3VC
2VC
1VC
BACKGROUND
MAIN PART VC
1
1) Main Incoming Fuse
2) Line terminal
2 3) Vacuum interrupter
3
4) Insutaion Rood &
Spring
4
5) Control trip coil card
5
Trip Coil Monitoring contact
Device for monitoring the functions of the trip coils.
To monitor the trip coils connect its terminals with the trip coil monitoring relay as shown on the circuit diagram.
- If the trip coil is normal : closed – circuit consisting.
- If the trip coil is damaged : open circuit.
1) monitor the trip coils in closed position of the breaker. 3
2) monitor the trip coils in trip position of the breaker.
OBSERVATION & ANALYSIS Control Unit failure?
Over voltage ? No
MV Motor Exhaust MV Bypass incoming panel
Condensate ? Humadity is high because stop long time, heater
Fan Z1P23 cannot be failure? Vacuum Contactor failure?
- Control System ? Good is not working.
run ? - Mechanical part? Good
- MV Motor? Good - Vacuum Contactor ? Not Product defect? Need factory check, need special tools.
- Fuse cut off? No
- MV Drive ? Good Life time? No (run 2 years)
Good-cannot closed. - Control unit ? Not Good
- MV Bypass Fuse protection failure ? Yes
Incoming panel ?
Not Good
WHY WHY
WHY WHY WHY
WHY WHY WHY WHY
10 A
5
ACTION AND CHECK
Countermeasure ACTION
1. Drying VCS controller and try to test
position again. FAILED
2. Temporary we switch and move control
unit (CU) from Z2 (control stock) until
part arrived.
3. Find sparepart from CPT and local
vendor. We get 1 from CPT and 2 from
local vendor (2 pcs controller arrived on
May 13th and it has been installed)
4. Set Heater on when ambient
temperature of panel under 35°C.