You are on page 1of 4

12 MGD STP Keshopur Delhi

Keshopur

Revival of SCADA System at 12 MGD STP Keshopur has been done by various modication
and by replacemets of various components at site, now SCADA system is operational at
site.

Fine Drum screen 02 nos of 12 MGD STP Keshopur Delhi maintenance completed.

Chlorination system of 12 MGD STP Keshopur completed successfully.

sustainable solutions. for a better life.


1
12 MGD STP Keshopur Delhi
Inspection work done of PLC IO List of 12 MGD Keshopur Site and observed
the errors in Digital IO List prepared so Instructed the Nocle System&
Technologies to prepare the correct IO List .

we had no drawings of MCC and PMCC panel of 12 MGD Keshopur Site but
we with our team done the troubleshooting, rectification, Loop checking,
Faulty Components replacement, Parameter Programming into VFD for
Modbus Communication & Trial Run taken from Scada thereby we have
made Every Motor Starter Functional from both Local Panel operation and
scada operation.

sustainable solutions. for a better life.


2
20 MGD STP Pappankalan Delhi
Pappankal
4 Nos. ACB installation and its commissioning in 20 MGD STP
Pappankalan Delhi. All ACB are now in operation and working properly.

SCADA healthiness & function of the Site 20 MGD STP Pappankalan


Delhi. The revival of SCADA done by support of vendors & team of
technicians. SCADA components & panel has been replaced and now
SCADA is fully operational. 90% of valves are operational now by
SCADA.

Field instruments made healthy by repairing or replacements, as per


requirments new cables has been put for SCADA revival at 20 MGD STP
Pappankalan Delhi.

sustainable solutions. for a better life.


3
20 MGD STP Pappankalan Delhi
Grit Collection system was defunct since long, so to Protect the
downstream of STP Grit panel and new grit pumps installation and
commissioning have been done at 20 MGD STP Pappankalan Delhi. Now
grit collection is taking place at site.

MTR Completed 0f 20 MGD STP Pappankalan and submit the report

we have done the re-commissioning of RIO-1 To RIO-4 Panels of 20 MGD


Pappankalan Site. we with our team done the troubleshooting,
rectification, Loop checking ,Faulty Components replacement, Parameter
Programming into Motor VFD and Trial run thereby we have made Every
Motor Starter & VFD Panel Functional from both Local Panel operation
and scada operation.