Directional Drilling Tutorial

• Radius of the Build up Section

x = tan-1 ()
x = 0.96

y = 20.99
Measured depth at end of build section: AE
AE = AB (KOP depth) + BE (Build up curved length)

AE = 2000 + 1097.5 = 3097.5ft


TVD at end of build: AX
AX = AB + PE
PE = Rsin = 1071.39ft
AX = 2000 + 1071.39 = 3071.39ft
• Horizontal deviation at end of build
XE = OB – OP
OB = R
OP = R cos α = 2658.47ft
XE = 2866.24 - 2658.47 = 207.77ft

• Along Hole Depth at target (Total Measured Depth): AT


AT = AE + ET
AE = 3097.5ft
AT = 3097.50 + 7470.12 = 10567.62ft.