General Criteria
Minimum Criteria
◦ If Basic Criteria missed consecutive 2 month, warning letter will be issued.
◦ If Basic Criteria missed consecutive 4 month, the Employee will be terminated.
Employee covering 4 points would automatically get the 25% increment on his gross
salary.
Down side renewal of the incentive program is not possible.
Up side renewal of the incentive shall be possible with the approval of Management.
Incentive Plan
Raja Umer (1624503) Assistant Engineer
Cable Laying 16 KM 16 – 30 KM 30 – 50 KM
Incentive Plan
Asif Majeed Mir (1623555) Project Engineer
Cable Laying 08 KM 08 – 15 KM 15 – 30 KM
Mohammad Khan Zafar Iqbal Khan Muhammad Asim Asif Majeed Mir
Managing Director General Manager Deputy General Manager Line Manager Project Engineer
Company Confidential
Incentive Plan
Mohammad Imran (1611238) Site Engineer
Cable Laying 08 KM 08 – 15 KM 15 – 30 KM
Incentive Plan
Muhammad Imran (1623876) Supervisor
Incentive Plan
Yasir Sohrab (1624314) Forman
Reinstatement 02 KM 02 – 04 KM 04 – 10 KM
Incentive Plan
Mohd. Zaheer Khan (1611035) Project Engineer
Excavation 20 KM 20 – 40 KM 40 – 60 KM
Cable Laying 16 KM 16 – 30 KM 30 – 50 KM
Warning 04 Maximum
Incentive Plan
Mohsin Kakkalatteeri (1624486) Draftsman
Incentive Plan
Muhammad Farhan Bashir (1623564) Draftsman
Mohammad Khan Zafar Iqbal Khan Muhammad Asim Muhammad Farhan Bashir
Managing Director General Manager Deputy General Manager Line Manager Draftsman
Company Confidential
Incentive Plan
Iftikhar Ahmed (1611282) Surveyor
Incentive Plan
Raja Ali Muhammad (1611254) Surveyor
Mohammad Khan Zafar Iqbal Khan Muhammad Asim Raja Ali Muhammad
Managing Director General Manager Deputy General Manager Line Manager Surveyor
Company Confidential
Incentive Plan
Sayed Muhammad Wahid (1625079) Project Manager
Mohammad Khan Zafar Iqbal Khan Muhammad Asim Sayed Muhammad Wahid
Managing Director General Manager Deputy General Manager Line Manager Project Manager
Company Confidential
Incentive Plan
Ibrahim Murad (1624471) Project Manager
Incentive Plan
Abu Hanifa (1611268) Electrical Engineer
Incentive Plan
Muhammad Saeed (1624172) Project Manager
Incentive Plan
Shaukat Ali (1624537) Document Controller
Site Instruction SI-1B-019, 054 & 057 approved and SVO issued
by 15th March 2012
QAR 20,000/- Letter of Appreciation + 1 Point
INCENTIVE
Incentive Plan
Mustafizur Rahman (1623587) Forman
Incentive Plan
Farhan Noor (1624958) Secretary
SDWR Closed 02
Incentive Plan
Sabir Bakht (1611052) PRO
Incentive Plan
Zaheer Ahmad(1611187) PRO
Incentive Plan
Amr El Sayed (1625094) Admin
Incentive Plan
Wajbah Site(CWR-5 & CWR-6) – GTC 403
Name Description Super Incentive
Raja Umer Mid of April Invoices Submitted to Double Salary, QAR 10,000/ +
KAHRAMAA for both CWR’s Letter of Appreciation + 1 Point
Muhammad Imran Both CWR’s must be completed on 15th March Double Salary, QAR 10,000/ +
2012 Letter of Appreciation + 1 Point
PRO (Sabir & 1st of March 2012 all permission and QAR 10.000/-
Zaheer) clearances must be obtained
Incentive Plan
Khisa Site(CWR-192) – GTC 291
Name Description Super Incentive
Asif Majeed Mir Site must be completed till 15th March 2012 Double Salary, QAR 10,000/ +
Letter of Appreciation + 1 Point
Zaheer Khan Invoice Must be submitted till 31st March Double Salary, QAR 10,000/ +
2012 Letter of Appreciation + 1 Point
Mohsin Till 31st March 2012, GIS Drawings must be QAR 2,000/-
Kakkalatteeri submitted to KAHRAMAA
PRO (Sabir & 1st of March 2012 all permission and QAR 10.000/-
Zaheer) clearances must be obtained.
Mohammad Khan
INCENTIVE
Zafar Iqbal Khan
Letter of Appreciation
Muhammad Asim
Managing Director General Manager
1 Point Line Manager
Deputy General Manager Employee
Company Confidential
Incentive Plan
Ain Khalid (CWR-155, 155A, 195, 195A) – GTC 291
Zaheer Khan Invoice Must be submitted till mid of May Double Salary, QAR 10,000/ +
2012 Letter of Appreciation + 1 Point
Mohsin & Farhan Till 01st May 2012, GIS Drawings must be QAR 2,000/-
submitted to KAHRAMAA
PRO (Sabir & 1st of March 2012 all permission and QAR 10.000/-
Zaheer) clearances must be obtained
Mohammad Khan
INCENTIVE
Zafar Iqbal Khan
Letter of Appreciation
Muhammad Asim
Managing Director General Manager
1 Point Line Manager
Deputy General Manager Employee