Professional Documents
Culture Documents
MTM
Chowking Banay-banay
BUILDING AND EQUIPMENT
INTEGRATED PEST CONTROL
FOOD SAFETY GUARDIAN
By: Robert John S. Modelo
BUILDING AND
EQUIPMENT
For Re-tiling at the front and back of
RDS
Missing Switch-Knob
Rusty shelves at the at PTB
back-up area.
For repaint.
RDS
• Water Supply-not
Pao-Cab
functioning
Water Sensor and Display Panel are not
• Both lights of Botton was
functioning
busted
Electric Kettle Uncalibrated Baine Marie Dimsum Fryer
Loose Screw at the bottom Compartment 3 Not calibrated
Defective Cover
Integrated Pest Control
Re-painted Pipes
FOOD SAFETY DEVIATION
On-going
Certification of
AKLs
Status of Certification
Stir-fry / / / to follow
Fryer / / / /