You are on page 1of 2

Timeline

2015 – It was founded


Lorem ipsum dolor sit amet, consectetur
adipiscing elit, sed do eiusmod tempor
incididunt ut labore et dolore magna aliqua
enim sut.

2016 – Merger with Borcelle


Lorem ipsum dolor sit amet, consectetur
adipiscing elit, sed do eiusmod tempor
incididunt ut labore et dolore magna aliqua
enim sut.

2017 – Magazine article


Lorem ipsum dolor sit amet, consectetur
adipiscing elit, sed do eiusmod tempor
incididunt ut labore et dolore magna aliqua
enim sut.

2018 – Economics award


Lorem ipsum dolor sit amet, consectetur
adipiscing elit, sed do eiusmod tempor
incididunt ut labore et dolore magna aliqua
enim sut.

2019 – Best company


Lorem ipsum dolor sit amet, consectetur
adipiscing elit, sed do eiusmod tempor
incididunt ut labore et dolore magna aliqua
enim sut.

2020 – Successful solution


Lorem ipsum dolor sit amet, consectetur
adipiscing elit, sed do eiusmod tempor
incididunt ut labore et dolore magna aliqua
enim sut.

2022 – Successful launch


Lorem ipsum dolor sit amet, consectetur
adipiscing elit, sed do eiusmod tempor
incididunt ut labore et dolore magna aliqua
enim sut.

2023 – Global reach


Lorem ipsum dolor sit amet, consectetur
adipiscing elit, sed do eiusmod tempor
incididunt ut labore et dolore magna aliqua
enim sut.
PROJECT
TIMELINE
WEEK 1
PROJECT INITIATION
• Define project objectives and scope.
• Assemble project team and assign roles.
• Conduct initial research and gather requirements.

WEEK 2
PLANNING PHASE
• Create a detailed project plan.
• Identify and allocate resources.
• Develop a website design and layout
• Set project milestones and deadlines.

WEEK 3
DESIGN AND DEVELOPMENT
• Start website development.
• Create content and graphics.
• Perform user testing and make necessary adjustments.

WEEK 4
TESTING AND QUALITY ASSURANCE
• Conduct thorough testing of the website.
• Identify and resolve bugs and issues.
• Verify website compatibility with different devices
and browsers.

WEEK 5
CONTENT UPLOAD AND FINALIZATION
• Upload all content and ensure it is formatted correctly.

• Finalize design and layout elements.


• Perform a final review of the website.

WEEK 6
LAUNCH AND DEPLOYMENT
• Plan and execute the website launch.
• Monitor website performance after launch.

WEEK 7
POST-LAUNCH REVIEW
• Gather feedback from users and stakeholders.

• Analyze website performance and identify areas for


improvement.

WEEK 8
PROJECT CLOSURE
• Evaluate the project's success against objectives.

• Conduct a post-mortem meeting with the project team.

• Archive project documentation and resources.

FOR MORE INFORMATION


www.reallygreatsite.com

You might also like