Professional Documents
Culture Documents
BOC TradeFinanceApproach
BOC TradeFinanceApproach
DRAFT (Work-In-Progress)
Discussion Document
December 2004
Today’s Agenda
DRAFT (Work-In-Progress)
Group Discussion
• Establish a world-class trade finance model • Market leadership in trade finance operations
and capabilities • Improved customer service, faster response
• Step improvement and fundamental time
restructuring from existing trade finance • Operational excellence and cost savings
practice in BOC and China
• Standardization and consistency of processing
• Encompassing leading global trade finance
and information
practices, tailored for China and BOC
• Improved operational risk control and
• Consolidation and centralization of functions
management
and processes, separating sales and operations
• Automation and STP, where possible
• Setting-up a world-class IT processing
platform • Clear roles and responsibilities
•Outward Remittance
Customer wants Collect
to close account END closure application account
at branch and withdrawal slip balance
机构 Teller
Verify
customer’s
In-Correct • Letter of Guarantee
identity?
Correct
Verify customer
information and perform
account closure enquiry
Retrieve
customer’s
Perform close
account
procedures in
• Standby L/C
际国
signature card
in the system the system
Delete record
• Trade Finance
业务处
from the
signature card
A.T. Kearney is uniquely positioned to assist BOC through all phases of the Trade
Finance transformation over the 3-5 years
DRAFT (Work-In-Progress)
A.T. Kearney’s • Knowledge and insights in • Proven program management • Trade finance business
Unique Value global trade finance business and implementation improvement expertise and
Proposition models and practices oversight experience and insights
• Recent rich experience and “know-how “
• Operational excellence and
insights in banking system • China transformation and cost reduction experience
assessment and selection change management
• Share/public processing
• Banking operations and expertise
utility expertise
process design expertise, • Organization restructuring
especially on centralization and performance metric in a
• Practical/implementation China context
focus or orientation of our • Operations and process
consultants implementation expertise
Today’s Agenda
DRAFT (Work-In-Progress)
Group Discussion
第一阶段:业务计划和系统选择
Phase I
DRAFT (Work-In-Progress)
Business Workstream
Business Baseline & Design Target Trade
Design Core
International Finance Business
Business Process
Benchmarking Model
Technology Workstream
Technical
Understanding of Vendor
Baselining RFP Preparation
Business Evaluation &
& Global & Issuance
Baseline Assessment
Benchmarking
Timing
Week 2-6 Week 6-14 Week 14-20 Week 37-40
Week 0-2 Week 28-36
Week 18-20 Week 20-24
Phase I Project Objectives
Define target operating/business model for trade finance
Determine specific business requirements and core-processes for the new model
Select optimal software platform according the target business model and requirements
Define a multi-year trade finance transformation roadmap for BOC
Launch the trade finance transformation program
A.T. Kearney / Bank of China 8
19 1083 _Macros
DRAFT (Work-In-Progress)
第一阶段:业务计划和系统选择
贸易融资愿景确认模块
业务模块
科技模块
实施计划模块
作为转型项目的基础,项目组将通过现状分析,在保证与全行业务战略一致性的前提下,
对现有贸易融资愿景进行评估和确认
DRAFT (Work-In-Progress)
关键目标
关键目标: :
业务模块
确认中
国
银
银行贸易融资愿景
确认中
国 行贸易融资愿景
主要活动
主要活动: : 目标营运模式设计 关键流程设计
•高层次中国
银
银行贸易融资现状分析
•高层次中
国 行贸易融资现状分析
•现有贸易融资愿景评估
•现有贸易融资愿景评估
贸易融资愿
景确认 •与全行业务战略的一致性评估 实施计划
•与全行业务战略的一致性评估 Technology Process Workstream
•贸易融资愿景确认
•贸易融资愿景确认 Baseline &
Execute Vendor Evaluation and
主要问题
主要问题: : Benchmark Technical Selection
Vendor RFP
Requirements
•贸易融资产品
•贸易融资产品/ /服务的范围界定是什么?
服务的范围界定是什么?
•中
国
银银行贸易融资目前在市场上的竞争地位如何?
•中
国 行贸易融资目前在市场上的竞争地位如何?
•贸易融资与其他相关业务部门(如公司业务、金融机构部及风险管理部
•贸易融资与其他相关业务部门(如公司业务、金融机构部及风险管理部
等)协同效应如何?哪些方面需要改善?
等)协同效应如何?哪些方面需要改善?
•现有的贸易融资战略是否与中国
银
银行市场潜力和中
•现有的贸易融资战略是否与中
国 国
银
银行贸易融资现状相
行市场潜力和中
国 行贸易融资现状相
适应?哪些方面需要改善?
适应?哪些方面需要改善?
•贸易融资愿景与中国
银
银行总体业务战略是否一致?哪些方面需要改善?
•贸易融资愿景与中
国 行总体业务战略是否一致?哪些方面需要改善?
•如何获得公司高管层及各相关部门在贸易融资愿景方面的一致意见?
•如何获得公司高管层及各相关部门在贸易融资愿景方面的一致意见? A.T. Kearney / Bank of China 10
19 1083 _Macros
贸易融资愿景确认工作计划
分析
访谈 工作文件
贸易融资愿景确认
DRAFT (Work-In-Progress)
会议 关键项目成果
第二周
第一周
主要活动
1
数据需求 贸易融资业务
数据 / 文件
高
易层
次
资中
银
分行
析贸
国
融
现
状
访谈提纲 部
内 (1)
部
外访谈
&
2
数据需求 贸易融资愿
现
有
贸
评易
估融
资
愿
景
景文件
访谈提纲 部
内访谈
3
数据需求 全行业务战
略文件
与
全
致行
业
性务
估战
略
的
一
访谈提纲 部
内访谈
4
贸易融资愿景
确认
贸
易
融
资
愿
景
确
认
关键节点
项目启动会 愿景讨论会
注: 部
内访谈包括高级管理层、清算部主要成员及其他相关部门负责人
(1) A.T. Kearney / Bank of China 11
19 1083 _Macros
愿景确认对保证贸易融资业务集中化与全行战略及贸易融资战略 / 愿景的一致性至关重
要
示意
DRAFT (Work-In-Progress)
• 增加业务收入 • 全行统一的客户资料数据库,
战略措施 •提高服务质量,改善客户体 全面掌握客户信息 保
持
• 和增加市场份额
验,提高客户忠诚度 • 进一步提高中行
外
贸
汇业务
• 各分支行服务流程服务水平要
•根据
际
贸国易的变化开发满 的声誉
足客户需求的新产品 一致化,以利于管理和监控
• 成为行业标准和典范
•吸引更多客户选择中国
银行 • 尽量减少操作风险的发生
的贸易服务 • 完善风险管理的制度和政策,
• 降低成本支出
•取得规模效益 并确
保
其实施
•避免不必要的浪费
第一阶段:业务计划和系统选择
贸易融资愿景确认模块
业务模块
科技模块
实施计划模块
科尔尼的这个银行客户在金行后台作业集中项目之前存在有许多的问题急待解
决
DRAFT (Work-In-Progress)
我们协助银行做两个阶段的作业集中的项目
银行高層對作業服務集中的期望
DRAFT (Work-In-Progress)
價值
第 三 進程
第 二 進程 將作業服務變成營利事業,及
將作業服務變成營利事業,及 //
或獨立成一家公司
或獨立成一家公司
第 一 進程 將作業服務轉型擴展到
將作業服務轉型擴展到 完成第二階段轉型
整個金控公司
整個金控公司 工作後,银行已具
備下述能力:
建立世界級的作業服務能力
建立世界級的作業服務能力
時間 •專案設計、規
畫與監督的方
法
2002 年 第 一 階段 2002 年 2003 年 第 二 階段 2003 年 第 三 階段 2004 年
•系統化的再造
9 月 16 日 12 月 13 日 2 月 24 日 5 月 16 日 6月 方式
3 個月 3 個月 12 個月
•整合與再造的
建立作業服務組織 執行能力
整合及再造設計
整合及再造 執行及轉型
並評估流程
我们的项目主旨在创造一个最有效率最低成本的作业中心,是客户在其歷史上进行过最大規模的整
合活動,牽涉到多個單位,因此需要有一個強而有力的架構與方法來規劃與執行
DRAFT (Work-In-Progress)
將有作業整合至作服處的單位
總經理
財 個 個 信 消 商 分 法 海 財 法 法
富 金 金 用 金 務 行 金 外 務 金 金
管 授 行 卡 事 金 營 資 分 處 管 業
理 管 銷 事 業 融 運 產 行 理 務
事 處 處 業 處 處 事 管 事 處 處
業 處 業 理 業
處 處 處 處
信 財 信 信 產 廣 信 信 信 直 消 消 消 商 商 商 分 分 分 分 香 香 國 法 國 法 業 業
託 富 用 用 品 告 用 用 用 效 金 金 金 務 務 務 行 行 行 行 港 港 際 金 外 金 一 二
部 管 卡 卡 行 部 卡 卡 卡 行 北 北 北 金 金 金 管 北 北 北 代 財 金 作 部 管 組 組
理 授 資 銷 收 行 系 銷 一 二 三 融 融 融 理 一 二 三 表 務 融 業 理
銀 管 管 部 單 政 統 部 區 區 區 授 管 北 部 區 區 區 人 公 業 部 部
行 部 部 業 管 協 管 理 一 辦 司 務
務 理 調 部 部 區 事 分
部 部 部 處 行
消 消 客 信 信 信 信 消 消 消 商 商 商 電 分 分 法 法 金 資 業 業 業 業
金 金 戶 用 用 用 用 金 金 金 務 務 務 話 行 行 金 金 融 金 三 四 五 六
授 資 關 卡 卡 卡 卡 南 中 管 金 金 金 理 南 中 授 資 交 交 組 組 組 組
管 管 係 業 客 徵 帳 區 區 理 融 融 融 財 區 區 管 產 易 易
部 部 發 務 戶 信 務 部 北 北 中 部 部 管 部 部
(1) 展 推 服 審 發 (2) 三 二 區 理
部 廣 務 核 卡 區 區 部
部 部 部 部
商 商 業 新 台 台
轉移至作服處 務 務 七 竹 中 南
金 金 組 組 組 組
融 融
將在專案評估整 台 高
南 雄
合可能性 區 區
附註: (1) 消金授管部內之信貸及車貸徵審作業,將在專案中被研究其整合至作服處之可能性
(2) 消金管理部內之予備金處理組將於五月一日整合至作服處; 22 家店之作業整合可行性亦會在專案中分析及
研究 A.T. Kearney / Bank of China 16
业务模块 – 案例
19 1083 _Macros
在組織彙報及實體上而言,流程的整合及再造設計都是相當複雜的過程,几乎整个银行的所有部们
都被影响且必需全行的全力配合
DRAFT (Work-In-Progress)
財富管理事業處
分行作業部
個金授管處
個金行銷處
作業服務處
信用卡事業處
分行作業部
客戶服務部 • 分行北一區
• 分行北二區
消金事業處
• 分行北三區
• 分行中區
• 分行南區
商務金融處
信用卡事業處
客戶服務部
分行營運事業處
• 貴賓組
• 客服組
• 後勤作業組 法金資產管理處
集中作業部 • 客戶關係維護組
• 服務品質查核組
• 教育訓練組
信用卡事業處 商務金融處
商務金融管理部
• 行政管理組
• 研究應用組
海外分行事業處
徵信審核部 • 業務支援組
• 徵信審核1-4組 • 消金北三區作業組
• 信用卡系統協調部
消金事業處
• 行政組
財務處
• 消金北一區作業組 • 消金中區作業組
• 消金南區作業組
• 資料輸入組 • 消金北二區作業組
法金管理處 作業服務處
國外部 法金作業部
消金事業處 • 國外部出口組 • 作業一組 分行作業部
• 予備金銷售據點(22家店)徵審 • 國外部進口組 • 作業二組
有關作業(1)
• 國外部匯兌組 • 外匯,TMU, • 分行北一區
OBU作業組
作業服務處 消金事業處
• 分行北二區
法金管理處
消金管理部 • 消金北1-3區作業組
• 消金南區作業組
消金中區作業組
予備金銷售據點(22家店)
信用卡事業處
• 予備金處理組 帳務發卡部 客戶服務部 消金管理部
發卡作業
予備金處理組 • 分行北三區
• 帳單匯款組 • 調單扣款組
• 銷帳組 • 專案檢核組 • 電話理財客服組 財務處
個金授信管理處
消金資管部(3) 信用卡資管部(3) • 分行中區
• 分行南區 信用卡服務處
個金授信管理處 作業服務處 • 電話理財後勤支援 • 財務處作業組
法金管理處 國外部(3)
作業服務處 信託部
• 連管組
信託
作業組
信託部作業組
集中作業部 作業服務處
集中作業部
• 影像作業
• 信託作業組 分行營運事業處 分行作業 (5區) • 影像作業 • 行政管理部
900 名员工
合并的时间和领域
DRAFT (Work-In-Progress)
分支 (Q1)
组织报告的时间
2003 年
Q1 Q2
600 名员工 Q3 Q4
信用卡事業處 (Q2) 2004 年
Q1
400 名员工
消费借款
(Q4)
300 名员工
公司业务 (2004 Q1)
100 名员工
消费信款
信用卡 (Q2) 中小客户银行( Q4) (Q4)
I.T. (Q3)
消费信贷
(Q3) 财富管理 (Q2) 120 名员工
信用卡 (Q2) P&S (Q1)
公司业务 (Q2)
消费信贷 (Q2)
40 个员工 消费借款( Q2)
信用卡 (Q2)
信用卡 (Q2) 资金 (2004 Q1) 20 名员工 P&S (Q1)
P&S (Q1) P&S (Q1) 财富管理 (Q4) 信用卡 (Q2)
除了集中整合外,项目的另一重点也在将集中起来的流程重新设计再造
專案管理結構及規範
DRAFT (Work-In-Progress)
周
主要工作 進入第三階段
1 2 3 4 5 6 7 8 9 10 11 12
a. 流程圖製作
規範及流程 紀錄現有流程 指出改善機會 設計未來
流程 制定再造執行計劃
再造方法
b. 成本基準及
再 節省預測方 確認現有 估算 重新計算流 估算
成本計算 收集各流程環 直接 計算作業
造 法 之假設前 節的數據資料
成本
總成本
程再造後的 成本
成本 節省
提與方法
整
c. 服務品質水 確認事業單
合 準協定起草
位對服務品
質協定的需
草擬並制定
服務品質水準協定
討論協商及修飾
服務品質水準協定 達成一致意見並實行
求
及規範
d. 整合規劃與 確定哪個流
程或流程的
監控並更新改善
草擬初步
執行監控 與業務單位訪談瞭 部
解整合意向與進度 分環節
預估資
源需求
的整合計
協調其它項目與
整合計劃
需要 劃
集中
執行整合
2002 年业务部门的平均月度营运开支
( 百万美元 / 月 )
300.0
将要
并
合的 P&S 成本
仍留在业务单位的 P&S 成本
200.0 • P&S 从业务部门承担的
200.0
处理和服务工作包括
— 512 个流程 ; 这些流
60% 程现在需要 2000 名
全职员工
— 将近 30 亿美元的年
度开支或 大约每月
40% 61.7 2.5 亿美元,占整个
36.7 银行营运成本的 三
12% 15.4
29.1 分之一
11.7 • 主要来源于分支机构和
26% 9% 12% 2% 4%
信用卡业务
分支行 ( 有 信用卡 消费借款 资金 公司 财富管理 消费信贷 中小企
P&S) 业务 业银行
450 90 200 80
50
30
40
5 235 20
40
30
5 25
信贷
客户服务
资金 信托
支付
信用卡 / 帐单
分支行
支付
信用卡 / 帐单
分支行
信贷
客户服务
资金 信托
总节约
总节约
占总节约中 16% 29% 25% 7% 18% 8% 15% 占总全职员 11% 27% 8% 9% 40% 8% 3%
的百分比 工的百分比
成本节约时间表 (1)
DRAFT (Work-In-Progress)
至 2004 年,成本节
( $ 百万 / 月) 约达 75%
200 100 3900
400
400
500
600
700
700
300
2003 Q4 2004 Q1 2004 Q2 2004 Q3 2004 Q4 2005 Q1 2005 Q2 2005 Q3 2005 Q4 Total Cost
Savings
全职人员减少时间表 至 2004 年全职人员
(个) 减少达 96%
4 1 200
5 5
55 5 5
50
60
10
2003 Q3 2003 Q4 2004 Q1 2004 Q2 2004 Q3 2004 Q4 2005 Q1 2005 Q2 2005 Q3 2005 Q4 全部
第一步:业务模块将首先基于国际先进经验差距分析确认贸易融资业务模式
业务模块
DRAFT (Work-In-Progress)
项目内容
目标业务模式确认 目标营运模式设计 关键流程设计
关键目标
关键目标: :
就中银
国
国行贸易融资业务模
就中
银 行贸易融资业务模 式进行差距分析并确认最佳业务模式
式进行差距分析并确认最佳业务模式
关键活动
关键活动: :
• • 评估中
银
国
国行现有贸易融资业务模
评估中
银 行现有贸易融资业务模 式特性
式特性
• • 介绍贸易融资业务模式最佳实践
介绍贸易融资业务模式最佳实践
• • 就中
银
国
国行现有业务模
就中
银 行现有业务模 式对比最佳实践模式进行差距分析
式对比最佳实践模式进行差距分析
• • 对最适
银
国
中
合
合行的业务模
对最适
银
国
中 行的业务模 式达成一致
式达成一致
关键问题
关键问题: :
•• 银
国
中
中行现有贸易融资业务模
银
国 行现有贸易融资业务模 式特性是什么?主要有什么问题?
式特性是什么?主要有什么问题?
全球领先的贸易融资业务模如何?各有什么样的业务背景?从中获得什么经验教训?
全球领先的贸易融资业务模如何?各有什么样的业务背景?从中获得什么经验教训?
银
国
中
中行现有业务模
银
国 行现有业务模 式与最佳实践的差距如何?
式与最佳实践的差距如何?
银
国
中
中行贸易融资愿景对业务模
银
国 行贸易融资愿景对业务模 式意味着什么样的变革?
式意味着什么样的变革?
银
国
中
中行贸易融资应在
银
国 际
际国
行贸易融资应在国 最佳实践和现有状况之间选择怎样的切实可行的模式?什么最佳实践模式最适
银
国
中
合
合行?
最佳实践和现有状况之间选择怎样的切实可行的模式?什么最佳实践模式最适
银
国
中 行?
银
国
中
中行贸易融资结算
银
国 行贸易融资结算理
处
处中
理 中 心应采用怎样的集中方式?
心应采用怎样的集中方式?
A.T. Kearney / Bank of China 23
业务模块 – 项目方法
19 1083 _Macros
目标业务模式确认工作计划
分析
访谈 工作文件
目标业务模式确认
DRAFT (Work-In-Progress)
会议 关键项目成果
式融银
资行
管理文件案头研究 现有业务
模式
国
模易
部
内访谈
2
业介
务绍
实模贸
践式易
最融
佳资
贸
际易融资
国 先进经验案头研究 际国 先进实
践及案例
部
外访谈
3 查据分析 差距
分析
差
距
分
析
文件
4
业务
模就
式最
达适
一业
致务
模式
建议
合
成
文件
初步沟通
关键节点 业务模式
确认
Note: (1) Internal interview including senior management, settlement department core member and heads of relevant BU A.T. Kearney / Bank of China 24
业务模块 – 项目方法
19 1083 _Macros
项目组将对客户管理、产品管理、渠道管理、运营处理、风险管理等关键因素的集中、
分散化管理进行确认
DRAFT (Work-In-Progress)
示意
运营模式驱动因素
单一业 横跨所有 客户管理和 渠道和交付 产品工厂 运营流程
业务线管理
务线 业务线 细分 管理
主要业务
风险管理
全面的跃进式的方式未必是最理想的。集中改善某些重要的驱动因素,即 • 全行范围
内
集管
中、
合 综
理各 种不同类型的风险,并随
可取得相当的成功 业务线的发展,积累专门知识
特别地,在营运
理方面,项目
处 组将参照
际国 先进经验就营运集中的业务模式进行研究
DRAFT (Work-In-Progress)
示意
运营作业的集中( 1 ) 国际领先大银行的运营作业 ( 1)
中行 中行贸易融资未来的
运营作业选择? 集中的全行 运营作 共享的 独立的
运营作 运营作
运营作业 业协作
业“设施” 业“设施”
北京分行 江苏分行
其他
际国 处际国
• Standard • Chase, FDC ( • J.P. Morgan, • Morgan Stanley
运营 运营 运营 Chartered ( 贸 信用卡 ) Dean Witter ( 信
EDS ( 衍生产
b 易融资 ) • Bradford & 品) 用卡 )
• Bank of Scotland Bingley, Alltel ( • Swiss FSG ( 清 • Royal Bank
住房按揭贷款 ) 算 ) Group ( 支票、
( 信用卡 )
d • Wells Fargo, • Kredietbank,
信用卡 )
市分行 • Citibank ( 信用 • US Bancorp ( 信
Regulus ( 支票 EDS ( 支付 )
卡)
) 用管理 )
• HSBC ( 多种流 • Barclays, • Lloyds TSB ( 信
• CIBC, Fiserv (
销售 运营 a 程)
支票 )
Lloyds TSB,
Unisys ( 支票 )
用管理)
结算
理
处中 心 • Bumiputra Bank/
b EPIC-I, EDS ( 多
种流程 )
运营
c
短期选择 长期选择
注释 : (1) 处
此 涉及各项业务,不仅仅限于贸易融资
来源 : 科尔尼分析 A.T. Kearney / Bank of China 26
业务模块 – 项目方法
19 1083 _Macros
我们将决定在过渡时期采用的运营集中模式
核心问题:集中哪些运营作业流程?集中到什么程度?
DRAFT (Work-In-Progress)
示意
总行 总行 总行
优点 • 规模经济最大化 • 合
结品
产 重点和地区性市场特点(如 • 针对地方市场特点
• 较强的管理控制 将信用卡中心设在上)
海 • 无通讯和物流问题
• 高度的服务标准化 • 对产品组
合
战略有 强有力的支持 • 可以进行试点,循序渐进
• 可以进行试点,循序渐进
来源 : 科尔尼分析
A.T. Kearney / Bank of China 27
业务模块 – 项目方法
19 1083 _Macros
第二步,项目组将进一步对贸易融资组织架构进行设计,并就具体业务流程逐项确认集
中化机会
业务模块
DRAFT (Work-In-Progress)
项目内容 目标业务模式
目标营运模式设计 关键流程设计
确认
关键目标 :
关键目标 :
设计贸易融资营运模式(包括组织架构和具体业务流程 ECSAP 建议)
设计贸易融资营运模式(包括组织架构和具体业务流程 ECSAP 建议)
关键活动 :
关键活动 :
• 设计贸易融资相关组织架构、汇报关系、与其他部门的协调方式、及关键绩效考核指标
• 设计贸易融资相关组织架构、汇报关系、与其他部门的协调方式、及关键绩效考核指标
• 就贸易融资业务流程提出集中再造建议
• 就贸易融资业务流程提出集中再造建议
关键问题 :
关键问题 :
• 区域结算处
理中 心应设在什么地方? 11 个数量是否
适
合?
• 区域结算处
理中 心应设在什么地方? 11 个数量是否
适
合?
• 适应新的业务模式,哪些贸易融资相关职能应集中到总行管理?哪些应区域化?哪些应 持
保在分行管理?
• 适应新的业务模式,哪些贸易融资相关职能应集中到总行管理?哪些应区域化?哪些应 持
保在分行管理?
• 总行、区域中心和分行之间贸易融资 / 结算职能应为怎样的汇报关系?
• 总行、区域中心和分行之间贸易融资 / 结算职能应为怎样的汇报关系?
• 贸易融资 / 结算职能与其他相关业务部门应为怎样的协调关系?
• 贸易融资 / 结算职能与其他相关业务部门应为怎样的协调关系?
• 贸易融资 / 结算部门及关键岗位的岗位职责应作什么调整?客户经理的岗位职责应做什么调整?
• 贸易融资 / 结算部门及关键岗位的岗位职责应作什么调整?客户经理的岗位职责应做什么调整?
• 什么样的关键绩效考核指标可支持新的组织架构和业务模式?
• 什么样的关键绩效考核指标可支持新的组织架构和业务模式?
• 现有贸易融资业务流程有哪些?其集中化 / 分散化程度如何?
• 现有贸易融资业务流程有哪些?其集中化 / 分散化程度如何?
• 对现有流程的 ECSAP 分析 – 哪些流程应该取消?集中?简化?自动化?并作相应政策调整?
• 对现有流程的 ECSAP 分析 – 哪些流程应该取消?集中?简化?自动化?并作相应政策调整?
A.T. Kearney / Bank of China 28
业务模块 – 项目方法
19 1083 _Macros
目标营运模式设计工作计划
分析
访谈 工作文件
目标运营模式设计
DRAFT (Work-In-Progress)
会议 关键项目成果
岗位职
组织架构及 责 KPI 设计 KPI
标
设
计
部
内访谈 ( 含总 初步沟 汇报关系
行和分行) 部
内访谈 ( 含总
行和分行) 通
草拟 SLA 部
内
和定 部
内定
SLA/
价机制 价机制
2
初步沟
业
再务
造流
建程
议集
中
部
内访谈( 含总行和分行)
ECSAP 分析 ESCAP 分析
关键节点 组织架构讨
论会 业务模式报告会
A.T. Kearney / Bank of China 29
业务模块 – 项目方法
19 1083 _Macros
我们将建议新的组织架构及汇报关系以适应贸易融资愿景和新的业务模式
示意
DRAFT (Work-In-Progress)
目前的汇报系统 建议的汇报系统
行长 行长
公司银行
、
处际
国 RMs RMs RMs RMs RMs RMs RMs RMs RMs RMs RMs RMs RMs RMs RMs RMs 国际处 业务客户
经理
潜在问题 可能改进举措
• 是否分行行长主要向总行行长汇报,导致结算 • 加强分行
处际国 向总行结算不得汇报关系?
部和分行
的
处业务管理关
际国 系不清晰? • 通过绩效考核加强结算部和公司业务部等相关部门的协调?(如
• 客户经理是否主要向公司业务 汇
处 报,妨碍了 ,设立更为积极的结算相关激励机制?)
结算部和分行
对
处业务发
际国 展的控制? 处
与
• 分行
际
结算
国处
理中 心是
内
部客户关 系,应使用内
部定 价清
业
际务国
• / 贸易融资和公司银行业务是
处否责 晰核算关系?
任不清,协调不力?
• 结算部
处
对际客户
国/ 经理的培训因纳入结算部
处
的际国
/ 绩效考
• 客户经理是否缺乏贸易融资业务知识?
核指标?
特别的,我们将设计贸易融资汇报系统及与其他部门的协调方式
示意
DRAFT (Work-In-Progress)
支持
名字 负责人
汇报系统及部门协调模式
集中作业部门
资金 / 信 单一联系人的
信贷流程 支付流程 客户服务 中央处理 分行营运 行政
托 作用
大量市场 名字
• 了解业务部
门的服务
信用卡 名字 需求
中小客户银行 • 在集中作业
名字
公司业务 部
内
的会议
上代表业务
消费借贷 单元
名字
消费信贷 • 向业务部门
资金 名字 提集中作业
需求的联系
财富管理 名字 人
I.T. 名字
再造原则和优先性方法 ( 续 )
DRAFT (Work-In-Progress)
示意
再造方法 (1)
共 300 个
是
基于流程的 估计 ? 估计流程
流程识别 流程
问题
10
• 多余的手工流程 否
• 流程被分解,在业 是
改进 再造项目 : 务单元和地区间产 合并 ? 并
合流程
流程识别
未来的再造 • 300 程序 生了冗余
机会 • 700 全职员 • 程序较少的地区不
90
工工作量 能达到规模经济 否
• 由于使用了多系统 是
• 200 程序 • 16 亿美元 理顺 ? 理顺流程
流程识别
平台而不是整的
合
对服务 的年度开支
• 500 全职 运作环境,人力界 100
水平的 面不足导致了在切 否
员工工作
影响 换系统时的时间浪 是 流程识别
量 费,特别是在理
处 自动化 ?
流程的自
动化
• 14 亿美元 异常情况时 80
的年度开 • 尽管自动解决方案 否
已经存在,但银行
支 没有充分的利用 是
政策的再
低 • 一些低价值的工作 政策改变 ?
访
增加成本 降低成本 由相对高成本的高
级员工完成 否
对成本的影响 • 不再需要的政策仍 流程确定
然存在,阻碍了流
持
保
程的理顺 现状 20
注: (1) E :估计, C 并
合
: S :流线型 , A :自动化, P :政策变革 A.T. Kearney / Bank of China 32
业务模块 – 项目方法
19 1083 _Macros
其中,切实有效的流程集中分析和判断能够带来显著的收益
运营作业整合的驱动因素和潜在收益
DRAFT (Work-In-Progress)
示意
集中的标准 简化业务流程
产生规模 减少重
复劳动
具有以下特点的流程应该
考虑进行集中: 典型收益
• 总体的非利息费用降低 15%
• 各个业务单位
都 进行的 • IT 支出降低 15-30% ,并提高 IT 投资的回报率
相似的
处
理和服务 活动 • 员工减少 25-35%
• 业务流程更加 理
合、高效
• 相当规模的交易量
• 节省更多的时间以专注于高价值创造的活动
• 通过集中可实现的较大 • 运营作业人员更加专业化
改进 • 改进客户服务和客户关系 持
保
• 集中对客户带来负面影 • 降低工作复杂度
响很小 • 实施成本节省的快捷方案
• 改进产品开发
专注于股东 减少附加价
回报的提高 创造交叉 值低的活动
销售的机会
我们还将建议集中整合轉移計劃
DRAFT (Work-In-Progress)
示意
集中整合轉移的階段
目標完成日期
关键流程设计模块将对关键流程进行详细设计,该模块的项目成果将成为招标书的关键
输入 ; 其他业务流程的设计可在后期由中行项目团队继续设计,如有需要科尔尼也将十
分乐意提供持续协助
DRAFT (Work-In-Progress)
业务模块
项目内容
目标业务模式确认 目标营运模式设计 关键流程设计
关键目标 :
关键目标 :
Design high level core business process to support RFP development
Design high level core business process to support RFP development
关键活动 :
关键活动 :
• 现有关键流程分析
• 现有关键流程分析
• Gap analysis of current core processes against best practice
• Gap analysis of current core processes against best practice
• 设计关键业务流程
• 设计关键业务流程
关键问题 :
关键问题 :
• What are the core process inputs for trade finance that would have a technology implication and need to be addressed in the
• What are the core process inputs for trade finance that would have a technology implication and need to be addressed in the
technology vendor RFP?
technology vendor RFP?
• Are there major ECSAP required for each particular core process? What are Bank of China’s practices?
• Are there major ECSAP required for each particular core process? What are Bank of China’s practices?
• What are some of the best practices for core processes?
• What are some of the best practices for core processes?
• What are the gaps/opportunities on the core processes compared to best practices? What are BOC’s key constraints?
• What are the gaps/opportunities on the core processes compared to best practices? What are BOC’s key constraints?
• What are the target core processes?
• What are the target core processes?
关键流程设计工作计划
分析
访谈 工作文件
关键流程设计
DRAFT (Work-In-Progress)
会议 关键项目成果
2 最佳实
践流程
就
关
差键
业
距务
析流
程
进
行
3
设
计
关
键
业
务
流
程
基于对中行流程现状与国际先进实践之间的差距分析,可确保新的流程的切实可行
DRAFT (Work-In-Progress)
示意
Mapping of ‘As-Is’
core processes
Mapping of ‘To-Be’
core processes
ID Gaps
对关键流程的分析对保证 IT 系统对新的业务流程的有效支持十分重要
DRAFT (Work-In-Progress)
Manual Activities • “Point of Sales” Calls; • Application data input • Request/ Review customer • Application data input • Answer customer
customer contact • Product fit documents; underwriting • Product fit questions
determination decision determination • Address delinquent
payments
• Very few • Electronic application • Electronic application • Automated recognition
Automated • Cross-selling notices • Account tracking and
tracking tracking of bill of lading
Activities from a CRM software • Document clearing and communications &
routing payment
Technology
• Delinquency notification Technology
Level of • Decentralized—next to • Relatively decentralized • Centralized at a regional • Centralized • Centralized Vendor RFP &
Vendor RFP &
Centralization ports processing center by Vendor
complexity Vendor
Selection
Selection
• Interface with • Document scanning • Electronic forms, auto- • Fully automated doc. • Integration into customer's Business Plan
System Business Plan
customer enterprise capabilities; automated adjudication, linked to management, interface & other bank’s trade
Requirements
data credit profiling origination system with all other systems finance
Potential Savings • Migration to more cost • Reduction in cycle time • Less errors from incorrect • Reduced cycle time; • Reduced processing costs
efficient channels data entry reduced processing
costs
第一阶段:业务计划和系统选择
贸易融资愿景确认模块
业务模块
科技模块
实施计划模块
A.T. Kearney is currently working on 2 core banking selection projects in Greater China,
with one involving a mid-size Chinese bank leveraging the system replacement to support
and catalyze its business growth and transformation ambitions
DRAFT (Work-In-Progress)
• Client has been aggressively developing • Define the target operating model for Client on
its key management systems since 2002 to which design of new core banking system will
build fundamental bank-wide business/IT be based
capabilities to support growth • Determine the scope, architecture design and
requirements for the new core banking
• Client has set 2004 as the “Year of system – ensuring alignment to Client’s
Transformation”; focusing focus on business growth aspirations
strategy, organization restructuring and
• Define a transformation program to drive and
business process reengineering manage the necessary structural changes towards
• With the completion of data migrating to Client’s target operating model
centralization, Client intends to replace its • Develop a phased transformation roadmap to
core banking system to support a truly achieve early wins with gradual enhancement on
customer-centric business model introducing business and IT capabilities
• As such, Client sought assistance for the • Facilitate the selection of the optimal
change management of the core banking international core banking solution to ensure
replacement program the transformation momentum is maintained
The client’s target operating model, target organization structure and business outlook
was assessed to determine framework for the new core banking system
DRAFT (Work-In-Progress)
B A C K – B O N E O F C L I E N T’S T R A N S F O R M A T I O N
Fundamental
China Banking How the Focus Business
building
System business is Products & and IT
blocks of the
Constraints organized Services Requirements
future bank
International
Banking
New Core
Practices/Trends Banking System
Framework
As the client wanted to quickly transition towards the business unit governance model,
A.T. Kearney conducted analysis to consider necessary trade-offs
DRAFT (Work-In-Progress)
Customer Ownership • What mindsets and capabilities should Client build in order to
Management transform into a truly customer-centric organization?
Channels and Delivery • With the proliferation of products and delivery channels how
Management can Client ensure consistency of customer experience?
Business Unit
Concept – • How should product development and management be handled
Product Management
Cornerstone of without losing local knowledge and needs of customers?
Transformation
• With the back-office consolidation exercise underway, what
Operational Processing should be the interim and end-state for the operations function
and how will it impact the future core banking system?
Internal Management • How will Client enhance corporate management and control in
and Control transitioning towards the business unit structure?
This resulted in the definition of a target operating model on which the new core banking
system would be defined
DRAFT (Work-In-Progress)
Line of Business 1
Customer Channels
Management and Product Operations
Line of Business 2
and Delivery Factory Processing
Segmentation Management
Line of Business …
Line of Business
Management Intelligence and Data Management
Tools & Engines
(Customer/Channel and Product Intelligence)
After determination of the selection criteria, five vendors were short-listed to provide the
required solution for the Bank
DRAFT (Work-In-Progress)
Final
Vendor
Selected
No No No
A.T. Kearney applied an international competitive bidding process for the core banking
system, with emphasis on comprehensiveness, transparency and speed
DRAFT (Work-In-Progress)
• The structured and detail scoring method to be utilized will ensure that bidders’
2. Transparency proposals are evaluated without bias
• The methodology to be applied will be shared with all bidders to ensure that
everybody are well prepared and compete on equal ground
科技工作小组的工作在第一阶段主要分为 3 个步骤,共需时约 18 至 20 周
分析步骤 主要里程碑事件
DRAFT (Work-In-Progress)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
主要工作步骤
1 1.1 IT 架构及现有
系统评估
现
状
分系评
估
析统及
厂全
IT 1.2 全球系统厂商
及产品分析 业务模式及流程设
球
计(业务小组)
商
银
际
1.3国
行贸易融
资系统运行情况调研
2.1 业务需求定义
2
2.2 系统目标
架构设计
招
及标
工
放 作
标准
备
发
2.3 标书文件准备
2.4 评标标准及细则
调查
商
主要事件 初步解决方案 确认
确定招标范围 标书发出 标书回复完毕
排序 排序
Technology workstream comprises 3 main steps in Phase I and will take about 18 weeks
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
主要工作步骤
1.1 Current IT
architecture and trade
1 finance system
assessment
IT baseling
and global 1.2 Global vendor
and product analysis Business model and
benchmarking process design (Biz
1.3 Research on trade workstream)
finance systems used
by global banks
2.1 Business
2 requirements definition
2.2 Target
architecture
RPF design
preparation
a& issuance 2.3 RFP document preparation
2.4 Evaluation
methodology and
criteria definition
Proposal preparation &
3 vendor Q&A 3.1 Proposal evaluation 3.4 POC
Vendor 3.2 Client
Evaluation & reference calls
3.5
Assessment 3.3 Investment Clarification &
analysis decision
making
Step 1: We will first obtain clear understanding of current IT environment of BOC and conduct
research on global vendors
Technology Workstream
DRAFT (Work-In-Progress)
项目内容 IT Baseling and Global RFP Preparation & Vendor Evaluation &
Benchmarking Issuance Assessment
Key
KeyObjectives:
Objectives:
Understand
Understandcurrent
currentITITenvironment
environmentand
andcurrent
currentstatus
statusofofglobal
globalvendors
vendors/ /products
products
Key
KeyActivities:
Activities:
• • IT architecture assessment
IT architecture assessment
• • System interfaces study
System interfaces study
• • On-going and planned IT projects analysis
On-going and planned IT projects analysis
• • Global vendor and product research
Global vendor and product research
Key
KeyIssues
IssuestotoAddress:
Address:
• • What are technical requirements for target trade finance system?
What are technical requirements for target trade finance system?
• • Which vendors should be issued RFP to?
Which vendors should be issued RFP to?
• • What are the things to watch for particular products during RFP evaluation?
What are the things to watch for particular products during RFP evaluation?
Step 1: During technical baseling, we will conduct assessment on overall IT architecture, interfaces
with current trade finance system, and dependencies with on-going IT projects
• Which systems does target trade finance interface Provide sufficient and
with? appropriate technical
System Interfaces Study
• What are potential impacts on other interlinking
guidance and requirements to
systems?
vendors in RFP document
• What are specific interfacing requirements?
Step 1: Current system assessment helps us understand the key issues and dependencies of current
trade finance system
Illustrative
DRAFT (Work-In-Progress)
银保通 手机银行系统
分行系统 国际结算系统
人民银行支付系统 电子口岸 银联前置系统 VT100 终端 VT100 终端 … VT100 终端
? 信用卡 (TradeNet)
网关 银行柜员
Step 1: We will summarize the latest trends and developments of major trade finance system vendors
and products to assist RFP preparation and future evaluation
Preliminary
DRAFT (Work-In-Progress)
Step 2: We will develop a comprehensive RFP document to ensure future trade finance system
support target business model
Technology Workstream
DRAFT (Work-In-Progress)
Key
KeyObjectives:
Objectives:
Prepare
Prepareand
andissue
issueRFP
RFPdocument
document
Key
KeyActivities:
Activities:
• • Define key functional modules of target trade finance system
Define key functional modules of target trade finance system
• • Define future business and technical requirements
Define future business and technical requirements
• • Develop evaluation methodology and criteria
Develop evaluation methodology and criteria
• • Prepare RFP document
Prepare RFP document
• • Issue RFP
Issue RFP
Key
KeyIssues
IssuestotoAddress:
Address:
• • How to develop business requirements to ensure target system support future business model?
How to develop business requirements to ensure target system support future business model?
• • How to develop a comprehensive RFP document?
How to develop a comprehensive RFP document?
• • How to ensure vendors are appropriately evaluated?
How to ensure vendors are appropriately evaluated?
Step 2: We will combine industry leading practice with BOC unique requirements to develop
business requirements in RFP document
For Discussion
DRAFT (Work-In-Progress)
Business Requirements in
RFP Document
Step 2: Technical requirements ensure system usability, efficiency, flexibility, scalability, security
and resilience
Illustrative
DRAFT (Work-In-Progress)
Utilize component-based architecture – where business services are grouped into components that can be rapidly
assembled to form new business support systems
Comply with established and emerging standards in the financial and IT industries
Secure information, hardware and software to both internal and external parties
Be parameter-driven
Support a common view of customer product, account data and management information across the enterprise
Interface to an EAI infrastructure that enables new applications to be integrated with existing applications by integrating
just once with a central integration service
Step 2: We will also develop evaluation methodology and criteria with BOC team for RFP evaluation
Illustrative
DRAFT (Work-In-Progress)
Implementation
Organization Functionality Technology Pricing
Step 3: We will select the most suitable vendor and product through a rigorous
evaluation process
DRAFT (Work-In-Progress)
科技模块
项目内容 IT Baseling and RFP Preparation
Global Benchmarking & Issuance Vendor Evaluation & Assessment
Key Objectives:
Key Objectives:
Select the most suitable trade finance vendor and product
Select the most suitable trade finance vendor and product
Key Activities:
Key Activities:
• Vendor evaluation
• Vendor evaluation
• Proof of concept
• Proof of concept
• Investment analysis
• Investment analysis
Key Issues to Address:
Key Issues to Address:
• Which products have the most comprehensive functional coverage?
• Which products have the most comprehensive functional coverage?
• Which products have the most desired technical features?
• Which products have the most desired technical features?
• Which vendors have the strongest implementation capabilities?
• Which vendors have the strongest implementation capabilities?
• Which solution has the most competitive TCO (total cost of ownership)?
• Which solution has the most competitive TCO (total cost of ownership)?
• Which solution is the most suitable for BOC?
• Which solution is the most suitable for BOC?
Step 3: We will utilize our proven vendor selection methodology to identify the most suitable vendor
for BOC
Illustrative
DRAFT (Work-In-Progress)
No No No
Step 3: We will conduct proof of concept in addition to proposal evaluation to have a first hand feel
of the systems
DRAFT (Work-In-Progress)
Step 3: We will also conduct detailed investment analysis to ensure BOC clearly understand the TCO
of each system and the implications
DRAFT (Work-In-Progress)
贸易融资系统总
体拥有成本
前期投入 持续性成本
第一阶段:业务计划和系统选择
贸易融资愿景确认模块
业务模块
科技模块
实施计划模块
Proposed approach
DRAFT (Work-In-Progress)
Key Objective:
Key Objective:
Plan the implementation of an integrated trade finance business
Plan the implementation of an integrated trade finance business
operating model and technology
Business solution
Processsolution for BOC
Workstream
operating model and technology for BOC
Key Activities:
Key Activities:
business baseline develop
and a change
• Create targetplan
management trade finance
to ensure the alignment of the design
international•benchmark core processes
Create a change management plan to ensure the alignment of the
operating
organization and the new processesmodel
organization and the new processes
• Conduct risk analysis to determine best / most effective regions/offices
• Conduct risk analysis to determine best / most effective regions/offices
Trade Finance for implementation roll-out
for implementation roll-out Implementation
Vision Validation
• Plan and execute an initial implementation communication
Technologycommunication plan for
Process Workstream Planning
• Plan and execute an initial implementation plan for
internal change management as well as external marketing purposes
internal change management as well as external marketing purposes
Baseline
• Work jointly with technology & provider to identify
solution Vendor
• Work jointly with technology solution providerExecute
to identify
Benchmark
implementation timeline and keyTechnical
metrics Evaluation and
implementation timeline and key metrics Vendor RFP
Key Issue to Address:
Requirements Selection
Key Issue to Address:
项目实施有什么风险?应有什么应对措施?
• •项目实施有什么风险?应有什么应对措施?
应该如何开始沟通计划?项目转型过程中应该如何持续
• •应该如何开始沟通计划?项目转型过程中应该如何持续
推进沟通计划?
推进沟通计划?
转型计划应该怎样按产品、地域、流程分步推
广 ?
• •转型计划应该怎样按产品、地域、流程分步推
广 ?
Implementation
Analysis Milestones
Information Feed Key Deliverables
DRAFT (Work-In-Progress)
2
Conduct Risk
Analysis to
Prioritize Determine best location to
test run the pilot and Risk Profile
Implementation
subsequent roll-out
3
Plan and Execute
Communication
Plan Organize Plan communication Communicate External
cascade Execute
communication high level internally of communication
team communication process/org
changes
4
Develop Joint
Work Plan with
Technology Set initial meetings Plan initial technical work Incorporate risk Determine Complete
solution Provider with technology plans & interfaces assessment into transition risks & transition plan by
provider’s transition plan mitigation region
implementation strategies
team
During the deployment planning, BOC needs to develop a plan incorporating considerations along
products, processes, and geographic spread
Illustrative
DRAFT (Work-In-Progress)
Processes
由于这一方式的高风
Which part of processes should be 一次过 险,一般不考虑实施
covered in what sequence?
典型的全面实 按产品分步推广
施方案
按地域分步推广
Products
Which products should covered in 阶段式
what sequence? 按流程分步推广
Geographic spread
Which region will be 结合上述角度综合
implementing first?
考虑
银行
Implementation Planning 变革管理 / 转型顾问
B: 配置
A: 差距分析 D: 推广
C: 试运行
整体项目管理办公室
指导向目标运营模式转型的用户工程师
变革管理 ( 如变革的优先度、沟通、人力资源的变革管理等 )
中行银行
培训培训员 培训用户
项目小组
项目 实施后
启动 流程回顾 调解 支持
A.T. Kearney will help BOC develop a complete implementation timeline that will
integrate the new business and technology processes Client Deliverable Example
DRAFT (Work-In-Progress)
第二阶段:实施和转型
We will be the owner’s engineer during implementation process to drive business changes
and keep vendors honest
Concept of “Owner’s Engineer”
DRAFT (Work-In-Progress)
我们根据未来的运营模型,采用了一套“用户工程师”的方案,来确定系统的方向性要
求,并在差距分析中明确未来的变化
“ 用户工程师”方案
DRAFT (Work-In-Progress)
评估供选的
未来模式解
细化目标业 决方案
银行运营 务运营模型 计划、实施
模式设计 和投资
提出业务模型
Future State
的理论依据
Scenarios/ Proof of
Concept/
Prototyping
建议项目参与者: 方案概览:
• 系统改造小组成员 • 充分利用可能
作
合 伙伴的经验,细化高层次的、
• 主要业务领域、职能部门和部分分支 经过充分验证的未来运营模型
机构主管 • 充足的业务理论实践依据,其中包括讨论会、原
• IT 规划部门 型开发和实地访问
• IT 系统供应商: • 方案实施评估和确认
– 系统产品供应商
– 实施伙伴
– 其它相关 IT 服务
作
合 伙伴
项目管理办公室的运作启动将推动系统改造项目的实施
项目管理办公室结构
DRAFT (Work-In-Progress)
中国银行
贸易融资系统改造项目
管理办公室
A. 全行范围变革管理 D. 沟通管理
“随着系统改造的生效,对中行组织及企 “关于银行系统转型 带来的业务转变及内
部及
业一致的协调与管理” 外
部改进的
合
全综面 交流”
B. 工作计划的管理与汇报 E. 进度跟踪及汇报
“行动及项目工作计划的协调与一致, “对表现指标准确的跟踪与监督,以评
以管理整个转型的附属因素与进程” 估行动对业务的影响”
C. 风险管理 F. 指导委员会管理
“业务转变的风险效应评估以及风险管 “对指导委员会定期会议的支持与准备
理策略以最小化业务上的中断与失误” ,以实现有效的管理参与”
通过对流程及工具的全面应用 , 将确保项目管理活动的有效性
我们将帮助中行建立一个负责银行系统改造项目的全行项目管理办公室
银行系统改造项目的建立 示意
DRAFT (Work-In-Progress)
指导委员会
( 治理 )
核心管理小组
( 管理 )
系统 项目总监
项目办公室
改造项目 ( 领导 )
( 支持 )
项目管理
( 实施 )
A B C D X
举措
( 根据模块及 公司 国际
运营 财务 …… 科技
业务 业务
业务领域 )
项目管理办公室将全程跟踪并监督各个工作计划的进度
进度更新 示意
DRAFT (Work-In-Progress)
解释
系统开发进度更新
示例
A. 本周亮点 / 成果
整
合 小组: 结束周
整
合 小组领导: 总体状况 : 红色 /A 琥珀色 / 绿色
• 完成的主要任务
• 达到的主要里程碑
A. 本周亮点 / 成果 • 快赢
B. 相对于里程碑进度的总体状况
• % 完成度
B. 相对于里程碑进度的总体状况 • 目标完成日期
行动 / 原始目标完成日 改进后目标完成日
% 完成度 总体状况
协同效应目标
达到的协
评价
• 协同效应目标 ( 可应用的里程碑 )
里程碑 期 期 同效应
总体状况 ( 加速 , 在轨道上 , 延迟 )
成本节
收入改善
约
•
C. 需特别提出并加以澄清的问题
绿色
• 较小的路障,需要跨功能的协作
C. 需特别提出并加以澄清的问题
• 将在整 合 小组的层面进行 理
处
问题类别 问题 所需的解决步骤 / 决定 既定日期 决议期限 责任
琥珀色
红色
琥珀色 • 有主要影像但不会导致工程严重推出的问题
将在指挥中心会议上加以讨论并解决
绿色
•
D. 确认的风险 红色
风险类别 风险 所需的解决步骤 / 决定 既定日期 决议期限 责任
• 整
合
项目进程的主要 阻碍
红色
• 对整有
合 深 远影响,需要指导委员会的支持 / 决议
琥珀色
绿色 • 需立即得到注意,对其进行讨论并最终解决
D. 确认的风险
E. 指挥中心 / 指导委员会需要做出的主要决定
• 会影响到其他整 合 小组行动的问题
E. 指挥中心 / 指导委员会需要做出的主要决定
• 无法在小组获得解决的事情,需要指挥中心 / 指导委
员会的讨论与决定
A.T. Kearney / Bank of China 71
19 1083 _Macros
项目管理办公室还应主动跟踪项目工作计划,以保证延期和其他问题可以被及时发现并
对其采取应对措施
示意
工作计划跟踪
DRAFT (Work-In-Progress)
ID Key Milestones Sub Team Day 1 Day 2 Day 3 % Complete Status Revised
(by Feb1) (by Mar 1) (by Apr1) (as of Mar 14) Comple tion Date
1 PLANNING
2
3 Branch closure candidate assessment LA 6-Dec 100% Completed
4
5 Notification to authorities and internal/external communication COMM 23-Dec 100% Completed
6
7 IT/Systems IT
8 User specification 17-Dec 100% Completed
9 System development 10-Jan 100% Completed
10 UAT 24-Jan 100% Completed
11
12 Logistics and Administration LA
13 Branch premise - Leased 27-Dec 100% Completed
14 Branch premise - Owned 27-Dec 100% Completed
15 Branch closure sequencing and timing 31-Dec 100% Completed
16 Capacity planning for branch consolidation (Cluster 1) LA/CR 24-Jan 100% Completed
17
18 Downside Risk Control/System & Method DRC
19 Identification of potential downside risks 22-Dec 100% Completed
20 Stock count 29-Dec 100% Completed
21 Password change 30-Dec 100% Completed
22 Custodian review 24-Dec 100% Completed
23 Computer weaknesses / Authority levels 5-Jan 70% -
24 Revised procedure manual S&M/DRC 15-Jan 100% Completed
25
26 Branch Inventories/Checklists
27 Customer/branch records LA 24-Dec 100% Completed
28 Computer equipment IT 27-Dec 100% Completed
29 Branch contracts LA/PFA 28-Jan 100% Completed
30 Branch listings and fixed assets PFA 13-Jan 100% Completed
31 Branch closure notification posters PFA 24-Jan 100% Completed
32
为确保形成的解决方案与目标运营模型保持一致,我们将同项目组共同参与解决方案的
具体设计及系统的最终测试工作
启动解决方案的评估、审核与测试
DRAFT (Work-In-Progress)
1. 银行系统项目管理办公室同项目
要业
求务
的与技
性
小组间周期性的交流,以不断强
术
确
定
调目标运营模型及其核心理念
系具
统体
设化
计的
3. 跨组会议将在那些需要进行作
合
协调的业务领域和功能部门展开
系
统
测
试
保
, 证解决方案一致有效
注 (1) 设计与构建包括系统的业务和技术方面
A.T. Kearney / Bank of China 73
19 1083 _Macros
转型项目组将针对主要问题和成功阻碍因素制定全面的变革管理计划
示意
变革管理-转型项目的重要内容
DRAFT (Work-In-Progress)
项目计划、跟踪和管理流程
总体质量控制和绩效衡量标准
主要阶段
衡量标准报
性目标实 依赖性 风险管理 渠道控制 变革管理
告
现日期
跟踪流程进展情 确定可能的阻碍
项目小组 制定项目计划工 评估项目计划,
修改和调整 IPP 况,深入了解小 因素,部署全面
作流程 明确风险因素
组计划 活动
必须制定明确的沟通计划,以确保每个人都理解转型计划,并对变革的要求作出适当回
应
变革管理-计划的制定
DRAFT (Work-In-Progress)
利益相关方的
高层计划 详细计划
细分
项目团队
我们建议由本地顾问人员组建团队,同时由一个全球顾问组给予支持
初步
提议的小组结构
DRAFT (Work-In-Progress)
指导委员会
•中国
银行 : 朱行助、结算部总
经理、公司业务部总经理、金 • 提供领导与项目指导
融机构部总经理、风险管理部 • 解决问题以及困难
总经理 • 积极的参与
• 科尔尼 : • 每月 / 定期更新信息
科尔尼顾问组
• John Meinhold
• David Hovenden
项目领导 • 管理并领导项目工作
• 配置资源
•中
国
银行项 • William Yin • 解决问题
目经理 • Vivian Lai • 沟通管理
• 跟踪并汇报进度
业务组 科技组
Today’s Agenda
DRAFT (Work-In-Progress)
Group Discussion