Document Title: Doc. No.
Solar PV System Sizing HPCL-47000189-EL-025
Calculation
1. INTRODUCTION:
This document describes considerations made in Solar PV System Sizing Calculation for this
project.
2. REFERNCE DOCUMENTS:
3. SITE CONDITIONS
The following site conditions have been used as a basis for design.
Ambient Air Temperature Design: 45 °C.
14-NOV-2019
KATYAL GAURAV (B728)
2 of 15
Page 2 of 15
CLARIFICATION FROM AGNI POWER ON EIL COMMENTS
AS PER EIL COMMENTS ON SOLAR PV SYSTEM SIZING CALCULATION, DRG. NOS. HPCL-47000189-EL-025, REV 1,
OUR REPLIES ARE AS BELOW:
COMMENT S.NO. 1- CONSIDERING THE SHADOW FREE AREA AND MAN MOVEMENT FOR O&M, THE
MAXIMUM 50.16KWP CAPACITY OF SOLAR POWER PLANT SHALL BE POSSIBLE TO INSTALL.
COMMENT S.NO. 3- PVSYST REPORT ATTACHED FOR REFERENCE WHICH IS BASED ON METEONORM DATA,
HOWEVER THE ACTUAL GENERATION SHALL BE APPROX 10 TO 12% LESS THAN THE PVSYST REPORT.
14-NOV-2019
KATYAL GAURAV (B728)
3 of 15
Page 3 of 15
A) AS PER TECHNICAL DOCUMENT, WITHIN 12M2 AREA ATLEAST 1kWp SOLAR POWER PLANT SHOULD BE
INSTALLED. FOR 517M2AREA, ATLEAST (517/12)= 43.08kWp SOLAR POWER PLANT MUST BE INSTALLED. WE
HAVE CONSIDERED 133 NO MODULES ON THE ROOFTOP i.e. 133 X 330Wp= 43.8kWp.
AS PER THE PRESENT LAYOUT, WE HAVE SLIGHTLY MODIFIED THE PREVIOUS MODULE LAYOUT TO MINIMISE THE
WIND LOAD ON THE PROPOSED MODULE OVER THE STAIR CASE ROOF.
PREVIOUSLY WE HAD CONSIDERED DOULE TIRE MMS ON THE STAIR CASE ROOF. BUT, PRESENTLY WE ARE
PROPOSING SINGLE TIRE MMS.
ALSO WE REDUCE INTERROW GAP, BECAUSE WE HAVE TO SHIFT THE MMS LAYOUT TOWARDS SOUTH TO ELIMINATE
STAIRCASE SHADOW.
14-NOV-2019
KATYAL GAURAV (B728)
4 of 15
Page 4 of 15
B) SOLAR SIZING CALCULATION FOR 2ND FLOOR TERRACE
1. SHADOW FREE AREA AVAILABLE- 77 SQ METER
2. SOLAR MODULE SIZE- 1995 X 982 X 42 mm
3. AREA OF EACH MODULE- 1.959 Sq Meter
4. NO OF MODULE USED- 19NOS
5. GAP BETWEEN EACH MODULE- 50mm
6. AREA COVERED BY SOLAR MODULE- 37.22 Sq M
FOR 77M2 AREA, ATLEAST (77/12)=6.41kWp SOLAR POWER PLANT MUST BE INSTALLED. TO REDUCE DC LOSSES WE
HAVE CONSIDERED ONLY ONE STRING CONSISTS OF 19 NO MODULES ON THE TERRACE (ONE STRING CONSIST OF
19NOS OF MODULES IN SERIES) i.e. 19 X 330Wp= 6.27kWp.
TOTAL PROPOSED CAPACITY OF ROOFTOP SOLAR POWER PLANT AS PER SHADOW FREE SPACE AVAILABLE SHALL BE
(A+B)=50kWp(AC)
14-NOV-2019
KATYAL GAURAV (B728)
5 of 15
Page 5 of 15
DOCUMENT NAME : PVSYST SIMULATION REPORT (18˚)
REVISION NO : 0
PAGE NO : 4
14-NOV-2019
KATYAL GAURAV (B728)
6 of 15
Page 6 of 15
Page 1/3
Geographical Site
Latitude
Time defined as Time zone UT+5.3 45 m
Albedo 0.20
PVsyst TRIAL
Meteo data: Meteonorm 7.1 (1981-2010) - Synthetic
PVsyst TRIAL
PV Array Characteristics
PV module Si-poly Model
Custom parameters definition
Number of PV modules In series 19 modules 8 strings
Total number of PV modules Nb. modules Unit Nom. Power 330 Wp
Array global power 50.2 kWp At operating cond.
U mpp 636 V 71 A
Model
Original PVsyst database
Characteristics Operating Voltage Unit Nom. Power 50.0 kWac
1 units 50 kWac
PVsyst TRIAL
Pnom ratio 1.00
PVsyst TRIAL
AC wire loss inverter to transfo
50 m Loss Fraction 3.4 % at STC
External transformer Iron loss (24H connexion) 50 W Loss Fraction 0.1 % at STC
Resistive/Inductive losses 46.4 mOhm Loss Fraction 1.0 % at STC
14-NOV-2019
KATYAL GAURAV (B728)
7 of 15
Page 7 of 15
Page 2/3
PVsyst TRIAL
PV Array Nb. of modules Pnom total 50.2 kWp
Model Pnom 50.0 kW ac
User's needs Unlimited load (grid)
Normalized productions (per installed kWp): Nominal power 50.2 kWp Performance Ratio PR
7 1.0
PR : Performance Ratio (Yf / Yr) : 0.750
0.9
Ls : System Loss (inverter, ...) 0.19 kWh/kWp/day
6
Yf : Produced useful energy (inverter output) 4.04 kWh/kWp/day
0.8
5 0.7
PVsyst TRIAL
0.6
4
0.5
3
0.4
2 0.3
0.2
1
0.1
0 0.0
Feb Apr Oct Nov Feb Apr Oct Nov
PVsyst TRIAL
Balances and main results
July
PVsyst TRIAL
Legends:
DiffHor Horizontal diffuse irradiation EArray
Effective Global, corr. for IAM and shadings
Effective energy at the output of the array
14-NOV-2019
KATYAL GAURAV (B728)
8 of 15
Page 8 of 15
Page 3/3
PVsyst TRIAL
PV Array Nb. of modules Pnom total 50.2 kWp
Model Pnom 50.0 kW ac
User's needs Unlimited load (grid)
PVsyst TRIAL
-4.0% Soiling loss factor
+0.4%
-4.0%
-1.1%
-1.5% Ohmic wiring loss
Array virtual energy at MPP
PVsyst TRIAL
-1.8% Inverter Loss during operation (efficiency)
0.0% Inverter Loss over nominal inv. power
0.0% Inverter Loss due to max. input current
0.0% Inverter Loss over nominal inv. voltage
0.0% Inverter Loss due to power threshold
0.0% Inverter Loss due to voltage threshold
Available Energy at Inverter Output
PVsyst TRIAL
14-NOV-2019
KATYAL GAURAV (B728)
9 of 15
Page 9 of 15
LAYOUT OF SOLAR SYSTEM ON ROOF
DOCUMENT NAME :
INCLUDING PROPOSED PEDASTAL POSITION
DOCUMENT NUMBER : AGNI/LINDE_50K/HPCL VIZAG/1819/004
REVISION NO : 1
PAGE NO : 3
14-NOV-2019
KATYAL GAURAV (B728)
10 of 15
Page 10 of 15
1 2 3 4 5 6 7
N
Customer Name
Reference Number :
S
Drawing Title :
B B
Drawing No. :
Agni/18-19/LINDE/50KW/CIVIL
Drawing File.
Agni/18-19/LINDE/50KW
C C
Drawn By
Checked by
Approved by
E E
Description Details:
FT : For Tender Purpose
FAO : For Approval Only
TOTAL NO OF MODULES- 133 NOS FIO : For Information Only
F F
NO OF STRINGS- 7 NOS Location of WMS (Weather Monitoring System) GFC : Good For Construction
N Customer Name
S
Drawing Title :
B B
Drawing No. :
Agni/18-19/LINDE/50KW/CIVIL
Drawing File.
Agni/18-19/LINDE/50KW
C C
Drawn By
Checked by
Approved by
E E
Description Details:
FT : For Tender Purpose
FAO : For Approval Only
NO OF STRINGS- 1 NO
NO OF MODULES IN EACH STRING- 19 NOS
MODULE- 330Wp
Agni Power & Electronics Pvt. Ltd.
G
NO OF PEDESTAL - 12 NOS 114, Rajdanga Gold Park, 1st Floor, G
Kolkata - 700107
www.agnipower.com
14-NOV-2019 All Dimensions are in mm
KATYAL GAURAV (B728)
12 of 15
Page 12 of 15
RESOLUTION SHEET
OWNER : HINDUSTAN PETROLEUM CORPORATION LIMITED
PMC : ENGINEERS INDIA LIMITED
CONTRACTOR : LINDE INDIA LIMITED
DOCUMENT NO : HPCL-47000189-EL-025
DESCRIPTION : SOLAR PV SYSTEM SIZING CALCULATION
TRANSMITTAL NO : COMMENTS GIVEN IN "EDOCX"
14-NOV-2019
KATYAL GAURAV (B728)
13 of 15 Page 1 of 1
Page 13 of 15
Refer comment sheet attached
14-NOV-2019
KATYAL GAURAV (B728)
14 of 15
Page 14 of 15
COMMENT SHEET
CLIENT : M/s HPCL EIL Job No. B016
PROJECT : VRMP Transmittal No. -
PLANT : NITROEGN Document No. as indicated below
CONTRACTOR : LINDE Review Code as indicated below
1: NO COMMENTS
2: PROCEED WITH MANUFACTURE/FABRICATION AS PER COMMENTED.DRAWING/DOCUMENTS.
REVISED DRAWING/DOCUMENT REQUIRED.
3: DOCUMENT DOES NOT CONFORM TO BASIC REQUIREMENTS AS MARKED. RESUBMIT DOCUMENT.
I: RETAINED FOR RECORDS.
V: VOID.
Page 15 of 15