CONTRACT MANAGEMENT
1. STATES BENEFITED
OUTLINE
11. STRUCTURES
15. SEDIMENTATION
BIBLIOGRAPHY
Location
A family stands by after loading their meager possessions, India Today, July
31 st 1981
Reconstruction & Rehabilitation
• Diversion Channel:
Bed width : 15.24 m (50 ft)
Length : 594.36 m (1950 ft)
Upstream Discharge : 283.0 cumecs
Water Level at EL.174.80 m : 10,000 (cusecs)
Bed Level : EL 167.64 m (EL. 550ft)
• Diversion Tunnel :
• 9.14 m (30 ft) Dia circular lined Length : 686 (2250 ft)
• Invert Level at Entrance : EL. 161.54 m (530 ft)
• Upstream Discharge : 566.4 cumecs
• Water Level at EL. 176.11 m (EL.577.80 ft) : 20,000 cusecs
COFFER DAMS & DIVERSIONS
COFFER DAMS & DIVERSIONS
FOUNDATION CONSTRUCTION
FOUNDATION CONSTRUCTION
FOUNDATION, RCC BRIDGE, ROAD ON SPILLWAY
RIGHT BANK POWER HOUSE CONSTRUCTION
RIGHT BANK POWER HOUSE CONSTRUCTION
RIGHT BANK POWER HOUSE CONSTRUCTION
RADIAL CREST GATES, GANTRY CRANE
GAUGE METER, EVAPORIMETER & FRL
CONTRACT MANAGEMENT
• The Initial modest estimate of ₹384.7 million for a Power
Project
Telangana
Due to Its location between the two states of Andhra Pradesh
and Telangana got benefited by the project and Chennai.
HYDROLOGY & RAINFALL
Reservoir : Srisailam
2, 03,597 Sq. K.M
Catchment Area :
(79,530 Sq. Miles)
Max. Flood discharge : 30,316 Cumecs
Live Storage : 247.79 TMC Ft.
Gross Storage : 308.06 TMC Ft.
1. Reservoir:
• Environmental Issue: NO
No new area will come under submergence due to this canal project
as the existing Srisailam reservoir is used in this link proposal.
Srisailam-Pennar Link Proposal
TRIBUNAL AWARDS
• For 25 years before 2009 the first gate was not operated, if
they were operated the flanks get destroyed.
SEDIMENTATION
• Reservoir Sedimentation Is Filling of Reservoir
Behind Dam with Sediment Carried Into Reservoir
by Streams.
Presented By:
K. Anil Venkata Nag, AEE
L. V. V. A. Hari Prasad, AEE