objective 3
Site Overview 4
Infrastructure Overview 5
Stakeholders 6
Team from Client 6
Team from Ecolibrium 6
Sample SCADA Architecture (Share here or separate file) 7
SITE SLA/KPI 8
Dependencies 10

Confidential Ecolibrium Energy


Page 3

Overview
● Date of Filling: 5th July 2021

● Data filling by (Name) : Shijith K N

● Contact Details (Phone and Email): shijith.kn@cpmjk.jkmail.com

Project Objective
Please state the objective of the project

Objective Priority Yes No Good to Have

Labor and Maintenance Cost P2 Yes


Reduction

Asset Efficiency improvement P1 Yes


(Through reduced Energy, fuel,
compressed air consumption)

Asset Downtime reduction P1 Yes

Improving Throughput P1 Yes

Others (Please mention here) P1 Yes


Reduction in water consumption

Increase in Return condensate P1 Yes

Additional information on the objective the needs to achieve would help design the solution better.

1. Connectivity with SAP


2. Auto load shedding.
3. What if scenario

Confidential Ecolibrium Energy


Page 4

Site Overview

Description Site 1 Site 2 Site 3

Name of Company JK Paper Limited,


Unit : CPM

Total Area (in Sqft)

Product being manufactured Writing & Printing Paper


& Duplex Board

Annual Maintenance costs ACCONTS DEPT


(Manpower and repairs)

Annual Energy FY 2020-21


(in kWh / USD)
138273874 kwh

Annual Downtime hrs PM1 -4626 hrs To be vetted with PK


affecting production PM2 -1562 hrs Mittal
BOARD -1441 hrs

Current Reject % Finishing +Break (20-21) To be vetted with PK


PM1 -15.68 Mittal
PM2 – 11.67
BOARD -10.34

Energy Meters installed (Nos) ELECTR. DEPT ANNEX -1 EM LIST No Further list will be
ofm meters likely to shared (MEP area)
increase minimum by
2 to 3 times so as to
monitor energy
section wise/
equipment wise. Now
it is monitored plant
wis only.

Motors (# and make) ELECTR. DEPT ANNEX- 2 – MOTOR Further list will be
LIST PAPER PLANT shared (MEP area)
AND BM4

Pumps (# and make) NEERAJ NILMANI

Water Cooled Chiller (# and NEERAJ NILMANI


make)

Air Cooled Chiller (# and NIL


make)

Transformers (# and make) ELECTR. DEPT ANNEX -3 Further list will be


TRANSFORMER LIST shared (MEP area)
PAPER PLANT,

Compressors (# and make) 3 NOS SCREW

Confidential Ecolibrium Energy


Page 5

COMPRESSORS
MAKE ATLAS COPCO

2 NOS CENTRIFUGAL
COMPRESSORS MAKE IR

Boilers (# and make) DETAILS AS PER


ANNEXURE 1

GearBox (# and make) 2 NOS TRIVENI MAKE


GEAR BOX FOR NEW
TURBOGENERATORS

DG (# and make) NIL

Fans (# and make) NEERAJ NILMANI

Cooling Tower (# and make) TG#3 CT – GEA


TG#4 CT - SHRIRAM
OLD EVAP. CT - HIMAGIRI
TG#5&6 CT – NORTH
STREET
PROCESS CT – NEW
PLANT- NORTH STREET

Flowmeters (# and make) NEERAJ NILMANI

Furnace (# and make) NA

UPS (# and make) JARNAIL YADAV

CNC Machine (# and make) NA

Other – Specialized critical


manufacturing machine ( List
Type, # and Make)

Type 1 Paper Machine 1

Type2 Paper Machine 2

Type 3 BOARD MACHINE


MAKE –SAPI
RETROFIT BY VOITH

Type 4

Infrastructure Overview
Description Facility 1 Facility 2 Facility 3

Confidential Ecolibrium Energy


Page 6

Make & Model of Production NO PRODUCTION


Management systems MANAGEMENT SYSTEM
(SCADA, MES, etc) INSTALLED

QMS FOR MACHINES


AVAILABLE

PM 1&2 – ABB (QCS)


BOARD – HONEYWELL

Functional Status ( Working, WORKING


non functional)

Protocol Available for NEERAJ NILMANI


communication with existing
systems (List all by systems)

Internet Connection Available YES


on site ?

ERP System make and APIs SAP HANA S4


available

CMMS Details (if used on site) No

do we have single Line ANNEX -4 – ELECTRICAL DONE


Diagram Available SLD

Do we have the SCADA, MES NO


Architecture Available –
Please share architecture

PM Schedule available – YES –ANNEXURE 2


Please share list NEERAJ NILMANI

Are the sensor Meters DCS –


connected to the SCADA? AVAILABLE SENSORS &
METERES CONNECTED

Confidential Ecolibrium Energy


Page 7

Equipment Overview
(Attach the relevant Architecture / Document to support the data)

Description Quantit Rated Controller type Communic Parameters to be Expectation


y Details (PLC/SCADA/ ation shown on from
DCS/OPC detail Dashboard Algorithm
Analogue/Port) Protocol &
Port &

Energy ANNEX ANNEX - PORT 485 ELECT ELECT DEPT Warning/


Meters- DEPT KW/KWH/PF Alram for
ELECT DEPT 485 ACTUAL/
over
TARGET/HIGH/
LOW/AVG comsumpti
on/trip for
very high /
settable/sel
ectable
UPS – ANNEX ANNEX Potential free 485 INV Algorithm to
ELECT DEPT contacts/ port VOLTAGE/HZ/LO give warning
AD/ALARM/WAR about UPS
485
NING FOR loading/overlo
TRIP/ALT / ading and Will
BATTERY save UPS
VOLTAGES/ROO failure.
M AND
BATTERIES TEMP/
ALARMS/

Chiller 8 NEERAJ/ PLC NEERAJ


CHINTU

Pumps NEERAJ NEERAJ EFFICIENCY

Cooling NEERAJ EFFICIENCY


Tower

AHU CHINTU CHINTU CHINTU MITRA CHINTU CHINTU MITRA CHINTU MITRA
MITRA MITRA MITRA

Air 5 ANNEXU PLC AIR


compressor RE 3 CONSUMPTION
BREAK UP.
POWER/NM3

Turbine ANNEXURE 1 NEERAJ NEERAJ STEAM AUTO LOAD


CONSUMPTION SHEDDING.
BREAK UP.
STEAM/MWH, WHAT IF
HEAT RATE SCENARIO.

BEST
EFFICIENCY
OPERATION

Confidential Ecolibrium Energy


Page 8

DISPLAY TO
GUIDE
OPERATORAND
CLOSED LOOP
BASED ON
ACTION TAKEN

Boiler NEERAJ NEERAJ BOILER BEST


EFFICIENCY EFFICIENCY
OPERATION
DISPLAY TO
GUIDE
OPERATORAND
CLOSED LOOP
BASED ON
ACTION TAKEN

Motors ANNEX ANNEX Potential free Potential Load in Algorithm to


ELECT DEPT contacts free KW/Amps/Volts/ give warning
motor body about motor
contacts
temparatures, loading/overlo
/RTDs Ambient temp. ading and Will
for save motor
motor failure,
temp/ improve
load in efficiency.
amps/K
W
Transformer ANNEX ANNEX Potential free Potential Load in Algorithm to
s contacts free KW/Amps/input give warning
ELECT DEPT and output about
contacts
Volts/Transforme transformer
/for r oil and body loading/overlo
Alarms/ temparatures, ading and Will
warning Ambient temp. save
s/Analog transformer
ue failure,
inputs improve
efficiency.
for Body
and oil
temp

Confidential Ecolibrium Energy


Page 9

Stakeholders
Team from Client- GS Govindraj

Name Designation Mobile No Email ID


Plant -1  

Team from Ecolibrium

Name Designation Mobile No Email ID


Naman Gupta Consultant - Connected Naman.gupta@ecolibriumenergy.c
Factory om

Confidential Ecolibrium Energy


Page 10

Sample SCADA Architecture (Share here or separate file)

(this is an Example)

Confidential Ecolibrium Energy


Page 11

SITE SLA/KPI
(Below is an Example ) – List attached –Annexure 4

S.No Desired Outcome Parameters Devices Monitored

1 Electrical Power distribution - Energy Meters (Distribution Network),


Transformers, Panels

UPS Power system

Centralized HVAC System - Chillers, AHU, Pumps, CT, Temperature (Run & Trip Status)

OEE -

(Availability and productivity)

2 Reject % Rejects%

Confidential Ecolibrium Energy


Page 12

3 Energy Performance Index POWER IN KWH/MT OF PAPER,


POWER IN KWH /MT OF BOARD
POWER IN KWH/MT OF PULP

STEAM MT/MT OF PAPER,


STEAM MT/MT OF BOARD
STEAM MT/MT OF PULP

WATER M3/MT OF PAPER,


WATER M3/MT OF BOARD
WATER M3/MT OF PULP

AIR NM3/MT OF PAPER,


AIR NM3/MT OF BOARD
AIR NM3/MT OF PULP

CONDENSATE RETURN -%

Confidential Ecolibrium Energy


Page 13

Dependencies
(This will be filled by the Ecolibrium Team post the site survey)

Dependencies Action Owner Remarks

Confidential Ecolibrium Energy