Professional Documents
Culture Documents
2
Mechanical Description
3
Mechanical Description
4
Mechanical Description
5
Mechanical Description
6
P&ID - INSTRUMENT AND PRESSURIZED AIR
7
P&ID – TRANSPORT AIR
8
Functional Description
9
MAIN CONTROLS AND INTERLOCKING
Interlocking
10
GENERAL OPERATING CONDITIONS
Preparation of the System
Before boiler start-up the following inspections and procedures shall be done:
Verify that manual shut off valves are open
Verify if measurements are operated
11
GENERAL OPERATING CONDITIONS
Start-up of the System
Switch ON absorption dryers and verify that dew point control unit is
operational (dryers not in SUMITOMO Heavy Industries, Ltd. scope of supply)
Start compressor. Switch the other compressor to stand-by mode for
automatic start (compressors not in SUMITOMO Heavy Industries, Ltd. scope
of supply).
Open shut-off valves to all consumers.
12
GENERAL OPERATING CONDITIONS
Normal Operation
During normal operation verify that dew point and instrument air pressure are
in set point.
Verify that local pressure measurements and pressure measurements in DCS
are on same level.
13
General Operating conditions
Shutdown of the System
For the normal boiler shut down the system is not needed to shut down. If
the system needs to be shut down, shut down the compressors and switch of
the dryers (dryers and compressors not in SUMITOMO Heavy Industries, Ltd.
scope of supply). Before starting up the maintenance works verify that the
pressure is released from the all parts of the system.
14
General Operating conditions
Abnormal Operating Conditions
If there are problems with adsorption dryer and dew point of air is increasing,
drain air lines carefully to get water out from the air lines.
For instrument air, avoid pressure drop below interlocking limit of the
instrument air.
15
shi-fw.com