Presentation on Internship
Maintainance of Electrical
Equipments

Presented By
Name: Chirag Arunkar
Enrollment No: 190330109001

Guided by: Ketan Patel


• CONTENT

• Introduction
• HT yard
• Single line diagram
• Block diagram
• Cooling Tower
• Chiller
• Boiler
• Pump House
• Product Manufactured
• Objective of Proposed Work
• Scope of Proposed Work
• Coclusion
• Reference
INTODUCTION`

This report is a detailed overview of my internship journey at VVF pvt Ltd.


During my internship I have learned a lot About Motor, Transformer, Cooling
Tower, Chiller, Pump house, DG set, Stabilizer, Boiler and the product
manufactured in company and nowadays this is the essential equipment of
modern industries.
This machinery is the used to detect fault parts in industries and there are also
automatic fault detection in the industries and this machinery is so advanced with
technology that it work with constant speed and give efficient of energy to other
machinery. And we have to look sometime when the major fault occurs. And this
machinery is making human to work less with advanced technology.
HT YARD

Make Telawne Power

Rating 500KVA

Voltage 11KV/440V

This is the main and very important part


of company from where electricity is
transferred to whole company
SINGLE LINE DIAGRAM
BLOCK DIAGRAM

Distributer
11KV Stepdown 440V
HT Stabilizer
Transformer(LT)

Bus Bar
Loads MCCB
Junction
COOLING TOWER
The water from chiller comes here, In
cooling tower on top there is a fan
rotating anticlockwise. The water is
circulated in this tower through pipes &
the fan which is rotating anticlockwise
throws the hot air outside from the top
and this way the temperature of water is
decreased by 2 to 3 degree and send again
to chiller with the help of pump and from
chiller the water is circulated to
manufacturing units and AHU
CHILLER
Make Bluestar
Rated capacity 51.10TR (ton of
refrigeration)

Rated current 71.30A


Maximum 91.39A
Current
Maximum 1410kg
Weight
Power Supply 400V/3Ph/50Hz

There are two chiller in company


from Chiller-1 water goes to
AHU & from Chiller-2 water
goes to manufacturing plant
BOILER

There are 2 boiler in company


1. 400kg
Make Thermax Ltd
Year of Mfg 2000
Evaporation 400kg/hr
Pressure 10.5kg/cm2
Temperature 185°C
Heating Area 4.93m2
Connecting Load 2.3kW
Fuel Diesel
2. 600kg
Make Thermax Ltd
+
Year of Mfg 1989
Evaporation 600kg/hr
Pressure 10.5kg/cm2
Temperature 185°C
Heating Area 7.4m2
Connecting Load 2.3kW
Fuel Diesel
PUMP HOUSE

There are 3 pump


1. Jockey Pump
Make Kirlosker
Power 10hp

It just maintain the pressure of 2kg.It cannot


pump water. If any fire occur in company
then this pumps pressures increases as in
normal condition it just maintain the
pressure of 2kg
2. Main Pump

Make Kirlosker
Power 75hp

when any fire situation occur in


company,this pump can pump water till
7kg pressure(70m vertical). it works on
electricity. it has the capacity of
2850litre/min
3. DG Pump

Make Kirlosker

Power 85hp

It also can pump the water till 7kg


pressure (70m vertical).But when there is
no electricity main pump cannot work so
at that time this pump can pump water as
this pump works on diesel.
PRODUCT MANUFACTURED
1Dettol Antiseptic Liquid
2Softsen Baby Lotion
3Johnson & Johnsons
4Dettol (750ml) pack
5Clean & Clear Foaming Face Wash
6Dettol Hand Sanitizer
OBJECTIVE OF PROPOSED WORK

I.learned how the electicity is distributed by distributer and how it is reduced


and used by company as per there needs
II.Done connection of 3 phase in MCB
III. Can handle the situation if fire take place in company
IV. Understand why is the maintainance department is needed in company
V. Have seen how the product are made and packed
VI. Know how to start DG when there is no electricity in company
VII. Learned how to make earthing
SCOPE OF PROPOSED WORK

I.I can work in maintainance department


II.Can handle the situation where any fault occur
III.Can make Earthing for any company
IV.Can do wiring of house
V.Learned how to bserve Clamp meter
CONCLUSION

By doing this internship i conclude what & how an electrical engineer


work in any company/industry, what kind of situation he has to handle
and solve before any dangerous situation takes place.