Kronologi Kegagalan
Start PLTG Sebalang

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, or 2
distribute this document without permission of PLN NUSANTARA POWER, PT
History Recovery

Sinkron 15 MW Sinkron 13 MW

10 Jul 23 04 Sep 23 15 Sep 23 09 Okt 23


01 Agu 23 16 Agu 23
Flame Failure
Maintenance Module STKJ Modul SIFA & Blower Rpm Tidak & Rpm Tidak
Outage Problem EPSY Problem Problem Naik
Naik

Control Bulk Power Flame Failure


Rpm tidak Rectifier
Speedtronic Supply & Rpm Tidak
Naik Problem
Problem Problem Naik
24 Jul 23 11 Agu 23 31 Agu 23 08 Sep 23 06 Okt 23
Sinkron 15 MW

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT
History Recovery

Sinkron 13 MW Sinkron 14.5 MW

09 Okt 23 01 Nov 23
23 Okt 23 30 Okt 23
Flame Failure
MO Fire Alarm Failure
& Rpm Tidak Failure to Fire
Fighting to Fire
Naik

Rpm tidak Exhaust Temp


Start After MO
Naik 2700 High Note :
10 Okt 23 27 Okt 23 31 Okt 23 Kondisi sistem lampung defisit sehingga PLTG
Sinkron 15 MW Sinkron 15 MW setiap hari di Order Start oleh P3BS, dengan kondisi
hampir lebih dari 5 kali start stop gagal akibat
Gangguan Berulang seperti Putaran RPM tidak bisa naik
dan tidak ada pembakaran (No Flame)

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT
History MO Juli 2023

MO PLTG Sembalang dilaksanakan pada 10 Juli – 31 Juli 2023


Scope pada MO PLTG Sebalang adalah sebagai berikut:

SCOPE TURBIN
Borescope Blade PLTG
Cleaning filter strainer fuel pump
Kopel Motor dan Fan Blower
Cek & cleaning inlet filter compresor
Perbaikan hidrolik rachet
Pengecekan/panambahan peredam panas/suara (GLASSWOOL) di area exhaust
Perbaikan tetesan kebocoran oli di transmisi antara diesel dan rachet (gear putih)
Pengecekan pompa solar diesel
Pengecekan blower udara pembakaran diesel

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, or
distribute this document without permission of PLN NUSANTARA POWER, PT
History MO Juli 2023

SCOPE LISTRIK
Deenergize
Perbaikan Rectifier Eksisting
Penggantian Kabel 11 kV
Recovery Breaker 400 VAC
Pemasangan Battery 125 VDC dan 180 VDC
Purifier Oli Trafo PLTG
Penggantian Silica Gel Trafo PLTG
Perbaikan fan motor AC+ DC lube oil ( kurang bagus/layak)
Pengetesan Battery dan Rectifier

SCOPE I&C
Pengecekkan dan Penggantian Thermokopel
Perbaikan timer motor
Perbaikan pressure gauge inlet dan outlet filter

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, or
distribute this document without permission of PLN NUSANTARA POWER, PT
History Recovery Aug - Sept 2023

Recovery PLTG Sembalang dilaksanakan pada 1 Aug – 13 Sept 2023


Scope pada Recovery PLTG Sebalang adalah sebagai berikut:

SCOPE RECOVERY
Pengecekkan komponen power supplay Speedtronic dan penelusuran root cause kerusakan
Pengecekkan kembali gangguan grounding pada power supply DC
Repair Module ESPSU dari Gresik
Pengetesan Power Supplay dan Pengetesan Module STKJ (Jika berhasil lanjut pengetesan individual
peralatan : Pompa AC/DC, Ratchet, Fan Radiator,Pompa Booster,Proteksi Diesel 20DT,20DV,20DA,
Solenoid area turbin3CB)
Pengecekkan komponen Power Supplay (temuan tambahan)

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, or
distribute this document without permission of PLN NUSANTARA POWER, PT
Tindakan saat gangguan berulang

1. Cleaning filter High & Low Pressure


2. Cleaning Busi (terindikasi basah)
3. Reject temperature control exhaust saat speed up
4. Pengaturan control terhadap karakteristik servo valve
5. Penambahan set ignitor dari 1 menjadi 2

Note:

Sampai saat ini tindakan yang dilakukan untuk mengatasi gangguan berulang terkadang
bisa sampai FSNL dan sinkron namun terkadang tidak bisa diatasi meskipun sudah
dilakukan tindakan (Stuck di 2600 Rpm)

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify,
or distribute this document without permission of PLN NUSANTARA POWER, PT 4
RCFA Kegagalan Start
PLTG Sebalang

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, or 9
distribute this document without permission of PLN NUSANTARA POWER, PT
RCFA Kegagalan Start PLTG Sebalang

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, or
distribute this document without permission of PLN NUSANTARA POWER, PT 10
Kebutuhan data pendukung:
1. Log sheet operasi PLTG
2. Log alarm yang muncul saat terjadi kegagalan

Possible
cause Rencana Tindak
No. Kemungkinan Root Cause Data yang diperlukan Lanjut**
Yes No
1 Nozzle buntu Data hasil inspeksi*
2 Kurangnya pressure atomizing Nilai pressure atomizing
3 Motor atomizing bermasalah Data hasil inspeksi*
4 Udara atomizing berair Data hasil inspeksi*
5 Fuel filter bermasalah Data hasil inspeksi*
6 Fuel check valve bermasalah Data hasil inspeksi*
7 Bukaan IGV bermasalah Data operasi & Data hasil inspeksi*
8 Compressor blade kotor Data hasil inspeksi*
9 Air intake filter kotor Data hasil inspeksi*
10 Flame detector bermasalah Data operasi & Data hasil inspeksi*
11 Kegagalan ignition Data operasi & Data hasil inspeksi*
*Jika belum dilakukan, maka akan dilakukan inspeksi pada saat CI
** Inspeksi yang akan dilakukan pada saat CI berdasarkan possible cause
The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, or
distribute this document without permission of PLN NUSANTARA POWER, PT 11
Possible
cause Rencana Tindak
No. Kemungkinan Root Cause Data yang diperlukan Lanjut**
Yes No
12 Kegagalan cross fire Data hasil inspeksi*
13 Distribusi fuel tidak merata Data operasi & Data hasil inspeksi*
14 Liquid control valve bermasalah Data operasi & Data hasil inspeksi*
15 Laju aliran fuel bermasalah Data operasi & Data hasil inspeksi*
16 Exhaust blower bermasalah Data hasil inspeksi*
17 Kegagalan isolasi exhaust Data hasil inspeksi*
18 Termokopel bermasalah Data operasi & Data hasil inspeksi*
19 LVDT Feedback bermasalah Data operasi & Data hasil inspeksi*
20 Software Mark II Bermasalah Data operasi & Data hasil inspeksi*

*Jika belum dilakukan, maka akan dilakukan inspeksi pada saat CI


** Inspeksi yang akan dilakukan pada saat CI berdasarkan possible cause

The information contained in this document is strictly confidential. It is strictly forbidden to use, disclose, copy, modify, or
distribute this document without permission of PLN NUSANTARA POWER, PT 12
THANK YOU