Professional Documents
Culture Documents
20180507
Syarat:
1. Sitenya ada 2 Band FDD, Contoh L1800 + L900
2. Antara L1800 dan L900 berada di Slot BPN2 yang sama, contoh:
3. kombinasi DL CA relation:
FDD eNodeB FDD eNodeB
(1800) (900)
BOTHWAY
Sec 1 Sec 1
BOTHWAY
Sec 2 Sec 2
BOTHWAY
Sec 3 Sec 3
13 FDD
15 17. In PUCH & PDCH, both FDD & FDD, find parameter “numPucch1b” & “pucch3RB” set to
proposed value below :
Path parameter Value proposed
PhyChannel numPucch1b 12 12
PhyChannel pucch3RB 0 1
17
FDD
18 FDD 18. In UL Power Control, both FDD & FDD, find parameter “SwitchForDCI3A3Pusch”
& “SwitchForDCI3A3Pucch” set to proposed value below :
19