You are on page 1of 7

PT PLN (PERSERO)

UNIT INDUK WILAYAH NTB


UNIT PELAKSANA PENYALURAN DAN PENGATUR BEBAN MATARAM

LOGSHEET 150 kV GARDU INDUK BAYAN

Hari / Tanggal :
BAY TRAFO I : 30 MVA BAY LINE : SAMBELIA 1 / 2 BAY LINE : TANJUNG 2 / 1
JAM BEBAN kWh TEMPERATUR TEGANGAN (kV) ARUS (I) kWh BEBAN TEGANGAN (kV) ARUS (I) kWh BEBAN
TAP
(MW) (Mvar) IMPORT EKSPORT TOP OIL WINDING R S T R S T IMPORT EKSPORT (MW) (Mvar) R S T R S T IMPORT EKSPORT (MW) (Mvar)

0:00

1:00

2:00

3:00

4:00

5:00

5:30

6:00

7:00

8:00

9:00

10:00

11:00

12:00

12:30

13:00

14:00

15:00

16:00

17:00

18:00

18:30

19:00

19:30

20:00

21:00

22:00

23:00

Operator Nama NIP Tanda Tangan Keterangan Bay Beban Tertinggi Beban Terendah
Shift Pagi

Shift Sore

Shift Malam
PT PLN (PERSERO)
UNIT INDUK WILAYAH NTB
UNIT PELAKSANA PENYALURAN DAN PENGATUR BEBAN MATARAM

LOGSHEET KUBIKEL 20 kV GI : BAYAN

F. SENARU F. AKAR-AKAR F. SAMBIK ELEN INCOMING TRAFO


TEGANGAN (kV)
JAM ARUS (I) BEBAN ARUS (I) BEBAN ARUS (I) BEBAN ARUS (I) BEBAN

R S T R S T (kW) R S T (kW) R S T (kW) R S T (kW)

0:00

1:00

2:00

3:00

4:00

5:00

5:30

6:00

7:00

8:00

9:00

10:00

11:00

12:00

12:30

13:00

14:00

15:00

16:00

17:00

18:00

18:30

19:00

19:30

20:00

21:00

22:00

23:00

Operator Nama NIP Tanda Tangan Keterangan


Shift Pagi

Shift Sore

Shift Malam
PT PLN (PERSERO)
UNIT INDUK WILAYAH NTB
UNIT PELAKSANA PENYALURAN DAN PENGATUR BEBAN MATARAM

LOGSHEET KUBIKEL 20 kV GI : BAYAN

F. SENARU F. AKAR-AKAR F. SAMBIK ELEN INCOMING TRAFO TRAFO

kWh kWh kWh kWh PS/EB


JAM EDMI ABB EDMI ABB EDMI ABB EDMI ABB kWh
Import Export Imp/Exp Import Export Imp/Exp Import Export Imp/Exp Import Export Imp/Exp Imp/Eks

0:00

1:00

2:00

3:00

4:00

5:00

5:30

6:00

7:00

8:00

9:00

10:00

11:00

12:00

12:30

13:00

14:00

15:00

16:00

17:00

18:00

18:30

19:00

19:30

20:00

21:00

22:00

23:00

Feeder Beban Tertinggi Beban Terendah


SUMBER DANA &
NO HARI/TANGGAL NAMA BARANG JUMLAH BARANG HARGA BARANG JUMLAH DANA BULAN