Alstom Steam Turbine
Alstom Steam Turbine
विशेषताए
SALIENT FEATURES
OF
STEAM TURBINE
SOLAPUR STPP
LOAD : 660 MW
HP
FROM MS LINE
IP
HRH
STEAM PRESSURE : 54.34 Kgf/cm2
STEAM TEMPERATURE : 593 DEG. C
STEAM FLOW : 1626.3 T/HR
REHEAER
FROM CRH
SOLAPUR STPP
LP
CONDENSER
HP IP LP GENERATOR EXCITOR
HP IP LP GENERATOR EXCITOR
The outer casing consists of a top and a bottom half, which are made of cast steel.
The top half and the bottom half of the outer casing are bolted together with
hydraulically tightened expansion studs.
HP TURBINE
OUTER CASING
BLADING SHRINK RING
INNER CASING
ROTOR
SHAFT SEAL
HP IP LP GENERATOR EXCITOR
HP IP LP GENERATOR EXCITOR
The cylindrical outer casing is split horizontally on the level of the rotor axis center in
to upper and lower half.
The inner casing is split horizontally on the level of the rotor axis center and held
together by expansion studs, which are hydraulically tightened with recorded pre
stress.
HP ROTOR
The high-pressure rotor is machined from forged steel. The rotor blades are
inserted into the radial grooves of the rotor.
SOLAPUR STPP
IP TURBINE
INNER CASING
INLET SPIRAL
BLADING
OUTER CASING
SHAFT SEAL
ROTOR
SOLAPUR STPP
HP IP LP GENERATOR EXCITOR
MAC10
NO OF STAGES : 2 X 5 REACTION STAGES
SOLAPUR STPP
HP IP LP GENERATOR EXCITOR
The cast inner casing is provided with a 360° inlet spiral; it is horizontally split
on the level of the turbine axis and bolted together by means of hydraulically
tightened expansion studs.
HP ROTOR
The rotor of the low pressure turbine consists of several disks and two shaft
ends that are welded together. The rotor has two balancing planes; the
balancing holes on the front side are accessible through openings in the outer
casing. The coupling flanges are integral part of the rotor.
SOLAPUR STPP
OUTER CASING
ROTOR
GLAND SEAL
SOLAPUR STPP
1 2 3 4 5 6
HP IP LP GENERATOR EXCITOR
HP-IP COUPLING
LP-GEN COUPLING
BEARING ARRANGEMENT
1 2 3 4 5 6
HP IP LP GENERATOR EXCITOR
[ RADIAL
+
AXIAL ]
THRUST RADIAL
RADIAL RADIAL RADIAL RADIAL
BEARING BEARING
BEARING BEARING BEARING BEARING
MOP
1 2 3 4 5 6
HP IP LP GENERATOR EXCITOR
TEMP JOP-1
CV
RETURN OIL
HEADER COOLER FILETR
JOP-2
OIL REQUIREMENT PER BEARING (LITRES/MIN) : N1-42, N2-702, N3-522 , N4-834, N5-
240, N6-42
AOP FLOW : 55.5 Liters/sec , MOP FLOW : 55.5 Liters/sec , EOP FLOW : 18.5 Liters/ sec
JACKING OIL SYSTEM
DESIGN FLOW : 430 LITRES/HR
M
1 2 3 4 5 6
HP IP LP GENERATOR EXCITOR
TURNING GEAR
HP IP
PROXIMATY
SWITCH
MAK80CG201
GEAR
TURNING GEAR PROTECTIONS ARRANGEMENT
ENGAGING
1. AUXILLARY LUBE OIL PUMPS OFF SOLENOID
2. LUBE OIL PRESSURE < 20 % MAK80AA015 LED LIGHT
3. JACKING OIL PUMPS NOT IN
SERVICE
Pushbutton for
Manual operation
MAINTENANCE SWITCH AT
LOCAL FOR MAINTENANCE M TURNING GEAR
MOTOR MAK80AE011
DRAIN
Off – isolate power supply
FROM LUBE Proximity switches for
OIL HEADER
1.5 bar
Manual operation
ECCENRICITY BRG
METAL
BRG TEMP BRG BRG BRG BRG
METAL METAL METAL METAL METAL
TEMP TEMP TEMP TEMP TEMP
SHAFT SPEED
SHAFT VIB SHAFT SHAFT SHAFT SHAFT
VIB VIB VIB VIB VIB
1 2 3 4 5 6
HP IP LP GENERATOR EXCITOR
PHASE
ABSOLUTE AXIAL ANGLE
EXPANSION SHAFT
POSITION DIFFERENTIAL DIFFERENTIAL
EXPANSION EXPANSION TURBOSUPERVISORY INSTRUMENTS
DIFFERENTIAL
EXPANSION
ALARM TRIP
AXIAL SHAFT POSITION : +/- 0.6 mm +/- 0.8 mm
RELATIVE SHAFT VIBRATION : >165 microns DURING >240 microns DURING
NORMAL OPERATION NORMAL OPERATION
>247 microns DURING >360 microns DURING
ST RUN UP ST RUN UP
OVERSPEED : >110 % OF RATED SPEED
SOLAPUR STPP
HP IP LP
RELIEF STEAM
TO CONDENSER
GLAND STEAM GLAND STEAM
SUCTION STEAM
SUCTION STEAM TO GSC
ADMISSION CV
M M M
FROM
CRH
LP
EXT-1
M M
FROM M
AUX M
PRDS
FROM CONDENSATE
SOLAPUR STPP
GLAND SEALING : AUX STEAM DURING STARTUP AND SELF SEALING DURING
NORMAL OPERATION
LPT DIAPHRAGM
1 2 3 4 5 6
HP IP LP GENERATOR EXCITOR
D
C
CONDENSER
VACUUM BREAKER
VACUUM BRAKER
A vacuum breaker is mounted on the low pressure outer casing and is used to break
partly or thoroughly the vacuum in order to reach a determined condenser pressure
Vacuum breaker valve is DC operated
LP TURBINE DIAPHRAGM
On the outer casing upper half, a rupture disk is mounted to protect the
condenser and to prevent over-pressure in the LP-turbine
Internal pressure at which the diaphragm is designed to rupture : 1.5 KSC
SOLAPUR STPP
LPBP-1
SV CV
OVERLOAD VALVES
MS LHS ALLOWS STEAM TO
HPBP-1 ENTER AT 5TH STAGE
OF HP TURBINE
CV SV
OV
CRH NRV
HP IP LP
CRH NRV
CONDENSER
HPBP-2
OV
MS RHS
SV CV
CV SV
CRH HRH
REHEATER LPBP-2
The live steam enters the HP turbine through the main stop valves MAA11/12AA001, the main control valves
MAA11/12AA011 and the overload control valves MAA11/12AA013
SOLAPUR STPP
LPBP-1
SV CV
OV
CRH NRV
HP IP LP
CRH NRV
CONDENSER
HPBP-2
OV
MS RHS
SV CV
CV SV
CRH HRH
REHEATER LPBP-2
The live steam enters the HP turbine through the main stop valves MAA11/12AA001, the main control valves
MAA11/12AA011 and the overload control valves MAA11/12AA013
SOLAPUR STPP
The live steam stop and control valves and the intercept stop and control valves
are operated electro-hydraulically
Valves are designed according to the hydraulic fail safe principle, e.g. hydraulic
pressure to open, spring force to close.
The stop valves are controlled by the electronic turbine protection system via 3
trip solenoid valves whereas the electronic turbine controller acts on the control
valves via electro- hydraulic transducers.
The valves are testable during normal operation without tripping the turboset.