Professional Documents
Culture Documents
Main Objective
The main objective of this project is to design smart
monitoring system for distribution transformer protection
system.
Specific objectives
• Improve the operating condition of the power system and increase reliability
of the grid.
• Improving the power system stability.
• Proving protection to operating personnel against fault current and
overvoltage.
• Providing protection to electrical equipment against overvoltage excess fault
currents.
• To simplify the detection of overvoltage and overcurrent in protection system.