Summary: Total sites=58 ( Alrdy Twr Erected with agreement done =11 + 47 new sites (4 IP +43 ) )
work detail of new sites -47 :: NewAgreemDone(sites hired )=14, HPC done but agreement pending =2, HPC pndg or file sent to HPC =10,application required=13
Sr
No
SDC
A
Total
Sites(IP/SSA)
Hiring
of
Site(NR
/IP/SSA
)
Nominal
s
(NotRrc
eived/O
K/Not
Ok)RF
finalizati
Status of Site
hiring by SSA
(NR/IP/Y/to
HPC/WIP)
Agreem
ent
AD/D/N
R
EC status
(Y)
Tower
Founda
tion(NR
/Zte/Ci
vil)
Tower
Erection(
NR/SSA/Z
te)
Shelter
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS Status
Site
2G/com
bo
3G STATUS Concern DE Remarks Summary
1 Grg Dhankot NR NR NR AD y NR NR
ALREADY
SHELTER
Pending
ZTE
OFC Done done DONE Combo
comissione
d
DE(NWO-w) EMF Sent on 14.08.13
2 Grg Kherki Daula NR NR NR AD y NR NR
ROOM
DONE
Installed OFC Done done Installed Combo pending
DET(Sohna
RD)
BTS on AIR
03/05/2013
on air 03-05-13
3 Grg Binola NR NR NR AD y NR NR
Room
Already
done OFC Done done Installed Combo pending SDE(IMT)
BTS on AIR
01/05/2013
on air 01-05-13
4 Grg Tikli NR NR NR AD y NR NR Outdoor done
M/W
pending(ZT
E)
Not reqd Pending ZTE 2G NA
DET(Sohna
RD)
BTS O/D
Allotted
ready to install
5 Nuh Sudaka NR NR NR AD yes NR NR Outdoor DONE
M/W
pending(ZT
E)
Not reqd Pending ZTE 2G NA DE(Mewat)
BTS O/D
Allotted
ready to install
6 Nuh salamba NR NR NR AD yes NR NR W\P
Pending
ZTE
M/W
pending(ZT
E)
Pending
ZTE
Pending ZTE 2G NA DE(Mewat) work pending at ZTE
7 Nuh Alduka NR NR NR AD y NR NR W\P
Pending
ZTE
M/W
pending(ZT
E)
Pending
ZTE
Pending ZTE 2G NA DE(Mewat) work pending at ZTE
8 Nuh Indri NR NR NR AD
will take 7-8
days more
NR NR W\P
Pending
ZTE
M/W
pending(ZT
E)
Pending
ZTE
Pending ZTE 2G NA DE(Mewat)
work pending at ZTE (EC work
completed 07/09/13 as per de
mewat)
9 Fpj Jamalgarh NR NR NR AD yes NR NR Outdoor done
M/W
pending(ZT
E)
Not reqd Pending ZTE 2G NA DE(Mewat)
BTS O/D
Allotted
ready to install
10 Fpj Sikrawa NR NR NR AD yes NR NR
Room
Already
Done OFC Done done Installed 2G pending DE(Mewat)
BTS on air on 30-
04-13
On air 30-04-13
11 Fpj Gulalta NR NR NR AD yes NR NR W\P
Pending
ZTE
M/W
pending(ZT
E)
Pending
ZTE
Pending ZTE 2G NA DE(Mewat) work pending at ZTE
12 Nuh Sangail SSA OK done AD
SECURITY
DEPOSITED AT
DHBVNL,
estimate
recived
DONE done Outdoor
Pending
ZTE
M/W
pending(ZT
E)
Not reqd Pending ZTE 2G NA DE(Mewat)
13 Fpj Bisru SSA OK done DONE
Demand note
received ,file at
AO (BSNL)
DONE DONE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE 2G NA DE(Mewat)
14 Grg mumtajpur SSA OK Done Done
file submitted
to DHBVNL &
wip
Done outdoor
Pending
ZTE
OFC/wip Not reqd Pending ZTE 2G NA SDE(IMT)
site handed over to
circle
15 Grg Sikhopur SSA OK Done done
file submitted
to DHBVNL
&wip
civil civil Outdoor
Pending
ZTE
OFC Not reqd Pending ZTE Combo pending SDE(IMT)
Court case done by
neighbour next
date:24/09/13
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT
*total site=2
sites hired =2 (HPC done with
agreement)
but E/C pending at both sites
* total sites=19
sites hired =5 (HPC done with
agreement )
file sent for HPC=7 application
required=7

* so pending sites for hiring =
14 (file sent for hpc +HPC done
w/o agreement + application
required )
E/C pending in hired sites=5
Sr
No
SDC
A
Total
Sites(IP/SSA)
Hiring
of
Site(NR
/IP/SSA
Nominal
s
(NotRrc
eived/O
Status of Site
hiring by SSA
(NR/IP/Y/to
HPC/WIP)
Agreem
ent
AD/D/N
R
EC status
(Y)
Tower
Founda
tion(NR
/Zte/Ci
Tower
Erection(
NR/SSA/Z
te)
Shelter
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS Status
Site
2G/com
bo
3G STATUS Concern DE Remarks
16 Grg
Nahar pur
KASAN
SSA OK Done Done
file submitted
to DHBVNL
&wip
DONE WIP Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
Court case done by
neighbour, next
date:15/10/13
17 Grg
Imt Sec-8
manesar
SSA OK Done DONE
file submitted
to DHBVNL
&wip
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
to apeal in higher
court
18 Grg
Nawada
fatehpur
SSA OK Done DONE
file submitted
to DHBVNL
&wip
done
Civil
W/P Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
site handed over to
circle
19 Grg kota khandewla SSA ok Done Civil Civil outdoor
Pending
ZTE
OFC Not reqd Pending ZTE Combo pending SDE(IMT)
20 Grg Nakhdola SSA
new lat-
long
sent
Revised application
required
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
new lat-long
sent to circle
21 Grg IMT-Sec-7 SSA
lat long
sent to
circle
Revised application
required
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
lat long sent to
circle
22 Grg
nsg gate no-2
(near)/Navrang
pur
SSA OK
final letter pending
from NSG
ZTE ZTE outdoor
Pending
ZTE
OFC
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
NSG ready to
give Site
now...SDE(IMT)
23 Grg
Bhangrola/Kakr
ola
SSA OK Done ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
24 Grg IMT sect-1 SSA OK file sent for HPC ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
25 Grg
Near
GITM(searching
near pathrari )
SSA ok Done Civil Civil outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
26 Grg Hayatpur SSA ok HPC WIP ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT) file sent to HPC
27 Grg
Jatuli/Hali
Mandi 2
SSA ok file sent to HPC Civil Civil Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT) file sent to HPC
28 Grg IMT-sec-6 SSA
Revise application
Pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
29 Grg
Amity(Near
Pachgaon)-
badanki
SSA ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
site hand over
ip (indus) by
circle office
30 Grg Kasan IP IP IP IP IP IP IP Pending ZTE Combo pending SDE(IMT)
site hand over
ip (indus) by
circle office
31 Grg
Imt Sec-3
manesar
IP IP
IP (ssa searching
)
IP IP IP IP Pending ZTE Combo pending SDE(IMT)
* total sites=19
sites hired =5 (HPC done with
agreement )
file sent for HPC=7 application
required=7

* so pending sites for hiring =
14 (file sent for hpc +HPC done
w/o agreement + application
required )
E/C pending in hired sites=5
32 Grg
Bilaspur,
Haryana
(bilaspur khurd
)
IP ok Done IP IP IP IP Pending ZTE Combo pending SDE(IMT)
33 Grg Hasanpur SSA
Revised application
required
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
owner refused
34 Grg Palra SSA
Revised application
required
ZTE ZTE Outdoor
Pending
ZTE
OFC Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
owner refused
35 Grg Silani SSA
revise application
required
Civil Civil
Shelter
Pending ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending ZTE Combo pending
DET(Sohna
RD)
site visited by
sde(mp) and
de(sohnard) but
site found very
far from
nominals
36 Grg TE Sohna SSA OK done DONE y (TE xge )
done
Civil
done M/s
SKC
Room
Already
Already OFC Done done Pending ZTE Combo
material
received
DET(Sohna
RD)
Ready for BTS
installation
37 Grg CRPF Camp SSA OK done DONE
Yes (CRPF will
provide EC)EC
wiring
pending
DONE ZTE Outdoor
Pending
ZTE
OFC
Pending(D
E Tx
Urban)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
site handed
over to circle
38 Grg Medawas SSA OK Done DONE
File work
started
DONE DONE
Shelter
Pending ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending ZTE Combo pending
DET(Sohna
RD)
site handed
over to circle
39 GRG RojkaMeo SSA OK done AD
EC security
paid.
Waiting for
the
estimate
done
Civil
done M/s
SKC
Outdoor
Pending
ZTE
M/W
pending(ZT
E)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
site handed
over to circle
40 Grg
Sikandarpur(Ba
da)
SSA OK HPC in Progress ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
41 Grg Lakhuwas IP IP IP IP IP IP IP Pending ZTE Combo pending
DET(Sohna
RD)
42 Grg Sector-67 SSA OK
Revise
application
Required
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending
DET(Sohna
RD)
Revise
application
Required
43 Grg Wazirpur SSA
site hand over ip
(indus) by circle
office
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending
DET(Sohna
RD)
site hand over
ip (indus) by
circle office
44 Grg
Sohna DENSE
AREA
SSA Bid not recd ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
45 Grg
BSF camp
bhondsi
SSA
Revise
application
Pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
46 Grg
PawalaKhusurP
ur/Sec 109
SSA OK
Revise
application
Pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-N)
* total sites=6,
Sites Hired =2 (HPC done with
agreement )
file sent for HPC=1
application required= 2

* so pending sites = 4 (file sent
for hpc + HPC done w/o
agreement +application
required )
E/C pending in hired sites=1
* total sites=19
sites hired =5 (HPC done with
agreement )
file sent for HPC=7 application
required=7

* so pending sites for hiring =
14 (file sent for hpc +HPC done
w/o agreement + application
required )
E/C pending in hired sites=5
* total sites=13
Sites Hired=4 (1 xge sites +3
HPC done with agreement )
file sent for HPC=1 (wip )
application required= 8 ( 6+1
ip)

* so pending sites = 9 (file sent
for hpc + HPC done w/o
agreement+application
required )
E/C pending in hired sites=2
Sr
No
SDC
A
Total
Sites(IP/SSA)
Hiring
of
Site(NR
/IP/SSA
)
Nominal
s
(NotRrc
eived/O
K/Not
Status of Site
hiring by SSA
(NR/IP/Y/to
HPC/WIP)
Agreem
ent
AD/D/N
R
EC status
(Y)
Tower
Founda
tion(NR
/Zte/Ci
vil)
Tower
Erection(
NR/SSA/Z
te)
Shelter
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS Status
Site
2G/com
bo
3G STATUS Concern DE Remarks
47 Grg Daultabad SSA ok
file sent to
HPC(at DE civil
for sign)
Civil Civil
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-N) file sent to HPC
48 Grg dharampur SSA OK
Revise
application
Pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-N)
new lat long
sent to circle
49 Grg
Kherki Majra
(Dhanwapur)
SSA OK
file sent to
HPC(at DE civil
for sign)
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-E)
file sent for
HPC
50 Grg Bajghera SSA OK done AD Yes
done
Civil
done M/s
SKC
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(ZT
E)
Pending
ZTE
Pending ZTE Combo pending DE(NWO-N)
site handed over to
circle
51 Grg Khetawas SSA OK Done DONE
file submitted
to DHBVNL
&wip
Done Done Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-W)
site handed
over to circle
52 Grg
SGT Medical
college near
Budera
/Chandu
SSA
Revise
application
Pending
Civil Civil
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending DE(NWO-W)
site hand over
ip (indus) by
circle office
53 Grg Mussaidpur SSA OK HPC Done DONE Civil Civil Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-W)
agreement
pending
54 Grg sultanpur SSA OK done DONE Civil Civil Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-W)
tower foundation
work stopped by
local authorities
55 Grg Baslambi SSA not ok
new lat long sent
to circle
Civil Civil Outdoor
Pending
ZTE
OFC Not reqd Pending ZTE Combo pending DE(NOW-W)
lat long sent to
circle, NOT OK
56 Grg
Gawal
pahari/Baliawa
s
SSA
new lat long sent
to circle
Civil Civil Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NOW-E)
party demanded
higher rent (Rs
25000/-)
57 Grg Ullawas SSA ok HPC Done ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NOW-E)
58 Grg Behrampur SSA ok HPC in Progress ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NOW-E) HPC in Progress
* total sites=6,
Sites Hired =2 (HPC done with
agreement )
file sent for HPC=1
application required= 2

* so pending sites = 4 (file sent
for hpc + HPC done w/o
agreement +application
required )
E/C pending in hired sites=1
* total sites=4
Sites hired =1 ( HPC done with
agreement )
HPC done w/o agreement =1
file sent for HPC=0
application required= 2

* so pending sites = 3 (file sent
for hpc +HPC DONE w/o
agreement + application
required )
E/C pending in hired sites=1
* total sites=3
Sites Hired =0
HPC done w/o agreement=1
file sent for HPC=1
application required= 1

* so pending sites = 3 (file sent
for hpc +HPC DONE w/o
agreement + application
required )
Mobile
JTO
nodals
JTO (MOB
) nodal -
GRG
Sh. PP
Gupta
JTO (MOB
) nodal -
Tauru
Sh. Rajiv
Kumar
Marothia
JTO (MOB
) nodal -
Tauru
Sh. Rajiv
Kumar
Marothia
JTO (MOB
) nodal -
GRG
Sh. PP
Gupta
JTO (MOB
) nodal -
Patudi
Sh. Ajay
Kumar
JTO (MOB
) nodal -
Tauru
Sh. Rajiv
Kumar
Marothia
JTO (MOB
) nodal -
Patudi
Sh. Ajay
Kumar
DATED 11-4-2013
Sr No
SDCA
Total
Sites(IP/SSA)
Hiring
of
Site(NR
/IP/SSA
)
Nominals
(NotRrceived
/OK/Not
Ok)RF
finalization
Status of
Site hiring
by SSA
(NR/IP/Y/to
HPC/WIP)
Agreem
ent
AD/D/N
R
EC status (Y)
Tower
Foundation
(NR/Zte/Civ
il)
Tower
Erection(
NR/SSA/Z
te)
58= 4+54
58=11
+4 +43
43=5+31+7 11/4/5/22/2 6 11/4/1 11/15/23
1 Grg Dhankot NR NR NR AD y NR NR
2 Grg Kherki Daula NR NR NR AD y NR NR
3 Grg Binola NR NR NR AD y NR NR
4 Grg Tikli NR NR NR AD y NR NR
5 Nuh Sudaka NR NR NR AD yes NR NR
6 Nuh salamba NR NR NR AD yes NR NR
7 Nuh Alduka NR NR NR AD y NR NR
8 Nuh Indri NR NR NR AD
pending
(tgt=20/4/13)
NR NR
9 Fpj Jamalgarh NR NR NR AD yes NR NR
10 Fpj Sikrawa NR NR NR AD yes NR NR
11 Fpj Gulalta NR NR NR AD yes NR NR
12 Grg TE Sohna SSA OK Y NR y (TE xge ) done Civil
done M/s
SKC
13 Grg CRPF Camp SSA OK Y WIP
discuss with crpf
admin. CRPF xge rent
file in accts for
payment release.
WIP/ZTE ZTE
14 Nuh Sangail SSA OK Y AD
25000 security
required. File is with
AO(SBP)
DONE M/s SKC
15 GRG RojkaMeo SSA OK Y AD
Room pendling. EC
security paid.
done Civil
done M/s
SKC
16 Grg Bajghera SSA OK Y AD Yes done Civil
done M/s
SKC
17 Fpj Bisru SSA OK y DONE
file submitted to
dhbvnl
DONE M/s SKC
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT
18 Grg mumtajpur SSA OK HPC Done Done File work started Civil Civil
19 Grg Sikhopur SSA OK HPC Done done File work started civil civil
20 Grg
Nahar pur
KASAN
SSA OK HPC Done Done File work started Civil civil
21 Grg
Imt Sec-8
manesar
SSA OK HPC Done DONE File work started ZTE ZTE
22 Grg
Nawada
fatehpur
SSA OK HPC Done DONE File work started Civil Civil
23 Grg Medawas SSA OK HPC Done DONE File work started civil WIP M/s SKC
24 Grg Khetawas SSA OK HPC Done DONE Pending ZTE ZTE
25 Grg
kota
khandewla
SSA OK HPC done WIP Civil Civil
26 Grg Hasanpur SSA OK HPC Done WIP ZTE ZTE
27 Grg sultanpur SSA OK HPC Done
done
30413
Civil Civil
28 Grg Palra SSA OK HPC done WIP ZTE ZTE
29 Grg
SGT Medical
college near
Budera
SSA OK hPC Done Civil Civil
30 Grg Silani SSA OK
file sent to
HPC
Civil Civil
31 Grg Sikandarpur SSA OK
file sent to
HPC
ZTE ZTE
32 Grg Sector-67 SSA OK
Revise
application
Pending
ZTE ZTE
33 Grg Nakhdola SSA Ok
Revise
application
Pending (file
sent to
sdeimt )
ZTE ZTE
34 Grg IMT-Sec-7 SSA OK
file sent to
HPC
ZTE ZTE
35 Grg
nsg gate no-2
(near)/Navran
gpur
SSA OK
file sent to
HPC
ZTE ZTE
36 Grg Hayatpur SSA
lat/long sent
to circle
ZTE ZTE
37 Grg
Bhangrola/Kak
rola
SSA OK HPC done ZTE ZTE
38 Grg IMT sect-1 SSA OK
file sent for
HPC
ZTE ZTE
39 Grg
Jatuli/Hali
Mandi 2
SSA OK
Revise
application
Pending
Civil Civil
40 Grg Near GITM SSA OK
file sent for
HPC
Civil Civil
41 Grg
Kherki Majra
(Dhanwapur)
SSA OK
file sent for
HPC
ZTE ZTE
42 Grg Mussaidpur SSA OK
file sent for
HPC
Civil Civil
43 Grg
Sohna DENSE
AREA
IP IP IP IP IP IP
44 Grg Lakhuwas IP IP IP IP IP IP
45 Grg Kasan IP IP IP IP IP IP
46 Grg
Imt Sec-3
manesar
IP IP IP IP IP IP
47 Grg
Bilaspur,
Haryana
IP IP IP IP IP IP
48 Grg
BSF camp
bhondsi
SSA
letter sent to
circle to
consider as
IP site
Recommend
ed for IP
ZTE ZTE
49 Grg Baslambi SSA
Letter sent
to circle to
consider as
IP site
Recommend
ed for IP
Civil Civil
50 Grg Ullawas SSA
Letter sent
to circle to
consider as
IP site
Recommend
ed for IP
ZTE ZTE
51 Grg Behrampur SSA
Letter sent
to circle to
consider as
IP site
Recommend
ed for IP
ZTE ZTE
52 Grg
Gawal
pahari/Baliaw
as
SSA OK WIP Civil Civil
53 Grg IMT-sec-6 SSA
letter sent to
circle to
consider as
IP site
Recommend
ed for IP
ZTE ZTE
54 Grg Wazirpur SSA
letter sent to
circle to
consider as
IP site
Recommend
ed for IP
ZTE ZTE
55 Grg
Amity(Near
Pachgaon)
SSA Ok
Recommend
ed for IP
ZTE ZTE
56 Grg
PawalaKhusur
Pur/Sec 109
SSA
Letter sent
to circle
toconsider as
ip site
Recommend
ed for IP
ZTE ZTE
57 Grg Daultabad SSA
Letter sent
to circle
toconsider as
ip site
Recommend
ed for IP
Civil Civil
58 Grg dharampur SSA
letter sent to
circle to
consider as
IP site
Recommend
ed for IP
ZTE ZTE
DATED 11-4-2013
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTATI
C
BTS Status
ALREADY
SHELTER
DONE Done Pending ZTE Pending ZTE OFC Done done Pending ZTE
ROOM DONE DONE Installed Installed Installed OFC Done done Installed
Room Already DONE Done Done done OFC Done done Installed
Outdoor Not reqd Done Done done
M/W
pending(ZTE)
Not reqd Pending ZTE
Outdoor Not reqd Done Pending ZTE Pending ZTE
M/W
pending(ZTE)
Not reqd Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE
M/W
pending(ZTE)
Pending
ZTE
Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE
M/W
pending(ZTE)
Pending
ZTE
Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE
M/W
pending(ZTE)
Pending
ZTE
Pending ZTE
Outdoor Not reqd Done Done done
M/W
pending(ZTE)
Not reqd Pending ZTE
Room Already Done Done Done Done OFC Done done Installed
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE
M/W
pending(ZTE)
Pending
ZTE
Pending ZTE
Room Already Done Already Already Already OFC Done done Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE
OFC
Pending(DE Tx
Urban)
Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE
M/W
pending(ZTE)
Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE
M/W
pending(ZTE)
Not reqd Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE
M/W
pending(ZTE)
Pending
ZTE
Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE OFC/wip Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE OFC Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE OFC
Pending
ZTE
Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE OFC Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE OFC Not reqd Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE OFC
Pending
ZTE
Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE
outdoor Pending ZTE Pending ZTE Pending ZTE Pending ZTE OFC
Pending
ZTE
Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
IP IP IP IP IP IP IP Pending ZTE
IP Pending ZTE
IP Pending ZTE
IP Pending ZTE
IP Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE OFC Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE OFC
Pending
ZTE
Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Site
2G/comb
o
Concern DE Remarks
18/40
Combo DE(NWO-II)
Ready for BTS instln, ZTE
infra pndg.
Combo DET(Sohna RD) BTS instld-Integrated
Combo SDE(IMT) BTS instld-Integrated
2G DET(Sohna RD)
2G DE(Mewat)
2G DE(Mewat)
2G DE(Mewat)
2G DE(Mewat)
2G DE(Mewat)
Combo DE(Mewat) BTS on air on 30.04.13
2G DE(Mewat)
Combo DET(Sohna RD) Ready for BTS installation
Combo DET(Sohna RD) site handed over to circle
2G DE(Mewat)
Combo DET(Sohna RD)
Combo DE(NWO-II)
Notice rd from Panchayat
for not taking permission
2G DE(Mewat)
2G SDE(IMT) site handed over to circle
Combo SDE(IMT) site handed over to circle
Combo SDE(IMT) site handed over to circle
Combo SDE(IMT) site handed over to circle
Combo SDE(IMT) site handed over to circle
Combo DET(Sohna RD) site handed over to circle
Combo DE(NWO-II)
Combo SDE(IMT)
Tehsildar objecting
agreement
Combo DET(Sohna RD)
Combo DE(NWO-II)
Combo DET(Sohna RD)
owner wants in writing
that TWR will be removed
after 15 years
Combo DE(NWO-II)
Panchayat refused
agreement
Combo DET(Sohna RD)
Combo DET(Sohna RD)
Party not coming. Hpc
pndg.
Combo DET(Sohna RD)
High rent 40000. New site
to be searched.
Combo SDE(IMT)
New site lat-long ok. Appln
pending.
Combo SDE(IMT) Civil SDE rejected site
Combo SDE(IMT)
Combo SDE(IMT) Party rejecting
Combo SDE(IMT) Party rejecting
Combo SDE(IMT)
Combo SDE(IMT)
1. party rejected. 2. lat-
long failed. 3. new site to
be searched
Combo SDE(IMT)
Combo DE(NWO-II)
Combo DE(NWO-IV)
Combo DET(Sohna RD)
Combo DET(Sohna RD)
Combo SDE(IMT)
Combo SDE(IMT)
Combo SDE(IMT)
Combo DET(Sohna RD)
Combo DE(NWO-II)
Combo DE(NWO-IV)
Combo DE(NWO-IV)
Combo DE(NWO-IV)
Combo SDE(IMT)
Combo DET(Sohna RD)
Combo SDE(IMT)
Combo DE(NWO-II)
Combo DE(NWO-II)
Combo DE(NWO-II)
DATED 11-4-2013
Sr No
SDCA
Total
Sites(IP/SSA)
Hiring
of
Site(NR
/IP/SSA
)
Nominals
(NotRrceived
/OK/Not
Ok)RF
finalization
Status of
Site hiring
by SSA
(NR/IP/Y/to
HPC/WIP)
Agreem
ent
AD/D/N
R
EC status (Y)
Tower
Foundation
(NR/Zte/Civ
il)
Tower
Erection(
NR/SSA/Z
te)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTATI
C
BTS Status
Site
2G/comb
o
Concern DE
58= 4+54
58=11
+4 +43
43=5+31+7 11/4/5/22/2 6 11/4/1 11/15/23 18/40
1 Grg Dhankot NR NR NR AD y NR NR
ALREADY
SHELTER
DONE Done Pending ZTE Pending ZTE OFC Done done Pending ZTE Combo DE(NWO-II)
2 Grg Kherki Daula NR NR NR AD y NR NR ROOM DONE DONE Installed Installed Installed OFC Done done Installed Combo DET(Sohna RD)
3 Grg Binola NR NR NR AD y NR NR RoomAlready DONE Done Done done OFC Done done Installed Combo SDE(IMT)
4 Grg Tikli NR NR NR AD y NR NR Outdoor Not reqd Done Done done
M/W
pending(ZTE)
Not reqd Pending ZTE 2G DET(Sohna RD)
5 Nuh Sudaka NR NR NR AD yes NR NR Outdoor Not reqd Done Pending ZTE Pending ZTE
M/W
pending(ZTE)
Not reqd Pending ZTE 2G DE(Mewat)
6 Nuh salamba NR NR NR AD yes NR NR
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE
M/W
pending(ZTE)
Pending
ZTE
Pending ZTE 2G DE(Mewat)
7 Nuh Alduka NR NR NR AD y NR NR
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE
M/W
pending(ZTE)
Pending
ZTE
Pending ZTE 2G DE(Mewat)
8 Nuh Indri NR NR NR AD
pending
(tgt=20/4/13)
NR NR
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE
M/W
pending(ZTE)
Pending
ZTE
Pending ZTE 2G DE(Mewat)
9 Fpj Jamalgarh NR NR NR AD yes NR NR Outdoor Not reqd Done Done done
M/W
pending(ZTE)
Not reqd Pending ZTE 2G DE(Mewat)
10 Fpj Sikrawa NR NR NR AD yes NR NR RoomAlready Done Done Done Done OFC Done done Installed Combo DE(Mewat)
11 Fpj Gulalta NR NR NR AD yes NR NR
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE
M/W
pending(ZTE)
Pending
ZTE
Pending ZTE 2G DE(Mewat)
12 Grg TE Sohna SSA OK Y NR y (TE xge ) done Civil
done M/s
SKC
RoomAlready Done Already Already Already OFC Done done Pending ZTE Combo DET(Sohna RD)
13 Grg CRPF Camp SSA OK Y WIP PAYMENT made WIP/ZTE ZTE Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE
OFC
Pending(DE Tx
Urban)
Not reqd Pending ZTE Combo DET(Sohna RD)
14 Nuh Sangail SSA OK Y AD
25000 security
required. File is with
AO(SBP)
DONE WIP Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE
M/W
pending(ZTE)
Not reqd Pending ZTE 2G DE(Mewat)
15 GRG RojkaMeo SSA OK Y AD
Roompendling. EC
security paid.
done Civil
done M/s
SKC
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE
M/W
pending(ZTE)
Not reqd Pending ZTE Combo DET(Sohna RD)
16 Grg Bajghera SSA OK Y AD Yes done Civil
done M/s
SKC
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE
M/W
pending(ZTE)
Pending
ZTE
Pending ZTE Combo DE(NWO-II)
17 Fpj Bisru SSA OK y DONE
file submitted to
dhbvnl
DONE M/s SKC Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE 2G DE(Mewat)
18 Grg mumtajpur SSA OK HPC Done Done File work started Done WIP outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE OFC/wip Not reqd Pending ZTE 2G SDE(IMT)
19 Grg Sikhopur SSA OK HPC Done done File work started civil civil Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE OFC Not reqd Pending ZTE Combo SDE(IMT)
20 Grg
Nahar pur
KASAN
SSA OK HPC Done Done File work started WIP/Civil civil Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo SDE(IMT)
21 Grg
Imt Sec-8
manesar
SSA OK HPC Done DONE File work started ZTE ZTE Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo SDE(IMT)
22 Grg
Nawada
fatehpur
SSA OK HPC Done DONE File work started done Civil Civil Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo SDE(IMT)
23 Grg Medawas SSA OK HPC Done DONE File work started done Civil M/s SKC
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE OFC
Pending
ZTE
Pending ZTE Combo DET(Sohna RD)
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT
24 Grg Khetawas SSA OK HPC Done DONE Pending ZTE ZTE Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DE(NWO-II)
25 Grg
kota
khandewla
SSA OK HPC done WIP Civil Civil outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE OFC Not reqd Pending ZTE Combo SDE(IMT)
26 Grg Hasanpur SSA OK HPC Done WIP ZTE ZTE Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DET(Sohna RD)
27 Grg sultanpur SSA OK HPC Done
done
30413
Civil Civil Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DE(NWO-II)
28 Grg Palra SSA OK HPC done WIP ZTE ZTE Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE OFC Not reqd Pending ZTE Combo DET(Sohna RD)
29 Grg
SGT Medical
college near
Budera
/Chandu
SSA
Revise
application
Pending
Civil Civil
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE Combo DE(NWO-II)
30 Grg Silani SSA OK HPC Done Civil Civil
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE OFC
Pending
ZTE
Pending ZTE Combo DET(Sohna RD)
31 Grg Sikandarpur SSA OK
file sent to
HPC
ZTE ZTE Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DET(Sohna RD)
32 Grg Sector-67 SSA
Revise
application
Pending
ZTE ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE Combo DET(Sohna RD)
33 Grg Nakhdola SSA Ok
Revise
application
Pending (file
sent to
sdeimt )
ZTE ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE Combo SDE(IMT)
34 Grg IMT-Sec-7 SSA OK
file sent to
HPC
ZTE ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE Combo SDE(IMT)
35 Grg
nsg gate no-2
(near)/Navran
gpur
SSA OK
file sent to
HPC
ZTE ZTE outdoor Pending ZTE Pending ZTE Pending ZTE Pending ZTE OFC
Pending
ZTE
Pending ZTE Combo SDE(IMT)
36 Grg Hayatpur SSA
lat/long sent
to circle
ZTE ZTE Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo SDE(IMT)
37 Grg
Bhangrola/Kak
rola
SSA OK HPC done ZTE ZTE Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo SDE(IMT)
38 Grg IMT sect-1 SSA OK
file sent for
HPC
ZTE ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE Combo SDE(IMT)
39 Grg
Jatuli/Hali
Mandi 2
SSA
Revise
application
Pending
Civil Civil Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo SDE(IMT)
40 Grg Near GITM SSA OK
file sent for
HPC
Civil Civil outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo SDE(IMT)
41 Grg
Kherki Majra
(Dhanwapur)
SSA OK
file sent for
HPC
ZTE ZTE Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DE(NWO-II)
42 Grg Mussaidpur SSA OK
file sent for
HPC
Civil Civil Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DE(NWO-IV)
43 Grg
Sohna DENSE
AREA
SSA Bid not recd ZTE ZTE Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DET(Sohna RD)
44 Grg Lakhuwas IP IP IP IP IP IP IP Pending ZTE Combo DET(Sohna RD)
45 Grg Kasan IP IP IP IP IP IP IP Pending ZTE Combo SDE(IMT)
46 Grg
Imt Sec-3
manesar
IP IP IP IP IP IP IP Pending ZTE Combo SDE(IMT)
47 Grg
Bilaspur,
Haryana
IP IP IP IP IP IP IP Pending ZTE Combo SDE(IMT)
48 Grg
BSF camp
bhondsi
SSA
Revise
application
Pending
ZTE ZTE Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DET(Sohna RD)
49 Grg Baslambi SSA
Revise
application
Pending
Civil Civil Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE OFC Not reqd Pending ZTE Combo DE(NWO-II)
50 Grg Ullawas SSA
Revise
application
Pending
ZTE ZTE Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DE(NWO-IV)
51 Grg Behrampur SSA
Revise
application
Pending
ZTE ZTE Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DE(NWO-IV)
52 Grg
Gawal
pahari/Baliaw
as
SSA OK WIP Civil Civil Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DE(NWO-IV)
53 Grg IMT-sec-6 SSA
Revise
application
Pending
ZTE ZTE Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo SDE(IMT)
54 Grg Wazirpur SSA
Revise
application
Pending
ZTE ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE Combo DET(Sohna RD)
55 Grg
Amity(Near
Pachgaon)
SSA
Revise
application
Pending
ZTE ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE OFC
Pending
ZTE
Pending ZTE Combo SDE(IMT)
56 Grg
PawalaKhusur
Pur/Sec 109
SSA
Revise
application
Pending
ZTE ZTE Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DE(NWO-II)
57 Grg Daultabad SSA
Revise
application
Pending
Civil Civil
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DE(NWO-II)
58 Grg dharampur SSA
Revise
application
Pending
ZTE ZTE Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DE(NWO-II)
Remarks
Ready for BTS instln, ZTE
infra pndg.
BTS instld-Integrated
BTS on AIR 01/05/2013
BTS on air on 30.04.13
Ready for BTS installation
site handed over to circle
site handed over to circle
site handed over to circle
site handed over to circle
site handed over to circle
site handed over to circle
site handed over to circle
Tehsildar objecting
agreement
owner wants in writing that
TWR will be removed after
15 years
Panchayat refused
agreement
Party not coming. Hpc pndg.
High rent 40000. New site to
be searched.
New site lat-long ok. Appln
pending.
Civil SDE rejected site
NSG ready to give Site
,SDE(IMT)
1. party rejected. 2. lat-long
failed. 3. new site to be
searched
DATED 04-05-2013
Summary: Total sites=58, IP=4, Twr Erected=11, AlrdyAgreemDone=3, NewAgreemDone=11, ToBeHired=29, AgreemPndg=4, HPCpndg=9, HPCfilePndg=1, LatLongApprvlPndg=1, BidPndg=14
Sr No
SDCA
Total
Sites(IP/SSA)
Hiring
of
Site(NR
/IP/SSA
)
Nominals
(NotRrceived
/OK/Not
Ok)RF
finalization
Status of
Site hiring
by SSA
(NR/IP/Y/to
HPC/WIP)
Agreem
ent
AD/D/N
R
EC status (Y)
Tower
Foundation
(NR/Zte/Civ
il)
Tower
Erection(
NR/SSA/Z
te)
58= 4+54
58=11
+4 +43
43=5+31+7 11/4/5/22/2 6 11/4/1 11/15/23
1 Grg Dhankot NR NR NR AD y NR NR
2 Grg Kherki Daula NR NR NR AD y NR NR
3 Grg Binola NR NR NR AD y NR NR
4 Grg Tikli NR NR NR AD y NR NR
5 Nuh Sudaka NR NR NR AD yes NR NR
6 Nuh salamba NR NR NR AD yes NR NR
7 Nuh Alduka NR NR NR AD y NR NR
8 Nuh Indri NR NR NR AD
pending
(tgt=20/4/13)
NR NR
9 Fpj Jamalgarh NR NR NR AD yes NR NR
10 Fpj Sikrawa NR NR NR AD yes NR NR
11 Fpj Gulalta NR NR NR AD yes NR NR
12 Grg TE Sohna SSA OK Y NR y (TE xge ) done Civil
done M/s
SKC
13 Grg CRPF Camp SSA OK Y WIP
Yes (CRPF will
provide EC)
WIP/ZTE ZTE
14 Nuh Sangail SSA OK Y AD
25000 security
required. File is with
AO(SBP)
DONE done
15 GRG RojkaMeo SSA OK Y AD EC security paid. done Civil
done M/s
SKC
16 Grg Bajghera SSA OK Y AD Yes done Civil
done M/s
SKC
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT
17 Fpj Bisru SSA OK y DONE
file submitted to
dhbvnl
DONE M/s SKC
18 Grg mumtajpur SSA OK HPC Done Done File work started Done DONE
19 Grg Sikhopur SSA OK HPC Done done File work started civil civil
20 Grg
Nahar pur
KASAN
SSA OK HPC Done Done File work started DONE WIP
21 Grg
Imt Sec-8
manesar
SSA OK HPC Done DONE File work started ZTE ZTE
22 Grg
Nawada
fatehpur
SSA OK HPC Done DONE File work started done Civil W/P
23 Grg Medawas SSA OK HPC Done DONE File work started DONE DONE
24 Grg Khetawas SSA OK HPC Done DONE Pending ZTE ZTE
25 Grg sultanpur SSA OK HPC Done
done
30413
Civil Civil
26 Grg
kota
khandewla
SSA OK HPC done WIP Civil Civil
27 Grg Hasanpur SSA OK HPC Done WIP ZTE ZTE
28 Grg Palra SSA OK HPC done WIP ZTE ZTE
29 Grg Silani SSA OK HPC Done Civil Civil
30 Grg
Gawal
pahari/Baliaw
as
SSA OK HPC Done Civil Civil
31 Grg Sikandarpur SSA OK
file sent to
HPC
ZTE ZTE
32 Grg Nakhdola SSA Ok
file sent to
HPC
ZTE ZTE
33 Grg IMT-Sec-7 SSA OK
file sent to
HPC
ZTE ZTE
34 Grg
nsg gate no-2
(near)/Navran
gpur
SSA OK
file sent to
HPC
ZTE ZTE
35 Grg
Bhangrola/Kak
rola
SSA OK
file sent to
HPC
ZTE ZTE
36 Grg IMT sect-1 SSA OK
file sent for
HPC
ZTE ZTE
37 Grg Near GITM SSA OK HPC DONE Civil Civil
38 Grg
Kherki Majra
(Dhanwapur)
SSA OK
file sent for
HPC
ZTE ZTE
39 Grg Mussaidpur SSA OK
file sent for
HPC
Civil Civil
40 Grg Hayatpur SSA
lat/long sent
to circle
ZTE ZTE
41 Grg Sector-67 SSA
Revise
application
Pending
ZTE ZTE
42 Grg
SGT Medical
college near
Budera
/Chandu
SSA
Revise
application
Pending
Civil Civil
43 Grg
Jatuli/Hali
Mandi 2
SSA
lat/long sent
to circle
Civil Civil
44 Grg
Sohna DENSE
AREA
SSA Bid not recd ZTE ZTE
45 Grg
BSF camp
bhondsi
SSA
Revise
application
Pending
ZTE ZTE
46 Grg Baslambi SSA
Revise
application
Pending
Civil Civil
47 Grg Ullawas SSA
Revise
application
Pending
ZTE ZTE
48 Grg Behrampur SSA
Revise
application
Pending
ZTE ZTE
49 Grg IMT-sec-6 SSA
Revise
application
Pending
ZTE ZTE
50 Grg Wazirpur SSA
Revise
application
Pending
ZTE ZTE
51 Grg
Amity(Near
Pachgaon)
SSA
Revise
application
Pending
ZTE ZTE
52 Grg
PawalaKhusur
Pur/Sec 109
SSA
Revise
application
Pending
ZTE ZTE
53 Grg Daultabad SSA
Revise
application
Pending
Civil Civil
54 Grg dharampur SSA
Revise
application
Pending
ZTE ZTE
55 Grg Lakhuwas IP IP IP IP IP IP
56 Grg Kasan IP IP IP IP IP IP
57 Grg
Imt Sec-3
manesar
IP IP IP IP IP IP
58 Grg
Bilaspur,
Haryana
IP IP IP IP IP IP
DATED 04-05-2013
Summary: Total sites=58, IP=4, Twr Erected=11, AlrdyAgreemDone=3, NewAgreemDone=11, ToBeHired=29, AgreemPndg=4, HPCpndg=9, HPCfilePndg=1, LatLongApprvlPndg=1, BidPndg=14
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTATI
C
BTS Status
ALREADY
SHELTER
DONE Done Pending ZTE Pending ZTE OFC Done done Pending ZTE
ROOM DONE DONE Installed Installed Installed OFC Done done Installed
Room Already DONE Done Done done OFC Done done Installed
Outdoor Not reqd Done Done done
M/W
pending(ZTE)
Not reqd Pending ZTE
Outdoor Not reqd Done Pending ZTE Pending ZTE
M/W
pending(ZTE)
Not reqd Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE
M/W
pending(ZTE)
Pending
ZTE
Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE
M/W
pending(ZTE)
Pending
ZTE
Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE
M/W
pending(ZTE)
Pending
ZTE
Pending ZTE
Outdoor Not reqd Done Done done
M/W
pending(ZTE)
Not reqd Pending ZTE
Room Already Done Done Done Done OFC Done done Installed
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE
M/W
pending(ZTE)
Pending
ZTE
Pending ZTE
Room Already Done Already Already Already OFC Done done Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE
OFC
Pending(DE Tx
Urban)
Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE
M/W
pending(ZTE)
Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE
M/W
pending(ZTE)
Not reqd Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE
M/W
pending(ZTE)
Pending
ZTE
Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE OFC/wip Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE OFC Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE OFC
Pending
ZTE
Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE OFC Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE OFC Not reqd Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE OFC
Pending
ZTE
Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE
outdoor Pending ZTE Pending ZTE Pending ZTE Pending ZTE OFC
Pending
ZTE
Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE
outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE OFC Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE OFC
Pending
ZTE
Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
IP Pending ZTE
IP Pending ZTE
IP Pending ZTE
IP Pending ZTE
Summary: Total sites=58, IP=4, Twr Erected=11, AlrdyAgreemDone=3, NewAgreemDone=11, ToBeHired=29, AgreemPndg=4, HPCpndg=9, HPCfilePndg=1, LatLongApprvlPndg=1, BidPndg=14
Site
2G/comb
o
Concern DE Remarks
18/40
Combo DE(NWO-II)
Ready for BTS instln, ZTE
infra pndg.
Combo DET(Sohna RD) BTS on AIR 03/05/2013
Combo SDE(IMT) BTS on AIR 01/05/2013
2G DET(Sohna RD)
2G DE(Mewat)
2G DE(Mewat)
2G DE(Mewat)
2G DE(Mewat)
2G DE(Mewat)
Combo DE(Mewat) BTS on air on 30.04.13
2G DE(Mewat)
Combo DET(Sohna RD) Ready for BTS installation
Combo DET(Sohna RD) site handed over to circle
2G DE(Mewat)
Combo DET(Sohna RD)
Combo DE(NWO-II)
2G DE(Mewat)
2G SDE(IMT) site handed over to circle
Combo SDE(IMT)
site handed over to circle but
panchayat disputed
Combo SDE(IMT) site handed over to circle
Combo SDE(IMT) site handed over to circle
Combo SDE(IMT) site handed over to circle
Combo DET(Sohna RD) site handed over to circle
Combo DE(NWO-II)
Combo DE(NWO-II)
Combo SDE(IMT)
Tehsildar objecting
agreement
Combo DET(Sohna RD)
Combo DET(Sohna RD)
owner wants in writing that
TWR will be removed after
15 years
Combo DET(Sohna RD)
Combo DE(NWO-IV)
Combo DET(Sohna RD) Party not coming. Hpc pndg.
Combo SDE(IMT)
New site lat-long ok. Appln
pending.
Combo SDE(IMT) Civil SDE rejected site
Combo SDE(IMT)
NSG ready to give Site
now...SDE(IMT)
Combo SDE(IMT)
Combo SDE(IMT)
Combo SDE(IMT)
Combo DE(NWO-II)
Combo DE(NWO-II)
Combo SDE(IMT)
Combo DET(Sohna RD)
High rent 40000. New site to
be searched.
Combo DE(NWO-II)
Panchayat refused
agreement
Combo SDE(IMT)
1. party rejected. 2. lat-long
failed. 3. new site to be
searched
Combo DET(Sohna RD)
Combo DET(Sohna RD)
Combo DE(NWO-II)
Combo DE(NWO-IV)
Combo DE(NWO-IV)
Combo SDE(IMT)
Combo DET(Sohna RD)
Combo SDE(IMT)
Combo DE(NWO-II)
Combo DE(NWO-II)
Combo DE(NWO-II)
Combo DET(Sohna RD)
Combo SDE(IMT)
Combo SDE(IMT)
Combo SDE(IMT)
DATED 16-05-2013
Summary: Total sites=58, IP=4, Twr Erected=11, AlrdyAgreemDone=3, NewAgreemDone=11, ToBeHired=29, AgreemPndg=4, HPCpndg=9, HPCfilePndg=1, LatLongApprvlPndg=1, BidPndg=14
Sr No
SDCA
Total
Sites(IP/SSA)
Hiring
of
Site(NR
/IP/SSA
)
Nominals
(NotRrceived
/OK/Not
Ok)RF
finalization
Status of
Site hiring
by SSA
(NR/IP/Y/to
HPC/WIP)
Agreem
ent
AD/D/N
R
EC status (Y)
Tower
Foundation
(NR/Zte/Civ
il)
Tower
Erection(
NR/SSA/Z
te)
58= 4+54
58=11
+4 +43
43=5+31+7 11/4/5/22/2 6 11/4/1 11/15/23
1 Grg Dhankot NR NR NR AD y NR NR
2 Grg Kherki Daula NR NR NR AD y NR NR
3 Grg Binola NR NR NR AD y NR NR
4 Grg Tikli NR NR NR AD y NR NR
5 Nuh Sudaka NR NR NR AD yes NR NR
6 Nuh salamba NR NR NR AD yes NR NR
7 Nuh Alduka NR NR NR AD y NR NR
8 Nuh Indri NR NR NR AD
pending
(tgt=20/5/13)
NR NR
9 Fpj Jamalgarh NR NR NR AD yes NR NR
10 Fpj Sikrawa NR NR NR AD yes NR NR
11 Fpj Gulalta NR NR NR AD yes NR NR
12 Grg TE Sohna SSA OK Y NR y (TE xge ) done Civil
done M/s
SKC
13 Grg CRPF Camp SSA OK Y WIP
Yes (CRPF will
provide EC)
WIP/ZTE ZTE
14 Nuh Sangail SSA OK Y AD
25000 security
required. File is with
AO(SBP)
DONE done
15 GRG RojkaMeo SSA OK Y AD
EC security paid.
Waiting for the
estimate
done Civil
done M/s
SKC
16 Grg Bajghera SSA OK Y AD Yes done Civil
done M/s
SKC
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT
17 Fpj Bisru SSA OK y DONE
file submitted to
dhbvnl
DONE M/s SKC
18 Grg mumtajpur SSA OK HPC Done Done File work started Done DONE
19 Grg Sikhopur SSA OK HPC Done done File work started civil civil
20 Grg
Nahar pur
KASAN
SSA OK HPC Done Done File work started DONE WIP
21 Grg
Imt Sec-8
manesar
SSA OK HPC Done DONE File work started ZTE ZTE
22 Grg
Nawada
fatehpur
SSA OK HPC Done DONE File work started done Civil W/P
23 Grg Medawas SSA OK HPC Done DONE File work started DONE DONE
24 Grg Khetawas SSA OK HPC Done DONE Pending ZTE ZTE
25 Grg sultanpur SSA OK HPC Done
done
30413
Civil Civil
26 Grg
kota
khandewla
SSA OK HPC done WIP Civil Civil
27 Grg Hasanpur SSA OK HPC Done WIP ZTE ZTE
28 Grg Palra SSA OK HPC done WIP ZTE ZTE
29 Grg Silani SSA OK
HPC in
progress
Civil Civil
30 Grg
Gawal
pahari/Baliaw
as
SSA OK HPC Done Civil Civil
31 Grg Sikandarpur SSA OK
file sent to
HPC
ZTE ZTE
32 Grg Nakhdola SSA Ok
file sent to
HPC
ZTE ZTE
33 Grg IMT-Sec-7 SSA OK
file sent to
HPC
ZTE ZTE
34 Grg
nsg gate no-2
(near)/Navran
gpur
SSA OK
file sent to
HPC
ZTE ZTE
35 Grg
Bhangrola/Kak
rola
SSA OK
file sent to
HPC
ZTE ZTE
36 Grg IMT sect-1 SSA OK
file sent for
HPC
ZTE ZTE
37 Grg Near GITM SSA OK HPC DONE Civil Civil
38 Grg
Kherki Majra
(Dhanwapur)
SSA OK
file sent for
HPC
ZTE ZTE
39 Grg Mussaidpur SSA OK
file sent for
HPC
Civil Civil
40 Grg Hayatpur SSA
lat/long sent
to circle
ZTE ZTE
41 Grg Sector-67 SSA
Revise
application
Pending
ZTE ZTE
42 Grg
SGT Medical
college near
Budera
/Chandu
SSA
Revise
application
Pending
Civil Civil
43 Grg
Jatuli/Hali
Mandi 2
SSA
lat/long sent
to circle
Civil Civil
44 Grg
Sohna DENSE
AREA
SSA Bid not recd ZTE ZTE
45 Grg
BSF camp
bhondsi
SSA
Revise
application
Pending
ZTE ZTE
46 Grg Baslambi SSA
Revise
application
Pending
Civil Civil
47 Grg Ullawas SSA
Revise
application
Pending
ZTE ZTE
48 Grg Behrampur SSA
Revise
application
Pending
ZTE ZTE
49 Grg IMT-sec-6 SSA
Revise
application
Pending
ZTE ZTE
50 Grg Wazirpur SSA
Revise
application
Pending
ZTE ZTE
51 Grg
Amity(Near
Pachgaon)
SSA
Revise
application
Pending
ZTE ZTE
52 Grg
PawalaKhusur
Pur/Sec 109
SSA
Revise
application
Pending
ZTE ZTE
53 Grg Daultabad SSA
Revise
application
Pending
Civil Civil
54 Grg dharampur SSA
Revise
application
Pending
ZTE ZTE
55 Grg Lakhuwas IP IP IP IP IP IP
56 Grg Kasan IP IP IP IP IP IP
57 Grg
Imt Sec-3
manesar
IP IP IP IP IP IP
58 Grg
Bilaspur,
Haryana
IP IP IP IP IP IP
DATED 16-05-2013
Summary: Total sites=58, IP=4, Twr Erected=11, AlrdyAgreemDone=3, NewAgreemDone=11, ToBeHired=29, AgreemPndg=4, HPCpndg=9, HPCfilePndg=1, LatLongApprvlPndg=1, BidPndg=14
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTATI
C
BTS Status
ALREADY
SHELTER
DONE Done Pending ZTE Pending ZTE OFC Done done Pending ZTE
ROOM DONE DONE Installed Installed Installed OFC Done done Installed
Room Already DONE Done Done done OFC Done done Installed
Outdoor Not reqd Done Done done
M/W
pending(ZTE)
Not reqd Pending ZTE
Outdoor Not reqd Done Pending ZTE Pending ZTE
M/W
pending(ZTE)
Not reqd Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE
M/W
pending(ZTE)
Pending
ZTE
Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE
M/W
pending(ZTE)
Pending
ZTE
Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE
M/W
pending(ZTE)
Pending
ZTE
Pending ZTE
Outdoor Not reqd Done Done done
M/W
pending(ZTE)
Not reqd Pending ZTE
Room Already Done Done Done Done OFC Done done Installed
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE
M/W
pending(ZTE)
Pending
ZTE
Pending ZTE
Room Already Done Already Already Already OFC Done done Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE
OFC
Pending(DE Tx
Urban)
Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE
M/W
pending(ZTE)
Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE
M/W
pending(ZTE)
Not reqd Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE
M/W
pending(ZTE)
Pending
ZTE
Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE OFC/wip Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE OFC Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE OFC
Pending
ZTE
Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE OFC Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE OFC Not reqd Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE OFC
Pending
ZTE
Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE
outdoor Pending ZTE Pending ZTE Pending ZTE Pending ZTE OFC
Pending
ZTE
Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE
outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE OFC Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE OFC
Pending
ZTE
Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE
IP Pending ZTE
IP Pending ZTE
IP Pending ZTE
IP Pending ZTE
Summary: Total sites=58, IP=4, Twr Erected=11, AlrdyAgreemDone=3, NewAgreemDone=11, ToBeHired=29, AgreemPndg=4, HPCpndg=9, HPCfilePndg=1, LatLongApprvlPndg=1, BidPndg=14
Site
2G/comb
o
Concern DE Remarks
18/40
Combo DE(NWO-II)
Ready for BTS instln, ZTE
infra pndg.
Combo DET(Sohna RD) BTS on AIR 03/05/2013
Combo SDE(IMT) BTS on AIR 01/05/2013
2G DET(Sohna RD)
2G DE(Mewat)
2G DE(Mewat)
2G DE(Mewat)
2G DE(Mewat)
2G DE(Mewat)
Combo DE(Mewat) BTS on air on 30.04.13
2G DE(Mewat)
Combo DET(Sohna RD) Ready for BTS installation
Combo DET(Sohna RD) site handed over to circle
2G DE(Mewat)
Combo DET(Sohna RD)
Combo DE(NWO-II)
2G DE(Mewat)
2G SDE(IMT) site handed over to circle
Combo SDE(IMT)
Court case done by
neighbour
Combo SDE(IMT)
Court case done by
neighbour
Combo SDE(IMT)
Court case done by
neighbour
Combo SDE(IMT) site handed over to circle
Combo DET(Sohna RD) site handed over to circle
Combo DE(NWO-II)
Combo DE(NWO-II)
Combo SDE(IMT)
Tehsildar objecting
agreement
Combo DET(Sohna RD) party will come on 18-5-13
Combo DET(Sohna RD)
owner wants in writing that
TWR will be removed after
15 years
Combo DET(Sohna RD)
Combo DE(NWO-IV)
Combo DET(Sohna RD) Party will come on 24-5-13
Combo SDE(IMT)
New site lat-long ok. Appln
pending.
Combo SDE(IMT) Civil SDE rejected site
Combo SDE(IMT)
NSG ready to give Site
now...SDE(IMT)
Combo SDE(IMT)
Combo SDE(IMT)
Combo SDE(IMT)
Combo DE(NWO-II)
site visit pending by hpc
team
Combo DE(NWO-II)
site visit pending by hpc
team
Combo SDE(IMT)
Combo DET(Sohna RD)
High rent 40000. New site to
be searched.
Combo DE(NWO-II)
Panchayat refused
agreement
Combo SDE(IMT)
1. party rejected. 2. lat-long
failed. 3. new site to be
searched
Combo DET(Sohna RD)
Combo DET(Sohna RD)
Combo DE(NWO-II)
Combo DE(NWO-IV)
Combo DE(NWO-IV)
Combo SDE(IMT)
Combo DET(Sohna RD)
Combo SDE(IMT)
Combo DE(NWO-II)
Combo DE(NWO-II)
Combo DE(NWO-II)
Combo DET(Sohna RD)
Combo SDE(IMT)
Combo SDE(IMT)
Combo SDE(IMT)
DATED 02-06-2013
Summary: Total sites=58, IP=4, Twr Erected=11, AlrdyAgreemDone=3, NewAgreemDone=11, ToBeHired=29, AgreemPndg=4, HPCpndg=9, HPCfilePndg=1, LatLongApprvlPndg=1, BidPndg=14
Sr No
SDCA
Total
Sites(IP/SSA)
Hiring
of
Site(NR
/IP/SSA
)
Nominals
(NotRrceiv
ed/OK/Not
Ok)RF
finalization
Status of
Site
hiring by
SSA
(NR/IP/Y/
to
HPC/WIP
Agreem
ent
AD/D/N
R
EC status (Y)
Tower
Foundation
(NR/Zte/Civ
il)
Tower
Erection(
NR/SSA/Z
te)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTATI
C
BTS Status
Site
2G/comb
o
Concern DE Remarks
58= 4+54
58=11
+4 +43
43=5+31+7
11/4/5/2
2/2
6 11/4/1 11/15/23 18/40
1 Grg Dhankot NR NR NR AD y NR NR
ALREADY
SHELTER
DONE Done Pending ZTE Pending ZTE OFC Done done Pending ZTE Combo DE(NWO-II)
Ready for BTS
instln, ZTE infra
pndg.
2 Grg Kherki Daula NR NR NR AD y NR NR ROOM DONE DONE Installed Installed Installed OFC Done done Installed Combo
DET(Sohna
RD)
BTS on AIR
03/05/2013
3 Grg Binola NR NR NR AD y NR NR RoomAlready DONE Done Done done OFC Done done Installed Combo SDE(IMT)
BTS on AIR
01/05/2013
4 Grg Tikli NR NR NR AD y NR NR Outdoor Not reqd Done Done done
M/W
pending(ZTE)
Not reqd Pending ZTE 2G
DET(Sohna
RD)
5 Nuh Sudaka NR NR NR AD yes NR NR Outdoor Not reqd Done Pending ZTE Pending ZTE
M/W
pending(ZTE)
Not reqd Pending ZTE 2G DE(Mewat)
6 Nuh salamba NR NR NR AD yes NR NR
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE
M/W
pending(ZTE)
Pending
ZTE
Pending ZTE 2G DE(Mewat)
7 Nuh Alduka NR NR NR AD y NR NR
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE
M/W
pending(ZTE)
Pending
ZTE
Pending ZTE 2G DE(Mewat)
8 Nuh Indri NR NR NR AD
pending
(tgt=20/5/1
3)
NR NR
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE
M/W
pending(ZTE)
Pending
ZTE
Pending ZTE 2G DE(Mewat)
9 Fpj Jamalgarh NR NR NR AD yes NR NR Outdoor Not reqd Done Done done
M/W
pending(ZTE)
Not reqd Pending ZTE 2G DE(Mewat)
10 Fpj Sikrawa NR NR NR AD yes NR NR RoomAlready Done Done Done Done OFC Done done Installed Combo DE(Mewat)
BTS on air on
30.04.13
11 Fpj Gulalta NR NR NR AD yes NR NR
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE
M/W
pending(ZTE)
Pending
ZTE
Pending ZTE 2G DE(Mewat)
12 Grg TE Sohna SSA OK Y NR y (TE xge ) done Civil
done M/s
SKC
RoomAlready Done Already Already Already OFC Done done Pending ZTE Combo
DET(Sohna
RD)
Ready for BTS
installation
13 Grg CRPF Camp SSA OK Y WIP
Yes (CRPF
will provide
EC)
WIP/ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE
OFC
Pending(DE Tx
Urban)
Not reqd Pending ZTE Combo
DET(Sohna
RD)
site handed over
to circle
14 Nuh Sangail SSA OK Y AD
25000
security
required.
File is with
AO(SBP)
DONE done Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE
M/W
pending(ZTE)
Not reqd Pending ZTE 2G DE(Mewat)
15 GRG RojkaMeo SSA OK Y AD
EC security
paid.
Waiting for
the estimate
done Civil
done M/s
SKC
Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE
M/W
pending(ZTE)
Not reqd Pending ZTE Combo
DET(Sohna
RD)
16 Grg Bajghera SSA OK Y AD Yes done Civil
done M/s
SKC
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE
M/W
pending(ZTE)
Pending
ZTE
Pending ZTE Combo DE(NWO-II)
17 Fpj Bisru SSA OK y DONE
file
submitted
to dhbvnl
DONE M/s SKC Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE 2G DE(Mewat)
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT
18 Grg mumtajpur SSA OK
HPC
Done
Done
File work
started
Done DONE outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE OFC/wip Not reqd Pending ZTE 2G SDE(IMT)
site handed over
to circle
19 Grg Sikhopur SSA OK
HPC
Done
done
File work
started
civil civil Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE OFC Not reqd Pending ZTE Combo SDE(IMT)
Court case done
by neighbour
20 Grg
Nahar pur
KASAN
SSA OK
HPC
Done
Done
File work
started
DONE WIP Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo SDE(IMT)
Court case done
by neighbour
21 Grg
Imt Sec-8
manesar
SSA OK
HPC
Done
DONE
File work
started
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo SDE(IMT)
Court case done
by neighbour
22 Grg
Nawada
fatehpur
SSA OK
HPC
Done
DONE
File work
started
done Civil W/P Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo SDE(IMT)
site handed over
to circle
23 Grg Medawas SSA OK
HPC
Done
DONE
File work
started
DONE DONE
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE OFC
Pending
ZTE
Pending ZTE Combo
DET(Sohna
RD)
site handed over
to circle
24 Grg Khetawas SSA OK
HPC
Done
DONE Pending ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DE(NWO-II)
25 Grg sultanpur SSA OK
HPC
Done
done
30413
Civil Civil Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DE(NWO-II)
26 Grg
kota
khandewla
SSA
REVISED
LAT LONG
SENT
Civil Civil outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE OFC Not reqd Pending ZTE Combo SDE(IMT)
27 Grg Hasanpur SSA OK
HPC
Done
WIP ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo
DET(Sohna
RD)
party will come on
18-5-13
28 Grg Palra SSA OK
HPC
done
WIP ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE OFC Not reqd Pending ZTE Combo
DET(Sohna
RD)
owner wants in
writing that TWR
will be removed
29 Grg Silani SSA OK
HPC in
progress
Civil Civil
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE OFC
Pending
ZTE
Pending ZTE Combo
DET(Sohna
RD)
30 Grg
Gawal
pahari/Baliaw
as
SSA OK
HPC
Done
Civil Civil Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo
DE(NWO-
IV)
31 Grg Sikandarpur SSA OK
file sent
to HPC
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo
DET(Sohna
RD)
Party will come on
24-5-13
32 Grg Nakhdola SSA Ok
file sent
to HPC
ZTE ZTE
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE Combo SDE(IMT)
New site lat-long
ok. Appln pending.
33 Grg IMT-Sec-7 SSA OK
file sent
to HPC
ZTE ZTE
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE Combo SDE(IMT)
Civil SDE rejected
site
34 Grg
nsg gate no-2
(near)/Navran
gpur
SSA OK
file sent
to HPC
ZTE ZTE outdoor Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE OFC
Pending
ZTE
Pending ZTE Combo SDE(IMT)
NSG ready to give
Site
now...SDE(IMT)
35 Grg
Bhangrola/Kak
rola
SSA OK
file sent
to HPC
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo SDE(IMT)
36 Grg IMT sect-1 SSA OK
file sent
for HPC
ZTE ZTE
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE Combo SDE(IMT)
37 Grg Near GITM SSA OK
HPC
DONE
Civil Civil outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo SDE(IMT)
38 Grg
Kherki Majra
(Dhanwapur)
SSA OK
file sent
for HPC
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DE(NWO-II)
site visit pending
by hpc team
39 Grg Mussaidpur SSA OK
file sent
for HPC
Civil Civil Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DE(NWO-II)
site visit pending
by hpc team
40 Grg Hayatpur SSA ok
file sent
to HPC
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo SDE(IMT)
41 Grg Sector-67 SSA
Revise
applicatio
n Pending
ZTE ZTE
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE Combo
DET(Sohna
RD)
High rent 40000.
New site to be
searched.
42 Grg
SGT Medical
college near
Budera
/Chandu
SSA
Revise
applicatio
n Pending
Civil Civil
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE Combo DE(NWO-II)
Panchayat refused
agreement
43 Grg
Jatuli/Hali
Mandi 2
SSA
lat/long
sent to
circle
Civil Civil Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo SDE(IMT)
1. party rejected.
2. lat-long failed.
3. new site to be
44 Grg
Sohna DENSE
AREA
SSA
Bid not
recd
ZTE ZTE Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo
DET(Sohna
RD)
45 Grg
BSF camp
bhondsi
SSA
Revise
applicatio
n Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo
DET(Sohna
RD)
46 Grg Baslambi SSA
Revise
applicatio
n Pending
Civil Civil Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE OFC Not reqd Pending ZTE Combo DE(NWO-II)
47 Grg Ullawas SSA
Revise
applicatio
n Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo
DE(NWO-
IV)
48 Grg Behrampur SSA
Revise
applicatio
n Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo
DE(NWO-
IV)
49 Grg IMT-sec-6 SSA
Revise
applicatio
n Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo SDE(IMT)
50 Grg Wazirpur SSA
Revise
applicatio
n Pending
ZTE ZTE
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE Combo
DET(Sohna
RD)
51 Grg
Amity(Near
Pachgaon)
SSA
Revise
applicatio
n Pending
ZTE ZTE
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE OFC
Pending
ZTE
Pending ZTE Combo SDE(IMT)
52 Grg
PawalaKhusur
Pur/Sec 109
SSA
Revise
applicatio
n Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DE(NWO-II)
53 Grg Daultabad SSA
Revise
applicatio
n Pending
Civil Civil
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DE(NWO-II)
54 Grg dharampur SSA
Revise
applicatio
n Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DE(NWO-II)
55 Grg Lakhuwas IP IP IP IP IP IP IP Pending ZTE Combo
DET(Sohna
RD)
56 Grg Kasan IP IP IP IP IP IP IP Pending ZTE Combo SDE(IMT)
57 Grg
Imt Sec-3
manesar
IP IP IP IP IP IP IP Pending ZTE Combo SDE(IMT)
58 Grg
Bilaspur,
Haryana
IP IP IP IP IP IP IP Pending ZTE Combo SDE(IMT)
DATED 14-06-2013
Summary: Total sites=58, IP=4, Twr Erected=11, AlrdyAgreemDone=3, NewAgreemDone=11, ToBeHired=29, AgreemPndg=4, HPCpndg=9, HPCfilePndg=1, LatLongApprvlPndg=1, BidPndg=14
Sr No
SDCA
Total
Sites(IP/SSA)
Hiring
of
Site(NR
/IP/SSA
)
Nominals
(NotRrceiv
ed/OK/Not
Ok)RF
finalization
Status of
Site hiring
by SSA
(NR/IP/Y/t
o
HPC/WIP)
Agreem
ent
AD/D/N
R
EC status (Y)
Tower
Foundati
on(NR/Zt
e/Civil)
Tower
Erection(
NR/SSA/Z
te)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTATI
C
BTS Status
Site
2G/comb
o
Concern DE Remarks
58= 4+54
58=11
+4 +43
43=5+31+7
11/4/5/22/
2
6 11/4/1 11/15/23 18/40
1 Grg Dhankot NR NR NR AD y NR NR
ALREADY
SHELTER
DONE Done Pending ZTE Pending ZTE OFC Done done Pending ZTE Combo DE(NWO-II)
Ready for BTS
instln, ZTE infra
pndg.
2 Grg Kherki Daula NR NR NR AD y NR NR ROOM DONE DONE Installed Installed Installed OFC Done done Installed Combo
DET(Sohna
RD)
BTS on AIR
03/05/2013
3 Grg Binola NR NR NR AD y NR NR RoomAlready DONE Done Done done OFC Done done Installed Combo SDE(IMT)
BTS on AIR
01/05/2013
4 Grg Tikli NR NR NR AD y NR NR Outdoor Not reqd Done Done done
M/W
pending(ZTE)
Not reqd Pending ZTE 2G
DET(Sohna
RD)
5 Nuh Sudaka NR NR NR AD yes NR NR Outdoor Not reqd Done Pending ZTE Pending ZTE
M/W
pending(ZTE)
Not reqd Pending ZTE 2G DE(Mewat)
6 Nuh salamba NR NR NR AD yes NR NR
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE
M/W
pending(ZTE)
Pending
ZTE
Pending ZTE 2G DE(Mewat)
7 Nuh Alduka NR NR NR AD y NR NR
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE
M/W
pending(ZTE)
Pending
ZTE
Pending ZTE 2G DE(Mewat)
8 Nuh Indri NR NR NR AD
pending
(tgt=20/5/13)
NR NR
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE
M/W
pending(ZTE)
Pending
ZTE
Pending ZTE 2G DE(Mewat)
9 Fpj Jamalgarh NR NR NR AD yes NR NR Outdoor Not reqd Done Done done
M/W
pending(ZTE)
Not reqd Pending ZTE 2G DE(Mewat)
10 Fpj Sikrawa NR NR NR AD yes NR NR RoomAlready Done Done Done Done OFC Done done Installed Combo DE(Mewat)
BTS on air on
30.04.13
11 Fpj Gulalta NR NR NR AD yes NR NR
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE
M/W
pending(ZTE)
Pending
ZTE
Pending ZTE 2G DE(Mewat)
12 Grg TE Sohna SSA OK Y NR y (TE xge )
done
Civil
done M/s
SKC
RoomAlready Done Already Already Already OFC Done done Pending ZTE Combo
DET(Sohna
RD)
Ready for BTS
installation
13 Grg CRPF Camp SSA OK Y WIP
Yes (CRPF will
provide EC)
DONE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE
OFC
Pending(DE Tx
Urban)
Not reqd Pending ZTE Combo
DET(Sohna
RD)
site handed over
to circle
14 Nuh Sangail SSA OK Y AD
SECURITY
DEPOSITED AT
DHBVNL
DONE done Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE
M/W
pending(ZTE)
Not reqd Pending ZTE 2G DE(Mewat)
15 GRG RojkaMeo SSA OK Y AD
EC security
paid. Waiting
for the
estimate
done
Civil
done M/s
SKC
Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE
M/W
pending(ZTE)
Not reqd Pending ZTE Combo
DET(Sohna
RD)
16 Grg Bajghera SSA OK Y AD Yes
done
Civil
done M/s
SKC
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE
M/W
pending(ZTE)
Pending
ZTE
Pending ZTE Combo DE(NWO-II)
17 Fpj Bisru SSA OK y DONE
SECURITY
DEPOSITED AT
DHBVNL
DONE M/s SKC Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE 2G DE(Mewat)
18 Grg mumtajpur SSA OK HPC Done Done
File work
started
Done DONE outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE OFC/wip Not reqd Pending ZTE 2G SDE(IMT)
site handed over
to circle
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT
19 Grg Sikhopur SSA OK HPC Done done
File work
started
civil civil Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE OFC Not reqd Pending ZTE Combo SDE(IMT)
Court case done
by neighbour
20 Grg
Nahar pur
KASAN
SSA OK HPC Done Done
File work
started
DONE WIP Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo SDE(IMT)
Court case done
by neighbour
21 Grg
Imt Sec-8
manesar
SSA OK HPC Done DONE
File work
started
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo SDE(IMT)
Court case done
by neighbour
22 Grg
Nawada
fatehpur
SSA OK HPC Done DONE
File work
started
done
Civil
W/P Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo SDE(IMT)
site handed over
to circle
23 Grg Medawas SSA OK HPC Done DONE
File work
started
DONE DONE
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE OFC
Pending
ZTE
Pending ZTE Combo
DET(Sohna
RD)
site handed over
to circle
24 Grg Khetawas SSA OK HPC Done DONE Pending ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DE(NWO-II)
25 Grg sultanpur SSA OK HPC Done
done
30413
Civil Civil Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DE(NWO-II)
tower foundation
work stopped by
local authorities
26 Grg
kota
khandewla
SSA
REVISED
LAT LONG
SENT
Civil Civil outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE OFC Not reqd Pending ZTE Combo SDE(IMT)
27 Grg Hasanpur SSA OK HPC Done WIP ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo
DET(Sohna
RD)
party will come on
18-5-13
28 Grg Palra SSA OK HPC done WIP ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE OFC Not reqd Pending ZTE Combo
DET(Sohna
RD)
owner wants in
writing that TWR
will be removed
29 Grg Silani SSA OK
HPC in
progress
Civil Civil
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE OFC
Pending
ZTE
Pending ZTE Combo
DET(Sohna
RD)
party demand
agreement for
guard post to his
family persons
30 Grg
Gawal
pahari/Baliaw
as
SSA OK HPC Done Civil Civil Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo
DE(NWO-
IV)
31 Grg Sikandarpur SSA OK
file sent to
HPC
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo
DET(Sohna
RD)
Party will come on
24-5-13
32 Grg Nakhdola SSA Ok
file sent to
HPC
ZTE ZTE
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE Combo SDE(IMT)
New site lat-long
ok. Appln pending.
33 Grg IMT-Sec-7 SSA OK
file sent to
HPC
ZTE ZTE
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE Combo SDE(IMT)
Civil SDE rejected
site
34 Grg
nsg gate no-2
(near)/Navran
gpur
SSA OK
file sent to
HPC
ZTE ZTE outdoor Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE OFC
Pending
ZTE
Pending ZTE Combo SDE(IMT)
NSG ready to give
Site
now...SDE(IMT)
35 Grg
Bhangrola/Kak
rola
SSA OK
file sent to
HPC
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo SDE(IMT)
36 Grg IMT sect-1 SSA OK
file sent
for HPC
ZTE ZTE
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE Combo SDE(IMT)
37 Grg Near GITM SSA OK HPC DONE Civil Civil outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo SDE(IMT)
38 Grg
Kherki Majra
(Dhanwapur)
SSA OK
file sent
for HPC
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DE(NWO-II)
site visit pending
by hpc team
39 Grg Mussaidpur SSA OK
file sent
for HPC
Civil Civil Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DE(NWO-II)
site visit pending
by hpc team
40 Grg Hayatpur SSA ok
file sent to
HPC
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo SDE(IMT)
41 Grg Sector-67 SSA
Revise
application
Pending
ZTE ZTE
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE Combo
DET(Sohna
RD)
High rent 40000.
New site to be
searched.
42 Grg
SGT Medical
college near
Budera
/Chandu
SSA
Revise
application
Pending
Civil Civil
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE Combo DE(NWO-II)
Panchayat refused
agreement
43 Grg
Jatuli/Hali
Mandi 2
SSA
lat/long
sent to
circle
Civil Civil Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo SDE(IMT)
1. party rejected.
2. lat-long failed.
3. new site to be
44 Grg
Sohna DENSE
AREA
SSA
Bid not
recd
ZTE ZTE Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo
DET(Sohna
RD)
45 Grg
BSF camp
bhondsi
SSA
Revise
application
Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo
DET(Sohna
RD)
46 Grg Baslambi SSA
Revise
application
Pending
Civil Civil Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE OFC Not reqd Pending ZTE Combo DE(NWO-II)
47 Grg Ullawas SSA
Revise
application
Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo
DE(NWO-
IV)
48 Grg Behrampur SSA
Revise
application
Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo
DE(NWO-
IV)
49 Grg IMT-sec-6 SSA
Revise
application
Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo SDE(IMT)
50 Grg Wazirpur SSA
REVISED
LAT LONG
SENT TO
CIRCLE
ZTE ZTE
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE Combo
DET(Sohna
RD)
51 Grg
Amity(Near
Pachgaon)
SSA
Revise
application
Pending
ZTE ZTE
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE OFC
Pending
ZTE
Pending ZTE Combo SDE(IMT)
52 Grg
PawalaKhusur
Pur/Sec 109
SSA
Revise
application
Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DE(NWO-II)
53 Grg Daultabad SSA
Revise
application
Pending
Civil Civil
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DE(NWO-II)
54 Grg dharampur SSA
Revise
application
Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DE(NWO-II)
55 Grg Lakhuwas IP IP IP IP IP IP IP Pending ZTE Combo
DET(Sohna
RD)
56 Grg Kasan IP IP IP IP IP IP IP Pending ZTE Combo SDE(IMT)
57 Grg
Imt Sec-3
manesar
IP IP IP IP IP IP IP Pending ZTE Combo SDE(IMT)
58 Grg
Bilaspur,
Haryana
IP IP IP IP IP IP IP Pending ZTE Combo SDE(IMT)
DATED 06-07-2013
Summary: Total sites=58, IP=4, Twr Erected=11, AlrdyAgreemDone=3, NewAgreemDone=11, ToBeHired=29, AgreemPndg=4, HPCpndg=9, HPCfilePndg=1, LatLongApprvlPndg=1, BidPndg=14
Sr No
SDCA
Total
Sites(IP/SSA)
Hiring
of
Site(NR
/IP/SSA
)
Nominals
(NotRrceiv
ed/OK/Not
Ok)RF
finalization
Status of
Site hiring
by SSA
(NR/IP/Y/to
HPC/WIP)
Agreem
ent
AD/D/N
R
EC status (Y)
Tower
Foundati
on(NR/Zt
e/Civil)
Tower
Erection(
NR/SSA/Z
te)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTATI
C
BTS Status
Site
2G/comb
o
Concern DE Remarks
58= 4+54
58=11
+4 +43
43=5+31+7 11/4/5/22/2 6 11/4/1 11/15/23 18/40
1 Grg Dhankot NR NR NR AD y NR NR
ALREADY
SHELTER
DONE Done Pending ZTE Pending ZTE OFC Done done DONE Combo DE(NWO-II)
2 Grg Kherki Daula NR NR NR AD y NR NR ROOM DONE DONE Installed Installed Installed OFC Done done Installed Combo
DET(Sohna
RD)
BTS on AIR 03/05/2013
3 Grg Binola NR NR NR AD y NR NR RoomAlready DONE Done Done done OFC Done done Installed Combo SDE(IMT) BTS on AIR 01/05/2013
4 Grg Tikli NR NR NR AD y NR NR Outdoor Not reqd Done Done done
M/W
pending(ZTE)
Not reqd Pending ZTE 2G
DET(Sohna
RD)
5 Nuh Sudaka NR NR NR AD yes NR NR Outdoor Not reqd Done Pending ZTE Pending ZTE
M/W
pending(ZTE)
Not reqd Pending ZTE 2G DE(Mewat)
6 Nuh salamba NR NR NR AD yes NR NR
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE
M/W
pending(ZTE)
Pending
ZTE
Pending ZTE 2G DE(Mewat)
7 Nuh Alduka NR NR NR AD y NR NR
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE
M/W
pending(ZTE)
Pending
ZTE
Pending ZTE 2G DE(Mewat)
8 Nuh Indri NR NR NR AD
pending
(tgt=20/5/13)
NR NR
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE
M/W
pending(ZTE)
Pending
ZTE
Pending ZTE 2G DE(Mewat)
9 Fpj Jamalgarh NR NR NR AD yes NR NR Outdoor Not reqd Done Done done
M/W
pending(ZTE)
Not reqd Pending ZTE 2G DE(Mewat)
10 Fpj Sikrawa NR NR NR AD yes NR NR RoomAlready Done Done Done Done OFC Done done Installed Combo DE(Mewat) BTS on air on 30.04.13
11 Fpj Gulalta NR NR NR AD yes NR NR
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE
M/W
pending(ZTE)
Pending
ZTE
Pending ZTE 2G DE(Mewat)
12 Grg TE Sohna SSA OK Y NR y (TE xge )
done
Civil
done M/s
SKC
RoomAlready Done Already Already Already OFC Done done Pending ZTE Combo
DET(Sohna
RD)
Ready for BTS installation
13 Grg CRPF Camp SSA OK Y WIP
Yes (CRPF will
provide EC)
DONE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE
OFC
Pending(DE Tx
Urban)
Not reqd Pending ZTE Combo
DET(Sohna
RD)
site handed over to circle
14 Nuh Sangail SSA OK Y AD
SECURITY
DEPOSITED AT
DHBVNL
DONE done Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE
M/W
pending(ZTE)
Not reqd Pending ZTE 2G DE(Mewat)
15 GRG RojkaMeo SSA OK Y AD
EC security
paid. Waiting for
the estimate
done
Civil
done M/s
SKC
Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE
M/W
pending(ZTE)
Not reqd Pending ZTE Combo
DET(Sohna
RD)
16 Grg Bajghera SSA OK Y AD Yes
done
Civil
done M/s
SKC
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE
M/W
pending(ZTE)
Pending
ZTE
Pending ZTE Combo DE(NWO-II)
17 Fpj Bisru SSA OK y DONE
SECURITY
DEPOSITED AT
DHBVNL
DONE M/s SKC Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE 2G DE(Mewat)
18 Grg mumtajpur SSA OK HPC Done Done File work started Done DONE outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE OFC/wip Not reqd Pending ZTE 2G SDE(IMT) site handed over to circle
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT
19 Grg Sikhopur SSA OK HPC Done done File work started civil civil Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE OFC Not reqd Pending ZTE Combo SDE(IMT)
Court case done by
neighbour
20 Grg
Nahar pur
KASAN
SSA OK HPC Done Done File work started DONE WIP Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo SDE(IMT)
Court case done by
neighbour
21 Grg
Imt Sec-8
manesar
SSA OK HPC Done DONE File work started ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo SDE(IMT)
Court case done by
neighbour
22 Grg
Nawada
fatehpur
SSA OK HPC Done DONE File work started
done
Civil
W/P Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo SDE(IMT) site handed over to circle
23 Grg Medawas SSA OK HPC Done DONE File work started DONE DONE
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE OFC
Pending
ZTE
Pending ZTE Combo
DET(Sohna
RD)
site handed over to circle
24 Grg Khetawas SSA OK HPC Done DONE Pending ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DE(NWO-II)
25 Grg sultanpur SSA OK HPC Done
done
30413
Civil Civil Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DE(NWO-II)
tower foundation work
stopped by local authorities
26 Grg
kota
khandewla
SSA
REVISED
LAT LONG
SENT
Civil Civil outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE OFC Not reqd Pending ZTE Combo SDE(IMT)
27 Grg Hasanpur SSA OK HPC Done WIP ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo
DET(Sohna
RD)
Agreement pending
28 Grg Palra SSA OK HPC done WIP ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE OFC Not reqd Pending ZTE Combo
DET(Sohna
RD)
owner wants in writing that
TWR will be removed after
15 years
29 Grg Silani SSA OK
HPC in
progress
Civil Civil
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE OFC
Pending
ZTE
Pending ZTE Combo
DET(Sohna
RD)
party demand agreement
for guard post to his family
persons only
30 Grg
Gawal
pahari/Baliaw
as
SSA OK HPC Done Civil Civil Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DE(NWO-IV)
31 Grg Sikandarpur SSA OK
HPC in
Progress
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo
DET(Sohna
RD)
1 week target given for HPC
by DE(Sohna rd)
32 Grg Nakhdola SSA Ok
file sent to
HPC
ZTE ZTE
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE Combo SDE(IMT)
New site lat-long ok. Appln
pending.
33 Grg IMT-Sec-7 SSA OK
file sent to
HPC
ZTE ZTE
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE Combo SDE(IMT) Civil SDE rejected site
34 Grg
nsg gate no-2
(near)/Navran
gpur
SSA OK
file sent to
HPC
ZTE ZTE outdoor Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE OFC
Pending
ZTE
Pending ZTE Combo SDE(IMT)
NSG ready to give Site
now...SDE(IMT)
35 Grg
Bhangrola/Kak
rola
SSA OK
file sent to
HPC
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo SDE(IMT)
36 Grg IMT sect-1 SSA OK
file sent for
HPC
ZTE ZTE
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE Combo SDE(IMT)
37 Grg Near GITM SSA OK HPC DONE Civil Civil outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo SDE(IMT)
38 Grg
Kherki Majra
(Dhanwapur)
SSA OK
file sent for
HPC
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DE(NWO-II)
site visit pending by hpc
team
39 Grg Mussaidpur SSA OK
file sent for
HPC
Civil Civil Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DE(NWO-II)
site visit pending by hpc
team
40 Grg Hayatpur SSA ok
file sent to
HPC
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo SDE(IMT)
41 Grg Sector-67 SSA
Revise
application
Pending
ZTE ZTE
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE Combo
DET(Sohna
RD)
High rent 40000. New site
to be searched.
42 Grg
SGT Medical
college near
Budera
/Chandu
SSA
Revise
application
Pending
Civil Civil
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE Combo DE(NWO-II)
Discussed with circle to give
it to IP VIOM
43 Grg
Jatuli/Hali
Mandi 2
SSA
lat/long
sent to
circle
Civil Civil Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo SDE(IMT)
1. party rejected. 2. lat-long
failed. 3. new site to be
searched
44 Grg
Sohna DENSE
AREA
SSA Bid not recd ZTE ZTE Outdoor Not reqd Pending ZTE Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo
DET(Sohna
RD)
Discussed with circle to give
it to IP VIOM
45 Grg
BSF camp
bhondsi
SSA
Revise
application
Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo
DET(Sohna
RD)
46 Grg Baslambi SSA
Revise
application
Pending
Civil Civil Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE OFC Not reqd Pending ZTE Combo DE(NWO-II)
47 Grg Ullawas SSA
Revise
application
RECD
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DE(NWO-IV)
48 Grg Behrampur SSA
Revise
application
RECD
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DE(NWO-IV)
49 Grg IMT-sec-6 SSA
Revise
application
Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo SDE(IMT)
50 Grg Wazirpur SSA
REVISED LAT
LONG SENT
TO CIRCLE
ZTE ZTE
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE)
Pending
ZTE
Pending ZTE Combo
DET(Sohna
RD)
Discussed with circle to give
it to IP VIOM
51 Grg
Amity(Near
Pachgaon)
SSA
Revise
application
Pending
ZTE ZTE
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE OFC
Pending
ZTE
Pending ZTE Combo SDE(IMT)
52 Grg
PawalaKhusur
Pur/Sec 109
SSA
Revise
application
Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DE(NWO-II)
53 Grg Daultabad SSA
Revise
application
Pending
Civil Civil
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DE(NWO-II)
54 Grg dharampur SSA
Revise
application
Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending ZTE Pending ZTE Mini link(ZTE) Not reqd Pending ZTE Combo DE(NWO-II)
55 Grg Lakhuwas IP IP IP IP IP IP IP Pending ZTE Combo
DET(Sohna
RD)
56 Grg Kasan IP IP IP IP IP IP IP Pending ZTE Combo SDE(IMT)
Discussed with circle to give
it to IP VIOM
57 Grg
Imt Sec-3
manesar
IP IP IP IP IP IP IP Pending ZTE Combo SDE(IMT)
58 Grg
Bilaspur,
Haryana
IP IP IP IP IP IP IP Pending ZTE Combo SDE(IMT)
Discussed with circle to give
it to IP VIOM
DATED 03-08-2013
Summary: Total sites=58, IP=4, Twr Erected=11, AlrdyAgreemDone=3, NewAgreemDone=11, ToBeHired=29, AgreemPndg=5, HPCpndg=8, HPCfilePndg=1, LatLongApprvlPndg=1, BidPndg=14
Sr No
SDCA
Total
Sites(IP/SS
A)
Hiring of
Site(NR/
IP/SSA)
Nominals
(NotRrceived
/OK/Not
Ok)RF
finalization
Status of
Site hiring
by SSA
(NR/IP/Y/to
HPC/WIP)
Agreem
ent
AD/D/N
R
EC status (Y)
Tower
Foundati
on(NR/Zt
e/Civil)
Tower
Erection(
NR/SSA/Z
te)
Shelter
POWER
PLANT
MEDIA
ANTISTATI
C
BTS Status
Site
2G/comb
o
3G
STATUS
Concern DE Remarks
58= 4+54
58=11
+4 +43
43=5+31+7 11/4/5/22/2 6 11/4/1 11/15/23 18/40
1 Grg Dhankot NR NR NR AD y NR NR
ALREADY
SHELTER
Pending
ZTE
OFC
Done
done DONE Combo
comission
ed
DE(NWO-II)
2 Grg
Kherki
Daula
NR NR NR AD y NR NR
ROOM
DONE
Installed
OFC
Done
done Installed Combo pending
DET(Sohna
RD)
BTS on AIR
03/05/2013
3 Grg Binola NR NR NR AD y NR NR
Room
Already
done
OFC
Done
done Installed Combo pending SDE(IMT)
BTS on AIR
01/05/2013
4 Grg Tikli NR NR NR AD y NR NR Outdoor done
M/W
pending(
ZTE)
Not reqd Pending ZTE 2G NA
DET(Sohna
RD)
5 Nuh Sudaka NR NR NR AD yes NR NR Outdoor
Pending
ZTE
M/W
pending(
ZTE)
Not reqd Pending ZTE 2G NA DE(Mewat)
6 Nuh salamba NR NR NR AD yes NR NR
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(
Pending
ZTE
Pending ZTE 2G NA DE(Mewat)
7 Nuh Alduka NR NR NR AD y NR NR
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(
ZTE)
Pending
ZTE
Pending ZTE 2G NA DE(Mewat)
8 Nuh Indri NR NR NR AD
file work in
progress at
DHBVNL
NR NR
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(
ZTE)
Pending
ZTE
Pending ZTE 2G NA DE(Mewat)
9 Fpj Jamalgarh NR NR NR AD yes NR NR Outdoor done
M/W
pending(
ZTE)
Not reqd Pending ZTE 2G NA DE(Mewat)
10 Fpj Sikrawa NR NR NR AD yes NR NR
Room
Already
Done
OFC
Done
done Installed Combo pending DE(Mewat)
BTS on air on
30.04.13
11 Fpj Gulalta NR NR NR AD yes NR NR
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(
ZTE)
Pending
ZTE
Pending ZTE 2G NA DE(Mewat)
12 Grg TE Sohna SSA OK Y NR y (TE xge )
done
Civil
done M/s
SKC
Room
Already
Already
OFC
Done
done Pending ZTE Combo
material
received
DET(Sohna
RD)
Ready for BTS
installation
13 Grg CRPF Camp SSA OK Y WIP
Yes (CRPF will
provide EC)
DONE ZTE Outdoor
Pending
ZTE
OFC
Pending(
DE Tx
Urban)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
site handed over to
circle
14 Nuh Sangail SSA OK Y AD
SECURITY
DEPOSITED AT
DHBVNL,estim
ate recived
DONE done Outdoor
Pending
ZTE
M/W
pending(
ZTE)
Not reqd Pending ZTE 2G NA DE(Mewat)
15 GRG RojkaMeo SSA OK Y AD
EC security
paid. Waiting
for the
estimate
done
Civil
done M/s
SKC
Outdoor
Pending
ZTE
M/W
pending(
ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
16 Grg Bajghera SSA OK Y AD Yes
done
Civil
done M/s
SKC
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(
ZTE)
Pending
ZTE
Pending ZTE Combo pending DE(NWO-II)
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT
17 Fpj Bisru SSA OK y DONE
SECURITY
DEPOSITED AT
DHBVNL ,one
estimate
pending from
DHBVNL
DONE DONE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE 2G NA DE(Mewat)
18 Grg mumtajpur SSA OK HPC Done Done
File work
started
Done DONE outdoor
Pending
ZTE
OFC/wip Not reqd Pending ZTE 2G NA SDE(IMT)
site handed over to
circle
19 Grg Sikhopur SSA OK HPC Done done
File work
started
civil civil Outdoor
Pending
ZTE
OFC Not reqd Pending ZTE Combo pending SDE(IMT)
Court case done by
neighbour next
date:23/7/13
20 Grg
Nahar pur
KASAN
SSA OK HPC Done Done
File work
started
DONE WIP Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
Court case done by
neighbour, next
date:1/8/13
21 Grg
Imt Sec-8
manesar
SSA OK HPC Done DONE
File work
started
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
Court case done by
neighbour,next
date:27/8/13
22 Grg
Nawada
fatehpur
SSA OK HPC Done DONE
File work
started
done
Civil
W/P Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
site handed over to
circle
23 Grg Medawas SSA OK HPC Done DONE
File work
started
DONE DONE
Shelter
Pending ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending ZTE Combo pending
DET(Sohna
RD)
site handed over to
circle
24 Grg Khetawas SSA OK HPC Done DONE
File work
started
Done Done Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-II)
25 Grg sultanpur SSA OK HPC Done
done
30413
Civil Civil Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-II)
tower foundation
work stopped by
local authorities
26 Grg
kota
khandewla
SSA
Revised
application
required
Civil Civil outdoor
Pending
ZTE
OFC Not reqd Pending ZTE Combo pending SDE(IMT)
27 Grg Hasanpur SSA OK
Revised
application
required
WIP ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
owner refused
28 Grg Palra SSA OK
Revised
application
required
WIP ZTE ZTE Outdoor
Pending
ZTE
OFC Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
owner refused
29 Grg Silani SSA OK
owner
refused,revi
se bid reqd
Civil Civil
Shelter
Pending ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending ZTE Combo pending
DET(Sohna
RD)
party demand
agreement for guard
post to his family
persons only
30 Grg
Gawal
pahari/Bali
awas
SSA OK HPC Done Civil Civil Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-IV)
31 Grg
Sikandarpu
r(Bada)
SSA OK
HPC in
Progress
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
32 Grg Nakhdola SSA Ok
file sent to
HPC
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
New site lat-long ok.
Appln pending.
33 Grg IMT-Sec-7 SSA OK
Revised
application
required
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending SDE(IMT) Civil SDE rejected site
34 Grg
nsg gate no-
2
(near)/Navr
angpur
SSA OK
file sent to
HPC
ZTE ZTE outdoor
Pending
ZTE
OFC
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
NSG ready to give
Site now...SDE(IMT)
35 Grg
Bhangrola/
Kakrola
SSA OK
file sent to
HPC
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
36 Grg IMT sect-1 SSA OK
file sent for
HPC
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
37 Grg Near GITM SSA OK
Revised
application
required
Civil Civil outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
38 Grg
Kherki
Majra
(Dhanwapu
r)
SSA OK
file sent for
HPC
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-II)
39 Grg Mussaidpur SSA OK HPC Done Civil Civil Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-II) agreement pending
40 Grg Hayatpur SSA ok
Revised
application
required
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT) owner refused
41 Grg Sector-67 SSA
Revise
application
Pending
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending
DET(Sohna
RD)
High rent 40000.
New site to be
searched.
42 Grg
SGT
Medical
college
near
Budera
/Chandu
SSA
Revise
application
Pending
Civil Civil
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending DE(NWO-II)
Discussed with circle
to give it to IP VIOM
43 Grg
Jatuli/Hali
Mandi 2
SSA
lat/long sent
to circle
Civil Civil Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
1. party rejected. 2.
lat-long failed. 3.
new site to be
searched
44 Grg
Sohna
DENSE
AREA
SSA Bid not recd ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
Discussed with circle
to give it to IP VIOM
45 Grg
BSF camp
bhondsi
SSA
Revise
application
Pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
46 Grg Baslambi SSA
Revise
application
Pending
Civil Civil Outdoor
Pending
ZTE
OFC Not reqd Pending ZTE Combo pending DE(NWO-II)
47 Grg Ullawas SSA ok
aplication
pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-IV)
48 Grg Behrampur SSA
Revise
application
RECD
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-IV)
circle querry about
MTNL area replied
that site beyond
MTNL area
49 Grg IMT-sec-6 SSA
Revise
application
Pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
50 Grg Wazirpur SSA
REVISED LAT
LONG SENT
TO CIRCLE
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending
DET(Sohna
RD)
Discussed with circle
to give it to IP VIOM
51 Grg
Amity(Near
Pachgaon)
SSA
Revise
application
Pending
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending ZTE Combo pending SDE(IMT) owner refused
52 Grg
PawalaKhu
surPur/Sec
109
SSA
Revise
application
Pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-II)
53 Grg Daultabad SSA ok
owner
aplication
not received
Civil Civil
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-II)
54 Grg dharampur SSA
Revise
application
Pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-II)
55 Grg Lakhuwas IP IP IP IP IP IP IP Pending ZTE Combo pending
DET(Sohna
RD)
56 Grg Kasan IP IP IP IP IP IP IP Pending ZTE Combo pending SDE(IMT)
Discussed with circle
to give it to IP VIOM
57 Grg
Imt Sec-3
manesar
IP IP IP IP IP IP IP Pending ZTE Combo pending SDE(IMT)
58 Grg
Bilaspur,
Haryana
IP IP IP IP IP IP IP Pending ZTE Combo pending SDE(IMT)
Discussed with circle
to give it to IP VIOM
DATED 03-08-2013
Summary: Total sites=58, IP=4, Twr Erected=11, AlrdyAgreemDone=3, NewAgreemDone=11, ToBeHired=29, AgreemPndg=5, HPCpndg=8, HPCfilePndg=1, LatLongApprvlPndg=1, BidPndg=14
Sr No
SDCA
Total
Sites(IP/SS
A)
Hiring of
Site(NR/
IP/SSA)
Nominals
(NotRrceived
/OK/Not
Ok)RF
finalization
Status of
Site hiring
by SSA
(NR/IP/Y/to
HPC/WIP)
Agreem
ent
AD/D/N
R
EC status (Y)
Tower
Foundati
on(NR/Zt
e/Civil)
Tower
Erection(
NR/SSA/Z
te)
Shelter
POWER
PLANT
MEDIA
ANTISTATI
C
BTS Status
Site
2G/comb
o
3G
STATUS
Concern DE Remarks
58= 4+54
58=11
+4 +43
43=5+31+7 11/4/5/22/2 6 11/4/1 11/15/23 18/40
1 Grg Dhankot NR NR NR AD y NR NR
ALREADY
SHELTER
Pending
ZTE
OFC
Done
done DONE Combo
comission
ed
DE(NWO-II)
2 Grg
Kherki
Daula
NR NR NR AD y NR NR
ROOM
DONE
Installed
OFC
Done
done Installed Combo pending
DET(Sohna
RD)
BTS on AIR
03/05/2013
3 Grg Binola NR NR NR AD y NR NR
Room
Already
done
OFC
Done
done Installed Combo pending SDE(IMT)
BTS on AIR
01/05/2013
4 Grg Tikli NR NR NR AD y NR NR Outdoor done
M/W
pending(
ZTE)
Not reqd Pending ZTE 2G NA
DET(Sohna
RD)
5 Nuh Sudaka NR NR NR AD yes NR NR Outdoor
Pending
ZTE
M/W
pending(
ZTE)
Not reqd Pending ZTE 2G NA DE(Mewat)
6 Nuh salamba NR NR NR AD yes NR NR
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(
Pending
ZTE
Pending ZTE 2G NA DE(Mewat)
7 Nuh Alduka NR NR NR AD y NR NR
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(
ZTE)
Pending
ZTE
Pending ZTE 2G NA DE(Mewat)
8 Nuh Indri NR NR NR AD
file work in
progress at
DHBVNL
NR NR
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(
ZTE)
Pending
ZTE
Pending ZTE 2G NA DE(Mewat)
9 Fpj Jamalgarh NR NR NR AD yes NR NR Outdoor done
M/W
pending(
ZTE)
Not reqd Pending ZTE 2G NA DE(Mewat)
10 Fpj Sikrawa NR NR NR AD yes NR NR
Room
Already
Done
OFC
Done
done Installed Combo pending DE(Mewat)
BTS on air on
30.04.13
11 Fpj Gulalta NR NR NR AD yes NR NR
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(
ZTE)
Pending
ZTE
Pending ZTE 2G NA DE(Mewat)
12 Grg TE Sohna SSA OK Y NR y (TE xge )
done
Civil
done M/s
SKC
Room
Already
Already
OFC
Done
done Pending ZTE Combo
material
received
DET(Sohna
RD)
Ready for BTS
installation
13 Grg CRPF Camp SSA OK Y WIP
Yes (CRPF will
provide EC)
DONE ZTE Outdoor
Pending
ZTE
OFC
Pending(
DE Tx
Urban)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
site handed over to
circle
14 Nuh Sangail SSA OK Y AD
SECURITY
DEPOSITED AT
DHBVNL,estim
ate recived
DONE done Outdoor
Pending
ZTE
M/W
pending(
ZTE)
Not reqd Pending ZTE 2G NA DE(Mewat)
15 GRG RojkaMeo SSA OK Y AD
EC security
paid. Waiting
for the
estimate
done
Civil
done M/s
SKC
Outdoor
Pending
ZTE
M/W
pending(
ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
16 Grg Bajghera SSA OK Y AD Yes
done
Civil
done M/s
SKC
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(
ZTE)
Pending
ZTE
Pending ZTE Combo pending DE(NWO-II)
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT
17 Fpj Bisru SSA OK y DONE
SECURITY
DEPOSITED AT
DHBVNL ,one
estimate
pending from
DHBVNL
DONE DONE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE 2G NA DE(Mewat)
18 Grg mumtajpur SSA OK HPC Done Done
File work
started
Done DONE outdoor
Pending
ZTE
OFC/wip Not reqd Pending ZTE 2G NA SDE(IMT)
site handed over to
circle
19 Grg Sikhopur SSA OK HPC Done done
File work
started
civil civil Outdoor
Pending
ZTE
OFC Not reqd Pending ZTE Combo pending SDE(IMT)
Court case done by
neighbour next
date:23/7/13
20 Grg
Nahar pur
KASAN
SSA OK HPC Done Done
File work
started
DONE WIP Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
Court case done by
neighbour, next
date:1/8/13
21 Grg
Imt Sec-8
manesar
SSA OK HPC Done DONE
File work
started
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
Court case done by
neighbour,next
date:27/8/13
22 Grg
Nawada
fatehpur
SSA OK HPC Done DONE
File work
started
done
Civil
W/P Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
site handed over to
circle
23 Grg Medawas SSA OK HPC Done DONE
File work
started
DONE DONE
Shelter
Pending ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending ZTE Combo pending
DET(Sohna
RD)
site handed over to
circle
24 Grg Khetawas SSA OK HPC Done DONE
File work
started
Done Done Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-II)
25 Grg sultanpur SSA OK HPC Done
done
30413
Civil Civil Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-II)
tower foundation
work stopped by
local authorities
26 Grg
kota
khandewla
SSA
Revised
application
required
Civil Civil outdoor
Pending
ZTE
OFC Not reqd Pending ZTE Combo pending SDE(IMT)
27 Grg Hasanpur SSA OK
Revised
application
required
WIP ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
owner refused
28 Grg Palra SSA OK
Revised
application
required
WIP ZTE ZTE Outdoor
Pending
ZTE
OFC Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
owner refused
29 Grg Silani SSA OK
owner
refused,revi
se bid reqd
Civil Civil
Shelter
Pending ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending ZTE Combo pending
DET(Sohna
RD)
party demand
agreement for guard
post to his family
persons only
30 Grg
Gawal
pahari/Bali
awas
SSA OK HPC Done Civil Civil Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-IV)
31 Grg
Sikandarpu
r(Bada)
SSA OK
HPC in
Progress
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
32 Grg Nakhdola SSA Ok
file sent to
HPC
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
New site lat-long ok.
Appln pending.
33 Grg IMT-Sec-7 SSA OK
Revised
application
required
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending SDE(IMT) Civil SDE rejected site
34 Grg
nsg gate no-
2
(near)/Navr
angpur
SSA OK
file sent to
HPC
ZTE ZTE outdoor
Pending
ZTE
OFC
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
NSG ready to give
Site now...SDE(IMT)
35 Grg
Bhangrola/
Kakrola
SSA OK
file sent to
HPC
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
36 Grg IMT sect-1 SSA OK
file sent for
HPC
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
37 Grg Near GITM SSA OK
Revised
application
required
Civil Civil outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
38 Grg
Kherki
Majra
(Dhanwapu
r)
SSA OK
file sent for
HPC
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-II)
39 Grg Mussaidpur SSA OK HPC Done Civil Civil Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-II) agreement pending
40 Grg Hayatpur SSA ok
Revised
application
required
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT) owner refused
41 Grg Sector-67 SSA
Revise
application
Pending
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending
DET(Sohna
RD)
High rent 40000.
New site to be
searched.
42 Grg
SGT
Medical
college
near
Budera
/Chandu
SSA
Revise
application
Pending
Civil Civil
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending DE(NWO-II)
Discussed with circle
to give it to IP VIOM
43 Grg
Jatuli/Hali
Mandi 2
SSA
lat/long sent
to circle
Civil Civil Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
1. party rejected. 2.
lat-long failed. 3.
new site to be
searched
44 Grg
Sohna
DENSE
AREA
SSA Bid not recd ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
Discussed with circle
to give it to IP VIOM
45 Grg
BSF camp
bhondsi
SSA
Revise
application
Pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
46 Grg Baslambi SSA
Revise
application
Pending
Civil Civil Outdoor
Pending
ZTE
OFC Not reqd Pending ZTE Combo pending DE(NWO-II)
47 Grg Ullawas SSA ok
aplication
pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-IV)
48 Grg Behrampur SSA ok
Revise
application
RECD
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-IV)
circle querry about
MTNL area replied
that site beyond
MTNL area
49 Grg IMT-sec-6 SSA
Revise
application
Pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
50 Grg Wazirpur SSA
REVISED LAT
LONG SENT
TO CIRCLE
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending
DET(Sohna
RD)
Discussed with circle
to give it to IP VIOM
51 Grg
Amity(Near
Pachgaon)
SSA
Revise
application
Pending
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending ZTE Combo pending SDE(IMT) owner refused
52 Grg
PawalaKhu
surPur/Sec
109
SSA
Revise
application
Pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-II)
53 Grg Daultabad SSA ok
owner
aplication
not received
Civil Civil
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-II)
54 Grg dharampur SSA
Revise
application
Pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-II)
55 Grg Lakhuwas IP IP IP IP IP IP IP Pending ZTE Combo pending
DET(Sohna
RD)
56 Grg Kasan IP IP IP IP IP IP IP Pending ZTE Combo pending SDE(IMT)
Discussed with circle
to give it to IP VIOM
57 Grg
Imt Sec-3
manesar
IP IP IP IP IP IP IP Pending ZTE Combo pending SDE(IMT)
58 Grg
Bilaspur,
Haryana
IP IP IP IP IP IP IP Pending ZTE Combo pending SDE(IMT)
Discussed with circle
to give it to IP VIOM
DATED 13-08-2013
Summary: Total sites=58, IP=4, Twr Erected=11, AlrdyAgreemDone=3, NewAgreemDone=11, ToBeHired=29, AgreemPndg=5, HPCpndg=8, HPCfilePndg=1, LatLongApprvlPndg=1, BidPndg=14
Sr No
SDCA
Total
Sites(IP/SS
A)
Hiring of
Site(NR/
IP/SSA)
Nominals
(NotRrceived
/OK/Not
Ok)RF
finalization
Status of
Site hiring
by SSA
(NR/IP/Y/to
HPC/WIP)
Agreem
ent
AD/D/N
R
EC status (Y)
Tower
Foundati
on(NR/Zt
e/Civil)
Tower
Erection(
NR/SSA/Z
te)
Shelter
POWER
PLANT
MEDIA
ANTISTATI
C
BTS Status
Site
2G/comb
o
3G
STATUS
Concern DE Remarks
58= 4+54
58=11
+4 +43
43=5+31+7 11/4/5/22/2 6 11/4/1 11/15/23 18/40
1 Grg Dhankot NR NR NR AD y NR NR
ALREADY
SHELTER
Pending
ZTE
OFC
Done
done DONE Combo
comission
ed
DE(NWO-II)
2 Grg
Kherki
Daula
NR NR NR AD y NR NR
ROOM
DONE
Installed
OFC
Done
done Installed Combo pending
DET(Sohna
RD)
BTS on AIR
03/05/2013
3 Grg Binola NR NR NR AD y NR NR
Room
Already
done
OFC
Done
done Installed Combo pending SDE(IMT)
BTS on AIR
01/05/2013
4 Grg Tikli NR NR NR AD y NR NR Outdoor done
M/W
pending(
ZTE)
Not reqd Pending ZTE 2G NA
DET(Sohna
RD)
5 Nuh Sudaka NR NR NR AD yes NR NR Outdoor
Pending
ZTE
M/W
pending(
ZTE)
Not reqd Pending ZTE 2G NA DE(Mewat)
6 Nuh salamba NR NR NR AD yes NR NR
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(
Pending
ZTE
Pending ZTE 2G NA DE(Mewat)
7 Nuh Alduka NR NR NR AD y NR NR
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(
ZTE)
Pending
ZTE
Pending ZTE 2G NA DE(Mewat)
8 Nuh Indri NR NR NR AD
file work in
progress at
DHBVNL
NR NR
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(
ZTE)
Pending
ZTE
Pending ZTE 2G NA DE(Mewat)
9 Fpj Jamalgarh NR NR NR AD yes NR NR Outdoor done
M/W
pending(
ZTE)
Not reqd Pending ZTE 2G NA DE(Mewat)
10 Fpj Sikrawa NR NR NR AD yes NR NR
Room
Already
Done
OFC
Done
done Installed Combo pending DE(Mewat)
BTS on air on
30.04.13
11 Fpj Gulalta NR NR NR AD yes NR NR
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(
ZTE)
Pending
ZTE
Pending ZTE 2G NA DE(Mewat)
12 Grg TE Sohna SSA OK Y NR y (TE xge )
done
Civil
done M/s
SKC
Room
Already
Already
OFC
Done
done Pending ZTE Combo
material
received
DET(Sohna
RD)
Ready for BTS
installation
13 Grg CRPF Camp SSA OK Y WIP
Yes (CRPF will
provide EC)
DONE ZTE Outdoor
Pending
ZTE
OFC
Pending(
DE Tx
Urban)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
site handed over to
circle
14 Nuh Sangail SSA OK Y AD
SECURITY
DEPOSITED AT
DHBVNL,estim
ate recived
DONE done Outdoor
Pending
ZTE
M/W
pending(
ZTE)
Not reqd Pending ZTE 2G NA DE(Mewat)
15 GRG RojkaMeo SSA OK Y AD
EC security
paid. Waiting
for the
estimate
done
Civil
done M/s
SKC
Outdoor
Pending
ZTE
M/W
pending(
ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
16 Grg Bajghera SSA OK Y AD Yes
done
Civil
done M/s
SKC
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(
ZTE)
Pending
ZTE
Pending ZTE Combo pending DE(NWO-II)
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT
17 Fpj Bisru SSA OK y DONE
SECURITY
DEPOSITED AT
DHBVNL ,one
estimate
pending from
DHBVNL
DONE DONE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE 2G NA DE(Mewat)
18 Grg mumtajpur SSA OK HPC Done Done
File work
started
Done DONE outdoor
Pending
ZTE
OFC/wip Not reqd Pending ZTE 2G NA SDE(IMT)
site handed over to
circle
19 Grg Sikhopur SSA OK HPC Done done
File work
started
civil civil Outdoor
Pending
ZTE
OFC Not reqd Pending ZTE Combo pending SDE(IMT)
Court case done by
neighbour next
date:23/7/13
20 Grg
Nahar pur
KASAN
SSA OK HPC Done Done
File work
started
DONE WIP Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
Court case done by
neighbour, next
date:1/8/13
21 Grg
Imt Sec-8
manesar
SSA OK HPC Done DONE
File work
started
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
Court case done by
neighbour,next
date:27/8/13
22 Grg
Nawada
fatehpur
SSA OK HPC Done DONE
File work
started
done
Civil
W/P Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
site handed over to
circle
23 Grg Medawas SSA OK HPC Done DONE
File work
started
DONE DONE
Shelter
Pending ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending ZTE Combo pending
DET(Sohna
RD)
site handed over to
circle
24 Grg Khetawas SSA OK HPC Done DONE
File work
started
Done Done Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-II)
25 Grg sultanpur SSA OK HPC Done
done
30413
Civil Civil Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-II)
tower foundation
work stopped by
local authorities
26 Grg
kota
khandewla
SSA
Revised
application
required
Civil Civil outdoor
Pending
ZTE
OFC Not reqd Pending ZTE Combo pending SDE(IMT)
27 Grg Hasanpur SSA OK
Revised
application
required
WIP ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
owner refused
28 Grg Palra SSA OK
Revised
application
required
WIP ZTE ZTE Outdoor
Pending
ZTE
OFC Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
owner refused
29 Grg Silani SSA OK
owner
refused,revi
se bid reqd
Civil Civil
Shelter
Pending ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending ZTE Combo pending
DET(Sohna
RD)
party demand
agreement for guard
post to his family
persons only
30 Grg
Gawal
pahari/Bali
awas
SSA OK HPC Done Civil Civil Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-IV)
31 Grg
Sikandarpu
r(Bada)
SSA OK
HPC in
Progress
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
32 Grg Nakhdola SSA Ok
file sent to
HPC
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
New site lat-long ok.
Appln pending.
33 Grg IMT-Sec-7 SSA OK
Revised
application
required
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending SDE(IMT) Civil SDE rejected site
34 Grg
nsg gate no-
2
(near)/Navr
angpur
SSA OK
file sent to
HPC
ZTE ZTE outdoor
Pending
ZTE
OFC
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
NSG ready to give
Site now...SDE(IMT)
35 Grg
Bhangrola/
Kakrola
SSA OK
file sent to
HPC
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
36 Grg IMT sect-1 SSA OK
file sent for
HPC
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
37 Grg Near GITM SSA OK
Revised
application
required
Civil Civil outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
38 Grg
Kherki
Majra
(Dhanwapu
r)
SSA OK
file sent for
HPC
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-II)
39 Grg Mussaidpur SSA OK HPC Done Civil Civil Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-II) agreement pending
40 Grg Hayatpur SSA ok
Revised
application
required
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT) owner refused
41 Grg Sector-67 SSA
Revise
application
Pending
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending
DET(Sohna
RD)
High rent 40000.
New site to be
searched.
42 Grg
SGT
Medical
college
near
Budera
/Chandu
SSA
Revise
application
Pending
Civil Civil
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending DE(NWO-II)
Discussed with circle
to give it to IP VIOM
43 Grg
Jatuli/Hali
Mandi 2
SSA
lat/long sent
to circle
Civil Civil Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
1. party rejected. 2.
lat-long failed. 3.
new site to be
searched
44 Grg
Sohna
DENSE
AREA
SSA Bid not recd ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
Discussed with circle
to give it to IP VIOM
45 Grg
BSF camp
bhondsi
SSA
Revise
application
Pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
46 Grg Baslambi SSA
Revise
application
Pending
Civil Civil Outdoor
Pending
ZTE
OFC Not reqd Pending ZTE Combo pending DE(NWO-II)
47 Grg Ullawas SSA ok
aplication
pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-IV)
48 Grg Behrampur SSA ok
aplication
pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-IV)
circle querry about
MTNL area replied
that site beyond
MTNL area
49 Grg IMT-sec-6 SSA
Revise
application
Pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
50 Grg Wazirpur SSA
REVISED LAT
LONG SENT
TO CIRCLE
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending
DET(Sohna
RD)
Discussed with circle
to give it to IP VIOM
51 Grg
Amity(Near
Pachgaon)
SSA
Revise
application
Pending
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending ZTE Combo pending SDE(IMT) owner refused
52 Grg
PawalaKhu
surPur/Sec
109
SSA
Revise
application
Pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-II)
53 Grg Daultabad SSA ok
owner
aplication
not received
Civil Civil
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-II)
54 Grg dharampur SSA
Revise
application
Pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-II)
55 Grg Lakhuwas IP IP IP IP IP IP IP Pending ZTE Combo pending
DET(Sohna
RD)
56 Grg Kasan IP IP IP IP IP IP IP Pending ZTE Combo pending SDE(IMT)
Discussed with circle
to give it to IP VIOM
57 Grg
Imt Sec-3
manesar
IP IP IP IP IP IP IP Pending ZTE Combo pending SDE(IMT)
58 Grg
Bilaspur,
Haryana
IP IP IP IP IP IP IP Pending ZTE Combo pending SDE(IMT)
Discussed with circle
to give it to IP VIOM
DATED 24 -08-2013
Summary: Total sites=58 ( Alrdy Twr Erected with agreement done =11 + 47 new sites (4 IP +43 ) )
work detail of new sites -47 :: NewAgreemDone(sites hired )=14, HPC done but agreement pending =2, HPC pndg or file sent to HPC =4,application required=27
Sr
No
SDC
A
Total Sites(IP/SSA)
Hiring
of
Site(NR
/IP/SSA
)
Nomin
als
(NotRr
ceived/
OK/Not
Ok)RF
finaliza
Status of Site
hiring by SSA
(NR/IP/Y/to
HPC/WIP)
Agreem
ent
AD/D/N
R
EC status
(Y)
Tower
Foundat
ion(NR/
Zte/Civil
)
Tower
Erection(NR
/SSA/Zte)
Shelter
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS Status
Site
2G/com
bo
3G STATUS Concern DE Remarks Summary
Mobile
JTO nodals
1 Grg Dhankot NR NR NR AD y NR NR
ALREADY
SHELTER
Pending
ZTE
OFC Done done DONE Combo
comissione
d
DE(NWO-w) EMF Sent on 14.08.13
2 Grg Kherki Daula NR NR NR AD y NR NR
ROOM
DONE
Installed OFC Done done Installed Combo pending
DET(Sohna
RD)
BTS on AIR
03/05/2013
on air 03-05-13
3 Grg Binola NR NR NR AD y NR NR
Room
Already
done OFC Done done Installed Combo pending SDE(IMT)
BTS on AIR
01/05/2013
on air 01-05-13
4 Grg Tikli NR NR NR AD y NR NR Outdoor done
M/W
pending(ZT
E)
Not reqd Pending ZTE 2G NA
DET(Sohna
RD)
BTS O/D Allotted ready to install
5 Nuh Sudaka NR NR NR AD yes NR NR Outdoor
Pending
ZTE
M/W
pending(ZT
E)
Not reqd Pending ZTE 2G NA DE(Mewat) BTS O/D Allotted ready to install
6 Nuh salamba NR NR NR AD yes NR NR
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(ZT
E)
Pending
ZTE
Pending ZTE 2G NA DE(Mewat) work pending at ZTE
7 Nuh Alduka NR NR NR AD y NR NR
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(ZT
E)
Pending
ZTE
Pending ZTE 2G NA DE(Mewat) work pending at ZTE
8 Nuh Indri NR NR NR AD
file submitted
to DHBVNL
&wip
NR NR
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(ZT
E)
Pending
ZTE
Pending ZTE 2G NA DE(Mewat)
work pending at ZTE (EC work
completed 07/09/13 as per de
mewat)
9 Fpj Jamalgarh NR NR NR AD yes NR NR Outdoor done
M/W
pending(ZT
E)
Not reqd Pending ZTE 2G NA DE(Mewat) BTS O/D Allotted ready to install
10 Fpj Sikrawa NR NR NR AD yes NR NR
Room
Already
Done OFC Done done Installed Combo pending DE(Mewat)
BTS on air on 30-04-
13
On air 30-04-13
11 Fpj Gulalta NR NR NR AD yes NR NR
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(ZT
E)
Pending
ZTE
Pending ZTE 2G NA DE(Mewat) work pending at ZTE
12 Nuh Sangail SSA OK Y AD
SECURITY
DEPOSITED AT
DHBVNL,esti
mate recived
DONE done Outdoor
Pending
ZTE
M/W
pending(ZT
E)
Not reqd Pending ZTE 2G NA DE(Mewat)
13 Fpj Bisru SSA OK y DONE
SECURITY
DEPOSITED AT
DHBVNL ,one
estimate
DONE DONE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE 2G NA DE(Mewat)
14 Grg mumtajpur SSA OK HPC Done Done
file submitted
to DHBVNL
&wip
Done DONE outdoor
Pending
ZTE
OFC/wip Not reqd Pending ZTE 2G NA SDE(IMT)
site handed over to
circle
15 Grg Sikhopur SSA OK HPC Done done
file submitted
to DHBVNL
&wip
civil civil Outdoor
Pending
ZTE
OFC Not reqd Pending ZTE Combo pending SDE(IMT)
Court case done by
neighbour next
date:04/08/13
16 Grg Nahar pur KASAN SSA OK HPC Done Done
file submitted
to DHBVNL
&wip
DONE WIP Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
Court case done by
neighbour, next
date:1/8/13
17 Grg
Imt Sec-8
manesar
SSA OK HPC Done DONE
file submitted
to DHBVNL
&wip
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
Court case done by
neighbour,next
date:27/8/13 ,Stay by
court
18 Grg Nawada fatehpur SSA OK HPC Done DONE
file submitted
to DHBVNL
&wip
done
Civil
W/P Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
site handed over to
circle
JTO (MOB
) nodal -
GRG
Sh. PP
Gupta
JTO (MOB
) nodal -
Tauru
Sh. Rajiv
Kumar
Marothia
STATUS OF PRIORITY P1.1 OF PHASE 7 GSMPROJECT
*total site=2
sites hired =2 (HPC done with
agreement)
but E/C pending at both sites
* total sites=19
sites hired =5 (HPC done with
agreement )
file sent for HPC=2 application
required=12 (9+3 ip)

* so pending sites for hiring =
14 (file sent for hpc +HPC done
w/o agreement + application
required )
E/C pending in hired sites=5
19 Grg kota khandewla SSA
Revised application
required
Civil Civil outdoor
Pending
ZTE
OFC Not reqd Pending ZTE Combo pending SDE(IMT)
20 Grg Nakhdola SSA
Revised application
required
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
21 Grg IMT-Sec-7 SSA
Revised application
required
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
Civil SDE rejected
site
22 Grg
nsg gate no-2
(near)/Navrangpu
r
SSA OK
final letter pending
from NSG
ZTE ZTE outdoor
Pending
ZTE
OFC
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
NSG ready to give
Site
now...SDE(IMT)
23 Grg
Bhangrola/Kakrol
a
SSA OK file sent to HPC ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
lok adalat on
24/08/13
24 Grg IMT sect-1 SSA OK file sent for HPC ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
25 Grg
Near
GITM(searching
near pathrari )
SSA
Revised application
required
Civil Civil outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
26 Grg Hayatpur SSA
visit required by
sde civil
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT) owner refused
27 Grg
Jatuli/Hali Mandi
2
SSA
Revise application
Pending
Civil Civil Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
1. party rejected. 2.
lat-long failed. 3.
new site to be
searched
28 Grg IMT-sec-6 SSA
Revise application
Pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
29 Grg
Amity(Near
Pachgaon)-
badanki
SSA
Revise application
Pending
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending ZTE Combo pending SDE(IMT) owner refused
30 Grg Kasan IP IP IP IP IP IP IP Pending ZTE Combo pending SDE(IMT)
Discussed with
circle to give it to IP
VIOM
31 Grg
Imt Sec-3
manesar
IP IP IP (ssa searching ) IP IP IP IP Pending ZTE Combo pending SDE(IMT)
32 Grg
Bilaspur, Haryana
(bilaspur khurd )
IP IP IP IP IP IP IP Pending ZTE Combo pending SDE(IMT)
Discussed with
circle to give it to IP
VIOM
33 Grg Hasanpur SSA
Revised application
required
WIP ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
owner refused
34 Grg Palra SSA
Revised application
required
WIP ZTE ZTE Outdoor
Pending
ZTE
OFC Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
owner refused
35 Grg Silani SSA
revise application
required
Civil Civil
Shelter
Pending ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending ZTE Combo pending
DET(Sohna
RD)
site visited by
sde(mp) and
de(sohnard) but
site found very far
from nominals
36 Grg TE Sohna SSA OK Y NR y (TE xge )
done
Civil
done M/s
SKC
Room
Already
Already OFC Done done Pending ZTE Combo
material
received
DET(Sohna
RD)
Ready for BTS
installation
37 Grg CRPF Camp SSA OK Y WIP
Yes (CRPF
will provide
EC)EC wiring
pending
DONE ZTE Outdoor
Pending
ZTE
OFC
Pending(D
E Tx
Urban)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
site handed over to
circle
38 Grg Medawas SSA OK HPC Done DONE
File work
started
DONE DONE
Shelter
Pending ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending ZTE Combo pending
DET(Sohna
RD)
site handed over to
circle
JTO (MOB
) nodal -
Tauru
Sh. Rajiv
Kumar
Marothia
JTO (MOB
) nodal -
GRG
Sh. PP
Gupta
* total sites=19
sites hired =5 (HPC done with
agreement )
file sent for HPC=2 application
required=12 (9+3 ip)

* so pending sites for hiring =
14 (file sent for hpc +HPC done
w/o agreement + application
required )
E/C pending in hired sites=5
* total sites=13
Sites Hired=4 (1 xge sites +3
HPC done with agreement )
file sent for HPC=1 (wip )
application required= 8 ( 6+1
ip)

* so pending sites = 9 (file sent
for hpc + HPC done w/o
agreement+application
required )
E/C pending in hired sites=2
39 GRG RojkaMeo SSA OK Y AD
EC
security
paid.
Waiting
for the
estimate
done
Civil
done M/s
SKC
Outdoor
Pending
ZTE
M/W
pending(ZT
E)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
40 Grg
Sikandarpur(Bada
)
SSA OK HPC in Progress ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
41 Grg Lakhuwas IP IP IP IP IP IP IP Pending ZTE Combo pending
DET(Sohna
RD)
42 Grg Sector-67 SSA
Revise
application
Pending
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending
DET(Sohna
RD)
site visited by
sde(mp) and
de(sohnard), lat
long found ok,
sde(civil) visit
pending
43 Grg Wazirpur SSA
REVISED LAT
LONG SENT TO
CIRCLE
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending
DET(Sohna
RD)
44 Grg
Sohna DENSE
AREA
SSA Bid not recd ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
45 Grg BSF camp bhondsi SSA
Revise
application
Pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
46 Grg
PawalaKhusurPur
/Sec 109
SSA
Revise
application
Pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-N)
new site visit was
made by DE(NOW-
n) and sde(civil)
47 Grg Daultabad SSA ok
application
received
Civil Civil
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-N)
48 Grg dharampur SSA
Revise
application
Pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-N)
new site visit was
made by DE(NOW-
n) and sde(civil)
49 Grg
Kherki Majra
(Dhanwapur)
SSA OK file sent for HPC ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-N)
50 Grg Bajghera SSA OK Y AD Yes
done
Civil
done M/s
SKC
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(ZT
E)
Pending
ZTE
Pending ZTE Combo pending DE(NWO-N)
51 Grg Khetawas SSA OK HPC Done DONE
file submitted
to DHBVNL
&wip
Done Done Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-N)
site handed over to
circle
52 Grg
SGT Medical
college near
Budera /Chandu
SSA
Revise
application
Pending
Civil Civil
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending DE(NWO-W)
53 Grg Mussaidpur SSA OK HPC Done Civil Civil Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-W)
agreement
pending
54 Grg sultanpur SSA OK HPC Done
done
30413
Civil Civil Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-W)
tower foundation
work stopped by
local authorities
55 Grg Baslambi SSA
Revise
application
Pending
Civil Civil Outdoor
Pending
ZTE
OFC Not reqd Pending ZTE Combo pending DE(NWO-W)
56 Grg
Gawal
pahari/Baliawas
SSA
revise application
to be taken
Civil Civil Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-IV)
party demanded
higher rent (Rs
25000/-)
57 Grg Ullawas SSA ok HPC Done ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-IV)
* total sites=4
Sites hired =1 ( HPC done with
agreement )
HPC done w/o agreement =1
file sent for HPC=0 application
required= 2

* so pending sites = 3 (file sent
for hpc +HPC DONE w/o
agreement + application
required )
E/C pending in hired sites=1
JTO (MOB
) nodal -
GRG
Sh. PP
Gupta
JTO (MOB
) nodal -
Patudi
Sh. Ajay
Kumar
* total sites=13
Sites Hired=4 (1 xge sites +3
HPC done with agreement )
file sent for HPC=1 (wip )
application required= 8 ( 6+1
ip)

* so pending sites = 9 (file sent
for hpc + HPC done w/o
agreement+application
required )
E/C pending in hired sites=2
* total sites=3
Sites Hired =0
HPC done w/o agreement=1
file sent for HPC=0 application
required= 2

* so pending sites = 3 (file sent
for hpc +HPC DONE w/o
agreement + application
required )
* total sites=6,
Sites Hired =2 (HPC done with
agreement )
file sent for HPC=1 application
required= 2

* so pending sites = 4 (file sent
for hpc + HPC done w/o
agreement +application
required )
E/C pending in hired sites=1
58 Grg Behrampur SSA
revise aplication
pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-IV)
party demanded
higher rent (Rs
25000/-)
JTO (MOB
) nodal -
Patudi
Sh. Ajay
Kumar
* total sites=3
Sites Hired =0
HPC done w/o agreement=1
file sent for HPC=0 application
required= 2

* so pending sites = 3 (file sent
for hpc +HPC DONE w/o
agreement + application
required )
DATED 17-08-2013
Summary: Total sites=58, IP=4, Twr Erected=11, AlrdyAgreemDone=11, NewAgreemDone=9, ToBeHired=21, AgreemPndg=3,HPC done=10,HPCpndg=4, HPCfilePndg=1, LatLongApprvlPndg=0, BidPndg=14
Sr No
SDCA
Total
Sites(IP/SS
A)
Hiring of
Site(NR/
IP/SSA)
Nominals
(NotRrceived
/OK/Not
Ok)RF
finalization
Status of
Site hiring
by SSA
(NR/IP/Y/to
HPC/WIP)
Agreem
ent
AD/D/N
R
EC status (Y)
Tower
Foundati
on(NR/Zt
e/Civil)
Tower
Erection(
NR/SSA/Z
te)
Shelter
POWER
PLANT
MEDIA
ANTISTATI
C
BTS Status
Site
2G/comb
o
3G
STATUS
Concern DE Remarks
1 Grg Dhankot NR NR NR AD y NR NR
ALREADY
SHELTER
Pending
ZTE
OFC
Done
done DONE Combo
comission
ed
DE(NWO-II)
2 Grg
Kherki
Daula
NR NR NR AD y NR NR
ROOM
DONE
Installed
OFC
Done
done Installed Combo pending
DET(Sohna
RD)
BTS on AIR
03/05/2013
3 Grg Binola NR NR NR AD y NR NR
Room
Already
done
OFC
Done
done Installed Combo pending SDE(IMT)
BTS on AIR
01/05/2013
4 Grg Tikli NR NR NR AD y NR NR Outdoor done
M/W
pending(
ZTE)
Not reqd Pending ZTE 2G NA
DET(Sohna
RD)
BTS O/D Allotted
5 Nuh Sudaka NR NR NR AD yes NR NR Outdoor
Pending
ZTE
M/W
pending(
ZTE)
Not reqd Pending ZTE 2G NA DE(Mewat) BTS O/D Allotted
6 Nuh salamba NR NR NR AD yes NR NR
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(
Pending
ZTE
Pending ZTE 2G NA DE(Mewat)
7 Nuh Alduka NR NR NR AD y NR NR
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(
ZTE)
Pending
ZTE
Pending ZTE 2G NA DE(Mewat)
8 Nuh Indri NR NR NR AD
file work in
progress at
DHBVNL
NR NR
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(
ZTE)
Pending
ZTE
Pending ZTE 2G NA DE(Mewat)
9 Fpj Jamalgarh NR NR NR AD yes NR NR Outdoor done
M/W
pending(
ZTE)
Not reqd Pending ZTE 2G NA DE(Mewat) BTS O/D Allotted
10 Fpj Sikrawa NR NR NR AD yes NR NR
Room
Already
Done
OFC
Done
done Installed Combo pending DE(Mewat)
BTS on air on
30.04.13
11 Fpj Gulalta NR NR NR AD yes NR NR
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(
ZTE)
Pending
ZTE
Pending ZTE 2G NA DE(Mewat)
12 Grg TE Sohna SSA OK Y NR y (TE xge )
done
Civil
done M/s
SKC
Room
Already
Already
OFC
Done
done Pending ZTE Combo
material
received
DET(Sohna
RD)
Ready for BTS
installation
13 Grg CRPF Camp SSA OK Y WIP
Yes (CRPF will
provide EC)
DONE ZTE Outdoor
Pending
ZTE
OFC
Pending(
DE Tx
Urban)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
site handed over to
circle
14 Nuh Sangail SSA OK Y AD
SECURITY
DEPOSITED AT
DHBVNL,estim
ate recived
DONE done Outdoor
Pending
ZTE
M/W
pending(
ZTE)
Not reqd Pending ZTE 2G NA DE(Mewat)
15 GRG RojkaMeo SSA OK Y AD
EC security
paid. Waiting
for the
estimate
done
Civil
done M/s
SKC
Outdoor
Pending
ZTE
M/W
pending(
ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
16 Grg Bajghera SSA OK Y AD Yes
done
Civil
done M/s
SKC
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(
ZTE)
Pending
ZTE
Pending ZTE Combo pending DE(NWO-II)
17 Fpj Bisru SSA OK y DONE
SECURITY
DEPOSITED AT
DHBVNL ,one
estimate
pending from
DHBVNL
DONE DONE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE 2G NA DE(Mewat)
18 Grg mumtajpur SSA OK HPC Done Done
File work
started
Done DONE outdoor
Pending
ZTE
OFC/wip Not reqd Pending ZTE 2G NA SDE(IMT)
site handed over to
circle
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT
19 Grg Sikhopur SSA OK HPC Done done
File work
started
civil civil Outdoor
Pending
ZTE
OFC Not reqd Pending ZTE Combo pending SDE(IMT)
Court case done by
neighbour next
date:23/7/13
20 Grg
Nahar pur
KASAN
SSA OK HPC Done Done
File work
started
DONE WIP Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
Court case done by
neighbour, next
date:1/8/13
21 Grg
Imt Sec-8
manesar
SSA OK HPC Done DONE
File work
started
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
Court case done by
neighbour,next
date:27/8/13
22 Grg
Nawada
fatehpur
SSA OK HPC Done DONE
File work
started
done
Civil
W/P Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
site handed over to
circle
23 Grg Medawas SSA OK HPC Done DONE
File work
started
DONE DONE
Shelter
Pending ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending ZTE Combo pending
DET(Sohna
RD)
site handed over to
circle
24 Grg Khetawas SSA OK HPC Done DONE
File work
started
Done Done Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-II)
site handed over to
circle
25 Grg sultanpur SSA OK HPC Done
done
30413
Civil Civil Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-II)
tower foundation
work stopped by
local authorities
26 Grg
kota
khandewla
SSA
Revised
application
required
Civil Civil outdoor
Pending
ZTE
OFC Not reqd Pending ZTE Combo pending SDE(IMT)
27 Grg Hasanpur SSA
Revised
application
required
WIP ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
owner refused
28 Grg Palra SSA
Revised
application
required
WIP ZTE ZTE Outdoor
Pending
ZTE
OFC Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
owner refused
29 Grg Silani SSA
owner
refused,revi
se bid reqd
Civil Civil
Shelter
Pending ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending ZTE Combo pending
DET(Sohna
RD)
30 Grg
Gawal
pahari/Bali
awas
SSA OK HPC Done Civil Civil Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-IV)
31 Grg
Sikandarpu
r(Bada)
SSA OK
HPC in
Progress
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
32 Grg Nakhdola SSA
Revised
application
required
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
33 Grg IMT-Sec-7 SSA
Revised
application
required
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
Civil SDE rejected
site
34 Grg
nsg gate no-
2
(near)/Navr
angpur
SSA OK
letter
pending
from NSG
ZTE ZTE outdoor
Pending
ZTE
OFC
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
NSG ready to give
Site now...SDE(IMT)
35 Grg
Bhangrola/
Kakrola
SSA OK
file sent to
HPC
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
36 Grg IMT sect-1 SSA OK
file sent for
HPC
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
37 Grg Near GITM SSA
Revised
application
required
Civil Civil outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
38 Grg
Kherki
Majra
(Dhanwapu
r)
SSA OK
file sent for
HPC
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-II)
39 Grg Mussaidpur SSA OK HPC Done Civil Civil Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-II) agreement pending
40 Grg Hayatpur SSA
Revised
application
required
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT) owner refused
41 Grg Sector-67 SSA
Revise
application
Pending
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending
DET(Sohna
RD)
High rent 40000.
New site to be
searched.
42 Grg
SGT
Medical
college
near
Budera
/Chandu
SSA
Revise
application
Pending
Civil Civil
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending DE(NWO-II)
43 Grg
Jatuli/Hali
Mandi 2
SSA
Revise
application
Pending
Civil Civil Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
1. party rejected. 2.
lat-long failed. 3.
new site to be
searched
44 Grg
Sohna
DENSE
AREA
SSA Bid not recd ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
45 Grg
BSF camp
bhondsi
SSA
Revise
application
Pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
46 Grg Baslambi SSA
Revise
application
Pending
Civil Civil Outdoor
Pending
ZTE
OFC Not reqd Pending ZTE Combo pending DE(NWO-II)
47 Grg Ullawas SSA ok
aplication
pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-IV)
48 Grg Behrampur SSA ok
aplication
pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-IV)
49 Grg IMT-sec-6 SSA
Revise
application
Pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
50 Grg Wazirpur SSA
REVISED LAT
LONG SENT
TO CIRCLE
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending
DET(Sohna
RD)
51 Grg
Amity(Near
Pachgaon)
SSA
Revise
application
Pending
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending ZTE Combo pending SDE(IMT) owner refused
52 Grg
PawalaKhu
surPur/Sec
109
SSA
Revise
application
Pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-II)
53 Grg Daultabad SSA ok
owner
aplication
not received
Civil Civil
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-II)
54 Grg dharampur SSA
Revise
application
Pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-II)
55 Grg Lakhuwas IP IP IP IP IP IP IP Pending ZTE Combo pending
DET(Sohna
RD)
56 Grg Kasan IP IP IP IP IP IP IP Pending ZTE Combo pending SDE(IMT)
Discussed with
circle to give it to IP
VIOM
57 Grg
Imt Sec-3
manesar
IP IP IP IP IP IP IP Pending ZTE Combo pending SDE(IMT)
58 Grg
Bilaspur,
Haryana
IP IP IP IP IP IP IP Pending ZTE Combo pending SDE(IMT)
Discussed with
circle to give it to IP
VIOM
DATED 07-09-2013
Summary: Total sites=58 ( Alrdy Twr Erected with agreement done =11 + 47 new sites (4 IP +43 ) )
work detail of new sites -47 :: NewAgreemDone(sites hired )=14, HPC done but agreement pending =2, HPC pndg or file sent to HPC =4,application required=27
Sr
No
SDC
A
Total
Sites(IP/SSA)
Hiring
of
Site(NR
/IP/SSA
)
Nomin
als
(NotRr
ceived/
OK/Not
Ok)RF
finaliza
Status of Site
hiring by SSA
(NR/IP/Y/to
HPC/WIP)
Agreem
ent
AD/D/N
R
EC status
(Y)
Tower
Founda
tion(NR
/Zte/Civ
il)
Tower
Erection(N
R/SSA/Zte
)
Shelter
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS Status
Site
2G/com
bo
3G STATUS Concern DE Remarks Summary
Mobile
JTO nodals
1 Grg Dhankot NR NR NR AD y NR NR
ALREADY
SHELTER
Pending
ZTE
OFC Done done DONE Combo
comissione
d
DE(NWO-w) EMF Sent on 14.08.13
2 Grg Kherki Daula NR NR NR AD y NR NR
ROOM
DONE
Installed OFC Done done Installed Combo pending
DET(Sohna
RD)
BTS on AIR
03/05/2013
on air 03-05-13
3 Grg Binola NR NR NR AD y NR NR
Room
Already
done OFC Done done Installed Combo pending SDE(IMT)
BTS on AIR
01/05/2013
on air 01-05-13
4 Grg Tikli NR NR NR AD y NR NR Outdoor done
M/W
pending(ZT
E)
Not reqd Pending ZTE 2G NA
DET(Sohna
RD)
BTS O/D
Allotted
ready to install
5 Nuh Sudaka NR NR NR AD yes NR NR Outdoor
Pending
ZTE
M/W
pending(ZT
E)
Not reqd Pending ZTE 2G NA DE(Mewat)
BTS O/D
Allotted
ready to install
6 Nuh salamba NR NR NR AD yes NR NR
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(ZT
E)
Pending
ZTE
Pending ZTE 2G NA DE(Mewat) work pending at ZTE
7 Nuh Alduka NR NR NR AD y NR NR
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(ZT
E)
Pending
ZTE
Pending ZTE 2G NA DE(Mewat) work pending at ZTE
8 Nuh Indri NR NR NR AD
file submitted to
DHBVNL &wip
NR NR
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(ZT
E)
Pending
ZTE
Pending ZTE 2G NA DE(Mewat)
work pending at ZTE (EC work
completed 07/09/13 as per de
mewat)
9 Fpj Jamalgarh NR NR NR AD yes NR NR Outdoor done
M/W
pending(ZT
E)
Not reqd Pending ZTE 2G NA DE(Mewat)
BTS O/D
Allotted
ready to install
10 Fpj Sikrawa NR NR NR AD yes NR NR
Room
Already
Done OFC Done done Installed Combo pending DE(Mewat)
BTS on air on 30-
04-13
On air 30-04-13
11 Fpj Gulalta NR NR NR AD yes NR NR
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(ZT
E)
Pending
ZTE
Pending ZTE 2G NA DE(Mewat) work pending at ZTE
12 Nuh Sangail SSA OK Y AD
SECURITY
DEPOSITED AT
DHBVNL,
estimate
recived
DONE done Outdoor
Pending
ZTE
M/W
pending(ZT
E)
Not reqd Pending ZTE 2G NA DE(Mewat)
13 Fpj Bisru SSA OK y DONE
Estimate
received from
DHBVN
,Demand note
pending
DONE DONE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE 2G NA DE(Mewat)
14 Grg mumtajpur SSA OK HPC Done Done
file submitted to
DHBVNL &wip
Done outdoor
Pending
ZTE
OFC/wip Not reqd Pending ZTE 2G NA SDE(IMT)
site handed over to
circle
15 Grg Sikhopur SSA OK HPC Done done
file submitted to
DHBVNL &wip
civil civil Outdoor
Pending
ZTE
OFC Not reqd Pending ZTE Combo pending SDE(IMT)
Court case done by
neighbour next
date:24/09/13
16 Grg
Nahar pur
KASAN
SSA OK HPC Done Done
file submitted to
DHBVNL &wip
DONE WIP Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
Court case done by
neighbour, next
date:17/09/13
17 Grg
Imt Sec-8
manesar
SSA OK HPC Done DONE
file submitted to
DHBVNL &wip
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
to apeal in higher
court
18 Grg
Nawada
fatehpur
SSA OK HPC Done DONE
file submitted to
DHBVNL &wip
done
Civil
W/P Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
site handed over to
circle
STATUS OF PRIORITY P1.1 OF PHASE 7 GSMPROJECT
JTO (MOB
) nodal -
GRG
Sh. PP
Gupta
*total site=2
sites hired =2 (HPC done with
agreement)
but E/C pending at both sites
JTO (MOB
) nodal -
Tauru
Sh. Rajiv
Kumar
Marothia
* total sites=19
sites hired =5 (HPC done with
agreement )
file sent for HPC=2 application
required=7

* so pending sites for hiring =
14 (file sent for hpc +HPC done
w/o agreement + application
required )
E/C pending in hired sites=5
19 Grg kota khandewla SSA
lat long
sent
Civil Civil outdoor
Pending
ZTE
OFC Not reqd Pending ZTE Combo pending SDE(IMT)
lat long sent to
circle
20 Grg Nakhdola SSA
Revised application
required
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
21 Grg IMT-Sec-7 SSA
Revised application
required
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
Civil SDE
rejected site
22 Grg
nsg gate no-2
(near)/Navrang
pur
SSA OK
final letter pending
from NSG
ZTE ZTE outdoor
Pending
ZTE
OFC
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
NSG ready to
give Site
now...SDE(IMT)
23 Grg
Bhangrola/Kakr
ola
SSA OK file sent to HPC ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT) court case done
24 Grg IMT sect-1 SSA OK file sent for HPC ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
25 Grg
Near
GITM(searching
near pathrari )
SSA
lat long
sent
Civil Civil outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
lat long sent to
circle
26 Grg Hayatpur SSA
Let long sent to
circle
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
lat long sent to
circle
27 Grg
Jatuli/Hali
Mandi 2
SSA
Let long sent to
circle
Civil Civil Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
lat long sent to
circle
28 Grg IMT-sec-6 SSA
Revise application
Pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
29 Grg
Amity(Near
Pachgaon)-
badanki
SSA ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
site hand over ip
(indus) by circle
office
30 Grg Kasan IP IP IP IP IP IP IP Pending ZTE Combo pending SDE(IMT)
site hand over ip
(indus) by circle
office
31 Grg
Imt Sec-3
manesar
IP IP IP (ssa searching ) IP IP IP IP Pending ZTE Combo pending SDE(IMT)
32 Grg
Bilaspur,
Haryana
(bilaspur khurd
)
IP IP
Let long sent to
circle
IP IP IP IP Pending ZTE Combo pending SDE(IMT)
lat long sent to
circle
33 Grg Hasanpur SSA
Revised application
required
WIP ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
owner refused
34 Grg Palra SSA
Revised application
required
WIP ZTE ZTE Outdoor
Pending
ZTE
OFC Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
owner refused
35 Grg Silani SSA
revise application
required
Civil Civil
Shelter
Pending ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending ZTE Combo pending
DET(Sohna
RD)
site visited by
sde(mp) and
de(sohnard) but
site found very
far from
nominals
36 Grg TE Sohna SSA OK Y NR y (TE xge )
done
Civil
done M/s
SKC
Room
Already
Already OFC Done done Pending ZTE Combo
material
received
DET(Sohna
RD)
Ready for BTS
installation
37 Grg CRPF Camp SSA OK Y WIP
Yes (CRPF will
provide EC)EC
wiring
pending
DONE ZTE Outdoor
Pending
ZTE
OFC
Pending(D
E Tx
Urban)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
site handed
over to circle
38 Grg Medawas SSA OK HPC Done DONE
File work
started
DONE DONE
Shelter
Pending ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending ZTE Combo pending
DET(Sohna
RD)
site handed
over to circle
JTO (MOB
) nodal -
GRG
Sh. PP
Gupta
JTO (MOB
) nodal -
Tauru
Sh. Rajiv
Kumar
Marothia
* total sites=19
sites hired =5 (HPC done with
agreement )
file sent for HPC=2 application
required=7

* so pending sites for hiring =
14 (file sent for hpc +HPC done
w/o agreement + application
required )
E/C pending in hired sites=5
* total sites=13
Sites Hired=4 (1 xge sites +3
HPC done with agreement )
file sent for HPC=1 (wip )
application required= 8 ( 6+1
ip)

* so pending sites = 9 (file sent
for hpc + HPC done w/o
agreement+application
required )
E/C pending in hired sites=2
39 GRG RojkaMeo SSA OK Y AD
EC security
paid.
Waiting for
the
estimate
done
Civil
done M/s
SKC
Outdoor
Pending
ZTE
M/W
pending(ZT
E)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
40 Grg
Sikandarpur(Ba
da)
SSA OK HPC in Progress ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
41 Grg Lakhuwas IP IP IP IP IP IP IP Pending ZTE Combo pending
DET(Sohna
RD)
42 Grg Sector-67 SSA
Revise
application
Pending
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending
DET(Sohna
RD)
site visited by
sde(mp) and
de(sohnard), lat
long found ok,
sde(civil) visit
pending
43 Grg Wazirpur SSA
site hand over ip
(indus) by circle
office
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending
DET(Sohna
RD)
site hand over ip
(indus) by circle
office
44 Grg
Sohna DENSE
AREA
SSA Bid not recd ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
45 Grg
BSF camp
bhondsi
SSA
Revise
application
Pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
46 Grg
PawalaKhusurP
ur/Sec 109
SSA
Let long sent to
circle
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-N)
new site visit
was made by
DE(NOW-n) and
sde(civil)
47 Grg Daultabad SSA ok file sent to HPC Civil Civil
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-N)
48 Grg dharampur SSA
Revise
application
Pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-N)
new site visit
was made by
DE(NOW-n) and
sde(civil)
49 Grg
Kherki Majra
(Dhanwapur)
SSA OK file sent for HPC ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-N)
50 Grg Bajghera SSA OK Y AD Yes
done
Civil
done M/s
SKC
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(ZT
E)
Pending
ZTE
Pending ZTE Combo pending DE(NWO-N)
51 Grg Khetawas SSA OK HPC Done DONE
file submitted to
DHBVNL &wip
Done Done Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-N)
site handed
over to circle
52 Grg
SGT Medical
college near
Budera
/Chandu
SSA
Revise
application
Pending
Civil Civil
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending DE(NWO-W)
site hand over ip
(indus) by circle
office
53 Grg Mussaidpur SSA OK HPC Done Civil Civil Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-W)
agreement
pending
54 Grg sultanpur SSA OK HPC Done
done
30413
Civil Civil Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-W)
tower foundation
work stopped by
local authorities
55 Grg Baslambi SSA
Revise
application
Pending
Civil Civil Outdoor
Pending
ZTE
OFC Not reqd Pending ZTE Combo pending DE(NWO-W)
56 Grg
Gawal
pahari/Baliawas
SSA
revise application
to be taken
Civil Civil Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-IV)
party demanded
higher rent (Rs
25000/-)
57 Grg Ullawas SSA ok HPC Done ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-IV)
JTO (MOB
) nodal -
GRG
Sh. PP
Gupta
* total sites=6,
Sites Hired =2 (HPC done with
agreement )
file sent for HPC=1 application
required= 2

* so pending sites = 4 (file sent
for hpc + HPC done w/o
agreement +application
required )
E/C pending in hired sites=1
JTO (MOB
) nodal -
Patudi
Sh. Ajay
Kumar
* total sites=4
Sites hired =1 ( HPC done with
agreement )
HPC done w/o agreement =1
file sent for HPC=0 application
required= 2

* so pending sites = 3 (file sent
for hpc +HPC DONE w/o
agreement + application
required )
E/C pending in hired sites=1
* total sites=3
Sites Hired =0
HPC done w/o agreement=1
file sent for HPC=0 application
required= 2

* so pending sites = 3 (file sent
for hpc +HPC DONE w/o
agreement + application
required )
* total sites=13
Sites Hired=4 (1 xge sites +3
HPC done with agreement )
file sent for HPC=1 (wip )
application required= 8 ( 6+1
ip)

* so pending sites = 9 (file sent
for hpc + HPC done w/o
agreement+application
required )
E/C pending in hired sites=2
58 Grg Behrampur SSA
revise aplication
pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-IV)
party demanded
higher rent (Rs
25000/-)
JTO (MOB
) nodal -
Patudi
Sh. Ajay
Kumar
* total sites=3
Sites Hired =0
HPC done w/o agreement=1
file sent for HPC=0 application
required= 2

* so pending sites = 3 (file sent
for hpc +HPC DONE w/o
agreement + application
required )
DATED 13-09-2013
Summary: Total sites=58 ( Alrdy Twr Erected with agreement done =11 + 47 new sites (4 IP +43 ) )
work detail of new sites -47 :: NewAgreemDone(sites hired )=14, HPC done but agreement pending =2, HPC pndg or file sent to HPC =4,application required=27
Sr
No
SDC
A
Total
Sites(IP/SSA)
Hiring
of
Site(NR
/IP/SSA
)
Nomin
als
(NotRr
ceived/
OK/Not
Ok)RF
finaliza
Status of Site
hiring by SSA
(NR/IP/Y/to
HPC/WIP)
Agreem
ent
AD/D/N
R
EC status
(Y)
Tower
Founda
tion(NR
/Zte/Civ
il)
Tower
Erection(N
R/SSA/Zte
)
Shelter
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS Status
Site
2G/com
bo
3G STATUS Concern DE Remarks Summary
Mobile
JTO nodals
1 Grg Dhankot NR NR NR AD y NR NR
ALREADY
SHELTER
Pending
ZTE
OFC Done done DONE Combo
comissione
d
DE(NWO-w) EMF Sent on 14.08.13
2 Grg Kherki Daula NR NR NR AD y NR NR
ROOM
DONE
Installed OFC Done done Installed Combo pending
DET(Sohna
RD)
BTS on AIR
03/05/2013
on air 03-05-13
3 Grg Binola NR NR NR AD y NR NR
Room
Already
done OFC Done done Installed Combo pending SDE(IMT)
BTS on AIR
01/05/2013
on air 01-05-13
4 Grg Tikli NR NR NR AD y NR NR Outdoor done
M/W
pending(ZT
E)
Not reqd Pending ZTE 2G NA
DET(Sohna
RD)
BTS O/D
Allotted
ready to install
5 Nuh Sudaka NR NR NR AD yes NR NR Outdoor
Pending
ZTE
M/W
pending(ZT
E)
Not reqd Pending ZTE 2G NA DE(Mewat)
BTS O/D
Allotted
ready to install
6 Nuh salamba NR NR NR AD yes NR NR
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(ZT
E)
Pending
ZTE
Pending ZTE 2G NA DE(Mewat) work pending at ZTE
7 Nuh Alduka NR NR NR AD y NR NR
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(ZT
E)
Pending
ZTE
Pending ZTE 2G NA DE(Mewat) work pending at ZTE
8 Nuh Indri NR NR NR AD
will take 7-8
days more
NR NR
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(ZT
E)
Pending
ZTE
Pending ZTE 2G NA DE(Mewat)
work pending at ZTE (EC work
completed 07/09/13 as per de
mewat)
9 Fpj Jamalgarh NR NR NR AD yes NR NR Outdoor done
M/W
pending(ZT
E)
Not reqd Pending ZTE 2G NA DE(Mewat)
BTS O/D
Allotted
ready to install
10 Fpj Sikrawa NR NR NR AD yes NR NR
Room
Already
Done OFC Done done Installed Combo pending DE(Mewat)
BTS on air on 30-
04-13
On air 30-04-13
11 Fpj Gulalta NR NR NR AD yes NR NR
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(ZT
E)
Pending
ZTE
Pending ZTE 2G NA DE(Mewat) work pending at ZTE
12 Nuh Sangail SSA OK Y AD
SECURITY
DEPOSITED AT
DHBVNL,
estimate
recived
DONE done Outdoor
Pending
ZTE
M/W
pending(ZT
E)
Not reqd Pending ZTE 2G NA DE(Mewat)
13 Fpj Bisru SSA OK y DONE
Demand note
received ,file at
AO (BSNL)
DONE DONE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE 2G NA DE(Mewat)
14 Grg mumtajpur SSA OK HPC Done Done
file submitted to
DHBVNL &wip
Done outdoor
Pending
ZTE
OFC/wip Not reqd Pending ZTE 2G NA SDE(IMT)
site handed over to
circle
15 Grg Sikhopur SSA OK HPC Done done
file submitted to
DHBVNL &wip
civil civil Outdoor
Pending
ZTE
OFC Not reqd Pending ZTE Combo pending SDE(IMT)
Court case done by
neighbour next
date:24/09/13
16 Grg
Nahar pur
KASAN
SSA OK HPC Done Done
file submitted to
DHBVNL &wip
DONE WIP Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
Court case done by
neighbour, next
date:17/09/13
17 Grg
Imt Sec-8
manesar
SSA OK HPC Done DONE
file submitted to
DHBVNL &wip
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
to apeal in higher
court
18 Grg
Nawada
fatehpur
SSA OK HPC Done DONE
file submitted to
DHBVNL &wip
done
Civil
W/P Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
site handed over to
circle
STATUS OF PRIORITY P1.1 OF PHASE 7 GSMPROJECT
JTO (MOB
) nodal -
GRG
Sh. PP
Gupta
*total site=2
sites hired =2 (HPC done with
agreement)
but E/C pending at both sites
JTO (MOB
) nodal -
Tauru
Sh. Rajiv
Kumar
Marothia
* total sites=19
sites hired =5 (HPC done with
agreement )
file sent for HPC=2 application
required=7

* so pending sites for hiring =
14 (file sent for hpc +HPC done
w/o agreement + application
required )
E/C pending in hired sites=5
19 Grg kota khandewla SSA ok
application
required
Civil Civil outdoor
Pending
ZTE
OFC Not reqd Pending ZTE Combo pending SDE(IMT)
20 Grg Nakhdola SSA
Revised application
required
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
21 Grg IMT-Sec-7 SSA
Revised application
required
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
Civil SDE
rejected site
22 Grg
nsg gate no-2
(near)/Navrang
pur
SSA OK
final letter pending
from NSG
ZTE ZTE outdoor
Pending
ZTE
OFC
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
NSG ready to
give Site
now...SDE(IMT)
23 Grg
Bhangrola/Kakr
ola
SSA OK file sent to HPC ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT) court case done
24 Grg IMT sect-1 SSA OK file sent for HPC ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
25 Grg
Near
GITM(searching
near pathrari )
SSA ok
application
required
Civil Civil outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
26 Grg Hayatpur SSA ok
application
required
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
27 Grg
Jatuli/Hali
Mandi 2
SSA ok
application
required
Civil Civil Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
28 Grg IMT-sec-6 SSA
Revise application
Pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
29 Grg
Amity(Near
Pachgaon)-
badanki
SSA ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
site hand over ip
(indus) by circle
office
30 Grg Kasan IP IP IP IP IP IP IP Pending ZTE Combo pending SDE(IMT)
site hand over ip
(indus) by circle
office
31 Grg
Imt Sec-3
manesar
IP IP IP (ssa searching ) IP IP IP IP Pending ZTE Combo pending SDE(IMT)
32 Grg
Bilaspur,
Haryana
(bilaspur khurd
)
IP ok
application
required
IP IP IP IP Pending ZTE Combo pending SDE(IMT)
33 Grg Hasanpur SSA
Revised application
required
WIP ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
owner refused
34 Grg Palra SSA
Revised application
required
WIP ZTE ZTE Outdoor
Pending
ZTE
OFC Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
owner refused
35 Grg Silani SSA
revise application
required
Civil Civil
Shelter
Pending ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending ZTE Combo pending
DET(Sohna
RD)
site visited by
sde(mp) and
de(sohnard) but
site found very
far from
nominals
36 Grg TE Sohna SSA OK Y NR y (TE xge )
done
Civil
done M/s
SKC
Room
Already
Already OFC Done done Pending ZTE Combo
material
received
DET(Sohna
RD)
Ready for BTS
installation
37 Grg CRPF Camp SSA OK Y WIP
Yes (CRPF will
provide EC)EC
wiring
pending
DONE ZTE Outdoor
Pending
ZTE
OFC
Pending(D
E Tx
Urban)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
site handed
over to circle
38 Grg Medawas SSA OK HPC Done DONE
File work
started
DONE DONE
Shelter
Pending ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending ZTE Combo pending
DET(Sohna
RD)
site handed
over to circle
* total sites=13
Sites Hired=4 (1 xge sites +3
HPC done with agreement )
file sent for HPC=1 (wip )
application required= 8 ( 6+1
ip)

* so pending sites = 9 (file sent
for hpc + HPC done w/o
agreement+application
required )
E/C pending in hired sites=2
JTO (MOB
) nodal -
GRG
Sh. PP
Gupta
JTO (MOB
) nodal -
Tauru
Sh. Rajiv
Kumar
Marothia
* total sites=19
sites hired =5 (HPC done with
agreement )
file sent for HPC=2 application
required=7

* so pending sites for hiring =
14 (file sent for hpc +HPC done
w/o agreement + application
required )
E/C pending in hired sites=5
39 GRG RojkaMeo SSA OK Y AD
EC security
paid.
Waiting for
the
estimate
done
Civil
done M/s
SKC
Outdoor
Pending
ZTE
M/W
pending(ZT
E)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
40 Grg
Sikandarpur(Ba
da)
SSA OK HPC in Progress ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
41 Grg Lakhuwas IP IP IP IP IP IP IP Pending ZTE Combo pending
DET(Sohna
RD)
42 Grg Sector-67 SSA
lat long sent to
circle
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending
DET(Sohna
RD)
lat long sent to
circle
43 Grg Wazirpur SSA
site hand over ip
(indus) by circle
office
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending
DET(Sohna
RD)
site hand over ip
(indus) by circle
office
44 Grg
Sohna DENSE
AREA
SSA Bid not recd ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
45 Grg
BSF camp
bhondsi
SSA
Revise
application
Pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
46 Grg
PawalaKhusurP
ur/Sec 109
SSA not ok ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-N)
47 Grg Daultabad SSA ok file sent to HPC Civil Civil
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-N)
48 Grg dharampur SSA
new lat long sent
to circle
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-N)
new lat long
sent to circle
49 Grg
Kherki Majra
(Dhanwapur)
SSA OK file sent for HPC ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-E)
50 Grg Bajghera SSA OK Y AD Yes
done
Civil
done M/s
SKC
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(ZT
E)
Pending
ZTE
Pending ZTE Combo pending DE(NWO-N)
51 Grg Khetawas SSA OK HPC Done DONE
file submitted to
DHBVNL &wip
Done Done Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-E)
site handed
over to circle
52 Grg
SGT Medical
college near
Budera
/Chandu
SSA
Revise
application
Pending
Civil Civil
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending DE(NWO-W)
site hand over ip
(indus) by circle
office
53 Grg Mussaidpur SSA OK HPC Done Civil Civil Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-W)
agreement
pending
54 Grg sultanpur SSA OK HPC Done
done
30413
Civil Civil Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-W)
tower foundation
work stopped by
local authorities
55 Grg Baslambi SSA
new lat long sent
to circle
Civil Civil Outdoor
Pending
ZTE
OFC Not reqd Pending ZTE Combo pending DE(NOW-E)
lat long sent to
circle
56 Grg
Gawal
pahari/Baliawas
SSA
revise application
to be taken
Civil Civil Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NOW-E)
party demanded
higher rent (Rs
25000/-)
57 Grg Ullawas SSA ok HPC Done ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NOW-E)
* total sites=13
Sites Hired=4 (1 xge sites +3
HPC done with agreement )
file sent for HPC=1 (wip )
application required= 8 ( 6+1
ip)

* so pending sites = 9 (file sent
for hpc + HPC done w/o
agreement+application
required )
E/C pending in hired sites=2
JTO (MOB
) nodal -
GRG
Sh. PP
Gupta
* total sites=6,
Sites Hired =2 (HPC done with
agreement )
file sent for HPC=1 application
required= 2

* so pending sites = 4 (file sent
for hpc + HPC done w/o
agreement +application
required )
E/C pending in hired sites=1
JTO (MOB
) nodal -
Patudi
Sh. Ajay
Kumar
* total sites=4
Sites hired =1 ( HPC done with
agreement )
HPC done w/o agreement =1
file sent for HPC=0 application
required= 2

* so pending sites = 3 (file sent
for hpc +HPC DONE w/o
agreement + application
required )
E/C pending in hired sites=1
* total sites=3
Sites Hired =0
HPC done w/o agreement=1
file sent for HPC=0 application
required= 2

* so pending sites = 3 (file sent
for hpc +HPC DONE w/o
agreement + application
required )
58 Grg Behrampur SSA
revise aplication
pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NOW-E)
party demanded
higher rent (Rs
25000/-)
JTO (MOB
) nodal -
Patudi
Sh. Ajay
Kumar
* total sites=3
Sites Hired =0
HPC done w/o agreement=1
file sent for HPC=0 application
required= 2

* so pending sites = 3 (file sent
for hpc +HPC DONE w/o
agreement + application
required )
DATED 18-9-2013
Summary: Total sites=58 ( Alrdy Twr Erected with agreement done =11 + 47 new sites (4 IP +43 ) )
work detail of new sites -47 :: NewAgreemDone(sites hired )=14, HPC done but agreement pending =2, HPC pndg or file sent to HPC =10,application required=13
Sr
No
SDC
A
Total
Sites(IP/SSA)
Hiring
of
Site(NR
/IP/SSA
)
Nominal
s
(NotRrc
eived/O
K/Not
Ok)RF
finalizati
Status of Site
hiring by SSA
(NR/IP/Y/to
HPC/WIP)
Agreem
ent
AD/D/N
R
EC status
(Y)
Tower
Founda
tion(NR
/Zte/Ci
vil)
Tower
Erection(
NR/SSA/Z
te)
Shelter
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS Status
Site
2G/com
bo
3G STATUS Concern DE Remarks Summary
1 Grg Dhankot NR NR NR AD y NR NR
ALREADY
SHELTER
Pending
ZTE
OFC Done done DONE Combo
comissione
d
DE(NWO-w) EMF Sent on 14.08.13
2 Grg Kherki Daula NR NR NR AD y NR NR
ROOM
DONE
Installed OFC Done done Installed Combo pending
DET(Sohna
RD)
BTS on AIR
03/05/2013
on air 03-05-13
3 Grg Binola NR NR NR AD y NR NR
Room
Already
done OFC Done done Installed Combo pending SDE(IMT)
BTS on AIR
01/05/2013
on air 01-05-13
4 Grg Tikli NR NR NR AD y NR NR Outdoor done
M/W
pending(ZT
E)
Not reqd Pending ZTE 2G NA
DET(Sohna
RD)
BTS O/D
Allotted
ready to install
5 Nuh Sudaka NR NR NR AD yes NR NR Outdoor DONE
M/W
pending(ZT
E)
Not reqd Pending ZTE 2G NA DE(Mewat)
BTS O/D
Allotted
ready to install
6 Nuh salamba NR NR NR AD yes NR NR W\P
Pending
ZTE
M/W
pending(ZT
E)
Pending
ZTE
Pending ZTE 2G NA DE(Mewat) work pending at ZTE
7 Nuh Alduka NR NR NR AD y NR NR W\P
Pending
ZTE
M/W
pending(ZT
E)
Pending
ZTE
Pending ZTE 2G NA DE(Mewat) work pending at ZTE
8 Nuh Indri NR NR NR AD
will take 7-8
days more
NR NR W\P
Pending
ZTE
M/W
pending(ZT
E)
Pending
ZTE
Pending ZTE 2G NA DE(Mewat)
work pending at ZTE (EC work
completed 07/09/13 as per de
mewat)
9 Fpj Jamalgarh NR NR NR AD yes NR NR Outdoor done
M/W
pending(ZT
E)
Not reqd Pending ZTE 2G NA DE(Mewat)
BTS O/D
Allotted
ready to install
10 Fpj Sikrawa NR NR NR AD yes NR NR
Room
Already
Done OFC Done done Installed 2G pending DE(Mewat)
BTS on air on 30-
04-13
On air 30-04-13
11 Fpj Gulalta NR NR NR AD yes NR NR W\P
Pending
ZTE
M/W
pending(ZT
E)
Pending
ZTE
Pending ZTE 2G NA DE(Mewat) work pending at ZTE
12 Nuh Sangail SSA OK done AD
SECURITY
DEPOSITED AT
DHBVNL,
estimate
recived
DONE done Outdoor
Pending
ZTE
M/W
pending(ZT
E)
Not reqd Pending ZTE 2G NA DE(Mewat)
13 Fpj Bisru SSA OK done DONE
Demand note
received ,file at
AO (BSNL)
DONE DONE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE 2G NA DE(Mewat)
14 Grg mumtajpur SSA OK Done Done
file submitted
to DHBVNL &
wip
Done outdoor
Pending
ZTE
OFC/wip Not reqd Pending ZTE 2G NA SDE(IMT)
site handed over to
circle
15 Grg Sikhopur SSA OK Done done
file submitted
to DHBVNL
&wip
civil civil Outdoor
Pending
ZTE
OFC Not reqd Pending ZTE Combo pending SDE(IMT)
Court case done by
neighbour next
date:24/09/13
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT
*total site=2
sites hired =2 (HPC done with
agreement)
but E/C pending at both sites
* total sites=19
sites hired =5 (HPC done with
agreement )
file sent for HPC=7 application
required=7

* so pending sites for hiring =
14 (file sent for hpc +HPC done
w/o agreement + application
required )
E/C pending in hired sites=5
Sr
No
SDC
A
Total
Sites(IP/SSA)
Hiring
of
Site(NR
/IP/SSA
Nominal
s
(NotRrc
eived/O
Status of Site
hiring by SSA
(NR/IP/Y/to
HPC/WIP)
Agreem
ent
AD/D/N
R
EC status
(Y)
Tower
Founda
tion(NR
/Zte/Ci
Tower
Erection(
NR/SSA/Z
te)
Shelter
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS Status
Site
2G/com
bo
3G STATUS Concern DE Remarks
16 Grg
Nahar pur
KASAN
SSA OK Done Done
file submitted
to DHBVNL
&wip
DONE WIP Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
Court case done by
neighbour, next
date:15/10/13
17 Grg
Imt Sec-8
manesar
SSA OK Done DONE
file submitted
to DHBVNL
&wip
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
to apeal in higher
court
18 Grg
Nawada
fatehpur
SSA OK Done DONE
file submitted
to DHBVNL
&wip
done
Civil
W/P Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
site handed over to
circle
19 Grg kota khandewla SSA ok Done Civil Civil outdoor
Pending
ZTE
OFC Not reqd Pending ZTE Combo pending SDE(IMT)
20 Grg Nakhdola SSA
new lat-
long
sent
Revised application
required
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
new lat-long
sent to circle
21 Grg IMT-Sec-7 SSA
lat long
sent to
circle
Revised application
required
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
lat long sent to
circle
22 Grg
nsg gate no-2
(near)/Navrang
pur
SSA OK
final letter pending
from NSG
ZTE ZTE outdoor
Pending
ZTE
OFC
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
NSG ready to
give Site
now...SDE(IMT)
23 Grg
Bhangrola/Kakr
ola
SSA OK Done ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
24 Grg IMT sect-1 SSA OK file sent for HPC ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
25 Grg
Near
GITM(searching
near pathrari )
SSA ok Done Civil Civil outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
26 Grg Hayatpur SSA ok HPC WIP ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT) file sent to HPC
27 Grg
Jatuli/Hali
Mandi 2
SSA ok file sent to HPC Civil Civil Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT) file sent to HPC
28 Grg IMT-sec-6 SSA
Revise application
Pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending SDE(IMT)
29 Grg
Amity(Near
Pachgaon)-
badanki
SSA ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending ZTE Combo pending SDE(IMT)
site hand over
ip (indus) by
circle office
30 Grg Kasan IP IP IP IP IP IP IP Pending ZTE Combo pending SDE(IMT)
site hand over
ip (indus) by
circle office
31 Grg
Imt Sec-3
manesar
IP IP
IP (ssa searching
)
IP IP IP IP Pending ZTE Combo pending SDE(IMT)
* total sites=19
sites hired =5 (HPC done with
agreement )
file sent for HPC=7 application
required=7

* so pending sites for hiring =
14 (file sent for hpc +HPC done
w/o agreement + application
required )
E/C pending in hired sites=5
32 Grg
Bilaspur,
Haryana
(bilaspur khurd
)
IP ok Done IP IP IP IP Pending ZTE Combo pending SDE(IMT)
33 Grg Hasanpur SSA
Revised application
required
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
owner refused
34 Grg Palra SSA
Revised application
required
ZTE ZTE Outdoor
Pending
ZTE
OFC Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
owner refused
35 Grg Silani SSA
revise application
required
Civil Civil
Shelter
Pending ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending ZTE Combo pending
DET(Sohna
RD)
site visited by
sde(mp) and
de(sohnard) but
site found very
far from
nominals
36 Grg TE Sohna SSA OK done DONE y (TE xge )
done
Civil
done M/s
SKC
Room
Already
Already OFC Done done Pending ZTE Combo
material
received
DET(Sohna
RD)
Ready for BTS
installation
37 Grg CRPF Camp SSA OK done DONE
Yes (CRPF will
provide EC)EC
wiring
pending
DONE ZTE Outdoor
Pending
ZTE
OFC
Pending(D
E Tx
Urban)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
site handed
over to circle
38 Grg Medawas SSA OK Done DONE
File work
started
DONE DONE
Shelter
Pending ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending ZTE Combo pending
DET(Sohna
RD)
site handed
over to circle
39 GRG RojkaMeo SSA OK done AD
EC security
paid.
Waiting for
the
estimate
done
Civil
done M/s
SKC
Outdoor
Pending
ZTE
M/W
pending(ZT
E)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
site handed
over to circle
40 Grg
Sikandarpur(Ba
da)
SSA OK HPC in Progress ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
41 Grg Lakhuwas IP IP IP IP IP IP IP Pending ZTE Combo pending
DET(Sohna
RD)
42 Grg Sector-67 SSA OK
Revise
application
Required
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending
DET(Sohna
RD)
Revise
application
Required
43 Grg Wazirpur SSA
site hand over ip
(indus) by circle
office
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending
DET(Sohna
RD)
site hand over
ip (indus) by
circle office
44 Grg
Sohna DENSE
AREA
SSA Bid not recd ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
45 Grg
BSF camp
bhondsi
SSA
Revise
application
Pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending
DET(Sohna
RD)
46 Grg
PawalaKhusurP
ur/Sec 109
SSA OK
Revise
application
Pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-N)
* total sites=6,
Sites Hired =2 (HPC done with
agreement )
file sent for HPC=1
application required= 2

* so pending sites = 4 (file sent
for hpc + HPC done w/o
agreement +application
required )
E/C pending in hired sites=1
* total sites=19
sites hired =5 (HPC done with
agreement )
file sent for HPC=7 application
required=7

* so pending sites for hiring =
14 (file sent for hpc +HPC done
w/o agreement + application
required )
E/C pending in hired sites=5
* total sites=13
Sites Hired=4 (1 xge sites +3
HPC done with agreement )
file sent for HPC=1 (wip )
application required= 8 ( 6+1
ip)

* so pending sites = 9 (file sent
for hpc + HPC done w/o
agreement+application
required )
E/C pending in hired sites=2
Sr
No
SDC
A
Total
Sites(IP/SSA)
Hiring
of
Site(NR
/IP/SSA
)
Nominal
s
(NotRrc
eived/O
K/Not
Status of Site
hiring by SSA
(NR/IP/Y/to
HPC/WIP)
Agreem
ent
AD/D/N
R
EC status
(Y)
Tower
Founda
tion(NR
/Zte/Ci
vil)
Tower
Erection(
NR/SSA/Z
te)
Shelter
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS Status
Site
2G/com
bo
3G STATUS Concern DE Remarks
47 Grg Daultabad SSA ok
file sent to
HPC(at DE civil
for sign)
Civil Civil
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-N) file sent to HPC
48 Grg dharampur SSA OK
Revise
application
Pending
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-N)
new lat long
sent to circle
49 Grg
Kherki Majra
(Dhanwapur)
SSA OK
file sent to
HPC(at DE civil
for sign)
ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-E)
file sent for
HPC
50 Grg Bajghera SSA OK done AD Yes
done
Civil
done M/s
SKC
Shelter
Pending ZTE
Pending
ZTE
M/W
pending(ZT
E)
Pending
ZTE
Pending ZTE Combo pending DE(NWO-N)
site handed over to
circle
51 Grg Khetawas SSA OK Done DONE
file submitted
to DHBVNL
&wip
Done Done Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-W)
site handed
over to circle
52 Grg
SGT Medical
college near
Budera
/Chandu
SSA
Revise
application
Pending
Civil Civil
Shelter
Pending ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending ZTE Combo pending DE(NWO-W)
site hand over
ip (indus) by
circle office
53 Grg Mussaidpur SSA OK HPC Done DONE Civil Civil Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-W)
agreement
pending
54 Grg sultanpur SSA OK done DONE Civil Civil Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NWO-W)
tower foundation
work stopped by
local authorities
55 Grg Baslambi SSA not ok
new lat long sent
to circle
Civil Civil Outdoor
Pending
ZTE
OFC Not reqd Pending ZTE Combo pending DE(NOW-W)
lat long sent to
circle, NOT OK
56 Grg
Gawal
pahari/Baliawa
s
SSA
new lat long sent
to circle
Civil Civil Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NOW-E)
party demanded
higher rent (Rs
25000/-)
57 Grg Ullawas SSA ok HPC Done ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NOW-E)
58 Grg Behrampur SSA ok HPC in Progress ZTE ZTE Outdoor
Pending
ZTE
Mini
link(ZTE)
Not reqd Pending ZTE Combo pending DE(NOW-E) HPC in Progress
* total sites=6,
Sites Hired =2 (HPC done with
agreement )
file sent for HPC=1
application required= 2

* so pending sites = 4 (file sent
for hpc + HPC done w/o
agreement +application
required )
E/C pending in hired sites=1
* total sites=4
Sites hired =1 ( HPC done with
agreement )
HPC done w/o agreement =1
file sent for HPC=0
application required= 2

* so pending sites = 3 (file sent
for hpc +HPC DONE w/o
agreement + application
required )
E/C pending in hired sites=1
* total sites=3
Sites Hired =0
HPC done w/o agreement=1
file sent for HPC=1
application required= 1

* so pending sites = 3 (file sent
for hpc +HPC DONE w/o
agreement + application
required )
Mobile
JTO
nodals
JTO (MOB
) nodal -
GRG
Sh. PP
Gupta
JTO (MOB
) nodal -
Tauru
Sh. Rajiv
Kumar
Marothia
JTO (MOB
) nodal -
Tauru
Sh. Rajiv
Kumar
Marothia
JTO (MOB
) nodal -
GRG
Sh. PP
Gupta
JTO (MOB
) nodal -
Patudi
Sh. Ajay
Kumar
JTO (MOB
) nodal -
Tauru
Sh. Rajiv
Kumar
Marothia
JTO (MOB
) nodal -
Patudi
Sh. Ajay
Kumar
DATED 28-9-2013
Summary: Total sites=58 ( Alrdy Twr Erected with agreement done =11 + 47 new sites (4 IP +43 ) )
work detail of new sites -47 :: NewAgreemDone(sites hired )=14, HPC done but agreement pending =2, HPC pndg or file sent to HPC =10,application required=13
Sr
No
SDC
A
Total
Sites(IP/SSA)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrceiv
ed/OK/No
t Ok)RF
finalizatio
n
Status of
Site hiring
by SSA
(NR/IP/Y/to
HPC/WIP)
Agreem
ent
AD/D/
NR
EC status
(Y)
Tower
Founda
tion(NR
/Zte/Civ
il)
Tower
Erectio
n(NR/S
SA/Zte
)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
1 Grg Dhankot NR NR NR AD y NR NR
ALREADY
SHELTER
DONE Done
Pending
ZTE
Pending
ZTE
OFC Done done DONE Combo
comissio
ned
DE(NWO-
w)
2 Grg Kherki Daula NR NR NR AD y NR NR
ROOM
DONE
DONE Installed Installed Installed OFC Done done Installed Combo pending
DET(Sohn
a RD)
BTS on AIR
03/05/2013
3 Grg Binola NR NR NR AD y NR NR
Room
Already
DONE Done Done done OFC Done done Installed Combo pending SDE(IMT)
BTS on AIR
01/05/2013
4 Grg Tikli NR NR NR AD y NR NR Outdoor Not reqd Done Done done
M/W
pending(Z
TE)
Not reqd
Pending
ZTE
2G NA
DET(Sohn
a RD)
BTS O/D
Allotted
5 Nuh Sudaka NR NR NR AD yes NR NR Outdoor Not reqd Done Done DONE
M/W
pending(Z
TE)
Not reqd
Pending
ZTE
2G NA
DE(Mewat
)
BTS O/D
Allotted
6 Nuh salamba NR NR NR AD yes NR NR W\P
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(Z
TE)
Pending
ZTE
Pending
ZTE
2G NA
DE(Mewat
)
7 Nuh Alduka NR NR NR AD y NR NR W\P
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(Z
TE)
Pending
ZTE
Pending
ZTE
2G NA
DE(Mewat
)
8 Nuh Indri NR NR NR AD
will take 7-8
days more
NR NR W\P
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(Z
TE)
Pending
ZTE
Pending
ZTE
2G NA
DE(Mewat
)
9 Fpj Jamalgarh NR NR NR AD yes NR NR Outdoor Not reqd Done Done done
M/W
pending(Z
TE)
Not reqd
Pending
ZTE
2G NA
DE(Mewat
)
BTS O/D
Allotted
10 Fpj Sikrawa NR NR NR AD yes NR NR
Room
Already
Done Done Done Done OFC Done done Installed 2G pending
DE(Mewat
)
BTS on air on
30-04-13
11 Fpj Gulalta NR NR NR AD yes NR NR W\P
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(Z
TE)
Pending
ZTE
Pending
ZTE
2G NA
DE(Mewat
)
12 Nuh Sangail SSA OK done AD
SECURITY
DEPOSITED AT
DHBVNL,
estimate
recived
DONE done Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(Z
TE)
Not reqd
Pending
ZTE
2G NA
DE(Mewat
)
13 Fpj Bisru SSA OK done DONE
Demand note
received ,file
at AO (BSNL)
DONE DONE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
2G NA
DE(Mewat
)
14 Grg mumtajpur SSA OK Done Done
file submitted
to DHBVNL &
wip
Done outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC/wip Not reqd
Pending
ZTE
2G NA SDE(IMT)
site handed over
to circle
15 Grg Sikhopur SSA OK Done done
file submitted
to DHBVNL
&wip
civil civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending SDE(IMT)
Court case done
by neighbour next
date:10/10/13
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT
Sr
No
SDC
A
Total
Sites(IP/SSA)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrceiv
ed/OK/No
t Ok)RF
finalizatio
n
Status of
Site hiring
by SSA
(NR/IP/Y/to
HPC/WIP)
Agreem
ent
AD/D/
NR
EC status
(Y)
Tower
Founda
tion(NR
/Zte/Civ
il)
Tower
Erectio
n(NR/S
SA/Zte
)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
16 Grg
Nahar pur
KASAN
SSA OK Done Done
file submitted
to DHBVNL
&wip
DONE WIP Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
Court case done
by neighbour,
next
date:17/10/13
17 Grg
Imt Sec-8
manesar
SSA OK Done DONE
file submitted
to DHBVNL
&wip
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
to apeal in higher
court
18 Grg
Nawada
fatehpur
SSA OK Done DONE
file submitted
to DHBVNL
&wip
done
Civil
W/P Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
site handed over
to circle
19 Grg
kota
khandewla
SSA ok Done Civil Civil outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending SDE(IMT)
20 Grg Nakhdola SSA ok
Revised
application
required
ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
Revised
application
required
21 Grg IMT-Sec-7 SSA
lat long
sent to
circle
Revised
application
required
ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
lat long sent
to circle
22 Grg
nsg gate no-
2
(near)/Navra
ngpur
SSA OK
final letter
pending from
NSG
ZTE ZTE outdoor
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
NSG ready to
give Site
now...SDE(IM
T)
23 Grg
Bhangrola/K
akrola
SSA OK Done ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
24 Grg IMT sect-1 SSA OK
file sent for
HPC
ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
25 Grg
Near
GITM(search
ing near
pathrari )
SSA ok Done Civil Civil outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
26 Grg Hayatpur SSA ok HPC WIP ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
file sent to
HPC
27 Grg
Jatuli/Hali
Mandi 2
SSA ok
file sent to
HPC
Civil Civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT) file sent to HPC
28 Grg IMT-sec-6 SSA
Revise
application
Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
29 Grg
Amity(Near
Pachgaon)-
badanki
SSA ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
site hand over
ip (indus) by
circle office
30 Grg Kasan IP IP IP IP IP IP IP
Pending
ZTE
Combo pending SDE(IMT)
site hand over
ip (indus) by
circle office
31 Grg
Imt Sec-3
manesar
IP IP
IP (ssa
searching )
IP IP IP IP
Pending
ZTE
Combo pending SDE(IMT)
Sr
No
SDC
A
Total
Sites(IP/SSA)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrceiv
ed/OK/No
t Ok)RF
finalizatio
n
Status of
Site hiring
by SSA
(NR/IP/Y/to
HPC/WIP)
Agreem
ent
AD/D/
NR
EC status
(Y)
Tower
Founda
tion(NR
/Zte/Civ
il)
Tower
Erectio
n(NR/S
SA/Zte
)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
32 Grg
Bilaspur,
Haryana
(bilaspur
khurd )
IP ok Done IP IP IP IP
Pending
ZTE
Combo pending SDE(IMT)
33 Grg Hasanpur SSA
Revised
application
required
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
owner refused
34 Grg Palra SSA
Revised
application
required
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
owner refused
35 Grg Silani SSA
revise
application
required
Civil Civil
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sohn
a RD)
site visited by
sde(mp) and
de(sohnard)
but site found
36 Grg TE Sohna SSA OK done DONE y (TE xge )
done
Civil
done
M/s
SKC
Room
Already
Done Already Already Already OFC Done done
Pending
ZTE
Combo
material
received
DET(Sohn
a RD)
Ready for BTS
installation
37 Grg CRPF Camp SSA OK done DONE
Yes (CRPF
will provide
EC)EC wiring
pending
DONE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending(D
E Tx
Urban)
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
site handed
over to circle
38 Grg Medawas SSA OK Done DONE
File work
started
DONE DONE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sohn
a RD)
site handed
over to circle
39 GRG RojkaMeo SSA OK done AD
EC
security
paid.
Waiting for
done
Civil
done
M/s
SKC
Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(Z
TE)
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
site handed
over to circle
40 Grg
Sikandarpur(
Bada)
SSA OK
HPC in
Progress
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
41 Grg Lakhuwas IP IP IP IP IP IP IP
Pending
ZTE
Combo pending
DET(Sohn
a RD)
42 Grg Sector-67 SSA OK
Revise
application
Required
ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sohn
a RD)
Revise
application
Required
43 Grg Wazirpur SSA
site hand
over ip
(indus) by
ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sohn
a RD)
site hand over
ip (indus) by
circle office
44 Grg
Sohna
DENSE AREA
SSA Bid not recd ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
45 Grg
BSF camp
bhondsi
SSA
Revise
application
Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
46 Grg
PawalaKhusu
rPur/Sec 109
SSA OK
Revise
application
Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
Sr
No
SDC
A
Total
Sites(IP/SSA)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrceiv
ed/OK/No
t Ok)RF
finalizatio
n
Status of
Site hiring
by SSA
(NR/IP/Y/to
HPC/WIP)
Agreem
ent
AD/D/
NR
EC status
(Y)
Tower
Founda
tion(NR
/Zte/Civ
il)
Tower
Erectio
n(NR/S
SA/Zte
)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
47 Grg Daultabad SSA ok
file sent to
HPC(at DE
civil for
sign)
Civil Civil
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
file sent to
HPC
48 Grg dharampur SSA OK
Revise
application
Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
new lat long
sent to circle
49 Grg
Kherki Majra
(Dhanwapur)
SSA OK
file sent to
HPC(at DE
civil for
sign)
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
file sent for
HPC
50 Grg Bajghera SSA OK done AD Yes
done
Civil
done
M/s
SKC
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(Z
TE)
Pending
ZTE
Pending
ZTE
Combo pending
DE(NWO-
N)
site handed over
to circle
51 Grg Khetawas SSA OK Done DONE
file submitted
to DHBVNL
&wip
Done Done Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
site handed
over to circle
52 Grg
SGT Medical
college near
Budera
/Chandu
SSA
Revise
application
Pending
Civil Civil
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending
DE(NWO-
W)
site hand over
ip (indus) by
circle office
53 Grg Mussaidpur SSA OK HPC Done DONE Civil Civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
site handover
to circle
54 Grg sultanpur SSA OK done DONE Civil Civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
tower
foundation
work stopped
by local
authorities
55 Grg Baslambi SSA not ok
new lat long
sent to
circle
Civil Civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending
DE(NOW-
W)
lat long sent
to circle, NOT
OK
56 Grg
Gawal
pahari/Balia
was
SSA
new lat long
sent to
circle
Civil Civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
party
demanded
higher rent
(Rs 25000/-)
57 Grg Ullawas SSA ok HPC Done ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
58 Grg Behrampur SSA ok
HPC in
Progress
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
HPC in
Progress
Summary
Mobile
JTO
nodals
EMF Sent on
14.08.13
on air 03-05-13
on air 01-05-13
ready to install
ready to install
work pending at
ZTE
work pending at
ZTE
work pending at
ZTE (EC work
completed
07/09/13 as per de
ready to install
On air 30-04-13
work pending at
ZTE
JTO
(MOB )
nodal -
GRG
Sh. PP
Gupta
*total site=2
sites hired =2
(HPC done with
agreement)
but E/C pending at
both sites
JTO
(MOB )
nodal -
Tauru
Sh. Rajiv
Kumar
Marothi
a
* total sites=19
sites hired =5 (HPC
done with
agreement )
file sent for HPC=7
application
required=7

* so pending sites
for hiring = 14 (file
sent for hpc +HPC
done w/o
agreement +
application
required )
E/C pending in
hired sites=5
JTO
(MOB )
nodal -
Tauru
Sh. Rajiv
Kumar
Marothi
a
* total sites=19
sites hired =5 (HPC
done with
agreement )
file sent for HPC=7
application
required=7

* so pending sites
for hiring = 14 (file
sent for hpc +HPC
done w/o
agreement +
application
required )
E/C pending in
hired sites=5
* total sites=13
Sites Hired=4 (1
xge sites +3 HPC
done with
agreement )
file sent for HPC=1
(wip ) application
required= 8 ( 6+1
ip)

* so pending sites
= 9 (file sent for
hpc + HPC done
w/o
agreement+applica
tion required )
E/C pending in
hired sites=2
JTO
(MOB )
nodal -
GRG
Sh. PP
Gupta
* total sites=6,
Sites Hired =2 (HPC
done with
agreement )
file sent for HPC=1
application
required= 2

* so pending sites
= 4 (file sent for
hpc + HPC done
w/o agreement
+application
required )
E/C pending in
hired sites=1
JTO
(MOB )
nodal -
Patudi
Sh. Ajay
Kumar
JTO
(MOB )
nodal -
Tauru
Sh. Rajiv
Kumar
Marothi
a
* total sites=19
sites hired =5 (HPC
done with
agreement )
file sent for HPC=7
application
required=7

* so pending sites
for hiring = 14 (file
sent for hpc +HPC
done w/o
agreement +
application
required )
E/C pending in
hired sites=5
* total sites=6,
Sites Hired =2 (HPC
done with
agreement )
file sent for HPC=1
application
required= 2

* so pending sites
= 4 (file sent for
hpc + HPC done
w/o agreement
+application
required )
E/C pending in
hired sites=1
JTO
(MOB )
nodal -
Patudi
Sh. Ajay
Kumar
* total sites=4
Sites hired =1 (
HPC done with
agreement )
HPC done w/o
agreement =1
file sent for HPC=0
application
required= 2

* so pending sites
= 3 (file sent for
hpc +HPC DONE
w/o agreement +
application
required )
E/C pending in
hired sites=1
* total sites=3
Sites Hired =0
HPC done w/o
agreement=1
file sent for HPC=1
application
required= 1

* so pending sites
= 3 (file sent for
hpc +HPC DONE
w/o agreement +
application
required )
DATED 19-10-2013
Summary: Total sites=58 ( Alrdy Twr Erected with agreement done =11 + 47 new sites (4 IP +43 ) ) IP-amity,SGT medical college,kasan,wazirpur,lakuwas,imt sec3
work detail of new sites -47 :: NewAgreemDone(sites hired )=17, HPC done but agreement pending =8, file sent to HPC =3,application required=19(13+6)
Sr
No
SDC
A
Total
Sites(IP/SSA)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrceiv
ed/OK/No
t Ok)RF
finalizatio
n
Status of
Site hiring
by SSA
(NR/IP/Y/to
HPC/WIP)
Agreem
ent
AD/D/
NR
EC status
(Y)
Tower
Founda
tion(NR
/Zte/Civ
il)
Tower
Erectio
n(NR/S
SA/Zte
)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks Summary
1 Grg Dhankot NR NR NR AD y NR NR
ALREADY
SHELTER
DONE Done
Pending
ZTE
Pending
ZTE
OFC Done done DONE Combo
comissio
ned
DE(NWO-
w)
EMF Sent on
14.08.13
2 Grg Kherki Daula NR NR NR AD y NR NR
ROOM
DONE
DONE Installed Installed Installed OFC Done done Installed Combo pending
DET(Sohn
a RD)
BTS on AIR
03/05/2013
on air 03-05-13
3 Grg Binola NR NR NR AD y NR NR
Room
Already
DONE Done Done done OFC Done done Installed Combo pending SDE(IMT)
BTS on AIR
01/05/2013
on air 01-05-13
4 Grg Tikli NR NR NR AD y NR NR Outdoor Not reqd Done Done done
M/W
pending(Z
TE)
Not reqd
Pending
ZTE
2G NA
DET(Sohn
a RD)
BTS O/D
Allotted
ready to install
5 Nuh Sudaka NR NR NR AD yes NR NR Outdoor Not reqd Done Done DONE
M/W
pending(Z
TE)
Not reqd
Pending
ZTE
2G NA
DE(Mewat
)
BTS O/D
Allotted
ready to install
6 Nuh salamba NR NR NR AD yes NR NR W\P
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(Z
TE)
Pending
ZTE
Pending
ZTE
2G NA
DE(Mewat
)
work pending at ZTE
7 Nuh Alduka NR NR NR AD y NR NR W\P
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(Z
TE)
Pending
ZTE
Pending
ZTE
2G NA
DE(Mewat
)
work pending at ZTE
8 Nuh Indri NR NR NR AD
will take 7-8
days more
NR NR W\P
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(Z
TE)
Pending
ZTE
Pending
ZTE
2G NA
DE(Mewat
)
work pending at ZTE
(EC work completed
07/09/13 as per de
mewat)
9 Fpj Jamalgarh NR NR NR AD yes NR NR Outdoor Not reqd Done Done done
M/W
pending(Z
TE)
Not reqd
Pending
ZTE
2G NA
DE(Mewat
)
BTS O/D
Allotted
ready to install
10 Fpj Sikrawa NR NR NR AD yes NR NR
Room
Already
Done Done Done Done OFC Done done Installed 2G pending
DE(Mewat
)
BTS on air on
30-04-13
On air 30-04-13
11 Fpj Gulalta NR NR NR AD yes NR NR W\P
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(Z
TE)
Pending
ZTE
Pending
ZTE
2G NA
DE(Mewat
)
work pending at ZTE
12 Nuh Sangail SSA OK done AD
SECURITY
DEPOSITED AT
DHBVNL,
estimate
recived
DONE done Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(Z
TE)
Not reqd
Pending
ZTE
2G NA
DE(Mewat
)
13 Fpj Bisru SSA OK done DONE
Demand note
received ,file
at AO (BSNL)
DONE DONE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
2G NA
DE(Mewat
)
14 Grg mumtajpur SSA OK Done Done
file submitted
to DHBVNL &
wip
Done outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC/wip Not reqd
Pending
ZTE
2G NA SDE(IMT)
site handed over
to circle
15 Grg Sikhopur SSA OK Done done
Demand note
received ,file
at AO (BSNL)
civil civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending SDE(IMT)
Court case done
by neighbour
next
date:10/10/13
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT
*total site=2
sites hired =2 (HPC
done with
agreement)
but E/C pending at
both sites
* total sites=19
* sites hired =7
(HPC done with
agreement-
mumtajpur,sikhopur
,naharpur kasan,imt
sec8,nawadafathep
ur,near
gitm,bilaspur
haryana )
*HPC done but
agreement
pending=3 (kota
khandewala,bhangr
ola/kakrola,imt sec-
1 )
* file sent for
HPC=3(jatauli,nakhd
ola,hayatpur )
* application
required=
3(sec3,sec6,nsg2,)

* so pending sites
for hiring =10+2 =12
(file sent for hpc
+HPC done w/o
agreement +
application required
+IP)
all E/C pending in
hired sites=7
Sr
No
SDC
A
Total
Sites(IP/SSA)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrceiv
ed/OK/No
t Ok)RF
finalizatio
n
Status of
Site hiring
by SSA
(NR/IP/Y/to
HPC/WIP)
Agreem
ent
AD/D/
NR
EC status
(Y)
Tower
Founda
tion(NR
/Zte/Civ
il)
Tower
Erectio
n(NR/S
SA/Zte
)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
16 Grg
Nahar pur
KASAN
SSA OK Done Done
Check pending
with AO
DONE WIP Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
Court case done
by neighbour,
next
date:17/10/13
17 Grg
Imt Sec-8
manesar
SSA OK Done DONE
file submitted
to DHBVNL
&wip
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
to apeal in
higher court
18 Grg
Nawada
fatehpur
SSA OK Done DONE
Check pending
with AO
done
Civil
W/P Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
site handed over
to circle
19 Grg
kota
khandewla
SSA ok Done Civil Civil outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending SDE(IMT)
agreement
pending
20 Grg Nakhdola SSA ok done ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT) HPC done
21 Grg IMT-Sec-7 SSA
letter for
reconsider
lat long
sent to
circle
Revised
application
required
ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
lat long sent
to circle
22 Grg
nsg gate no-
2
(near)/Navra
ngpur
SSA OK
final letter
pending from
NSG
ZTE ZTE outdoor
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
NSG ready to
give Site
now...SDE(IM
T)
23 Grg
Bhangrola/K
akrola
SSA OK Done ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
file sent to
plg for
agreement
24 Grg IMT sect-1 SSA OK done ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT) HPC done
25 Grg Near GITM SSA ok Done DONE
EC file in
progress
Civil Civil outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
site handed
over to circle
26 Grg Hayatpur SSA ok HPC WIP ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
file sent to
HPC
27 Grg
Jatuli/Hali
Mandi 2
SSA ok
file sent to
HPC
Civil Civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT) file sent to HPC
28 Grg IMT-sec-6 SSA
Revise
application
Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
29 Grg
Amity(Near
Pachgaon)-
badanki
SSA ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
site hand
over ip
(indus) by
30 Grg Kasan IP IP IP IP IP IP IP
Pending
ZTE
Combo pending SDE(IMT)
site hand
over ip
(indus) by
31 Grg
Imt Sec-3
manesar
IP IP
IP (ssa
searching )
IP IP IP IP
Pending
ZTE
Combo pending SDE(IMT)
* total sites=19
* sites hired =7
(HPC done with
agreement-
mumtajpur,sikhopur
,naharpur kasan,imt
sec8,nawadafathep
ur,near
gitm,bilaspur
haryana )
*HPC done but
agreement
pending=3 (kota
khandewala,bhangr
ola/kakrola,imt sec-
1 )
* file sent for
HPC=3(jatauli,nakhd
ola,hayatpur )
* application
required=
3(sec3,sec6,nsg2,)

* so pending sites
for hiring =10+2 =12
(file sent for hpc
+HPC done w/o
agreement +
application required
+IP)
all E/C pending in
hired sites=7
Sr
No
SDC
A
Total
Sites(IP/SSA)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrceiv
ed/OK/No
t Ok)RF
finalizatio
n
Status of
Site hiring
by SSA
(NR/IP/Y/to
HPC/WIP)
Agreem
ent
AD/D/
NR
EC status
(Y)
Tower
Founda
tion(NR
/Zte/Civ
il)
Tower
Erectio
n(NR/S
SA/Zte
)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
32 Grg
Bilaspur,
Haryana
(bilaspur
khurd )
SSA ok Done DONE Civil
M/s
SKC
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
site handed
over to circle
33 Grg Hasanpur SSA
Revised
application
required
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
owner
refused
34 Grg Palra SSA
Revised
application
required
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
owner
refused
35 Grg Silani SSA
revise
application
required
Civil Civil
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sohn
a RD)
site visited by
sde(mp) and
de(sohnard)
but site
36 Grg TE Sohna SSA OK done DONE y (TE xge )
done
Civil
done
M/s
SKC
Room
Already
Done Already Already Already OFC Done done
Pending
ZTE
Combo
material
received
DET(Sohn
a RD)
Ready for BTS
installation
37 Grg CRPF Camp SSA OK done DONE
Yes (CRPF
will provide
EC)EC wiring
pending
DONE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending(D
E Tx
Urban)
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
site handed
over to circle
38 Grg Medawas SSA OK Done DONE
File work
started
DONE DONE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sohn
a RD)
site handed
over to circle
39 GRG RojkaMeo SSA OK done AD
EC
security
paid.
Waiting for
done
Civil
done
M/s
SKC
Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(Z
TE)
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
site handed
over to circle
40 Grg
Sikandarpur(
Bada)
SSA OK Done ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
agreement
pending
41 Grg Lakhuwas IP IP IP IP IP IP IP
Pending
ZTE
Combo pending
DET(Sohn
a RD)
42 Grg Sector-67 SSA OK
Revise
application
Required
ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sohn
a RD)
Revise
application
Required
43 Grg Wazirpur SSA
site hand
over ip
(indus) by
ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sohn
a RD)
site hand
over ip
(indus) by
44 Grg
Sohna
DENSE AREA
SSA Bid not recd ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
45 Grg
BSF camp
bhondsi
SSA
Revise
application
Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
46 Grg
PawalaKhusu
rPur/Sec 109
SSA
Revise Lat-
long sent to
circle
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
Revise Lat-
long sent to
circle
* total sites=5
* sites hired=1
(Bajghera with EC
done-HPC done with
agreement ),
*HPC done but
agreement pending
=2
(daultabad,kherki
mazra)
*File sent for HPC=0
* App reqd=2
(Pawala khusrupur
& Dharampur)
* total sites=19
* sites hired =7
(HPC done with
agreement-
mumtajpur,sikhopur
,naharpur kasan,imt
sec8,nawadafathep
ur,near
gitm,bilaspur
haryana )
*HPC done but
agreement
pending=3 (kota
khandewala,bhangr
ola/kakrola,imt sec-
1 )
* file sent for
HPC=3(jatauli,nakhd
ola,hayatpur )
* application
required=
3(sec3,sec6,nsg2,)

* so pending sites
for hiring =10+2 =12
(file sent for hpc
+HPC done w/o
agreement +
application required
+IP)
all E/C pending in
hired sites=7
* total sites=13
* Sites Hired=4 (1
xge sites +3 HPC
done with
agreement-te
sna,crp
camp,medawas,rojk
ameo )
*HPC done but
agreement
pending=1
(sikandarpur )
file sent for HPC=0
* application
required= 8 ( 6+2
ip)...hasanpur,palra,
silani,sec67,sna
dense area,bsf camp

* so pending sites =
9 (file sent for hpc +
HPC done w/o
agreement+applicat
ion required )
E/C pending in
hired sites=3
Sr
No
SDC
A
Total
Sites(IP/SSA)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrceiv
ed/OK/No
t Ok)RF
finalizatio
n
Status of
Site hiring
by SSA
(NR/IP/Y/to
HPC/WIP)
Agreem
ent
AD/D/
NR
EC status
(Y)
Tower
Founda
tion(NR
/Zte/Civ
il)
Tower
Erectio
n(NR/S
SA/Zte
)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
47 Grg Daultabad SSA ok HPC Done Civil Civil
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
agreement
pending
48 Grg dharampur SSA OK
Revise
application
Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
lat long
passed from
circle
49 Grg
Kherki Majra
(Dhanwapur)
SSA OK done ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
HPC done
50 Grg Bajghera SSA OK done AD Yes
done
Civil
done
M/s
SKC
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(Z
TE)
Pending
ZTE
Pending
ZTE
Combo pending
DE(NWO-
N)
site handed over
to circle
51 Grg Khetawas SSA OK Done DONE
demand note
submitted to
AO(BSNL)
Done Done Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
site handed
over to circle
52 Grg
SGT Medical
college near
Budera
/Chandu
IP
Revise
application
Pending
Civil Civil
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending
DE(NWO-
W)
site hand
over ip
(indus) by
circle office
53 Grg Mussaidpur SSA OK HPC Done DONE
File work
started
Civil Civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
site handover
to circle
54 Grg sultanpur SSA
Revise
application
Pending
Civil Civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
55 Grg Baslambi SSA
Revise
LAT/LONG
SENT TO
CIRCLE
Revise
application
Pending
Civil Civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending
DE(NOW-
W)
lat long sent
to circle, NOT
OK
56 Grg
Gawal
pahari/Balia
was
SSA
RECONSID
ER
revised
letter lat
long sent to
circle
Civil Civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
party
demanded
higher rent
(Rs 25000/-)
57 Grg Ullawas SSA ok HPC Done ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
58 Grg Behrampur SSA ok HPC Done ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
HPC in
Progress
work detail of new sites -47 :: NewAgreemDone(sites hired )=17 (sangail,bisru,mumtajpur,sikhopur,naharpur kasan,imt sec8,nawadafathepur,near gitm,bilaspur haryana
te sna,crp camp,medawas,rojkameo Bajghera Khetavas,Mussaidpur,sultanpur)
HPC done but agreement pending =8, kota khandewala,bhangrola/kakrola,imt sec-1 ) sikandarpur daultabad,kherki mazra,ullawas,behrampur)
file sent to HPC =3, jautuli,nakhraula,hayatpur
application required=19(13+6) sec3,sec6,nsg2 .hasanpur,palra,silani,sec67,sna dense area,bsf camp ,lakuwas,wazirpur Pawala khusrupur & Dharampur
baslambi,sgt medical college,gawalpari,amity ,kasan
* total sites=5
* sites hired=1
(Bajghera with EC
done-HPC done with
agreement ),
*HPC done but
agreement pending
=2
(daultabad,kherki
mazra)
*File sent for HPC=0
* App reqd=2
(Pawala khusrupur
& Dharampur)
* total
sites=5(4+1IP)
*Sites Hired =3
(HPC done with
agreement-
Khetavas,Mussaidpu
r,sultanpur)
*file sent for HPC=0
* application
required= 2
(baslambi,sgt
medical college)

* so pending sites =
1 (file sent for hpc
+HPC DONE w/o
agreement +
application required
)
* total sites=3
*Sites Hired =0
(HPC done with
agreement)
*HPC done but
agreement
pending=2 (ullawas
, behrampur )
*file sent for HPC=0
* application
required= 1
(gawalpari)
Mobile
JTO
nodals
JTO
(MOB )
nodal -
GRG
Sh. PP
Gupta
JTO
(MOB )
nodal -
Tauru
Sh. Rajiv
Kumar
Marothi
a
JTO
(MOB )
nodal -
Tauru
Sh. Rajiv
Kumar
Marothi
a
JTO
(MOB )
nodal -
GRG
Sh. PP
Gupta
JTO
(MOB )
nodal -
Patudi
Sh. Ajay
Kumar
JTO
(MOB )
nodal -
Tauru
Sh. Rajiv
Kumar
Marothi
a
JTO
(MOB )
nodal -
Patudi
Sh. Ajay
Kumar
DATED 31-10-2013
Summary: Total sites=58 ( Alrdy Twr Erected with agreement done =11 + 47 new sites (4 IP +43 ) ) IP-amity,SGT medical college,kasan,wazirpur,lakuwas,imt sec3
work detail of new sites -47 :: NewAgreemDone(sites hired )=19, HPC done but agreement pending =4, file sent to HPC =2,application required=22(16+6)
Sr
No
SDC
A
Total
Sites(IP/SSA)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrceived/
OK/Not Ok)RF
finalization
Status of
Site hiring
by SSA
(NR/IP/Y/to
HPC/WIP)
Agreem
ent
AD/D/
NR
EC status
(Y)
Tower
Founda
tion(NR
/Zte/Civ
il)
Tower
Erecti
on(NR
/SSA/
Zte)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
1 Grg Dhankot NR NR NR AD y NR NR
ALREADY
SHELTER
DONE Done
Pending
ZTE
Pending
ZTE
OFC Done done DONE Combo
comissio
ned
DE(NWO-
w)
2 Grg Kherki Daula NR NR NR AD y NR NR
ROOM
DONE
DONE Installed Installed Installed OFC Done done Installed Combo pending
DET(Sohn
a RD)
BTS on AIR
03/05/2013
3 Grg Binola NR NR NR AD y NR NR
Room
Already
DONE Done Done done OFC Done done Installed Combo pending SDE(IMT)
BTS on AIR
01/05/2013
4 Grg Tikli NR NR NR AD y NR NR Outdoor Not reqd Done Done done
M/W
pending(
ZTE)
Not reqd DONE 2G NA
DET(Sohn
a RD)
BTS O/D
Allotted
5 Nuh Sudaka NR NR NR AD yes NR NR Outdoor Not reqd Done Done DONE
M/W
pending(
ZTE)
Not reqd DONE 2G NA
DE(Mewat
)
BTS O/D
Allotted
6 Nuh salamba NR NR NR AD yes NR NR W\P
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(
ZTE)
Pending
ZTE
Pending
ZTE
2G NA
DE(Mewat
)
7 Nuh Alduka NR NR NR AD y NR NR W\P
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(
ZTE)
Pending
ZTE
Pending
ZTE
2G NA
DE(Mewat
)
8 Nuh Indri NR NR NR AD
will take 7-8
days more
NR NR W\P
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(
ZTE)
Pending
ZTE
Pending
ZTE
2G NA
DE(Mewat
)
9 Fpj Jamalgarh NR NR NR AD yes NR NR Outdoor Not reqd Done Done done
M/W
pending(
ZTE)
Not reqd DONE 2G NA
DE(Mewat
)
BTS O/D
Allotted
10 Fpj Sikrawa NR NR NR AD yes NR NR
Room
Already
Done Done Done Done OFC Done done Installed 2G pending
DE(Mewat
)
BTS on air on 30-
04-13
11 Fpj Gulalta NR NR NR AD yes NR NR W\P
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(
ZTE)
Pending
ZTE
Pending
ZTE
2G NA
DE(Mewat
)
12 Nuh Sangail SSA OK done AD
check
deposited
DONE done Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(
ZTE)
Not reqd
Pending
ZTE
2G NA
DE(Mewat
)
13 Fpj Bisru SSA OK done DONE
Demand
note
received ,file
at AO (BSNL)
DONE DONE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
2G NA
DE(Mewat
)
14 Grg mumtajpur SSA OK Done Done
demand note
submission in
progress
Done DONE outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC/wip Not reqd
Pending
ZTE
2G NA SDE(IMT)
site handed over to
circle
15 Grg Sikhopur SSA
OK; also to
search new
application
Done done
Demand
note
received ,file
at AO (BSNL)
civil civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending SDE(IMT)
Court case done by
neighbour next
date: 24/10/1 ; also
to search new
application
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT
Sr
No
SDC
A
Total
Sites(IP/SSA)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrceived/
OK/Not Ok)RF
finalization
Status of
Site hiring
by SSA
(NR/IP/Y/to
HPC/WIP)
Agreem
ent
AD/D/
NR
EC status
(Y)
Tower
Founda
tion(NR
/Zte/Civ
il)
Tower
Erecti
on(NR
/SSA/
Zte)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
16 Grg
Nahar pur
KASAN
SSA OK Done Done
Check
pending with
AO
DONE WIP Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
Court case done by
neighbour, next
date:15/11/13
17 Grg
Imt Sec-8
manesar
SSA OK Done DONE
file
submitted to
DHBVNL
&wip
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
apeal done in
higher court
18 Grg
Nawada
fatehpur
SSA OK Done DONE
Check
pending with
AO
done
Civil
DONE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
site handed over to
circle
19 Grg
kota
khandewla
SSA ok Done DONE
file
submitted to
DHBVNL
&wip
Civil Civil outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending SDE(IMT) DONE
20 Grg Nakhdola SSA
lat long sent
to circle
revised
aplication
needed
ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
lat long sent to
circle
21 Grg IMT-Sec-7 SSA OK
Revised
application
required
ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT) LAT -LONG OK
22 Grg
nsg gate no-
2
(near)/Navra
ngpur
SSA OK
final letter
pending from
NSG
ZTE ZTE outdoor
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
NSG ready to
give Site
now...SDE(IMT)
23 Grg
Bhangrola/K
akrola
SSA OK Done DONE
file
submitted to
DHBVNL
&wip
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT) DONE
24 Grg IMT sect-1 SSA OK done yes ZTE
pole
by ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT) HPC done
25 Grg Near GITM SSA ok Done DONE
EC file in
progress
Civil Civil outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
site handed
over to circle
26 Grg Hayatpur SSA ok
revise
applicattion
to take
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
revise applicattion
to take
27 Grg
Jatuli/Hali
Mandi 2
SSA
lat long sent
to circle
revised
aplication
needed
Civil Civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
revised
aplication
needed
28 Grg
Kakrola (IMT-
sec-6)
SSA
Revise
application
Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
29 Grg
Amity(Near
Pachgaon)-
badanki
SSA ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
site hand over ip
(indus) by circle
office
30 Grg Kasan IP IP IP IP IP IP IP
Pending
ZTE
Combo pending SDE(IMT)
site hand over ip
(indus) by circle
office
31 Grg
Imt Sec-3
manesar
IP IP
IP (ssa
searching )
IP IP IP IP
Pending
ZTE
Combo pending SDE(IMT)
Sr
No
SDC
A
Total
Sites(IP/SSA)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrceived/
OK/Not Ok)RF
finalization
Status of
Site hiring
by SSA
(NR/IP/Y/to
HPC/WIP)
Agreem
ent
AD/D/
NR
EC status
(Y)
Tower
Founda
tion(NR
/Zte/Civ
il)
Tower
Erecti
on(NR
/SSA/
Zte)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
32 Grg
Bilaspur,
Haryana
(bilaspur
khurd )
SSA ok Done DONE
file
submitted to
DHBVNL
&wip
Civil
M/s
SKC
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
site handed
over to circle
33 Grg Hasanpur SSA
Revised
application
required
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
owner refused
34 Grg Palra SSA
lat long sent
to circle
Revised
application
required
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
lat long sent to
circle
35 Grg Silani SSA
revise
application
required
Civil Civil
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sohn
a RD)
site visited by
sde(mp) and
de(sohnard) but
site found very
36 Grg TE Sohna SSA OK done DONE
y (TE xge
)
done
Civil
done
M/s
SKC
Room
Already
Done Already Already Already OFC Done done DONE Combo
material
received
DET(Sohn
a RD)
Ready for BTS
installation
37 Grg CRPF Camp SSA OK done
pendin
g
Yes (CRPF
will provide
EC)EC
wiring
DONE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending(
DE Tx
Urban)
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
site handed
over to circle
38 Grg Medawas SSA OK Done DONE
file at
AO(bsnl)
DONE DONE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sohn
a RD)
site handed
over to circle
39 GRG RojkaMeo SSA OK done AD
EC
security
paid.
Waiting
done
Civil
done
M/s
SKC
Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(
ZTE)
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
site handed
over to circle
40 Grg
Sikandarpur(
Bada)
SSA OK Done ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
agreement
pending
41 Grg Lakhuwas IP IP IP IP IP IP IP
Pending
ZTE
Combo pending
DET(Sohn
a RD)
42 Grg Sector-67 SSA
lat long sent
to circle
Revise
application
Required
ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sohn
a RD)
lat long sent to
circle
43 Grg Wazirpur SSA
site hand
over ip
(indus) by
ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sohn
a RD)
site hand over ip
(indus) by circle
office
44 Grg
Sohna
DENSE AREA
SSA Bid not recd ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
45 Grg
BSF camp
bhondsi
SSA
Revise
application
Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
46 Grg
PawalaKhusu
rPur/Sec 109
SSA OK
Revise Lat-
long sent to
circle
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
Revise Lat-long
sent to circle
Sr
No
SDC
A
Total
Sites(IP/SSA)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotReceived/
OK/Not Ok)RF
finalization
Status of
Site hiring
by SSA
(NR/IP/Y/to
HPC/WIP)
Agreem
ent
AD/D/
NR
EC status
(Y)
Tower
Founda
tion(NR
/Zte/Civ
il)
Tower
Erecti
on(NR
/SSA/
Zte)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
47 Grg Daultabad SSA ok HPC Done Civil Civil
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
agreement
pending
48 Grg dharampur SSA OK
Revise
application
Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
lat long passed
from circle
49 Grg
Kherki Majra
(Dhanwapur)
SSA
Revised lat
long sent to
circle
Revise
application
Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
Revised lat long
sent to circle
50 Grg Bajghera SSA OK done AD Yes
done
Civil
done
M/s
SKC
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(
ZTE)
Pending
ZTE
Pending
ZTE
Combo pending
DE(NWO-
N)
site handed over to
circle
51 Grg Khetawas SSA OK Done DONE
demand note
submitted to
AO(BSNL)
Done Done Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
site handed
over to circle
52 Grg
SGT Medical
college near
Budera
/Chandu
IP
Revised lat
long sent to
circle
Revise
application
Pending
Civil Civil
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending
DE(NWO-
W)
Revised lat long
sent to circle
53 Grg Mussaidpur SSA OK HPC Done DONE File at AO Civil Civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
site handover to
circle
54 Grg sultanpur SSA
Revised lat
long sent to
circle
Revise
application
Pending
Civil Civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
Revised lat long
sent to circle
55 Grg Baslambi SSA OK
file sent to
HPC
Civil Civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending
DE(NOW-
W)
file sent to HPC
56 Grg
Gawal
pahari/Balia
was
SSA RECONSIDER
revised
letter lat
long sent to
circle
Civil Civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
reconsideration
letter sent to
circle
57 Grg Ullawas SSA ok HPC Done DONE
File work
started
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
site handover to
circle
58 Grg Behrampur SSA ok HPC Done DONE
File work
started
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
site handover to
circle
work detail of new sites -47 :: NewAgreemDone(sites hired )=19
HPC done but agreement pending =4,
file sent to HPC =2,
application required=22(16+6) Imt Sec-3,NSG Gate-2,Hayatpur,IMT sec-6,AMITY,Kasan,IMT sec-3,Hasanpur,Palra,Silani,Sec-67,Wazirpur,Sohna Dense,BSF
Camp,Pawala Khusurpur,Dharampur,KherkiMazra,Gwalpahari,Sultanpur,SGT Medical College
imt sec-1 ,Sikanderpur,Daulatabad,CRPF camp
TE Sohna,Medawas,RojkaMeo,Bajghera,Khetawas,Mussaidpur,IMT sec-8.Nawada Fatehpur ,Naharpur Kasan,Sikohpur,Mumtajpur,Bisru,Sangail,Bhangrola Kakrola,Near GITM, Bilaspur haryana, Kota Khandewla,Ullawas,Behrampur
hayatpur, baslambi
Summary
Mobile
JTO
nodals
EMF Sent on
14.08.13
on air 03-05-13
on air 01-05-13
ready to install
ready to install
work pending at ZTE
work pending at ZTE
work pending at ZTE
(EC work completed
07/09/13 as per de
mewat)
ready to install
On air 30-04-13
work pending at ZTE
JTO
(MOB )
nodal -
GRG
Sh. PP
Gupta
*total site=2
sites hired =2 (HPC
done with
agreement)
but E/C pending at
both sites
JTO
(MOB )
nodal -
Tauru
Sh. Rajiv
Kumar
Marothi
a
* total sites=19
* sites hired =9 (HPC
done with
agreement-
mumtajpurKota
khandewla,Bhangrol
a/kakrola,sikhopur,n
aharpur kasan,imt
sec8,nawadafathepu
r,near gitm,bilaspur
haryana )
*HPC done but
agreement
pending=1 imt sec-1
)
* file sent for
HPC=1(hayatpur )
* application
required=
5(sec3,sec6,nsg2,jat
auli, nakhdaula)

* so pending sites
for hiring =10+2 =12
(file sent for hpc
+HPC done w/o
agreement +
application required
+IP)
all E/C pending in
hired sites=7
JTO
(MOB )
nodal -
Tauru
Sh. Rajiv
Kumar
Marothi
a
* total sites=19
* sites hired =9 (HPC
done with
agreement-
mumtajpurKota
khandewla,Bhangrol
a/kakrola,sikhopur,n
aharpur kasan,imt
sec8,nawadafathepu
r,near gitm,bilaspur
haryana )
*HPC done but
agreement
pending=1 imt sec-1
)
* file sent for
HPC=1(hayatpur )
* application
required=
5(sec3,sec6,nsg2,jat
auli, nakhdaula)

* so pending sites
for hiring =10+2 =12
(file sent for hpc
+HPC done w/o
agreement +
application required
+IP)
all E/C pending in
hired sites=7
JTO
(MOB )
nodal -
Tauru
Sh. Rajiv
Kumar
Marothi
a
* total sites=19
* sites hired =9 (HPC
done with
agreement-
mumtajpurKota
khandewla,Bhangrol
a/kakrola,sikhopur,n
aharpur kasan,imt
sec8,nawadafathepu
r,near gitm,bilaspur
haryana )
*HPC done but
agreement
pending=1 imt sec-1
)
* file sent for
HPC=1(hayatpur )
* application
required=
5(sec3,sec6,nsg2,jat
auli, nakhdaula)

* so pending sites
for hiring =10+2 =12
(file sent for hpc
+HPC done w/o
agreement +
application required
+IP)
all E/C pending in
hired sites=7
* total sites=5
* sites hired=1
(Bajghera with EC
done-HPC done with
agreement ),
*HPC done but
agreement pending
=2 (daultabad,kherki
mazra)
*File sent for HPC=0
* App reqd=2
(Pawala khusrupur &
Dharampur)
* total sites=13
* Sites Hired=4 (1
xge sites +3 HPC
done with
agreement-te
sna,crp
camp,medawas,rojk
ameo )
*HPC done but
agreement
pending=1
(sikandarpur )
file sent for HPC=0
* application
required= 8 ( 6+2
ip)...hasanpur,palra,s
ilani,sec67,sna dense
area,bsf camp

* so pending sites =
9 (file sent for hpc +
HPC done w/o
agreement+applicati
on required )
E/C pending in hired
sites=3
JTO
(MOB )
nodal -
Patudi
Sh. Ajay
Kumar
JTO
(MOB )
nodal -
GRG
Sh. PP
Gupta
* total sites=5
* sites hired=1
(Bajghera with EC
done-HPC done with
agreement ),
*HPC done but
agreement pending
=2 (daultabad,kherki
mazra)
*File sent for HPC=0
* App reqd=2
(Pawala khusrupur &
Dharampur)
JTO
(MOB )
nodal -
Patudi
Sh. Ajay
Kumar
* total sites=5(4+1IP)
*Sites Hired =3
(HPC done with
agreement-
Khetavas,Mussaidpu
r,sultanpur)
*file sent for HPC=0
* application
required= 2
(baslambi,sgt
medical college)

* so pending sites =
1 (file sent for hpc
+HPC DONE w/o
agreement +
application required
)
* total sites=3
*Sites Hired =2
(HPC done with
agreement)
*HPC done but
agreement
pending=2 (ullawas ,
behrampur )
*file sent for HPC=0
* application
required= 1
(gawalpari)
TE Sohna,Medawas,RojkaMeo,Bajghera,Khetawas,Mussaidpur,IMT sec-8.Nawada Fatehpur ,Naharpur Kasan,Sikohpur,Mumtajpur,Bisru,Sangail,Bhangrola Kakrola,Near GITM, Bilaspur haryana, Kota Khandewla,Ullawas,Behrampur
DATED 08-11-2013
Summary: Total sites=58 ( Alrdy Twr Erected with agreement done =11 + 47 new sites (4 IP +43 ) ) IP-amity,SGT medical college,kasan,wazirpur,lakuwas,imt sec3
work detail of new sites -47 :: NewAgreemDone(sites hired )=19, HPC done but agreement pending =4, file sent to HPC =2,application required=22(16+6)
Sr
No
SDC
A
Total
Sites(IP/SSA)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrceive
d/OK/Not
Ok)RF
finalization
Status of
Site hiring
by SSA
(NR/IP/Y/to
HPC/WIP)
Agreem
ent
AD/D/
NR
EC status
(Y)
Tower
Founda
tion(NR
/Zte/Civ
il)
Tower
Erecti
on(NR
/SSA/
Zte)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
1 Grg Dhankot NR NR NR AD y NR NR
ALREADY
SHELTER
DONE Done Done Done OFC Done done DONE Combo
comissio
ned
DE(NWO-
w)
2 Grg Kherki Daula NR NR NR AD y NR NR
ROOM
DONE
DONE Installed Installed Installed OFC Done done Installed Combo pending
DET(Sohn
a RD)
BTS on AIR
03/05/2013
3 Grg Binola NR NR NR AD y NR NR
Room
Already
DONE Done Done done OFC Done done Installed Combo pending SDE(IMT)
BTS on AIR
01/05/2013
4 Grg Tikli NR NR NR AD y NR NR Outdoor Not reqd Done Done done
M/W
pending(
ZTE)
Not reqd DONE 2G NA
DET(Sohn
a RD)
BTS O/D
Allotted
5 Nuh Sudaka NR NR NR AD yes NR NR Outdoor Not reqd Done Done DONE
M/W
pending(
ZTE)
Not reqd DONE 2G NA
DE(Mewat
)
BTS O/D
Allotted
6 Nuh salamba NR NR NR AD yes NR NR W\P
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(
ZTE)
Pending
ZTE
Pending
ZTE
2G NA
DE(Mewat
)
7 Nuh Alduka NR NR NR AD y NR NR W\P
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(
ZTE)
Pending
ZTE
Pending
ZTE
2G NA
DE(Mewat
)
8 Nuh Indri NR NR NR AD
will take 7-8
days more
NR NR W\P
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(
ZTE)
Pending
ZTE
Pending
ZTE
2G NA
DE(Mewat
)
9 Fpj Jamalgarh NR NR NR AD yes NR NR Outdoor Not reqd Done Done done
M/W
pending(
ZTE)
Not reqd DONE 2G NA
DE(Mewat
)
BTS O/D
Allotted
10 Fpj Sikrawa NR NR NR AD yes NR NR
Room
Already
Done Done Done Done OFC Done done Installed 2G pending
DE(Mewat
)
BTS on air on
30-04-13
11 Fpj Gulalta NR NR NR AD yes NR NR W\P
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(
ZTE)
Pending
ZTE
Pending
ZTE
2G NA
DE(Mewat
)
12 Nuh Sangail SSA OK done AD
check
deposited
DONE done Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(
ZTE)
Not reqd
Pending
ZTE
2G NA
DE(Mewat
)
13 Fpj Bisru SSA OK done DONE
Demand note
received ,file
at IFA
DONE DONE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
2G NA
DE(Mewat
)
14 Grg mumtajpur SSA OK Done Done
check
deposited in
DHBVNL
Done DONE outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC/wip Not reqd
Pending
ZTE
2G NA SDE(IMT)
site handed over
to circle
15 Grg Sikhopur SSA
OK; also to
search new
application
Done done
Demand note
received ,file
at IFA
civil civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending SDE(IMT)
Court case done
by neighbour
next date:
24/10/1 ; also to
search new
application
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT
Sr
No
SDC
A
Total
Sites(IP/SSA)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrceive
d/OK/Not
Ok)RF
finalization
Status of
Site hiring
by SSA
(NR/IP/Y/to
HPC/WIP)
Agreem
ent
AD/D/
NR
EC status
(Y)
Tower
Founda
tion(NR
/Zte/Civ
il)
Tower
Erecti
on(NR
/SSA/
Zte)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
16 Grg
Nahar pur
KASAN
SSA OK Done Done
Check
pending with
AO
DONE WIP Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
Court case done
by neighbour,
next
date:15/11/13
17 Grg
Imt Sec-8
manesar
SSA OK Done DONE
file submitted
to DHBVNL
&wip
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
apeal done in
higher court
18 Grg
Nawada
fatehpur
SSA OK Done DONE
Check
pending with
AO
done
Civil
DONE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
site handed over
to circle
19 Grg
kota
khandewla
SSA ok Done DONE
file submitted
to DHBVNL
&wip
Civil Civil outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending SDE(IMT) DONE
20 Grg Nakhdola SSA
lat long sent
to circle
revised
aplication
needed
ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
lat long sent
to circle
21 Grg IMT-Sec-7 SSA OK
Revised
application
required
ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
LAT -LONG
OK
22 Grg
nsg gate no-2
(near)/Navra
ngpur
SSA OK
final letter
pending from
NSG
ZTE ZTE outdoor
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
NSG ready to
give Site
now...SDE(IM
T)
23 Grg
Bhangrola/Ka
krola
SSA OK Done DONE
file submitted
to DHBVNL
&wip
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT) DONE
24 Grg IMT sect-1 SSA OK done yes ZTE
pole
by ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT) HPC done
25 Grg Near GITM SSA ok Done DONE
EC file in
progress
Civil Civil outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
site handed
over to circle
26 Grg Hayatpur SSA ok
revise
applicattion
to take
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
revise
applicattion to
take
27 Grg
Jatuli/Hali
Mandi 2
SSA
lat long sent
to circle
revised
aplication
needed
Civil Civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
revised
aplication
needed
28 Grg
Kakrola (IMT-
sec-6)
SSA
Revise
application
Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
29 Grg
Amity(Near
Pachgaon)-
badanki
SSA ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
site hand over
ip (indus) by
circle office
30 Grg Kasan IP IP IP IP IP IP IP
Pending
ZTE
Combo pending SDE(IMT)
site hand over
ip (indus) by
circle office
31 Grg
Imt Sec-3
manesar
IP IP
IP (ssa
searching )
IP IP IP IP
Pending
ZTE
Combo pending SDE(IMT)
Sr
No
SDC
A
Total
Sites(IP/SSA)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrceive
d/OK/Not
Ok)RF
finalization
Status of
Site hiring
by SSA
(NR/IP/Y/to
HPC/WIP)
Agreem
ent
AD/D/
NR
EC status
(Y)
Tower
Founda
tion(NR
/Zte/Civ
il)
Tower
Erecti
on(NR
/SSA/
Zte)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
32 Grg
Bilaspur,
Haryana
(bilaspur
khurd )
SSA ok Done DONE
file submitted
to DHBVNL
&wip
Civil
M/s
SKC
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
site handed
over to circle
33 Grg Hasanpur SSA
Revised
application
required
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
owner
refused
34 Grg Palra SSA
lat long sent
to circle
Revised
application
required
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
lat long sent
to circle
35 Grg Silani SSA
revise
application
required
Civil Civil
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sohn
a RD)
site visited by
sde(mp) and
de(sohnard)
but site found
36 Grg TE Sohna SSA OK done DONE y (TE xge )
done
Civil
done
M/s
SKC
Room
Already
Done Already Already Already OFC Done done DONE Combo
material
received
DET(Sohn
a RD)
rest
installation
WIP
37 Grg CRPF Camp SSA OK done
pendin
g
Yes (CRPF
will provide
EC)EC wiring
pending
DONE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending(
DE Tx
Urban)
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
site handed
over to circle
38 Grg Medawas SSA OK Done DONE
file at
AO(bsnl)
DONE DONE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sohn
a RD)
site handed
over to circle
39 GRG RojkaMeo SSA OK done AD
file at
AO(bsnl)
done
Civil
done
M/s
SKC
Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(
ZTE)
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
site handed
over to circle
40 Grg
Sikandarpur(
Bada)
SSA OK Done ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
agreement
pending
41 Grg Lakhuwas IP IP IP IP IP IP IP
Pending
ZTE
Combo pending
DET(Sohn
a RD)
42 Grg Sector-67 SSA
lat long sent
to circle
Revise
application
Required
ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sohn
a RD)
lat long sent
to circle
43 Grg Wazirpur SSA
site hand
over ip
(indus) by
ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sohn
a RD)
site hand over
ip (indus) by
circle office
44 Grg
Sohna DENSE
AREA
SSA Bid not recd ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
45 Grg
BSF camp
bhondsi
SSA
Revise
application
Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
46 Grg
PawalaKhusu
rPur/Sec 109
SSA OK
Revise Lat-
long sent to
circle
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
Revise Lat-
long sent to
circle
Sr
No
SDC
A
Total
Sites(IP/SSA)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotReceive
d/OK/Not
Ok)RF
finalization
Status of
Site hiring
by SSA
(NR/IP/Y/to
HPC/WIP)
Agreem
ent
AD/D/
NR
EC status
(Y)
Tower
Founda
tion(NR
/Zte/Civ
il)
Tower
Erecti
on(NR
/SSA/
Zte)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
47 Grg Daultabad SSA ok HPC Done Civil Civil
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
agreement
pending
48 Grg dharampur SSA
searching
new site
Revise
application
Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
searching
new site
49 Grg
Kherki Majra
(Dhanwapur)
SSA
Revised lat
long sent to
circle
Revise
application
Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
Revised lat
long sent to
circle
50 Grg Bajghera SSA OK done AD Yes
done
Civil
done
M/s
SKC
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(
ZTE)
Pending
ZTE
Pending
ZTE
Combo pending
DE(NWO-
N)
site handed over
to circle
51 Grg Khetawas SSA OK Done DONE
demand note
submitted to
AO(BSNL)
Done Done Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
site handed
over to circle
52 Grg
SGT Medical
college near
Budera
/Chandu
IP
Revised lat
long sent to
circle
Revise
application
Pending
Civil Civil
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending
DE(NWO-
W)
Revised lat
long sent to
circle
53 Grg Mussaidpur SSA OK HPC Done DONE
check
deposited
in
DHBVNL
Civil Civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
site handover
to circle
54 Grg sultanpur SSA
Revised lat
long sent to
circle
Revise
application
Pending
Civil Civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
Revised lat
long sent to
circle
55 Grg Baslambi SSA OK
file sent to
HPC
Civil Civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending
DE(NOW-
W)
file sent to
HPC
56 Grg
Gawal
pahari/Balia
was
SSA RECONSIDER
revised
letter lat
long sent to
circle
Civil Civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
reconsiderati
on letter sent
to circle
57 Grg Ullawas SSA ok HPC Done DONE
File work
started
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
site handover
to circle
58 Grg Behrampur SSA ok HPC Done DONE
File work
started
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
site handover
to circle
work detail of new sites -47 :: NewAgreemDone(sites hired )=19
HPC done but agreement pending =4,
file sent to HPC =2,
TE Sohna,Medawas,RojkaMeo,Bajghera,Khetawas,Mussaidpur,IMT sec-8.Nawada Fatehpur ,Naharpur Kasan,Sikohpur,Mumtajpur,Bisru,Sangail,Bhangrola Kakrola,Near GITM, Bilaspur haryana, Kota Khandewla,Ullawas,Behrampur
imt sec-1 ,Sikanderpur,Daulatabad,CRPF camp
hayatpur, baslambi
application required=22(16+6) Imt Sec-3,NSG Gate-2,Hayatpur,IMT sec-6,AMITY,Kasan,IMT sec-3,Hasanpur,Palra,Silani,Sec-67,Wazirpur,Sohna Dense,BSF
Camp,Pawala Khusurpur,Dharampur,KherkiMazra,Gwalpahari,Sultanpur,SGT Medical College
Tower Erection =9 (sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas)
total Tower Foundation done ssa civil = 10 (sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas, Naharpur,CRPF camp ZTE)
Summary
Mobile
JTO
nodals
on aired on 6-11-13
on air 03-05-13
on air 01-05-13
ready to install
ready to install
work pending at ZTE
work pending at ZTE
work pending at ZTE
(EC work completed
07/09/13 as per de
mewat)
ready to install
On air 30-04-13
work pending at ZTE
JTO
(MOB )
nodal -
GRG
Sh. PP
Gupta
*total site=2
sites hired =2 (HPC
done with
agreement)
but E/C pending at
both sites
JTO
(MOB )
nodal -
Tauru
Sh. Rajiv
Kumar
Marothi
a
* total sites=19
* sites hired =9 (HPC
done with
agreement-
mumtajpurKota
khandewla,Bhangrol
a/kakrola,sikhopur,n
aharpur kasan,imt
sec8,nawadafathepu
r,near gitm,bilaspur
haryana )
*HPC done but
agreement
pending=1 imt sec-1
)
* file sent for
HPC=1(hayatpur )
* application
required=
5(sec3,sec6,nsg2,jat
auli, nakhdaula)

* so pending sites
for hiring =10+2 =12
(file sent for hpc
+HPC done w/o
agreement +
application required
+IP)
all E/C pending in
hired sites=7
JTO
(MOB )
nodal -
Tauru
Sh. Rajiv
Kumar
Marothi
a
* total sites=19
* sites hired =9 (HPC
done with
agreement-
mumtajpurKota
khandewla,Bhangrol
a/kakrola,sikhopur,n
aharpur kasan,imt
sec8,nawadafathepu
r,near gitm,bilaspur
haryana )
*HPC done but
agreement
pending=1 imt sec-1
)
* file sent for
HPC=1(hayatpur )
* application
required=
5(sec3,sec6,nsg2,jat
auli, nakhdaula)

* so pending sites
for hiring =10+2 =12
(file sent for hpc
+HPC done w/o
agreement +
application required
+IP)
all E/C pending in
hired sites=7
JTO
(MOB )
nodal -
Tauru
Sh. Rajiv
Kumar
Marothi
a
* total sites=19
* sites hired =9 (HPC
done with
agreement-
mumtajpurKota
khandewla,Bhangrol
a/kakrola,sikhopur,n
aharpur kasan,imt
sec8,nawadafathepu
r,near gitm,bilaspur
haryana )
*HPC done but
agreement
pending=1 imt sec-1
)
* file sent for
HPC=1(hayatpur )
* application
required=
5(sec3,sec6,nsg2,jat
auli, nakhdaula)

* so pending sites
for hiring =10+2 =12
(file sent for hpc
+HPC done w/o
agreement +
application required
+IP)
all E/C pending in
hired sites=7
* total sites=13
* Sites Hired=4 (1
xge sites +3 HPC
done with
agreement-te
sna,crp
camp,medawas,rojk
ameo )
*HPC done but
agreement
pending=1
(sikandarpur )
file sent for HPC=0
* application
required= 8 ( 6+2
ip)...hasanpur,palra,s
ilani,sec67,sna dense
area,bsf camp

* so pending sites =
9 (file sent for hpc +
HPC done w/o
agreement+applicati
on required )
E/C pending in hired
sites=3
JTO
(MOB )
nodal -
GRG
Sh. PP
Gupta
JTO
(MOB )
nodal -
Patudi
Sh. Ajay
Kumar
* total sites=5
* sites hired=1
(Bajghera with EC
done-HPC done with
agreement ),
*HPC done but
agreement pending
=2 (daultabad,kherki
mazra)
*File sent for HPC=0
* App reqd=2
(Pawala khusrupur &
Dharampur)
JTO
(MOB )
nodal -
Patudi
Sh. Ajay
Kumar
* total sites=5
* sites hired=1
(Bajghera with EC
done-HPC done with
agreement ),
*HPC done but
agreement pending
=2 (daultabad,kherki
mazra)
*File sent for HPC=0
* App reqd=2
(Pawala khusrupur &
Dharampur)
* total sites=5(4+1IP)
*Sites Hired =3
(HPC done with
agreement-
Khetavas,Mussaidpu
r,sultanpur)
*file sent for HPC=0
* application
required= 2
(baslambi,sgt
medical college)

* so pending sites =
1 (file sent for hpc
+HPC DONE w/o
agreement +
application required
)
* total sites=3
*Sites Hired =2
(HPC done with
agreement)
*HPC done but
agreement
pending=2 (ullawas ,
behrampur )
*file sent for HPC=0
* application
required= 1
(gawalpari)
TE Sohna,Medawas,RojkaMeo,Bajghera,Khetawas,Mussaidpur,IMT sec-8.Nawada Fatehpur ,Naharpur Kasan,Sikohpur,Mumtajpur,Bisru,Sangail,Bhangrola Kakrola,Near GITM, Bilaspur haryana, Kota Khandewla,Ullawas,Behrampur
DATED 16-11-2013
Summary: Total sites=58 ( Alrdy Twr Erected with agreement done =11 + 47 new sites (4 IP +43 ) ) IP-amity,SGT medical college,kasan,wazirpur,lakuwas,imt sec3
work detail of new sites -47 :: NewAgreemDone(sites hired )=19, HPC done but agreement pending =4, file sent to HPC =2,application required=19(14+5)
Sr
No
SDC
A
Total
Sites(IP/SS
A)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrceiv
ed/OK/Not
Ok)RF
finalization
Status of
Site hiring
by SSA
(NR/IP/Y/t
o
HPC/WIP)
Agreeme
nt
AD/D/NR
EC status
(Y)
Tower
Founda
tion(NR
/Zte/Civ
il)
Tower
Erecti
on(NR
/SSA/
Zte)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
1 Grg Dhankot NR NR NR AD y NR NR
ALREADY
SHELTER
DONE Done Done Done OFC Done done DONE Combo
comissio
ned
DE(NWO-
w)
2 Grg
Kherki
Daula
NR NR NR AD y NR NR
ROOM
DONE
DONE Installed Installed Installed OFC Done done Installed Combo pending
DET(Sohn
a RD)
BTS on AIR
03/05/2013
3 Grg Binola NR NR NR AD y NR NR
Room
Already
DONE Done Done done OFC Done done Installed Combo pending SDE(IMT)
BTS on AIR
01/05/2013
4 Grg Tikli NR NR NR AD y NR NR Outdoor Not reqd Done Done done Done Not reqd DONE 2G NA
DET(Sohn
a RD)
BTS O/D
Allotted
5 Nuh Sudaka NR NR NR AD yes NR NR Outdoor Not reqd Done Done DONE Done Not reqd DONE 2G NA
DE(Mewat
)
BTS O/D
Allotted
6 Nuh salamba NR NR NR AD yes NR NR W\P
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(
ZTE)
Pending
ZTE
Pending
ZTE
2G NA
DE(Mewat
)
7 Nuh Alduka NR NR NR AD y NR NR W\P
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(
ZTE)
Pending
ZTE
Pending
ZTE
2G NA
DE(Mewat
)
8 Nuh Indri NR NR NR AD
will take 7-8
days more
NR NR W\P
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(
ZTE)
Pending
ZTE
Pending
ZTE
2G NA
DE(Mewat
)
9 Fpj Jamalgarh NR NR NR AD yes NR NR Outdoor Not reqd Done Done done
M/W
pending(
ZTE)
Not reqd DONE 2G NA
DE(Mewat
)
BTS O/D
Allotted
10 Fpj Sikrawa NR NR NR AD yes NR NR
Room
Already
Done Done Done Done OFC Done done Installed 2G pending
DE(Mewat
)
BTS on air on
30-04-13
11 Fpj Gulalta NR NR NR AD yes NR NR W\P
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(
ZTE)
Pending
ZTE
Pending
ZTE
2G NA
DE(Mewat
)
12 Nuh Sangail SSA OK done AD
check
deposited
DONE done Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(
ZTE)
Not reqd
Pending
ZTE
2G NA
DE(Mewat
)
13 Fpj Bisru SSA OK done DONE
Demand note
received ,file
at IFA
DONE DONE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
2G NA
DE(Mewat
)
14 Grg mumtajpur SSA OK Done Done
check
deposited in
DHBVNL
Done DONE outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC/wip Not reqd
Pending
ZTE
2G NA SDE(IMT)
site handed over
to circle
15 Grg Sikhopur SSA
OK; also to
search new
application
Done done
Demand note
received ,file
at IFA
civil civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending SDE(IMT)
Court case done
by neighbour
next date:
24/10/1 ; also to
search new
application
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT
Sr
No
SDC
A
Total
Sites(IP/SS
A)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrceiv
ed/OK/Not
Ok)RF
finalization
Status of
Site hiring
by SSA
(NR/IP/Y/t
o
HPC/WIP)
Agreeme
nt
AD/D/NR
EC status
(Y)
Tower
Founda
tion(NR
/Zte/Civ
il)
Tower
Erecti
on(NR
/SSA/
Zte)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
16 Grg
Nahar pur
KASAN
SSA OK Done Done
Check pending
with AO
DONE WIP Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
Court case done
by neighbour,
next
date:15/11/13
17 Grg
Imt Sec-8
manesar
SSA OK Done DONE
file submitted
to DHBVNL
&wip
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
apeal done in
higher court
18 Grg
Nawada
fatehpur
SSA OK Done DONE
Check pending
with AO
done
Civil
DONE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
site handed over
to circle
19 Grg
kota
khandewla
SSA ok Done DONE
file submitted
to DHBVNL
&wip
Civil Civil outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending SDE(IMT) DONE
20 Grg Nakhdola SSA ok ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
revised
aplication
needed
21 Grg IMT-Sec-7 SSA OK
Revised
application
required
ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
LAT -LONG
OK
22 Grg
nsg gate no-
2
(near)/Nav
rangpur
SSA OK
final letter
pending
from NSG
ZTE ZTE outdoor
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
NSG ready to
give Site
now...SDE(IM
T)
23 Grg
Bhangrola/
Kakrola
SSA OK Done DONE
file submitted
to DHBVNL
&wip
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT) DONE
24 Grg IMT sect-1 SSA OK done yes ZTE
pole
by ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT) HPC done
25 Grg Near GITM SSA ok Done DONE
EC file in
progress
Civil Civil outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
site handed
over to circle
26 Grg Hayatpur SSA ok ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
Revise
application
Pending
27 Grg
Jatuli/Hali
Mandi 2
SSA ok Civil Civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
file sent to
HPC
28 Grg
Kakrola
(IMT-sec-6)
SSA
lat long
sent to
circle
Revise
application
Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
revise lat long
sent to circle
29 Grg
Amity(Near
Pachgaon)-
badanki
SSA ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
site hand over
ip (indus) by
circle office
30 Grg Kasan IP IP IP IP IP IP IP
Pending
ZTE
Combo pending SDE(IMT)
site hand over
ip (indus) by
circle office
31 Grg
Imt Sec-3
manesar
IP IP
IP (ssa
searching )
IP IP IP IP
Pending
ZTE
Combo pending SDE(IMT)
Sr
No
SDC
A
Total
Sites(IP/SS
A)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrceiv
ed/OK/Not
Ok)RF
finalization
Status of
Site hiring
by SSA
(NR/IP/Y/t
o
HPC/WIP)
Agreeme
nt
AD/D/NR
EC status
(Y)
Tower
Founda
tion(NR
/Zte/Civ
il)
Tower
Erecti
on(NR
/SSA/
Zte)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
32 Grg
Bilaspur,
Haryana
(bilaspur
khurd )
SSA ok Done DONE
file submitted
to DHBVNL
&wip
Civil
M/s
SKC
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
site handed
over to circle
33 Grg Hasanpur SSA
Revised
application
required
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
lat long sent
to circle
34 Grg Palra SSA ok
Revised
application
required
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
Revised
application
required
35 Grg Silani SSA
revise
application
required
Civil Civil
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sohn
a RD)
site visited by
sde(mp) and
de(sohnard)
but site found
36 Grg TE Sohna SSA OK done DONE y (TE xge )
done
Civil
done
M/s
SKC
Room
Already
Done Already Already Already OFC Done done DONE Combo
material
received
DET(Sohn
a RD)
rest
installation
WIP
37 Grg CRPF Camp SSA OK done
permission
letter in
progres
Yes (CRPF
will provide
EC)EC wiring
pending
DONE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending(
DE Tx
Urban)
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
permission
letter in
progres at
delhi
38 Grg Medawas SSA OK Done DONE
check in
progress
DONE DONE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sohn
a RD)
site handed
over to circle
39 GRG RojkaMeo SSA OK done AD file at IFA
done
Civil
done
M/s
SKC
Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(
ZTE)
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
site handed
over to circle
40 Grg
Sikandarpu
r(Bada)
SSA OK Done ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
agreement
pending
41 Grg Lakhuwas IP IP IP IP IP IP IP
Pending
ZTE
Combo pending
DET(Sohn
a RD)
42 Grg Sector-67 SSA ok
Revise
application
Required
ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sohn
a RD)
Revise
application
Required
43 Grg Wazirpur SSA
site hand
over ip
(indus) by
ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sohn
a RD)
site hand over
ip (indus) by
circle office
44 Grg
Sohna
DENSE
AREA
SSA
Bid not
recd
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
45 Grg
BSF camp
bhondsi
SSA
Revise
application
Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
46 Grg
PawalaKhu
surPur/Sec
109
SSA OK
Revise Lat-
long sent
to circle
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
Revise Lat-
long sent to
circle
Sr
No
SDC
A
Total
Sites(IP/SS
A)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotReceiv
ed/OK/Not
Ok)RF
finalization
Status of
Site hiring
by SSA
(NR/IP/Y/t
o
HPC/WIP)
Agreeme
nt
AD/D/NR
EC status
(Y)
Tower
Founda
tion(NR
/Zte/Civ
il)
Tower
Erecti
on(NR
/SSA/
Zte)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
47 Grg Daultabad SSA ok HPC Done Civil Civil
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
agreement
pending
48 Grg dharampur SSA
searching
new site
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
searching
new site
49 Grg
Kherki
Majra
(Dhanwapu
r)
SSA OK
Revise
application
Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
file sent to
HPC
50 Grg Bajghera SSA OK done AD Yes
done
Civil
done
M/s
SKC
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(
ZTE)
Pending
ZTE
Pending
ZTE
Combo pending
DE(NWO-
N)
site handed over
to circle
51 Grg Khetawas SSA OK Done DONE
demand note
submitted to
AO(BSNL)
Done Done Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
site handed
over to circle
52 Grg
SGT
Medical
college
near
SSA OK Civil Civil
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending
DE(NWO-
W)
file sent to
HPC
53 Grg
Mussaidpu
r
SSA OK HPC Done DONE
check
deposited
in DHBVNL
Civil Civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
site handover
to circle
54 Grg sultanpur SSA OK
file sent to
HPC
Civil Civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
file sent to
HPC
55 Grg Baslambi SSA OK Civil Civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending
DE(NOW-
W)
file sent to
HPC
56 Grg
Gawal
pahari/Bali
awas
SSA OK
revised
letter lat
long sent
to circle
Civil Civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
57 Grg Ullawas SSA ok HPC Done DONE
File work
started
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
site handover
to circle
58 Grg Behrampur SSA ok HPC Done DONE
File work
started
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
site handover
to circle
work detail of new sites -47 :: NewAgreemDone(sites hired )=19
HPC done but agreement pending =4,
file sent to HPC =2,
application required=19(14+5) Imt Sec-3,NSG Gate-2,Hayatpur,IMT sec-6,AMITY,Kasan,IMT sec-3,Hasanpur,Palra,Silani,Sec-67,Wazirpur,Sohna Dense,BSF
Camp,Pawala Khusurpur,Dharampur,,Gwalpahari,
TE Sohna,Medawas,RojkaMeo,Bajghera,Khetawas,Mussaidpur,IMT sec-8.Nawada Fatehpur ,Naharpur Kasan,Sikohpur,Mumtajpur,Bisru,Sangail,Bhangrola Kakrola,Near GITM, Bilaspur haryana, Kota Khandewla,Ullawas,Behrampur
imt sec-1 ,Sikanderpur,Daulatabad,CRPF camp
hayatpur, baslambi
Tower Erection =9 (sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas)
total Tower Foundation done ssa civil = 10 (sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas, Naharpur,CRPF camp ZTE)
Summary
Mobile
JTO
nodals
on aired on 6-11-13
on air 03-05-13
on air 01-05-13
Ready to intigrate
READY TO
INTIGRATE
work pending at ZTE
work pending at ZTE
work pending at ZTE
(EC work completed
07/09/13 as per de
mewat)
ready to install
On air 30-04-13
work pending at ZTE
JTO
(MOB )
nodal -
GRG
Sh. PP
Gupta
*total site=2
sites hired =2 (HPC
done with
agreement)
but E/C pending at
both sites
JTO
(MOB )
nodal -
Tauru
Sh. Rajiv
Kumar
Marothi
a
* total sites=19
* sites hired =9 (HPC
done with
agreement-
mumtajpurKota
khandewla,Bhangrol
a/kakrola,sikhopur,n
aharpur kasan,imt
sec8,nawadafathepu
r,near gitm,bilaspur
haryana )
*HPC done but
agreement
pending=1 imt sec-1
)
* file sent for
HPC=1(hayatpur )
* application
required=
5(sec3,sec6,nsg2,jat
auli, nakhdaula)

* so pending sites
for hiring =10+2 =12
(file sent for hpc
+HPC done w/o
agreement +
application required
+IP)
all E/C pending in
hired sites=7
JTO
(MOB )
nodal -
Tauru
Sh. Rajiv
Kumar
Marothi
a
* total sites=19
* sites hired =9 (HPC
done with
agreement-
mumtajpurKota
khandewla,Bhangrol
a/kakrola,sikhopur,n
aharpur kasan,imt
sec8,nawadafathepu
r,near gitm,bilaspur
haryana )
*HPC done but
agreement
pending=1 imt sec-1
)
* file sent for
HPC=1(hayatpur )
* application
required=
5(sec3,sec6,nsg2,jat
auli, nakhdaula)

* so pending sites
for hiring =10+2 =12
(file sent for hpc
+HPC done w/o
agreement +
application required
+IP)
all E/C pending in
hired sites=7
* total sites=5
* sites hired=1
(Bajghera with EC
done-HPC done with
agreement ),
*HPC done but
agreement pending
=2 (daultabad,kherki
mazra)
*File sent for HPC=0
* App reqd=2
(Pawala khusrupur &
Dharampur)
JTO
(MOB )
nodal -
Tauru
Sh. Rajiv
Kumar
Marothi
a
* total sites=19
* sites hired =9 (HPC
done with
agreement-
mumtajpurKota
khandewla,Bhangrol
a/kakrola,sikhopur,n
aharpur kasan,imt
sec8,nawadafathepu
r,near gitm,bilaspur
haryana )
*HPC done but
agreement
pending=1 imt sec-1
)
* file sent for
HPC=1(hayatpur )
* application
required=
5(sec3,sec6,nsg2,jat
auli, nakhdaula)

* so pending sites
for hiring =10+2 =12
(file sent for hpc
+HPC done w/o
agreement +
application required
+IP)
all E/C pending in
hired sites=7
* total sites=13
* Sites Hired=4 (1
xge sites +3 HPC
done with
agreement-te
sna,crp
camp,medawas,rojk
ameo )
*HPC done but
agreement
pending=1
(sikandarpur )
file sent for HPC=0
* application
required= 8 ( 6+2
ip)...hasanpur,palra,s
ilani,sec67,sna dense
area,bsf camp

* so pending sites =
9 (file sent for hpc +
HPC done w/o
agreement+applicati
on required )
E/C pending in hired
sites=3
JTO
(MOB )
nodal -
GRG
Sh. PP
Gupta
JTO
(MOB )
nodal -
Patudi
Sh. Ajay
Kumar
* total sites=5
* sites hired=1
(Bajghera with EC
done-HPC done with
agreement ),
*HPC done but
agreement pending
=2 (daultabad,kherki
mazra)
*File sent for HPC=0
* App reqd=2
(Pawala khusrupur &
Dharampur)
* total sites=5(4+1IP)
*Sites Hired =3
(HPC done with
agreement-
Khetavas,Mussaidpu
r,sultanpur)
*file sent for HPC=0
* application
required= 2
(baslambi,sgt
medical college)

* so pending sites =
1 (file sent for hpc
+HPC DONE w/o
agreement +
application required
)
* total sites=3
*Sites Hired =2
(HPC done with
agreement)
*HPC done but
agreement
pending=2 (ullawas ,
behrampur )
*file sent for HPC=0
* application
required= 1
(gawalpari)
TE Sohna,Medawas,RojkaMeo,Bajghera,Khetawas,Mussaidpur,IMT sec-8.Nawada Fatehpur ,Naharpur Kasan,Sikohpur,Mumtajpur,Bisru,Sangail,Bhangrola Kakrola,Near GITM, Bilaspur haryana, Kota Khandewla,Ullawas,Behrampur
JTO
(MOB )
nodal -
Patudi
Sh. Ajay
Kumar
DATED 30-11-2013
Summary: Total sites=58 ( Alrdy Twr Erected with agreement done =11 + 47 new sites (4 IP +43 ) ) IP-amity,SGT medical college,kasan,wazirpur,lakuwas,imt sec3
work detail of new sites -47 :: NewAgreemDone(sites hired )=19, HPC done but agreement pending =4, file sent to HPC =2,application required=19(14+5)
Sr
No
SDC
A
Total
Sites(IP/SS
A)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrceiv
ed/OK/Not
Ok)RF
finalization
Status of
Site hiring
by SSA
(NR/IP/Y/t
o
HPC/WIP)
Agreeme
nt
AD/D/NR
EC status
(Y)
Tower
Founda
tion(NR
/Zte/Civ
il)
Tower
Erecti
on(NR
/SSA/
Zte)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
1 Grg Dhankot NR NR NR AD y NR NR
ALREADY
SHELTER
DONE Done Done Done OFC Done done DONE Combo
comissio
ned
DE(NWO-
w)
2 Grg
Kherki
Daula
NR NR NR AD y NR NR
ROOM
DONE
DONE Installed Installed Installed OFC Done done Installed Combo pending
DET(Sohn
a RD)
BTS on AIR
03/05/2013
3 Grg Binola NR NR NR AD y NR NR
Room
Already
DONE Done Done done OFC Done done Installed Combo pending SDE(IMT)
BTS on AIR
01/05/2013
4 Grg Tikli NR NR NR AD y NR NR Outdoor Not reqd Done Done done Done Not reqd DONE 2G NA
DET(Sohn
a RD)
BTS O/D
Allotted
5 Nuh Sudaka NR NR NR AD yes NR NR Outdoor Not reqd Done Done DONE Done Not reqd DONE 2G NA
DE(Mewat
)
BTS O/D
Allotted
6 Nuh salamba NR NR NR AD yes NR NR W\P
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(
ZTE)
Pending
ZTE
Pending
ZTE
2G NA
DE(Mewat
)
7 Nuh Alduka NR NR NR AD y NR NR W\P
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(
ZTE)
Pending
ZTE
Pending
ZTE
2G NA
DE(Mewat
)
8 Nuh Indri NR NR NR AD
will take 7-8
days more
NR NR W\P
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(
ZTE)
Pending
ZTE
Pending
ZTE
2G NA
DE(Mewat
)
9 Fpj Jamalgarh NR NR NR AD yes NR NR Outdoor Not reqd Done Done done
M/W
pending(
ZTE)
Not reqd DONE 2G NA
DE(Mewat
)
BTS O/D
Allotted
10 Fpj Sikrawa NR NR NR AD yes NR NR
Room
Already
Done Done Done Done OFC Done done Installed 2G pending
DE(Mewat
)
BTS on air on
30-04-13
11 Fpj Gulalta NR NR NR AD yes NR NR W\P
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(
ZTE)
Pending
ZTE
Pending
ZTE
2G NA
DE(Mewat
)
12 Nuh Sangail SSA OK done AD
check
deposited at
DHBVNL ,
work pending
at their end
DONE done Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(
ZTE)
Not reqd
Pending
ZTE
2G NA
DE(Mewat
)
13 Fpj Bisru SSA OK done DONE
File pending at
AO for Check
DONE DONE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
2G NA
DE(Mewat
)
14 Grg mumtajpur SSA OK Done Done
pending at
AO(BSNL) for
check
Done DONE outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC/wip Not reqd
Pending
ZTE
2G NA SDE(IMT)
site handed over
to circle
15 Grg Sikhopur SSA
OK; also to
search new
application
Done done
Demand note
received , file
at AO
civil civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending SDE(IMT)
Court case done
by neighbour
next date:
09/12/13 ; also to
search new
application
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT
Sr
No
SDC
A
Total
Sites(IP/SS
A)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrceiv
ed/OK/Not
Ok)RF
finalization
Status of
Site hiring
by SSA
(NR/IP/Y/t
o
HPC/WIP)
Agreeme
nt
AD/D/NR
EC status
(Y)
Tower
Founda
tion(NR
/Zte/Civ
il)
Tower
Erecti
on(NR
/SSA/
Zte)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
16 Grg
Nahar pur
KASAN
SSA OK Done Done
Check pending
with AO
DONE WIP Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
Court case done,
Comitee is mode
to resolve
17 Grg
Imt Sec-8
manesar
SSA OK Done DONE
file submitted
to DHBVNL
&wip
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
apeal done in
higher court
date:13-1-14
18 Grg
Nawada
fatehpur
SSA OK Done DONE
Check pending
at AO
done
Civil
DONE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
site handed over
to circle
19 Grg
kota
khandewla
SSA ok Done DONE
file submitted
to HSEB , site
visit fromHSEB
pending
Civil Civil outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending SDE(IMT)
20 Grg Nakhdola SSA ok ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
revised
aplication
needed
21 Grg
IMT-Sec-7/
Kakrola
SSA OK
Revised
application
required
in progres ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
agreement in
progres
22 Grg
nsg gate no-
2
(near)/Nav
rangpur
SSA OK
final letter
pending
from NSG
ZTE ZTE outdoor
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
NSG ready to
give Site
now...SDE(IM
T)
23 Grg
Bhangrola/
Kakrola
SSA OK Done DONE
file submitted
to DHBVNL
&WIP
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
24 Grg IMT sect-1 SSA OK done
in
progress
yes ZTE
pole
by ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT) HPC done
25 Grg Near GITM SSA ok Done DONE
pending at
DHBVNL for
demand note
Civil Civil outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
site handed
over to circle
26 Grg Hayatpur SSA ok HPC Pending ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT) HPC Pending
27 Grg
Jatuli/Hali
Mandi 2
SSA ok HPC Pending Civil Civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT) HPC Pending
28 Grg
Kakrola
(IMT-sec-6)
SSA
lat long
sent to
circle
Revise
application
Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
revise lat long
sent to circle
29 Grg
Amity(Near
Pachgaon)-
badanki
SSA ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
site hand over
ip (indus) by
circle office
30 Grg Kasan IP IP IP IP IP IP IP
Pending
ZTE
Combo pending SDE(IMT)
site hand over
ip (indus) by
circle office
31 Grg
Imt Sec-3
manesar
IP IP
IP (ssa
searching )
IP IP IP IP
Pending
ZTE
Combo pending SDE(IMT)
Sr
No
SDC
A
Total
Sites(IP/SS
A)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrceiv
ed/OK/Not
Ok)RF
finalization
Status of
Site hiring
by SSA
(NR/IP/Y/t
o
HPC/WIP)
Agreeme
nt
AD/D/NR
EC status
(Y)
Tower
Founda
tion(NR
/Zte/Civ
il)
Tower
Erecti
on(NR
/SSA/
Zte)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
32 Grg
Bilaspur,
Haryana
(bilaspur
khurd )
SSA ok Done DONE
demand note
pending at
DHBVNL
Civil
M/s
SKC
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
site handed
over to circle
33 Grg Hasanpur SSA
Revised
application
required
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
lat long sent
to circle
34 Grg Palra SSA ok
Revised
application
required
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
Revised
application
required
35 Grg Silani SSA
revise
application
required
Civil Civil
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sohn
a RD)
site visited by
sde(mp) and
de(sohnard)
but site found
36 Grg TE Sohna SSA OK done DONE y (TE xge )
done
Civil
done
M/s
SKC
Room
Already
Done Already Already Already OFC Done done DONE Combo
material
received
DET(Sohn
a RD)
rest
installation
WIP
37 Grg CRPF Camp SSA OK done
permission
letter in
progres
Yes (CRPF
will provide
EC)EC wiring
pending
DONE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending(
DE Tx
Urban)
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
permission
letter in
progres at
delhi
38 Grg Medawas SSA OK Done DONE
demand note
pending at
AO
DONE DONE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sohn
a RD)
site handed
over to circle
39 GRG RojkaMeo SSA OK done AD
file at AO
bsnl for
check
done
Civil
done
M/s
SKC
Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(
ZTE)
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
site handed
over to circle
40 Grg
Sikandarpu
r(Bada)
SSA OK Done in progres ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
agreement in
progres
41 Grg Lakhuwas IP IP IP IP IP IP IP
Pending
ZTE
Combo pending
DET(Sohn
a RD)
42 Grg Sector-67 SSA ok
Revise
application
Required
ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sohn
a RD)
Revise
application
Required
43 Grg Wazirpur SSA
site hand
over ip
(indus) by
ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sohn
a RD)
site hand over
ip (indus) by
circle office
44 Grg
Sohna
DENSE
AREA
SSA
Bid not
recd
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
45 Grg
BSF camp
bhondsi
SSA
Revise
application
Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
46 Grg
PawalaKhu
surPur/Sec
109
SSA OK
Revise Lat-
long sent
to circle
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
Revise Lat-
long sent to
circle
Sr
No
SDC
A
Total
Sites(IP/SS
A)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotReceiv
ed/OK/Not
Ok)RF
finalization
Status of
Site hiring
by SSA
(NR/IP/Y/t
o
HPC/WIP)
Agreeme
nt
AD/D/NR
EC status
(Y)
Tower
Founda
tion(NR
/Zte/Civ
il)
Tower
Erecti
on(NR
/SSA/
Zte)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
47 Grg Daultabad SSA ok HPC Done Civil Civil
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
agreement
pending
48 Grg dharampur SSA
searching
new site
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
searching
new site
49 Grg
Kherki
Majra
(Dhanwapu
r)
SSA OK
Revise
application
Pending
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
file sent to
HPC
50 Grg Bajghera SSA OK done AD Yes
done
Civil
done
M/s
SKC
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(
ZTE)
Pending
ZTE
Pending
ZTE
Combo pending
DE(NWO-
N)
site handed over
to circle
51 Grg Khetawas SSA OK Done DONE
Estimate
pending at
DHBVNL
Done Done Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
site handed
over to circle
52 Grg
SGT
Medical
college
near
SSA OK Civil Civil
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending
DE(NWO-
W)
file sent to
HPC
53 Grg
Mussaidpu
r
SSA OK HPC Done DONE
Estimate
pending at
DHBVNL
Civil Civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
site handover
to circle
54 Grg sultanpur SSA OK
file sent to
HPC
Civil Civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
file sent to
HPC
55 Grg Baslambi SSA OK Civil Civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending
DE(NOW-
W)
file sent to
HPC
56 Grg
Gawal
pahari/Bali
awas
SSA OK
revised
letter lat
long sent
to circle
Civil Civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
57 Grg Ullawas SSA ok HPC Done DONE
File work
started
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
site handover
to circle
58 Grg Behrampur SSA ok HPC Done DONE
File work
started
ZTE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
site handover
to circle
work detail of new sites -47 :: NewAgreemDone(sites hired )=19
HPC done but agreement pending =4,
file sent to HPC =2,
Tower Erection =9 (sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas)
total Tower Foundation done ssa civil = 10 (sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas, Naharpur,CRPF camp ZTE)
TE Sohna,Medawas,RojkaMeo,Bajghera,Khetawas,Mussaidpur,IMT sec-8.Nawada Fatehpur ,Naharpur Kasan,Sikohpur,Mumtajpur,Bisru,Sangail,Bhangrola Kakrola,Near GITM, Bilaspur haryana, Kota Khandewla,Ullawas,Behrampur
imt sec-1 ,Sikanderpur,Daulatabad,CRPF camp
hayatpur, baslambi
application required=19(14+5) Imt Sec-3,NSG Gate-2,Hayatpur,IMT sec-6,AMITY,Kasan,IMT sec-3,Hasanpur,Palra,Silani,Sec-67,Wazirpur,Sohna Dense,BSF
Camp,Pawala Khusurpur,Dharampur,,Gwalpahari,
Summary
Mobile
JTO
nodals
on aired on 6-11-13
on air 03-05-13
on air 01-05-13
Ready to intigrate
READY TO
INTIGRATE
work pending at ZTE
9
work pending at ZTE
ready to install
On air 30-04-13
work pending at ZTE
JTO
(MOB )
nodal -
GRG
Sh. PP
Gupta
*total site=2
sites hired =2 (HPC
done with
agreement)
but E/C pending at
both sites
JTO
(MOB )
nodal -
Tauru
Sh. Rajiv
Kumar
Marothi
a
* total sites=19
* sites hired =9 (HPC
done with
agreement-
mumtajpurKota
khandewla,Bhangrol
a/kakrola,sikhopur,n
aharpur kasan,imt
sec8,nawadafathepu
r,near gitm,bilaspur
haryana )
*HPC done but
agreement
pending=1 imt sec-1
)
* file sent for
HPC=1(hayatpur )
* application
required=
5(sec3,sec6,nsg2,jat
auli, nakhdaula)

* so pending sites
for hiring =10+2 =12
(file sent for hpc
+HPC done w/o
agreement +
application required
+IP)
all E/C pending in
hired sites=7
JTO
(MOB )
nodal -
Tauru
Sh. Rajiv
Kumar
Marothi
a
* total sites=19
* sites hired =9 (HPC
done with
agreement-
mumtajpurKota
khandewla,Bhangrol
a/kakrola,sikhopur,n
aharpur kasan,imt
sec8,nawadafathepu
r,near gitm,bilaspur
haryana )
*HPC done but
agreement
pending=1 imt sec-1
)
* file sent for
HPC=1(hayatpur )
* application
required=
5(sec3,sec6,nsg2,jat
auli, nakhdaula)

* so pending sites
for hiring =10+2 =12
(file sent for hpc
+HPC done w/o
agreement +
application required
+IP)
all E/C pending in
hired sites=7
JTO
(MOB )
nodal -
Tauru
Sh. Rajiv
Kumar
Marothi
a
* total sites=19
* sites hired =9 (HPC
done with
agreement-
mumtajpurKota
khandewla,Bhangrol
a/kakrola,sikhopur,n
aharpur kasan,imt
sec8,nawadafathepu
r,near gitm,bilaspur
haryana )
*HPC done but
agreement
pending=1 imt sec-1
)
* file sent for
HPC=1(hayatpur )
* application
required=
5(sec3,sec6,nsg2,jat
auli, nakhdaula)

* so pending sites
for hiring =10+2 =12
(file sent for hpc
+HPC done w/o
agreement +
application required
+IP)
all E/C pending in
hired sites=7
* total sites=13
* Sites Hired=4 (1
xge sites +3 HPC
done with
agreement-te
sna,crp
camp,medawas,rojk
ameo )
*HPC done but
agreement
pending=1
(sikandarpur )
file sent for HPC=0
* application
required= 8 ( 6+2
ip)...hasanpur,palra,s
ilani,sec67,sna dense
area,bsf camp

* so pending sites =
9 (file sent for hpc +
HPC done w/o
agreement+applicati
on required )
E/C pending in hired
sites=3
JTO
(MOB )
nodal -
GRG
Sh. PP
Gupta
JTO
(MOB )
nodal -
Patudi
Sh. Ajay
Kumar
* total sites=5
* sites hired=1
(Bajghera with EC
done-HPC done with
agreement ),
*HPC done but
agreement pending
=2 (daultabad,kherki
mazra)
*File sent for HPC=0
* App reqd=2
(Pawala khusrupur &
Dharampur)
JTO
(MOB )
nodal -
Patudi
Sh. Ajay
Kumar
* total sites=5
* sites hired=1
(Bajghera with EC
done-HPC done with
agreement ),
*HPC done but
agreement pending
=2 (daultabad,kherki
mazra)
*File sent for HPC=0
* App reqd=2
(Pawala khusrupur &
Dharampur)
* total sites=5(4+1IP)
*Sites Hired =3
(HPC done with
agreement-
Khetavas,Mussaidpu
r,sultanpur)
*file sent for HPC=0
* application
required= 2
(baslambi,sgt
medical college)

* so pending sites =
1 (file sent for hpc
+HPC DONE w/o
agreement +
application required
)
* total sites=3
*Sites Hired =2
(HPC done with
agreement)
*HPC done but
agreement
pending=2 (ullawas ,
behrampur )
*file sent for HPC=0
* application
required= 1
(gawalpari)
TE Sohna,Medawas,RojkaMeo,Bajghera,Khetawas,Mussaidpur,IMT sec-8.Nawada Fatehpur ,Naharpur Kasan,Sikohpur,Mumtajpur,Bisru,Sangail,Bhangrola Kakrola,Near GITM, Bilaspur haryana, Kota Khandewla,Ullawas,Behrampur
Summary: Total sites=58 ( Alrdy Twr Erected with agreement done =11 + 47 new sites (4 IP +43 ) )
work detail of new sites -47 :: NewAgreemDone(sites hired )=19, HPC done but agreement pending =5, file sent to HPC =6,application required=13
Sr
No
SDC
A
Total
Sites(IP/SS
A)
Hirin
g of
Site(
NR/IP
/SSA)
Nominals
(NotRrceiv
ed/OK/Not
Ok)RF
finalization
Status of
Site hiring
by SSA
(NR/IP/Y/t
o
HPC/WIP)
Agreeme
nt
AD/D/NR
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks Summary
Mobile
JTO
nodals
1 Grg Dhankot NR NR NR AD done DONE Combo
comissio
ned
DE(NWO-
w)
on air on 6-11-
13
on air on 6-11-13
2 Grg
Kherki
Daula
NR NR NR AD done Installed Combo pending
DET(Sohn
a RD)
BTS on AIR
03/05/2013
on air 03-05-13
3 Grg Binola NR NR NR AD done Installed Combo pending SDE(IMT)
BTS on AIR
01/05/2013
on air 01-05-13
4 Grg Tikli NR NR NR AD Not reqd DONE 2G NA
DET(Sohn
a RD)
BTS O/D
Allotted
READY TO INTIGRATE
(emf sent to circle)
5 Nuh Sudaka NR NR NR AD Not reqd DONE 2G NA
DE(Mewat
)
BTS O/D
Allotted
INTIGRATE (emf sent to
circle)
6 Nuh salamba NR NR NR
agreemen
t to be
revised
Pending
ZTE
Pending
ZTE
2G NA
DE(Mewat
)
work pending at ZTE
7 Nuh Alduka NR NR NR AD WIP WIP 2G NA
DE(Mewat
)
8 Nuh Indri NR NR NR AD done DONE 2G NA
DE(Mewat
)
9 Fpj Jamalgarh NR NR NR AD Not reqd DONE 2G NA
DE(Mewat
)
BTS O/D
Allotted
READY TO INTIGRATE
(emf sent to circle)
10 Fpj Sikrawa NR NR NR AD done Installed 2G pending
DE(Mewat
)
BTS on air on
30-04-13
On air 30-04-13
11 Fpj Gulalta NR NR NR AD done DONE 2G NA
DE(Mewat
)
12 Nuh Sangail SSA OK done AD Not reqd
Pending
ZTE
2G NA
DE(Mewat
)
13 Fpj Bisru SSA OK done DONE Not reqd
Pending
ZTE
2G NA
DE(Mewat
)
14 Grg mumtajpur SSA OK Done Done Not reqd
Pending
ZTE
2G NA SDE(IMT)
site handed over
to circle
15 Grg Sikhopur SSA
OK; also to
search new
application
Done done Not reqd
Pending
ZTE
Combo pending SDE(IMT)
Court case done
by neighbour
next date:
09/12/13 ; also
to search new
application
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM
JTO
(MOB )
nodal -
GRG
Sh. PP
Gupta
*total site=2
sites hired =2 (HPC
done with agreement)
but E/C pending at both
sites
JTO
(MOB )
nodal -
Tauru
Sh.
Rajiv
Kumar
Marothi
a * total sites=18
* sites hired =9 (HPC
done with agreement-
mumtajpurKota
khandewla,Bhangrola/ka
krola,sikhopur,naharpur
kasan,imt
sec8,nawadafathepur,ne
ar gitm,bilaspur haryana
)
*HPC done but
agreement pending=2
imt sec-1 ,imt kakrola)
* file sent for
HPC=2(hayatpur + jatauli
)
* application required=
3(sec3,nsg2,, nakhdaula)

* so pending sites for
hiring =10+2 =12 (file
sent for hpc +HPC done
w/o agreement +
application required +IP)
all E/C pending in hired
sites=7
Sr
No
SDC
A
Total
Sites(IP/SS
A)
Hirin
g of
Site(
NR/IP
/SSA)
Nominals
(NotRrceiv
ed/OK/Not
Ok)RF
finalization
Status of
Site hiring
by SSA
(NR/IP/Y/t
o
HPC/WIP)
Agreeme
nt
AD/D/NR
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
16 Grg
Nahar pur
KASAN
SSA OK Done Done Not reqd
Pending
ZTE
Combo pending SDE(IMT)
Court case done,
Comitee is mode
to resolve
17 Grg
Imt Sec-8
manesar
SSA OK Done DONE Not reqd
Pending
ZTE
Combo pending SDE(IMT)
apeal done in
higher court
date:13-1-14
18 Grg
Nawada
fatehpur
SSA OK Done DONE Not reqd
Pending
ZTE
Combo pending SDE(IMT)
site handed over
to circle
19 Grg
kota
khandewla
SSA ok Done DONE Not reqd
Pending
ZTE
Combo pending SDE(IMT)
20 Grg Nakhdola SSA ok
revised
aplication
needed
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
revised
aplication
needed
21 Grg

KakrolaI(M
T-Sec-7)
SSA OK
done,Sanctio
n letter
pending at
Plg
in progres
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
agreement in
progres
22 Grg
nsg gate no-
2
(near)/Nav
rangpur
SSA OK
final letter
pending
from NSG
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
NSG ready to
give Site
now...SDE(IM
T)
23 Grg
Bhangrola/
Kakrola
SSA OK Done DONE Not reqd
Pending
ZTE
Combo pending SDE(IMT)
24 Grg IMT sect-1 SSA OK done
in
progress
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
HPC done
butagreement
pending
25 Grg Near GITM SSA ok Done DONE Not reqd
Pending
ZTE
Combo pending SDE(IMT)
site handed
over to circle
26 Grg Hayatpur SSA ok HPC Pending Not reqd
Pending
ZTE
Combo pending SDE(IMT) HPC Pending
27 Grg
Jatuli/Hali
Mandi 2
SSA ok HPC Pending Not reqd
Pending
ZTE
Combo pending SDE(IMT) HPC Pending
28 Grg
Bandwadi
(old site--
>Kakrola
(IMT-sec-
6))
SSA
bandwadi
application
required
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
bandwadi site
searching
29 Grg
Amity(Near
Pachgaon)-
badanki
SSA
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
site hand over
ip (indus) by
circle office
30 Grg Kasan
IP/SS
A
aplication
reqd
Pending
ZTE
Combo pending SDE(IMT)
31 Grg
Imt Sec-3
manesar
IP IP
IP (ssa
searching )
Pending
ZTE
Combo pending SDE(IMT)
JTO
(MOB )
nodal -
Tauru
Sh.
Rajiv
Kumar
Marothi
a * total sites=18
* sites hired =9 (HPC
done with agreement-
mumtajpurKota
khandewla,Bhangrola/ka
krola,sikhopur,naharpur
kasan,imt
sec8,nawadafathepur,ne
ar gitm,bilaspur haryana
)
*HPC done but
agreement pending=2
imt sec-1 ,imt kakrola)
* file sent for
HPC=2(hayatpur + jatauli
)
* application required=
3(sec3,nsg2,, nakhdaula)

* so pending sites for
hiring =10+2 =12 (file
sent for hpc +HPC done
w/o agreement +
application required +IP)
all E/C pending in hired
sites=7
Sr
No
SDC
A
Total
Sites(IP/SS
A)
Hirin
g of
Site(
NR/IP
/SSA)
Nominals
(NotRrceiv
ed/OK/Not
Ok)RF
finalization
Status of
Site hiring
by SSA
(NR/IP/Y/t
o
HPC/WIP)
Agreeme
nt
AD/D/NR
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
32 Grg
Bilaspur,
Haryana
(bilaspur
khurd )
SSA ok Done DONE
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
site handed
over to circle
33 Grg Hasanpur SSA ok
file sent to
HPC
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
lat long sent
to circle (field
team visit
34 Grg Palra SSA ok
file sent to
HPC
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
Revised
application
required-team
visit required
35 Grg Silani SSA
revise
application
required
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sohn
a RD)
site visited by
sde(mp) and
de(sohnard)
but site found
36 Grg TE Sohna SSA OK done DONE done DONE Combo
material
received
DET(Sohn
a RD)
rest
installation
WIP (emf sent
to circle office
37 Grg CRPF Camp SSA OK done
permission
letter in
progres
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
permission
letter in
progres at
delhi
38 Grg Medawas SSA OK Done DONE
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sohn
a RD)
site handed
over to circle
39 GRG RojkaMeo SSA OK done AD Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
site handed
over to circle
40 Grg
Sikandarpu
r(Bada)
SSA OK Done in progres Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
agreement in
progres
41 Grg Lakhuwas ssa OK
file sent to
HPC
Pending
ZTE
Combo pending
DET(Sohn
a RD)
HPC Pending
42 Grg Sector-67 SSA ok
file sent to
HPC
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sohn
a RD)
HPC Pending
43 Grg Wazirpur SSA
site hand
over ip
(indus) by
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sohn
a RD)
site hand over
ip (indus) by
circle office
44 Grg
Sohna
DENSE
AREA
SSA
Bid not
recd
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
45 Grg
BSF camp
bhondsi
SSA
Revise
application
Pending
Not reqd
Pending
ZTE
Combo pending
DET(Sohn
a RD)
46 Grg
PawalaKhu
surPur/Sec
109
SSA OK
Revise
application
Pending
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
Revise Lat-
long sent to
circle
JTO
(MOB )
nodal -
Tauru
Sh.
Rajiv
Kumar
Marothi
a * total sites=18
* sites hired =9 (HPC
done with agreement-
mumtajpurKota
khandewla,Bhangrola/ka
krola,sikhopur,naharpur
kasan,imt
sec8,nawadafathepur,ne
ar gitm,bilaspur haryana
)
*HPC done but
agreement pending=2
imt sec-1 ,imt kakrola)
* file sent for
HPC=2(hayatpur + jatauli
)
* application required=
3(sec3,nsg2,, nakhdaula)

* so pending sites for
hiring =10+2 =12 (file
sent for hpc +HPC done
w/o agreement +
application required +IP)
all E/C pending in hired
sites=7
* total sites=13
* Sites Hired=4 (1 xge
sites +3 HPC done with
agreement-te sna,crp
camp,medawas,rojkame
o )
*HPC done but
agreement pending=1
(sikandarpur )
file sent for HPC=0
* application required=
8 ( 6+2
ip)...hasanpur,palra,silani
,sec67,sna dense
area,bsf camp

* so pending sites = 9
(file sent for hpc + HPC
done w/o
agreement+application
required )
E/C pending in hired
sites=3
hasanpur-palra-silani-
lakuwas-sec67-wazirpur -
sna dense de sna rd visit
required
JTO
(MOB )
nodal -
GRG
Sh. PP
Gupta
JTO
(MOB )
nodal -
Patudi
Sh. Ajay
Kumar
Sr
No
SDC
A
Total
Sites(IP/SS
A)
Hirin
g of
Site(
NR/IP
/SSA)
Nominals
(NotReceiv
ed/OK/Not
Ok)RF
finalization
Status of
Site hiring
by SSA
(NR/IP/Y/t
o
HPC/WIP)
Agreeme
nt
AD/D/NR
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
47 Grg Daultabad SSA ok HPC Done Not reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
agreement
pending
48 Grg dharampur SSA
searching
new site
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
searching new
site
49 Grg
Kherki
Majra
(Dhanwapu
r)
SSA OK HPC Done Not reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
agreement
pending
50 Grg Bajghera SSA OK done AD
Pending
ZTE
Pending
ZTE
Combo pending
DE(NWO-
N)
site handed over
to circle
51 Grg Khetawas SSA OK Done DONE Not reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
site handed
over to circle
52 Grg
SGT
Medical
college
near
SSA OK HPC Done
Pending
ZTE
Pending
ZTE
Combo pending
DE(NWO-
W)
agreement
pending
53 Grg
Mussaidpu
r
SSA OK HPC Done DONE Not reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
site handover
to circle
54 Grg sultanpur SSA OK
file sent to
HPC
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
file sent to
HPC
55 Grg Baslambi SSA OK HPC Done Not reqd
Pending
ZTE
Combo pending
DE(NOW-
W)
agreement
pending
56 Grg
Gawal
pahari/Bali
awas
SSA OK
Revise
application
Pending
Not reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
57 Grg Ullawas SSA ok HPC Done DONE Not reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
site handover
to circle
58 Grg Behrampur SSA ok HPC Done DONE Not reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
site handover
to circle
work detail of new sites -47 :: NewAgreemDone(sites hired )=19
HPC done but agreement pending =5,
file sent to HPC =6,
JTO
(MOB )
nodal -
Patudi
Sh. Ajay
Kumar
* total sites=5(4+1IP)
*Sites Hired =3
(HPC done with
agreement-
Khetavas,Mussaidpur,sul
tanpur)
*file sent for HPC=0
* application required= 2
(baslambi,sgt medical
college)

* so pending sites = 1
(file sent for hpc +HPC
DONE w/o agreement +
application required )
Tower Erection =9 (sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas)
* total sites=3
*Sites Hired =2
(HPC done with
agreement)
*HPC done but
agreement pending=2
(ullawas , behrampur )
*file sent for HPC=0
* application required=
1 (gawalpari)
TE Sohna,Medawas,RojkaMeo,Bajghera,Khetawas,Mussaidpur,IMT sec-8.Nawada Fatehpur ,Naharpur
application required=13 Imt Sec-3,NSG Gate-2,AMITY,Kasan,IMT sec-
3,Silani,Wazirpur,Sohna Dense,BSF Camp,Pawala
total Tower Foundation done ssa civil = 10 (sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas, Naharpur,CRPF camp ZTE)
DATED 13-12-2013
Summary: Total sites=58 ( Alrdy Twr Erected with agreement done =11 + 47 new sites (4 IP +43 ) ) IP-amity,SGT medical college,kasan,wazirpur,lakuwas,imt sec3
work detail of new sites -47 :: NewAgreemDone(sites hired )=22, HPC done but agreement pending =7, file sent to HPC =8,application required=10
Sr
No
SDC
A
Total
Sites(IP/SS
A)
Hirin
g of
Site(
NR/IP
/SSA)
Nominals
(NotRrceiv
ed/OK/Not
Ok)RF
finalization
Status of Site
hiring by SSA
(NR/IP/Y/to
HPC/WIP)
Agreement
AD/D/NR
EC status
(Y)
Tower
Foundatio
n(NR/Zte/
Civil)
Tower
Erectio
n(NR/S
SA/Zte)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
1 Grg Dhankot NR NR NR AD y NR NR
ALREAD
Y
SHELTER
DONE Done Done Done OFC Done done DONE Combo
comissio
ned
DE(NWO-
w)
on air on 6-
11-13
2 Grg
Kherki
Daula
NR NR NR AD y NR NR
ROOM
DONE
DONE Installed Installed Installed OFC Done done Installed Combo pending
DET(Sohn
a RD)
BTS on AIR
03/05/2013
3 Grg Binola NR NR NR AD y NR NR
Room
Already
DONE Done Done done OFC Done done Installed Combo pending SDE(IMT)
BTS on AIR
01/05/2013
4 Grg Tikli NR NR NR AD y NR NR Outdoor
Not
reqd
Done Done done Done Not reqd DONE 2G NA
DET(Sohn
a RD)
BTS O/D
Allotted
5 Nuh Sudaka NR NR NR AD y NR NR Outdoor
Not
reqd
Done Done DONE Done Not reqd DONE 2G NA
DE(Mewat
)
BTS O/D
Allotted
6 Nuh salamba NR NR NR
agreement
to be
revised
y NR NR
Shelter
W\P
Pendin
g ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(ZT
E)
Pending
ZTE
Pending
ZTE
2G NA
DE(Mewat
)
7 Nuh Alduka NR NR NR AD y NR NR
Shelter
W\P
WIP WIP WIP WIP
M/W
pending(ZT
E)
WIP WIP 2G NA
DE(Mewat
)
8 Nuh Indri NR NR NR AD
will take 7-8
days more
NR NR Done DONE Done Done Done
M/W
pending(ZT
E)
done DONE 2G NA
DE(Mewat
)
9 Fpj Jamalgarh NR NR NR AD y NR NR Outdoor
Not
reqd
Done Done done Done Not reqd DONE 2G NA
DE(Mewat
)
BTS O/D
Allotted
10 Fpj Sikrawa NR NR NR AD yes NR NR
Room
Already
Done Done Done Done OFC Done done Installed 2G pending
DE(Mewat
)
BTS on air
on 30-04-13
11 Fpj Gulalta NR NR NR AD yes NR NR Done DONE DONE Done Done
M/W
pending(ZT
E)
done DONE 2G NA
DE(Mewat
)
12 Nuh Sangail SSA OK done AD
check
deposited at
DHBVNL , work
pending at their
end
DONE done Outdoor
Not
reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(ZT
E)
Not reqd
Pending
ZTE
2G NA
DE(Mewat
)
13 Fpj Bisru SSA OK done DONE
File pending at
AO for Cheque
DONE DONE Outdoor
Not
reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
2G NA
DE(Mewat
)
14 Grg mumtajpur SSA OK Done Done
Tender will be
given for work
Done DONE outdoor
Not
reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC/wip Not reqd
Pending
ZTE
2G NA SDE(IMT)
site handed
over to circle
15 Grg Sikhopur SSA
OK; also to
search new
application
Done done
Demand note
received , file at
AO
civil civil Outdoor
Not
reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending SDE(IMT)
Court case
done by
neighbour next
date: 09/12/13
; also to search
new application
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT
Sr
No
SDC
A
Total
Sites(IP/SS
A)
Hirin
g of
Site(
NR/IP
/SSA)
Nominals
(NotRrceiv
ed/OK/Not
Ok)RF
finalization
Status of Site
hiring by SSA
(NR/IP/Y/to
HPC/WIP)
Agreement
AD/D/NR
EC status
(Y)
Tower
Foundatio
n(NR/Zte/
Civil)
Tower
Erectio
n(NR/S
SA/Zte)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
16 Grg
Nahar pur
KASAN
SSA OK Done Done
Intial security
deposited.
DONE WIP Outdoor
Not
reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
Court case
done, Comitee
is mode to
resolve
17 Grg
Imt Sec-8
manesar
SSA OK Done DONE
file submitted
to DHBVNL
&wip
ZTE ZTE Outdoor
Not
reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
apeal done in
higher court
date:13-1-14
18 Grg
Nawada
fatehpur
SSA OK Done DONE
Tender will be
given for work
done Civil DONE Outdoor
Not
reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
site handed
over to circle
19 Grg
kota
khandewla
SSA ok Done DONE
initial payment
done to hseb
Civil trg
15/12/13
Civil outdoor
Not
reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending SDE(IMT)
20 Grg Nakhdola SSA ok
revised
aplication
needed
ZTE ZTE
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
revised
aplication
needed
21 Grg

KakrolaI(M
T-Sec-7)
SSA OK
done,Sanction
letter pending
at Plg
done ZTE ZTE
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
agreement
in progres
22 Grg
nsg gate no-
2
(near)/Nav
rangpur
SSA OK
final letter
pending from
NSG
ZTE ZTE outdoor
Pendin
g ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
NSG ready
to give Site
now...SDE(I
MT)
23 Grg
Bhangrola/
Kakrola
SSA OK Done DONE
file submitted
to DHBVNL
&WIP (trg date
12/12/13 )
ZTE ZTE Outdoor
Not
reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
24 Grg IMT sect-1 SSA OK done in progress yes ZTE
pole by
ZTE
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
FE(bsnl)/Mi
ni link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
HPC done
butagreeme
nt pending
25 Grg Near GITM SSA ok Done DONE
pending at
DHBVNL for
demand note
Civil-trg
10/12/13
Civil outdoor
Not
reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT)
site handed
over to
circle
26 Grg Hayatpur SSA ok HPC Pending ZTE ZTE Outdoor
Not
reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT) HPC Pending
27 Grg
Jatuli/Hali
Mandi 2
SSA ok HPC Pending Civil Civil Outdoor
Not
reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending SDE(IMT) HPC Pending
28 Grg
Amity(Near
Pachgaon)-
badanki
SSA ZTE ZTE
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
site hand
over ip
(indus) by
circle office
29 Grg Kasan
IP/SS
A
aplication
reqd
shiv mandir
Pending
ZTE
Combo pending SDE(IMT)
30 Grg
Imt Sec-3
manesar
IP IP
IP (ssa
searching )
IP IP IP IP
Pending
ZTE
Combo pending SDE(IMT)
Sr
No
SDC
A
Total
Sites(IP/SS
A)
Hirin
g of
Site(
NR/IP
/SSA)
Nominals
(NotRrceiv
ed/OK/Not
Ok)RF
finalization
Status of Site
hiring by SSA
(NR/IP/Y/to
HPC/WIP)
Agreement
AD/D/NR
EC status
(Y)
Tower
Foundatio
n(NR/Zte/
Civil)
Tower
Erectio
n(NR/S
SA/Zte)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
31 Grg
Bilaspur,
Haryana
(bilaspur
khurd )
SSA ok Done DONE
demand note
pending at
DHBVNL
Civil
M/s
SKC
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
site handed
over to
circle
32 Grg Hasanpur SSA ok file sent to HPC HPC wip ZTE ZTE Outdoor
Not
reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DET(South
)
lat long sent
to circle
(field team
33 Grg Palra SSA ok file sent to HPC HPC wip ZTE ZTE Outdoor
Not
reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending
DET(South
)
File pending at
Mobile Team
34 Grg Silani SSA
revise
application
required
Civil Civil
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending
DET(South
)
site visited
by sde(mp)
and
de(sohnard)
35 Grg TE Sohna SSA OK done DONE y (TE xge ) done Civil
done
M/s
SKC
Room
Already
Done Already Already Already FE provided done DONE Combo DONE
DET(South
)
BTS on air
on 12-12-13
36 Grg CRPF Camp SSA OK done
permission
letter in progres
Yes (CRPF will
provide EC)EC
wiring
pending
DONE ZTE Outdoor
Not
reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending(DE
Tx Urban)
Not reqd
Pending
ZTE
Combo pending
DET(South
)
permission
letter in
progres at
delhi
37 Grg Medawas SSA OK Done DONE
electric
connection
applied
DONE DONE
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending
DET(South
)
site handed
over to
circle
38 GRG RojkaMeo SSA OK done AD
file at AO bsnl
for check
done Civil
done
M/s
SKC
Outdoor
Not
reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(ZT
E)
Not reqd
Pending
ZTE
Combo pending
DET(South
)
site handed
over to
circle
39 Grg
Sikandarpu
r(Bada)
SSA OK Done in progres ZTE ZTE Outdoor
Not
reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DET(South
)
agreement
in progres
40 Grg Lakhuwas ssa OK file sent to HPC HPC wip
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Combo pending
DET(South
)
File pending at
Mobile Team
41 Grg Sector-67 SSA ok file sent to HPC HPC wip ZTE ZTE
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending
DET(South
)
File pending at
Mobile Team
42 Grg Wazirpur SSA
site hand
over ip
(indus) by
lat/long
required
ZTE ZTE
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending
DET(South
)
site hand
over ip
(indus) by
43 Grg
Sohna
DENSE
AREA
SSA Bid not recd
lat/long
required
ZTE ZTE Outdoor
Not
reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DET(South
)
44 Grg
BSF camp
bhondsi
SSA
Revise
application
Pending
lat/long
required
ZTE ZTE Outdoor
Not
reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DET(South
)
45 Grg
PawalaKhu
surPur/Sec
109
SSA OK
Revise
application
Pending
visit of det
required
ZTE ZTE Outdoor
Not
reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
Revise Lat-
long sent to
circle
SDC
A
Total
Sites(IP/SS
A)
Hirin
g of
Site(
NR/IP
/SSA)
Nominals
(NotReceiv
ed/OK/Not
Ok)RF
finalization
Status of Site
hiring by SSA
(NR/IP/Y/to
HPC/WIP)
Agreement
AD/D/NR
EC status
(Y)
Tower
Foundatio
n(NR/Zte/
Civil)
Tower
Erectio
n(NR/S
SA/Zte)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
46 Grg Daultabad SSA ok HPC Done
agreement
pending
Civil Civil
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
agreement
pending
47 Grg dharampur SSA
searching
new site
ZTE ZTE Outdoor
Not
reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
searching
new site
48 Grg
Kherki
Majra
(Dhanwapu
SSA OK HPC Done ZTE ZTE Outdoor
Not
reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
agreement
pending
49 Grg Bajghera SSA OK done AD Yes done Civil
done
M/s
SKC
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini link
(ZTE)..far
end p/v
Pending
ZTE
Pending
ZTE
Combo pending
DE(NWO-
N)
site handed
over to circle
50 Grg Khetawas SSA OK Done DONE
Demand Note
pending at
DHBVNL,Teleph
onically
informed to
XEN DHBVN for
priority
Done Done Outdoor
Not
reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)..fa
r end fkn
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
site handed
over to
circle
51 Grg
SGT
Medical
college
SSA OK HPC Done Civil Civil
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)..fa
r end
Pending
ZTE
Pending
ZTE
Combo pending
DE(NWO-
W)
agreement
pending
52 Grg
Mussaidpu
r
SSA OK HPC Done DONE
Estimate
pending at
DHBVNL,Teleph
onically
informed to
XEN DHBVN for
priority
done
shifted
from silani
Civil Outdoor
Not
reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)f
ar end fkn
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
site
handover to
circle
53 Grg sultanpur SSA OK
file sent to
HPC
Civil Civil Outdoor
Not
reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
file sent to
HPC
54 Grg Baslambi SSA OK HPC Done Civil Civil Outdoor
Not
reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending
DE(NOW-
W)
agreement
pending
55 Grg
Gawal
pahari/Bali
awas
SSA OK
Revise
application
Pending
xen civil visit
required
Civil Civil Outdoor
Not
reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
56 Grg Ullawas SSA ok HPC Done DONE DD pending
Civil trg
25/12/13
shifted
from
sultanpur
ZTE Outdoor
Not
reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
minilinkfa
r end
kendriya
vihar
/kadarpur
& ofc(bsnl)
Not reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
site
handover to
circle
57 Grg Behrampur SSA ok HPC Done DONE DD pending
Civil trg
25/12/13
shifted
from
gawalpari
ZTE Outdoor
Not
reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)f
ar end fkn
Not reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
site
handover to
circle
58 Grg
Bandwadi
(old site--
>Kakrola
(IMT-sec-
6))
SSA
bandwadi
application
required
ZTE ZTE Outdoor
Not
reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
bandwadi
site
searching
work detail of new sites -47 :: NewAgreemDone(sites hired )=22
HPC done but agreement pending =7,
file sent to HPC =8,
Tower Erection =9 (sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas)
TE Sohna,Medawas,RojkaMeo,Bajghera,Khetawas,Mussaidpur,IMT sec-8.Nawada Fatehpur ,Naharpur Kasan,Sikohpur,Mumtajpur,Bisru,Sangail,Bhangrola, Kakrola(sec7),Near GITM, Bilaspur haryana, Kota Khandewla,Ullawas,Behrampur
imt sec-1 ,Sikanderpur,Daulatabad,CRPF camp, baslambi,chandu,kherki majra
application required=10
Imt Sec-3,NSG Gate-2,AMITY,Kasan,Silani,Wazirpur,Sohna Dense,BSF Camp,Pawala Khusurpur,Bandwadi,Nakhdaula
hayatpur,sec-67,lakhuwas,palra,hasanpur,Gwalpahari,Dharampur,Jatauli
total Tower Foundation done ssa civil = 10 (sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas, Naharpur,CRPF camp ZTE)
Summary
Mobile
JTO
nodals
on air on 6-11-13
on air 03-05-13
on air 01-05-13
READY TO INTIGRATE
(emf sent to circle)
INTIGRATE (emf sent
to circle)
work pending at ZTE
zte work done
READY TO INTIGRATE
(emf sent to circle)
On air 30-04-13
zte work done
JTO
(MOB )
nodal -
GRG
Sh. PP
Gupta
*total site=2
sites hired =2 (HPC
done with agreement)
but E/C pending at
both sites
JTO
(MOB )
nodal -
Tauru
Sh.
Rajiv
Kumar
Marothi
a
* total sites=18
* sites hired =10 (HPC
done with agreement-
mumtajpurKota
khandewla,Bhangrola,k
akrola(sec7),sikhopur,n
aharpur kasan,imt
sec8,nawadafathepur,n
ear gitm,bilaspur
haryana, )
*HPC done but
agreement pending=1
imt sec-1 ,)
* file sent for
HPC=2(hayatpur +
jatauli )
* application
required= 5(sec3,nsg2,,
nakhdaula,imt
sec3,amity )

JTO
(MOB )
nodal -
Tauru
Sh.
Rajiv
Kumar
Marothi
a
* total sites=18
* sites hired =10 (HPC
done with agreement-
mumtajpurKota
khandewla,Bhangrola,k
akrola(sec7),sikhopur,n
aharpur kasan,imt
sec8,nawadafathepur,n
ear gitm,bilaspur
haryana, )
*HPC done but
agreement pending=1
imt sec-1 ,)
* file sent for
HPC=2(hayatpur +
jatauli )
* application
required= 5(sec3,nsg2,,
nakhdaula,imt
sec3,amity )

JTO
(MOB )
nodal -
Tauru
Sh.
Rajiv
Kumar
Marothi
a
* total sites=18
* sites hired =10 (HPC
done with agreement-
mumtajpurKota
khandewla,Bhangrola,k
akrola(sec7),sikhopur,n
aharpur kasan,imt
sec8,nawadafathepur,n
ear gitm,bilaspur
haryana, )
*HPC done but
agreement pending=1
imt sec-1 ,)
* file sent for
HPC=2(hayatpur +
jatauli )
* application
required= 5(sec3,nsg2,,
nakhdaula,imt
sec3,amity )

* total sites=13
* Sites Hired=4 (1 xge
sites +3 HPC done with
agreement-te sna,crp
camp,medawas,rojkam
eo )
*HPC done but
agreement pending=1
(sikandarpur )
file sent for
HPC=4(hasanpur,sec67
,lakhuwas,palra)
* application
required= 4...silani,sna
dense area,bsf
camp,wazirpur)

* so pending sites = 9
(file sent for hpc + HPC
done w/o
agreement+application
required )
E/C pending in hired
sites=3
JTO
(MOB )
nodal -
GRG
Sh. PP
Gupta
JTO
(MOB )
nodal -
Patudi
Sh. Ajay
Kumar
* total sites=5
* sites hired=1
(Bajghera with EC done-
HPC done with
agreement ),
*HPC done but
agreement pending =2
(daultabad,kherki
mazra)
*File sent for
HPC=1(dharmpur)
* App reqd=1 (Pawala
khusrupur )
JTO
(MOB )
nodal -
Patudi
Sh. Ajay
Kumar
* total sites=5
* sites hired=1
(Bajghera with EC done-
HPC done with
agreement ),
*HPC done but
agreement pending =2
(daultabad,kherki
mazra)
*File sent for
HPC=1(dharmpur)
* App reqd=1 (Pawala
khusrupur )
* total sites=5(4+1IP)
*Sites Hired =3
(HPC done with
agreement-
Khetavas,Mussaidpur,s
ultanpur-court case)
* hpc done but
agreement pending=2
(baslambi,chandu )
*file sent for HPC=0
* application required=

* so pending sites =
0(file sent for hpc +HPC
DONE w/o agreement +
application required )
* total sites=4
*Sites Hired =2
(HPC done with
agreement)
(ullawas , behrampur )
*file sent for HPC=1
gawalpari
* application
required= 1
(bandwadi)
TE Sohna,Medawas,RojkaMeo,Bajghera,Khetawas,Mussaidpur,IMT sec-8.Nawada Fatehpur ,Naharpur Kasan,Sikohpur,Mumtajpur,Bisru,Sangail,Bhangrola, Kakrola(sec7),Near GITM, Bilaspur haryana, Kota Khandewla,Ullawas,Behrampur
DATED 19-12-2013
Summary: Total sites=58 ( Alrdy Twr Erected with agreement done =11 + 47 new sites (4 IP +43 ) ) IP-amity,SGT medical college,kasan,wazirpur,lakuwas,imt sec3
work detail of new sites -47 :: NewAgreemDone(sites hired )=22, HPC done but agreement pending =7, file sent to HPC =8,application required=10
Sr
No
SDC
A
Total
Sites(IP/SS
A)
Hiring
of
Site(NR
/IP/SSA
)
Nominals
(NotRrceived
/OK/Not
Ok)RF
finalization
Status of Site
hiring by SSA
(NR/IP/Y/to
HPC/WIP)
Agreemen
t
AD/D/NR
EC status (Y)
Tower
Foundati
on(NR/Z
te/Civil)
Tower
Erection
(NR/SS
A/Zte)
Shelter FDFA DG
BATTE
RY
POWE
R
PLANT
MEDIA
ANTIST
ATIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks Summary
1 Grg Dhankot NR NR NR AD y NR NR
ALREADY
SHELTER
DONE Done Done Done OFC Done done DONE Combo
comissio
ned
DE(NWO-
w)
on air on 6-11-13 on air on 6-11-13
2 Grg Kherki Daula NR NR NR AD y NR NR
ROOM
DONE
DONE Installed Installed Installed
OFC Done/for
3g FE pending
done Installed Combo pending
DET(Sohn
a RD)
BTS on AIR
03/05/2013
on air 03-05-13
3 Grg Binola NR NR NR AD y NR NR
Room
Already
DONE Done Done done OFC Done done Installed Combo pending SDE(IMT)
BTS on AIR
01/05/2013
on air 01-05-13
4 Grg Tikli NR NR NR AD y NR NR Outdoor Not reqd Done Done done
m/w link..far
end Kadarpur
pending
Not reqd DONE 2G NA
DET(Sohn
a RD)
intigration pending
READY TO INTIGRATE (emf sent
to circle)
5 Nuh Sudaka NR NR NR AD y NR NR Outdoor Not reqd Done Done DONE Done Not reqd DONE 2G NA
DE(Mewa
t)
intigrated INTIGRATE (emf sent to circle)
6 Nuh salamba NR NR NR
agreement
to be revised
y NR NR Done
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/Wfar end
nuh & pcm
testing
pending
Pending
ZTE
Pending
ZTE
2G NA
DE(Mewa
t)
work pending at ZTE
7 Nuh Alduka NR NR NR AD y NR NR zte done zte done zte done zte done zte done
M/W far end
ghasera &
pcm pending
zte done zte done 2G NA
DE(Mewa
t)
8 Nuh Indri NR NR NR AD
will take 7-8
days more
NR NR Done DONE Done Done Done
M/W
pending(ZTE)
done DONE 2G NA
DE(Mewa
t)
zte work done
9 Fpj Jamalgarh NR NR NR AD y NR NR Outdoor
Not
reqd
Done Done done DONE
Not
reqd
DONE 2G NA
DE(Mewa
t)
intigrated
READY TO INTIGRATE (emf sent to
circle)
10 Fpj Sikrawa NR NR NR AD yes NR NR
Room
Already
Done Done Done Done OFC Done done
Installe
d
2G pending
DE(Mewa
t)
BTS on air on 30-
04-13
On air 30-04-13
11 Fpj Gulalta NR NR NR AD yes NR NR Done DONE DONE Done Done
M/Wfar end
sikrawa &
testing
pending
done DONE 2G NA
DE(Mewa
t)
zte work done
12 Nuh Sangail SSA OK done AD
check deposited
at DHBVNL , work
pending at their
end
DONE done Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
M/W
pending(ZTE)f
ar end Ujjina
Not
reqd
Pending
ZTE
2G NA
DE(Mewa
t)
13 Fpj Bisru SSA OK done DONE
Final payment
done,work
pending at
DHBVNL
DONE DONE Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini
LinkPandding(
zte) far end
Gulalta
Not
reqd
Pending
ZTE
2G NA
DE(Mewa
t)
14 Grg
mumtajpu
r
SSA OK Done Done
Tender will be
given for work
Done DONE outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC/wip
Not
reqd
Pending
ZTE
2G NA SDE(IMT)
site handed over to
circle
15 Grg Sikhopur SSA
OK; also to
search new
application
Done done
Demand note
received , file at
AO
civil circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC
Not
reqd
Pending
ZTE
Combo pending SDE(IMT)
Court case done next
date: 14/01/14 ; to
search new application
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT
*total site=2
sites hired =2 (HPC done
with agreement)
but E/C pending at both
sites
* total sites=18
* sites hired =10 (HPC
done with agreement-
mumtajpurKota
khandewla,Bhangrola,kak
rola(sec7),sikhopur,nahar
pur kasan,imt
sec8,nawadafathepur,nea
r gitm,bilaspur haryana, )
*HPC done but
agreement pending=1
imt sec-1 ,)
* file sent for
HPC=2(hayatpur + jatauli )
* application required=
5(sec3,nsg2,,
nakhdaula,imt sec3,amity
)

Sr
No
SDC
A
Total
Sites(IP/SS
A)
Hiring
of
Site(NR
/IP/SSA
)
Nominals
(NotRrceived
/OK/Not
Ok)RF
finalization
Status of Site
hiring by SSA
(NR/IP/Y/to
HPC/WIP)
Agreemen
t
AD/D/NR
EC status (Y)
Tower
Foundati
on(NR/Z
te/Civil)
Tower
Erection
(NR/SS
A/Zte)
Shelter FDFA DG
BATTE
RY
POWE
R
PLANT
MEDIA
ANTIST
ATIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
16 Grg
Nahar pur
KASAN
SSA OK Done Done
Intial security
deposited.
DONE WIP Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending SDE(IMT)
Court case done,
Comitee is mode to
resolve
17 Grg
Imt Sec-8
manesar
SSA OK Done DONE
file submitted to
DHBVNL &wip
Civil ZTE Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending SDE(IMT)
apeal done in higher
court date:13-1-14
18 Grg
Nawada
fatehpur
SSA OK Done DONE
Tender will be
given for work
done
Civil
DONE Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending SDE(IMT)
site handed over to
circle
19 Grg
kota
khandewla
SSA ok Done DONE
initial payment
done to DHBVNL
Civil trg
wip
15/12/13
circle outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC
Not
reqd
Pending
ZTE
Combo pending SDE(IMT)
20 Grg Nakhdola SSA ok HPC Pending Civil ZTE
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
far end IMT
MANESER
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
revised aplication
needed
21 Grg

KakrolaI(M
T-Sec-7)
SSA OK done done
file submitted to
DHBVNL &wip
Civil ZTE
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT) Agreement done
22 Grg
nsg gate
no-2
(near)/Nav
rangpur
SSA OK
final letter
pending from
NSG
Civil ZTE outdoor
Pendin
g ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
NSG ready to give
Site
now...SDE(IMT)
23 Grg
Bhangrola/
Kakrola
SSA OK Done DONE
file submitted to
DHBVNL &WIP (trg
date 12/12/13 )
Civil ZTE Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
far end IMT
MANESER
Not
reqd
Pending
ZTE
Combo pending SDE(IMT)
24 Grg IMT sect-1 SSA OK done
in
progress
yes Civil
pole by
ZTE
OFC
Pending
ZTE
Combo pending SDE(IMT)
HPC done
butagreement
pending
25 Grg Near GITM SSA ok Done DONE
pending at
DHBVNL for
demand note
Civil-trg
10/12/13
work
started
circle outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC
Not
reqd
Pending
ZTE
Combo pending SDE(IMT)
site handed over
to circle
26 Grg Hayatpur SSA ok HPC Pending Civil ZTE Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending SDE(IMT) HPC Pending
27 Grg
Jatuli/Hali
Mandi 2
SSA ok HPC Pending Civil circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending SDE(IMT) HPC Pending
28 Grg
Amity(Nea
r
Pachgaon)-
IP IP ZTE ZTE
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
site hand over ip
(indus) by circle
office
29 Grg Kasan IP/SSA
aplication
reqd
shiv mandir
Mini link(ZTE)
far end IMT
MANESER
Pending
ZTE
Combo pending SDE(IMT)
30 Grg
Imt Sec-3
manesar
IP IP
IP (ssa
searching )
IP IP IP IP
Pending
ZTE
Combo pending SDE(IMT)
* total sites=18
* sites hired =10 (HPC
done with agreement-
mumtajpurKota
khandewla,Bhangrola,kak
rola(sec7),sikhopur,nahar
pur kasan,imt
sec8,nawadafathepur,nea
r gitm,bilaspur haryana, )
*HPC done but
agreement pending=1
imt sec-1 ,)
* file sent for
HPC=2(hayatpur + jatauli )
* application required=
5(sec3,nsg2,,
nakhdaula,imt sec3,amity
)

Sr
No
SDC
A
Total
Sites(IP/SS
A)
Hiring
of
Site(NR
/IP/SSA
)
Nominals
(NotRrceived
/OK/Not
Ok)RF
finalization
Status of Site
hiring by SSA
(NR/IP/Y/to
HPC/WIP)
Agreemen
t
AD/D/NR
EC status (Y)
Tower
Foundati
on(NR/Z
te/Civil)
Tower
Erection
(NR/SS
A/Zte)
Shelter FDFA DG
BATTE
RY
POWE
R
PLANT
MEDIA
ANTIST
ATIC

Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
31 Grg
Bilaspur,
Haryana
(bilaspur
SSA ok Done DONE
demand note
pending at
DHBVNL
Civil
M/s
SKC
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
site handed over
to circle
32 Grg Hasanpur SSA ok
file sent to
HPC
HPC wip Civil circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
PALRA
Not
reqd
Pending
ZTE
Combo pending
DET(Sout
h )
lat long sent to
circle (field team
visit requied)
33 Grg Palra SSA ok
file sent to
HPC
HPC wip Civil Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC
Not
reqd
Pending
ZTE
Combo pending
DET(Sout
h )
Revised application
required-team visit
required
34 Grg Silani SSA
revise
application
required
Civil circle
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sout
h )
site visited by
sde(mp) and
de(sohnard) but
35 Grg TE Sohna SSA OK done DONE y (TE xge )
done
Civil
done
M/s SKC
Room
Already
Done Already
Alread
y
Alread
y
FE provided done DONE Combo
material
received
DET(Sout
h )
on air on
13/12/13
36 Grg
CRPF
Camp
SSA OK done
permission
letter in
progres
Yes (CRPF will
provide EC)EC
wiring pending
DONE ZTE Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC
Pending(DE Tx
Urban)
Not
reqd
Pending
ZTE
Combo pending
DET(Sout
h )
permission letter
in progres at
delhi
37 Grg Medawas SSA OK Done DONE
Demand note
pending at
DHBVNL
DONE DONE
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sout
h )
site handed over
to circle
38 GRG RojkaMeo SSA OK done AD
file at AO bsnl
for cheque
done
Civil
done
M/s SKC
Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
M/W
pending(ZTE)
Not
reqd
Pending
ZTE
Combo pending
DET(Sout
h )
site handed over
to circle
39 Grg
Sikandarpu
r(Bada)
SSA OK Done in progres ZTE circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending
DET(Sout
h )
agreement in
progres
40 Grg Lakhuwas ssa OK
file sent to
HPC
HPC wip circle
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Combo pending
DET(Sout
h )
HPC Pending
41 Grg Sector-67 SSA ok
file sent to
HPC
HPC wip Civil circle
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sout
h )
HPC Pending
42 Grg Wazirpur IP
site hand
over ip
(indus) by
circle office
lat/long
required
ZTE ZTE
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sout
h )
site hand over ip
(indus) by circle
office
43 Grg
Sohna
DENSE
AREA
SSA Bid not recd
lat/long
required
Civil circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending
DET(Sout
h )
44 Grg
BSF camp
bhondsi
SSA OK
Revise
application
Pending
Civil circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending
DET(Sout
h )
45 Grg
PawalaKhu
surPur/Sec
109
SSA OK
Revise
application
Pending
visit of det
required
Civil circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
Revise Lat-long
sent to circle
* total sites=18
* sites hired =10 (HPC
done with agreement-
mumtajpurKota
khandewla,Bhangrola,kak
rola(sec7),sikhopur,nahar
pur kasan,imt
sec8,nawadafathepur,nea
r gitm,bilaspur haryana, )
*HPC done but
agreement pending=1
imt sec-1 ,)
* file sent for
HPC=2(hayatpur + jatauli )
* application required=
5(sec3,nsg2,,
nakhdaula,imt sec3,amity
)

* total sites=13
* Sites Hired=4 (1 xge
sites +3 HPC done with
agreement-te sna,crp
camp,medawas,rojkameo
)
*HPC done but
agreement pending=1
(sikandarpur )
file sent for
HPC=4(hasanpur,sec67,la
khuwas,palra)
* application required=
4...silani,sna dense
area,bsf camp,wazirpur)

* so pending sites = 9 (file
sent for hpc + HPC done
w/o
agreement+application
required )
E/C pending in hired
sites=3
* total sites=5
* sites hired=1
(Bajghera with EC done-
HPC done with agreement
),
*HPC done but
agreement pending =2
(daultabad,kherki mazra)
*File sent for
HPC=1(dharmpur)
* App reqd=1 (Pawala
khusrupur )
SDCA
Total
Sites(IP/SS
A)
Hiring
of
Site(NR
/IP/SSA)
Nominals
(NotReceived/
OK/Not Ok)RF
finalization
Status of
Site hiring
by SSA
(NR/IP/Y/to
HPC/WIP)
Agreement
AD/D/NR
EC status (Y)
Tower
Foundati
on(NR/Zt
e/Civil)
Tower
Erection(
NR/SSA/
Zte)
Shelter FDFA DG
BATTER
Y
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/com
bo
3G
STATUS
Concern
DE
Remarks
46 Grg Daultabad SSA
Revise
application
Pending
Civil circle
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
agreement
pending
47 Grg dharampur SSA OK
Revise
application
Pending
Civil circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
searching new
site
48 Grg
Kherki
Majra
SSA OK HPC Pending Civil circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
agreement
pending
49 Grg Bajghera SSA OK done AD Yes done
done
M/s SKC
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
M/W
pending(ZTE)..
far end p/v
Pending
ZTE
Pending
ZTE
Combo pending
DE(NWO-
N)
site handed over to
circle
50 Grg Khetawas SSA OK Done DONE
file is at CAO for
final payment
Done Done Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini
link(ZTE)..far
end fkn
Not
reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
site handed over
to circle
51 Grg
SGT Medical
college near
Budera
/Chandu
SSA OK HPC Done Civil circle
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini
link(ZTE)..far
end
fkn,chandu,gh
ari harsaru
Pending
ZTE
Pending
ZTE
Combo pending
DE(NWO-
W)
agreement
pending
52 Grg
Mussaidpu
r
SSA OK HPC Done DONE
Estimate pending
DHBVNL,Telephoni
cally informed to
XEN DHBVN for
priority
done
shifted
from
silani
circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini
link(ZTE)far
end fkn
Not
reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
site handover to
circle
53 Grg sultanpur SSA OK
file sent to
HPC
Civil circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
file sent to HPC
54 Grg Baslambi SSA OK HPC Done DONE
Applied for
connection
Civil circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC
Not
reqd
Pending
ZTE
Combo pending
DE(NOW-
W)
agreement done
55 Grg
Gawal
pahari/Bali
awas
SSA OK
Revise
application
Pending
xen civil
visit
required
Civil circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
56 Grg Ullawas SSA ok HPC Done DONE DD pending
Civil trg
25/12/13
shifted
from
sultanpu
circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
minilinkfar
end kendriya
vihar
/kadarpur &
ofc(bsnl)
Not
reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
site handover to
circle
57 Grg
Behrampu
r
SSA ok HPC Done DONE DD pending
Civil trg
25/12/13
shifted
from
gawalpari
circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini
link(ZTE)far
end fkn
Not
reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
site handover to
circle
58 Grg
Bandwadi
(old site--
>Kakrola (IMT-
sec-6))
SSA
bandwadi
application
required
Civil circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
bandwadi site
searching
work detail of new sites -47 :: NewAgreemDone(sites hired )=22
HPC done but agreement pending =7,
file sent to HPC =8,
Imt Sec-3,NSG Gate-2,AMITY,Kasan,Silani,Wazirpur,Sohna Dense,BSF Camp,Pawala Khusurpur,Bandwadi,Nakhdaula
total Tower Foundation done ssa civil = 11 (sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas, Naharpur,CRPF camp ZTE,musaidpur)
* total sites=4
*Sites Hired =2
(HPC done with
agreement)
(ullawas , behrampur )
*file sent for HPC=1
gawalpari
* application required= 1
(bandwadi)
TE Sohna,Medawas,RojkaMeo,Bajghera,Khetawas,Mussaidpur,IMT sec-8.Nawada Fatehpur ,Naharpur Kasan,Sikohpur,Mumtajpur,Bisru,Sangail,Bhangrola, Kakrola(sec7),Near GITM, Bilaspur haryana, Kota Khandewla,Ullawas,Behrampur
imt sec-1 ,Sikanderpur,Daulatabad,CRPF camp, baslambi,chandu,kherki majra
hayatpur,sec-67,lakhuwas,palra,hasanpur,Gwalpahari,Dharampur,Jatauli
application required=10
Tower Erection =9 (sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas)
* total sites=5
* sites hired=1
(Bajghera with EC done-
HPC done with agreement
),
*HPC done but
agreement pending =2
(daultabad,kherki mazra)
*File sent for
HPC=1(dharmpur)
* App reqd=1 (Pawala
khusrupur )
* total sites=5(4+1IP)
*Sites Hired =3
(HPC done with
agreement-
Khetavas,Mussaidpur,sult
anpur-court case)
* hpc done but
agreement pending=2
(baslambi,chandu )
*file sent for HPC=0
* application required=

* so pending sites = 0(file
sent for hpc +HPC DONE
w/o agreement +
application required )
Mobil
e JTO
nodal
s
JTO
(MOB
)
nodal
-GRG
Sh.
PP
Gupt
a
JTO
(MOB
)
nodal
-
Tauru
Sh.
Rajiv
Kuma
r
Maro
thia
JTO
(MOB
)
nodal
-
Tauru
Sh.
Rajiv
Kuma
r
Maro
thia
JTO
(MOB
)
nodal
-
Tauru
Sh.
Rajiv
Kuma
r
Maro
thia
JTO
(MOB
)
nodal
-GRG
Sh.
PP
Gupt
a
JTO
(MOB
)
nodal
-
Patud
i
Sh.
Ajay
Kuma
r
JTO
(MOB
)
nodal
-
Patud
i
Sh.
Ajay
Kuma
r
DATED 27-12-2013
Summary: Total sites=58 ( Alrdy Twr Erected with agreement done =11 + 47 new sites (4 IP +43 ) ) IP-amity,kasan,wazirpur,imt sec3
work detail of new sites -47 :: NewAgreemDone(sites hired )=22, HPC done but agreement pending =7, file sent to HPC =8,application required=10
Sr
No
SDC
A
Total
Sites(IP/SS
A)
Hiring
of
Site(NR
/IP/SSA
)
Nominals
(NotRrceived
/OK/Not
Ok)RF
finalization
Status of Site
hiring by SSA
(NR/IP/Y/to
HPC/WIP)
Agreemen
t
AD/D/NR
EC status (Y)
Tower
Foundati
on(NR/Z
te/Civil)
Tower
Erection
(NR/SS
A/Zte)
Shelter FDFA DG
BATTE
RY
POWE
R
PLANT
MEDIA
ANTIST
ATIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks Summary
1 Grg Dhankot NR NR NR AD y NR NR
ALREADY
SHELTER
DONE Done Done Done OFC Done done DONE Combo
comissio
ned
DE(NWO-
w)
on air on 6-11-13 on air on 6-11-13
2 Grg Kherki Daula NR NR NR AD y NR NR
ROOM
DONE
DONE Installed Installed Installed
OFC Done/for
3g FE pending
done Installed Combo pending
DET(Sohn
a RD)
BTS on AIR
03/05/2013
on air 03-05-13
3 Grg Binola NR NR NR AD y NR NR
Room
Already
DONE Done Done done OFC Done done Installed Combo pending SDE(IMT)
BTS on AIR
01/05/2013
on air 01-05-13
4 Grg Tikli NR NR NR AD y NR NR Outdoor Not reqd Done Done done
m/w link..far
end Kadarpur
pending
Not reqd DONE 2G NA
DET(Sohn
a RD)
intigration pending
READY TO INTIGRATE (emf sent
to circle)
5 Nuh Sudaka NR NR NR AD y NR NR Outdoor Not reqd Done Done DONE Done Not reqd DONE 2G NA
DE(Mewa
t)
intigrated INTIGRATE (emf sent to circle)
6 Nuh salamba NR NR NR
agreement
to be revised
y NR NR Done
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/Wfar end
nuh & pcm
testing
pending
Pending
ZTE
Pending
ZTE
2G NA
DE(Mewa
t)
work pending at ZTE
7 Nuh Alduka NR NR NR AD y NR NR zte done zte done zte done zte done zte done
M/W far end
ghasera &
pcm pending
zte done zte done 2G NA
DE(Mewa
t)
8 Nuh Indri NR NR NR AD
will take 7-8
days more
NR NR Done DONE Done Done Done
M/W
pending(ZTE)
done DONE 2G NA
DE(Mewa
t)
zte work done
9 Fpj Jamalgarh NR NR NR AD y NR NR Outdoor
Not
reqd
Done Done done DONE
Not
reqd
DONE 2G NA
DE(Mewa
t)
intigrated
READY TO INTIGRATE (emf sent to
circle)
10 Fpj Sikrawa NR NR NR AD yes NR NR
Room
Already
Done Done Done Done OFC Done done
Installe
d
2G pending
DE(Mewa
t)
BTS on air on 30-
04-13
On air 30-04-13
11 Fpj Gulalta NR NR NR AD yes NR NR Done DONE DONE Done Done
M/Wfar end
sikrawa &
testing
pending
done DONE 2G NA
DE(Mewa
t)
zte work done
12 Nuh Sangail SSA OK done AD
check deposited
at DHBVNL , work
pending at their
end
DONE done Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
M/W
pending(ZTE)f
ar end Ujjina
Not
reqd
Pending
ZTE
2G NA
DE(Mewa
t)
13 Fpj Bisru SSA OK done DONE
Final payment
done,work
pending at
DHBVNL
DONE DONE Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini
LinkPandding(
zte) far end
Gulalta
Not
reqd
Pending
ZTE
2G NA
DE(Mewa
t)
14 Grg
mumtajpu
r
SSA OK Done Done
Tender will be
given for work
Done DONE outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC/wip
Not
reqd
Pending
ZTE
2G NA SDE(IMT)
site handed over to
circle
15 Grg Sikhopur SSA
OK; also to
search new
application
Done done
Demand note
received , file at
AO
civil circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC
Not
reqd
Pending
ZTE
Combo pending SDE(IMT)
Court case done next
date: 14/01/14 ; to
search new application
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT
*total site=2
sites hired =2 (HPC done
with agreement)
but E/C pending at both
sites
* total sites=18
* sites hired =10 (HPC
done with agreement-
mumtajpurKota
khandewla,Bhangrola,kak
rola(sec7),sikhopur,nahar
pur kasan,imt
sec8,nawadafathepur,nea
r gitm,bilaspur haryana, )
*HPC done but
agreement pending=1
imt sec-1 ,)
* file sent for
HPC=2(hayatpur + jatauli )
* application required=
5(sec3,nsg2,,
nakhdaula,imt sec3,amity
)

Sr
No
SDC
A
Total
Sites(IP/SS
A)
Hiring
of
Site(NR
/IP/SSA
)
Nominals
(NotRrceived
/OK/Not
Ok)RF
finalization
Status of Site
hiring by SSA
(NR/IP/Y/to
HPC/WIP)
Agreemen
t
AD/D/NR
EC status (Y)
Tower
Foundati
on(NR/Z
te/Civil)
Tower
Erection
(NR/SS
A/Zte)
Shelter FDFA DG
BATTE
RY
POWE
R
PLANT
MEDIA
ANTIST
ATIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
16 Grg
Nahar pur
KASAN
SSA OK Done Done
Intial security
deposited.
DONE WIP Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending SDE(IMT)
Court case done,
Comitee is mode to
resolve
17 Grg
Imt Sec-8
manesar
SSA OK Done DONE
file submitted to
DHBVNL &wip
Civil ZTE Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending SDE(IMT)
apeal done in higher
court date:13-1-14
18 Grg
Nawada
fatehpur
SSA OK Done DONE
Tender will be
given for work
done
Civil
DONE Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending SDE(IMT)
site handed over to
circle
19 Grg
kota
khandewla
SSA ok Done DONE
initial payment
done to DHBVNL
done circle outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC
Not
reqd
Pending
ZTE
Combo pending SDE(IMT)
20 Grg Nakhdola SSA ok HPC Pending Civil ZTE
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
far end IMT
MANESER
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
revised aplication
needed
21 Grg

KakrolaI(M
T-Sec-7)
SSA OK done done
file submitted to
DHBVNL &wip
Civil ZTE
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT) Agreement done
22 Grg
nsg gate
no-2
(near)/Nav
rangpur
SSA OK
final letter
pending from
NSG
Civil ZTE outdoor
Pendin
g ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
NSG ready to give
Site
now...SDE(IMT)
23 Grg
Bhangrola/
Kakrola
SSA OK Done DONE
file submitted to
DHBVNL &WIP (trg
date 12/12/13 )
Civil ZTE Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
far end IMT
MANESER
Not
reqd
Pending
ZTE
Combo pending SDE(IMT)
24 Grg IMT sect-1 SSA OK done
in
progress
yes Civil
pole by
ZTE
OFC
Pending
ZTE
Combo pending SDE(IMT)
HPC done
butagreement
pending
25 Grg Near GITM SSA ok Done DONE
pending at
DHBVNL for
demand note
Civil-trg
10/12/13
work
started
circle outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC
Not
reqd
Pending
ZTE
Combo pending SDE(IMT)
site handed over
to circle
26 Grg Hayatpur SSA ok HPC Pending Civil ZTE Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending SDE(IMT) HPC Pending
27 Grg
Jatuli/Hali
Mandi 2
SSA ok HPC Pending Civil circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending SDE(IMT) HPC Pending
28 Grg
Amity(Nea
r
Pachgaon)-
IP IP ZTE ZTE
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
site hand over ip
(indus) by circle
office
29 Grg Kasan IP/SSA
aplication
reqd
shiv mandir
Mini link(ZTE)
far end IMT
MANESER
Pending
ZTE
Combo pending SDE(IMT)
30 Grg
Imt Sec-3
manesar
IP IP
IP (ssa
searching )
IP IP IP IP
Pending
ZTE
Combo pending SDE(IMT)
* total sites=18
* sites hired =10 (HPC
done with agreement-
mumtajpurKota
khandewla,Bhangrola,kak
rola(sec7),sikhopur,nahar
pur kasan,imt
sec8,nawadafathepur,nea
r gitm,bilaspur haryana, )
*HPC done but
agreement pending=1
imt sec-1 ,)
* file sent for
HPC=2(hayatpur + jatauli )
* application required=
5(sec3,nsg2,,
nakhdaula,imt sec3,amity
)

Sr
No
SDC
A
Total
Sites(IP/SS
A)
Hiring
of
Site(NR
/IP/SSA
)
Nominals
(NotRrceived
/OK/Not
Ok)RF
finalization
Status of Site
hiring by SSA
(NR/IP/Y/to
HPC/WIP)
Agreemen
t
AD/D/NR
EC status (Y)
Tower
Foundati
on(NR/Z
te/Civil)
Tower
Erection
(NR/SS
A/Zte)
Shelter FDFA DG
BATTE
RY
POWE
R
PLANT
MEDIA
ANTIST
ATIC

Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
31 Grg
Bilaspur,
Haryana
(bilaspur
khurd )
SSA ok Done DONE
demand note
pending at
DHBVNL
Civil
M/s
SKC
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
site handed over
to circle
32 Grg Hasanpur SSA ok
file sent to
HPC
HPC wip Civil circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
PALRA Not
reqd
Pending
ZTE
Combo pending
DET(Sout
h )
lat long sent to
circle (field team
visit requied)
33 Grg Palra SSA ok
file sent to
HPC
HPC wip Civil Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC
Not
reqd
Pending
ZTE
Combo pending
DET(Sout
h )
Revised application
required-team visit
required
34 Grg Silani SSA
revise
application
required
Civil circle
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sout
h )
site visited by
sde(mp) and
de(sohnard) but
site found very
35 Grg TE Sohna SSA OK done DONE y (TE xge )
done
Civil
done
M/s SKC
Room
Already
Done Already
Alread
y
Alread
y
FE provided done DONE Combo
material
received
DET(Sout
h )
on air on
13/12/13
36 Grg
CRPF
Camp
SSA OK done
permission
letter in
progres
Yes (CRPF will
provide EC)EC
wiring pending
DONE ZTE Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC
Pending(DE Tx
Urban)
Not
reqd
Pending
ZTE
Combo pending
DET(Sout
h )
permission letter
in progres at
delhi
37 Grg Medawas SSA OK Done DONE
Demand note
pending at
DHBVNL
DONE DONE
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sout
h )
site handed over
to circle
38 GRG RojkaMeo SSA OK done AD
file at AO bsnl
for cheque
done
Civil
done
M/s SKC
Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
M/W
pending(ZTE)
Not
reqd
Pending
ZTE
Combo pending
DET(Sout
h )
site handed over
to circle
39 Grg
Sikandarpu
r(Bada)
SSA OK Done in progres ZTE circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending
DET(Sout
h )
agreement in
progres
40 Grg Lakhuwas ssa OK
file sent to
HPC
HPC wip circle
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Combo pending
DET(Sout
h )
HPC Pending
41 Grg Sector-67 SSA ok
file sent to
HPC
HPC wip Civil circle
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sout
h )
HPC Pending
42 Grg Wazirpur IP
site hand
over ip
(indus) by
circle office
lat/long
required
ZTE ZTE
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sout
h )
site hand over ip
(indus) by circle
office
43 Grg
Sohna
DENSE
AREA
SSA Bid not recd
lat/long
required
Civil circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending
DET(Sout
h )
44 Grg
BSF camp
bhondsi
SSA OK
Revise
application
Pending
Civil circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending
DET(Sout
h )
45 Grg
PawalaKhu
surPur/Sec
109
SSA OK
Revise
application
Pending
visit of det
required
Civil circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
Revise Lat-long
sent to circle
* total sites=18
* sites hired =10 (HPC
done with agreement-
mumtajpurKota
khandewla,Bhangrola,kak
rola(sec7),sikhopur,nahar
pur kasan,imt
sec8,nawadafathepur,nea
r gitm,bilaspur haryana, )
*HPC done but
agreement pending=1
imt sec-1 ,)
* file sent for
HPC=2(hayatpur + jatauli )
* application required=
5(sec3,nsg2,,
nakhdaula,imt sec3,amity
)

* total sites=13
* Sites Hired=4 (1 xge
sites +3 HPC done with
agreement-te sna,crp
camp,medawas,rojkameo
)
*HPC done but
agreement pending=1
(sikandarpur )
file sent for
HPC=4(hasanpur,sec67,la
khuwas,palra)
* application required=
4...silani,sna dense
area,bsf camp,wazirpur)

* so pending sites = 9 (file
sent for hpc + HPC done
w/o
agreement+application
required )
E/C pending in hired
sites=3
* total sites=5
* sites hired=1
(Bajghera with EC done-
HPC done with agreement
),
*HPC done but
agreement pending =2
(daultabad,kherki mazra)
*File sent for
HPC=1(dharmpur)
* App reqd=1 (Pawala
khusrupur )
SDCA
Total
Sites(IP/SS
A)
Hiring
of
Site(NR
/IP/SSA)
Nominals
(NotReceived/
OK/Not Ok)RF
finalization
Status of
Site hiring
by SSA
(NR/IP/Y/to
HPC/WIP)
Agreement
AD/D/NR
EC status (Y)
Tower
Foundati
on(NR/Zt
e/Civil)
Tower
Erection(
NR/SSA/
Zte)
Shelter FDFA DG
BATTER
Y
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/com
bo
3G
STATUS
Concern
DE
Remarks
46 Grg Daultabad SSA
Lat long sent
to circle
Revise
application
Pending
Civil circle
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
agreement
pending
47 Grg dharampur SSA OK
Revise
application
Pending
Civil circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
searching new
site
48 Grg
Kherki
Majra
SSA OK HPC Pending Civil circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
agreement
pending
49 Grg Bajghera SSA OK done AD Yes done
done
M/s SKC
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
M/W
pending(ZTE)..
far end p/v
Pending
ZTE
Pending
ZTE
Combo pending
DE(NWO-
N)
site handed over to
circle
50 Grg Khetawas SSA OK Done DONE
file is at CAO for
final payment
Done Done Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini
link(ZTE)..far
end fkn
Not
reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
site handed over
to circle
51 Grg
SGT Medical
college near
Budera
/Chandu
SSA OK HPC Done Civil circle
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini
link(ZTE)..far
end
fkn,chandu,gh
ari harsaru
Pending
ZTE
Pending
ZTE
Combo pending
DE(NWO-
W)
agreement
pending
52 Grg
Mussaidpu
r
SSA OK HPC Done DONE
Estimate pending
DHBVNL,Telephoni
cally informed to
XEN DHBVN for
priority
done
shifted
from
silani
circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini
link(ZTE)far
end fkn
Not
reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
site handover to
circle
53 Grg sultanpur SSA OK
file sent to
HPC
Civil circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
file sent to HPC
54 Grg Baslambi SSA OK HPC Done DONE
Applied for
connection
Civil circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC
Not
reqd
Pending
ZTE
Combo pending
DE(NOW-
W)
agreement done
55 Grg
Gawal
pahari/Bali
awas
SSA OK
Revise
application
Pending
xen civil
visit
required
Civil circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
56 Grg Ullawas SSA ok HPC Done DONE DD pending
Civil trg
25/12/13
shifted
from
sultanpu
circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
minilinkfar
end kendriya
vihar
/kadarpur &
ofc(bsnl)
Not
reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
site handover to
circle
57 Grg
Behrampu
r
SSA ok HPC Done DONE DD pending
Civil trg
25/12/13
shifted
from
gawalpari
circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini
link(ZTE)far
end fkn
Not
reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
site handover to
circle
58 Grg
Bandwadi
(old site--
>Kakrola (IMT-
sec-6))
SSA
bandwadi
application
required
Civil circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
bandwadi site
searching
work detail of new sites -47 :: NewAgreemDone(sites hired )=22
HPC done but agreement pending =6,
file sent to HPC =8,
Imt Sec-3,NSG Gate-2,AMITY,Kasan,Silani,Wazirpur,Sohna Dense,BSF Camp,Pawala Khusurpur,Bandwadi,Nakhdaula,Daultabad
* total sites=5
* sites hired=1
(Bajghera with EC done-
HPC done with agreement
),
*HPC done but
agreement pending =2
(daultabad,kherki mazra)
*File sent for
HPC=1(dharmpur)
* App reqd=1 (Pawala
khusrupur )
* total sites=5(4+1IP)
*Sites Hired =3
(HPC done with
agreement-
Khetavas,Mussaidpur,sult
anpur-court case)
* hpc done but
agreement pending=2
(baslambi,chandu )
*file sent for HPC=0
* application required=

* so pending sites = 0(file
sent for hpc +HPC DONE
w/o agreement +
application required )
total Tower Foundation done ssa civil = 11 (sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas, Naharpur,CRPF camp ZTE,musaidpur)
* total sites=4
*Sites Hired =2
(HPC done with
agreement)
(ullawas , behrampur )
*file sent for HPC=1
gawalpari
* application required= 1
(bandwadi)
TE Sohna,Medawas,RojkaMeo,Bajghera,Khetawas,Mussaidpur,IMT sec-8.Nawada Fatehpur ,Naharpur Kasan,Sikohpur,Mumtajpur,Bisru,Sangail,Bhangrola, Kakrola(sec7),Near GITM, Bilaspur haryana, Kota Khandewla,Ullawas,Behrampur
imt sec-1 ,Sikanderpur,CRPF camp, baslambi,chandu,kherki majra
application required=11
Tower Erection =9 (sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas)
hayatpur,sec-67,lakhuwas,palra,hasanpur,Gwalpahari,Dharampur,Jatauli
Mobil
e JTO
nodal
s
JTO
(MOB
)
nodal
-GRG
Sh.
PP
Gupt
a
JTO
(MOB
)
nodal
-
Tauru
Sh.
Rajiv
Kuma
r
Maro
thia
JTO
(MOB
)
nodal
-
Tauru
Sh.
Rajiv
Kuma
r
Maro
thia
JTO
(MOB
)
nodal
-
Tauru
Sh.
Rajiv
Kuma
r
Maro
thia
JTO
(MOB
)
nodal
-GRG
Sh.
PP
Gupt
a
JTO
(MOB
)
nodal
-
Patud
i
Sh.
Ajay
Kuma
r
JTO
(MOB
)
nodal
-
Patud
i
Sh.
Ajay
Kuma
r
DATED 18-01-2014
Summary: Total sites=58 ( Alrdy Twr Erected with agreement done =11 + 47 new sites (4 IP +43 ) ) IP-amity,kasan,wazirpur,imt sec3
work detail of new sites -47 :: NewAgreemDone(sites hired )=24, HPC done but agreement pending =5, file sent to HPC =6,application required=8
Sr
No
SDC
A
Total
Sites(IP/SS
A)
Hiring
of
Site(NR
/IP/SSA
)
Nominals
(NotRrceived
/OK/Not
Ok)RF
finalization
Status of Site
hiring by SSA
(NR/IP/Y/to
HPC/WIP)
Agreemen
t
AD/D/NR
EC status (Y)
Tower
Foundati
on(NR/Z
te/Civil)
Tower
Erection
(NR/SS
A/Zte)
Shelter FDFA DG
BATTE
RY
POWE
R
PLANT
MEDIA
ANTIST
ATIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks Summary
1 Grg Dhankot NR NR NR AD y NR NR
ALREADY
SHELTER
DONE Done Done Done OFC Done done DONE Combo
comissio
ned
DE(NWO-
w)
on air on 6-11-13 on air on 6-11-13
2 Grg Kherki Daula NR NR NR AD y NR NR
ROOM
DONE
DONE Installed Installed Installed
OFC Done/for
3g FE pending
done Installed Combo pending
DET(Sohn
a RD)
BTS on AIR
03/05/2013
on air 03-05-13
3 Grg Binola NR NR NR AD y NR NR
Room
Already
DONE Done Done done OFC Done done Installed Combo pending SDE(IMT)
BTS on AIR
01/05/2013
on air 01-05-13
4 Grg Tikli NR NR NR AD y NR NR Outdoor Not reqd Done Done done
m/w link..far
end Kadarpur
pending
Not reqd DONE 2G NA
DET(Sohn
a RD)
intigration pending
READY TO INTIGRATE (emf sent
to circle)
5 Nuh Sudaka NR NR NR AD y NR NR Outdoor Not reqd Done Done DONE Done Not reqd DONE 2G NA
DE(Mewa
t)
BTS on AIR
01/01/2014
On Air 01/01/2014
6 Nuh salamba NR NR NR
agreement
to be revised
y NR NR Done
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/Wfar end
nuh & pcm
testing
pending
Pending
ZTE
Pending
ZTE
2G NA
DE(Mewa
t)
work pending at ZTE
7 Nuh Alduka NR NR NR AD y NR NR zte done zte done zte done zte done zte done done zte done zte done 2G NA
DE(Mewa
t)
intigrated
8 Nuh Indri NR NR NR AD
will take 7-8
days more
NR NR Done DONE Done Done Done done done DONE 2G NA
DE(Mewa
t)
zte work done
9 Fpj Jamalgarh NR NR NR AD y NR NR Outdoor
Not
reqd
Done Done done DONE
Not
reqd
DONE 2G NA
DE(Mewa
t)
BTS on AIR
16/01/2014
On Air 16/01/2014
10 Fpj Sikrawa NR NR NR AD yes NR NR
Room
Already
Done Done Done Done OFC Done done
Installe
d
2G pending
DE(Mewa
t)
BTS on air on 30-
04-13
On air 30-04-13
11 Fpj Gulalta NR NR NR AD yes NR NR Done DONE DONE Done Done DONE done DONE 2G NA
DE(Mewa
t)
zte work done
12 Nuh Sangail SSA OK done AD
check deposited
at DHBVNL , work
pending at their
end
DONE done Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
M/W
pending(ZTE)f
ar end Ujjina
Not
reqd
Pending
ZTE
2G NA
DE(Mewa
t)
13 Fpj Bisru SSA OK done DONE
Final payment
done,work
pending at
DHBVNL
DONE DONE Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini
LinkPandding(
zte) far end
Gulalta
Not
reqd
Pending
ZTE
2G NA
DE(Mewa
t)
14 Grg
mumtajpu
r
SSA OK Done Done
Tender will be
given for work
Done DONE outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC/wip
Not
reqd
Pending
ZTE
2G NA SDE(IMT)
site handed over to
circle
15 Grg Sikhopur SSA
OK; also to
search new
application
Done done
Demand note
received , file at
AO
civil circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC
Not
reqd
Pending
ZTE
Combo pending SDE(IMT)
Court case done next
date: 14/01/14 ; to
search new application
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT
*total site=2
sites hired =2 (HPC done
with agreement)
but E/C pending at both
sites
* total sites=18
* sites hired =10 (HPC
done with agreement-
mumtajpurKota
khandewla,Bhangrola,kak
rola(sec7),sikhopur,nahar
pur kasan,imt
sec8,nawadafathepur,nea
r gitm,bilaspur haryana, )
*HPC done but
agreement pending=1
imt sec-1 ,)
* file sent for
HPC=2(hayatpur + jatauli )
* application required=
5(sec3,nsg2,,
nakhdaula,imt sec3,amity
)

Sr
No
SDC
A
Total
Sites(IP/SS
A)
Hiring
of
Site(NR
/IP/SSA
)
Nominals
(NotRrceived
/OK/Not
Ok)RF
finalization
Status of Site
hiring by SSA
(NR/IP/Y/to
HPC/WIP)
Agreemen
t
AD/D/NR
EC status (Y)
Tower
Foundati
on(NR/Z
te/Civil)
Tower
Erection
(NR/SS
A/Zte)
Shelter FDFA DG
BATTE
RY
POWE
R
PLANT
MEDIA
ANTIST
ATIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
16 Grg
Nahar pur
KASAN
SSA OK Done Done
Intial security
deposited.
DONE WIP Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending SDE(IMT)
Court case done,
Comitee is mode to
resolve
17 Grg
Imt Sec-8
manesar
SSA OK Done DONE
file submitted to
DHBVNL &wip
Civil ZTE Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending SDE(IMT)
apeal done in higher
court date:13-1-14
18 Grg
Nawada
fatehpur
SSA OK Done DONE
Tender will be
given for work
done
Civil
DONE Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending SDE(IMT)
site handed over to
circle
19 Grg
kota
khandewla
SSA ok Done DONE
initial payment
done to DHBVNL
done circle outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC
Not
reqd
Pending
ZTE
Combo pending SDE(IMT)
20 Grg Nakhdola SSA ok
HPC Pending
at plg
Civil ZTE
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
far end IMT
MANESER
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
revised aplication
needed
21 Grg

KakrolaI(M
T-Sec-7)
SSA OK done done
Final estimate of
electric connection
pdg
Civil ZTE
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT) Agreement done
22 Grg
nsg gate
no-2
(near)/Nav
rangpur
SSA OK
final letter
pending from
NSG
Civil ZTE outdoor
Pendin
g ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
NSG ready to give
Site
now...SDE(IMT)
23 Grg
Bhangrola/
Kakrola
SSA OK Done DONE
file submitted to
DHBVNL &WIP (trg
date 12/12/13 )
Civil ZTE Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
far end IMT
MANESER
Not
reqd
Pending
ZTE
Combo pending SDE(IMT)
24 Grg IMT sect-1 SSA OK done
in
progress
yes Civil
pole by
ZTE
OFC
Pending
ZTE
Combo pending SDE(IMT)
HPC done
butagreement
pending
25 Grg Near GITM SSA ok Done DONE
pending at
DHBVNL for
demand pdg
done circle outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC
Not
reqd
Pending
ZTE
Combo pending SDE(IMT)
site handed over
to circle
26 Grg Hayatpur SSA ok
HPC Pending
in plg
Civil ZTE Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending SDE(IMT) HPC Pending
27 Grg
Jatuli/Hali
Mandi 2
SSA ok HPC Pending Civil circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending SDE(IMT) HPC Pending
28 Grg
Amity(Nea
r
Pachgaon)-
IP IP ZTE ZTE
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
site hand over ip
(indus) by circle
office
29 Grg Kasan IP/SSA
aplication
reqd
shiv mandir
Mini link(ZTE)
far end IMT
MANESER
Pending
ZTE
Combo pending SDE(IMT)
30 Grg
Imt Sec-3
manesar
IP IP
IP (ssa
searching )
IP IP IP IP
Pending
ZTE
Combo pending SDE(IMT)
* total sites=18
* sites hired =10 (HPC
done with agreement-
mumtajpurKota
khandewla,Bhangrola,kak
rola(sec7),sikhopur,nahar
pur kasan,imt
sec8,nawadafathepur,nea
r gitm,bilaspur haryana, )
*HPC done but
agreement pending=1
imt sec-1 ,)
* file sent for
HPC=2(hayatpur + jatauli )
* application required=
5(sec3,nsg2,,
nakhdaula,imt sec3,amity
)

Sr
No
SDC
A
Total
Sites(IP/SS
A)
Hiring
of
Site(NR
/IP/SSA
)
Nominals
(NotRrceived
/OK/Not
Ok)RF
finalization
Status of Site
hiring by SSA
(NR/IP/Y/to
HPC/WIP)
Agreemen
t
AD/D/NR
EC status (Y)
Tower
Foundati
on(NR/Z
te/Civil)
Tower
Erection
(NR/SS
A/Zte)
Shelter FDFA DG
BATTE
RY
POWE
R
PLANT
MEDIA
ANTIST
ATIC

Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
31 Grg
Bilaspur,
Haryana
(bilaspur
khurd )
SSA ok Done DONE
Final estimate of
electric
connection done
Civil
M/s
SKC
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT)
site handed over
to circle
32 Grg Hasanpur SSA ok
file sent to
HPC
HPC wip Civil circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
PALRA Not
reqd
Pending
ZTE
Combo pending
DET(Sout
h )
lat long sent to
circle (field team
visit requied)
33 Grg Palra SSA ok done DONE Civil Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC
Not
reqd
Pending
ZTE
Combo pending
DET(Sout
h )
agreement done
34 Grg Silani SSA
revise
application
required
Civil circle
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sout
h )
site visited by
sde(mp) and
de(sohnard) but
site found very
35 Grg TE Sohna SSA OK done DONE y (TE xge )
done
Civil
done
M/s SKC
Room
Already
Done Already
Alread
y
Alread
y
FE provided done DONE Combo
material
received
DET(Sout
h )
on air on
13/12/13
36 Grg
CRPF
Camp
SSA OK done
permission
letter in
progres
Yes (CRPF will
provide EC)EC
wiring pending
DONE ZTE Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC
Pending(DE Tx
Urban)
Not
reqd
Pending
ZTE
Combo pending
DET(Sout
h )
permission letter
in progres at
delhi
37 Grg Medawas SSA OK Done DONE
Demand note
pending at
DHBVNL
DONE DONE
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sout
h )
site handed over
to circle
38 GRG RojkaMeo SSA OK done AD
file at AO bsnl
for cheque
done
Civil
done
M/s SKC
Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
M/W
pending(ZTE)
Not
reqd
Pending
ZTE
Combo pending
DET(Sout
h )
site handed over
to circle
39 Grg
Sikandarpu
r(Bada)
SSA OK Done in progres ZTE circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending
DET(Sout
h )
agreement in
progres
40 Grg Lakhuwas ssa OK
file sent to
HPC
HPC wip circle
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Combo pending
DET(Sout
h )
HPC Pending
41 Grg Sector-67 SSA ok
Aggrement
Done
HPC wip Civil circle
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sout
h )
site handed over
to circle
42 Grg Wazirpur IP
site hand
over ip
(indus) by
circle office
lat/long
required
ZTE ZTE
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sout
h )
site hand over ip
(indus) by circle
office
43 Grg
Sohna
DENSE
AREA
SSA Bid not recd
lat/long
required
Civil circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending
DET(Sout
h )
44 Grg
BSF camp
bhondsi
SSA OK
Revise
application
Pending
Civil circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending
DET(Sout
h )
45 Grg
PawalaKhu
surPur/Sec
109
SSA OK
Revise
application
Pending
visit of det
required
Civil circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
Revise Lat-long
sent to circle
* total sites=18
* sites hired =10 (HPC
done with agreement-
mumtajpurKota
khandewla,Bhangrola,kak
rola(sec7),sikhopur,nahar
pur kasan,imt
sec8,nawadafathepur,nea
r gitm,bilaspur haryana, )
*HPC done but
agreement pending=1
imt sec-1 ,)
* file sent for
HPC=2(hayatpur + jatauli )
* application required=
5(sec3,nsg2,,
nakhdaula,imt sec3,amity
)

* total sites=13
* Sites Hired=4 (1 xge
sites +3 HPC done with
agreement-te sna,crp
camp,medawas,rojkameo
,palara,Sec-67 )
*HPC done but
agreement pending=1
(sikandarpur )
file sent for
HPC=2(hasanpur,lakhuw
as)
* application required=
3.silani,sna dense
area,wazirpur)

* so pending sites = 9 (file
sent for hpc + HPC done
w/o
agreement+application
required )
E/C pending in hired
sites=3
* total sites=5
* sites hired=1
(Bajghera with EC done-
HPC done with agreement
),
*HPC done but
agreement pending =2
(daultabad,kherki mazra)
*File sent for
HPC=1(dharmpur)
* App reqd=1 (Pawala
khusrupur )
SDCA
Total
Sites(IP/SS
A)
Hiring
of
Site(NR
/IP/SSA)
Nominals
(NotReceived/
OK/Not Ok)RF
finalization
Status of
Site hiring
by SSA
(NR/IP/Y/to
HPC/WIP)
Agreement
AD/D/NR
EC status (Y)
Tower
Foundati
on(NR/Zt
e/Civil)
Tower
Erection(
NR/SSA/
Zte)
Shelter FDFA DG
BATTER
Y
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/com
bo
3G
STATUS
Concern
DE
Remarks
46 Grg Daultabad SSA ok
Revise
application
Pending
Civil circle
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
agreement
pending
47 Grg dharampur SSA OK
Revise
application
Pending
Civil circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
searching new
site
48 Grg
Kherki
Majra
SSA OK HPC Pending Civil circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
agreement
pending
49 Grg Bajghera SSA OK done AD Yes done
done
M/s SKC
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
M/W
pending(ZTE)..
far end p/v
Pending
ZTE
Pending
ZTE
Combo pending
DE(NWO-
N)
site handed over to
circle
50 Grg Khetawas SSA OK Done DONE
file is at CAO for
final payment
Done Done Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini
link(ZTE)..far
end fkn
Not
reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
site handed over
to circle
51 Grg
SGT Medical
college near
Budera
/Chandu
SSA OK HPC Done Civil circle
Shelter
Pending
ZTE
Pendin
g ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini
link(ZTE)..far
end
fkn,chandu,gh
ari harsaru
Pending
ZTE
Pending
ZTE
Combo pending
DE(NWO-
W)
agreement
pending
52 Grg
Mussaidpu
r
SSA OK HPC Done DONE
Estimate pending
DHBVNL,Telephoni
cally informed to
XEN DHBVN for
priority
done
shifted
from
silani
circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini
link(ZTE)far
end fkn
Not
reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
site handover to
circle
53 Grg sultanpur SSA OK
file sent to
HPC
Civil circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
file sent to HPC
54 Grg Baslambi SSA OK HPC Done DONE
visit panding
at DHBVNL
Civil circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
OFC
Not
reqd
Pending
ZTE
Combo pending
DE(NOW-
W)
agreement done
55 Grg
Gawal
pahari/Bali
awas
SSA OK HPC Done Civil circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
56 Grg Ullawas SSA
Revise
application
Pending
Revise
application
Pending
DD pending
Civil trg
25/12/13
shifted
from
sultanpu
circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
minilinkfar
end kendriya
vihar
/kadarpur &
ofc(bsnl)
Not
reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
57 Grg
Behrampu
r
SSA ok HPC Done DONE DD pending
Civil trg
25/12/13
shifted
from
gawalpari
circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini
link(ZTE)far
end fkn
Not
reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
site handover to
circle
58 Grg
Bandwadi
(old site--
>Kakrola (IMT-
sec-6))
SSA ok
bandwadi
application
required
Civil circle Outdoor
Not
reqd
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
lat long ok
work detail of new sites -47 :: NewAgreemDone(sites hired )=24
HPC done but agreement pending =5,
file sent to HPC =6,
Imt Sec-3,NSG Gate-2,AMITY,Kasan,Silani,Wazirpur,Sohna Dense,Bandwadi,Daultabad
* total sites=5
* sites hired=1
(Bajghera with EC done-
HPC done with agreement
),
*HPC done but
agreement pending =2
(daultabad,kherki mazra)
*File sent for
HPC=1(dharmpur)
* App reqd=1 (Pawala
khusrupur )
* total sites=5(4+1IP)
*Sites Hired =3
(HPC done with
agreement-
Khetavas,Mussaidpur,sult
anpur-court case)
* hpc done but
agreement pending=2
(baslambi,chandu )
*file sent for HPC=0
* application required=

* so pending sites = 0(file
sent for hpc +HPC DONE
w/o agreement +
application required )
total Tower Foundation done ssa civil = 13 (sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas, Naharpur,CRPF camp ZTE,musaidpur,near
GITM,Kota Khandewla)
* total sites=4
*Sites Hired =1
(HPC done with
agreement)
( behrampur )
*file sent for HPC=1
Gwalpahari
* application required= 2
(bandwadi and Ullavas)
TE Sohna,Medawas,RojkaMeo,Bajghera,Khetawas,Mussaidpur,IMT sec-8.Nawada Fatehpur ,Naharpur Kasan,Sikohpur,Mumtajpur,Bisru,Sangail,Bhangrola, Kakrola(sec7),Near GITM, Bilaspur haryana, Kota Khandewla,Ullawas,Behrampur
imt sec-1 ,Sikanderpur,CRPF camp, baslambi,chandu,kherki majra
hayatpur,lakhuwas,hasanpur,Gwalpahari,Dharampur,Jatauli
application required=8
Tower Erection =9 (sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas)
Mobil
e JTO
nodal
s
JTO
(MOB
)
nodal
-GRG
Sh.
PP
Gupt
a
JTO
(MOB
)
nodal
-
Tauru
Sh.
Rajiv
Kuma
r
Maro
thia
JTO
(MOB
)
nodal
-
Tauru
Sh.
Rajiv
Kuma
r
Maro
thia
JTO
(MOB
)
nodal
-
Tauru
Sh.
Rajiv
Kuma
r
Maro
thia
JTO
(MOB
)
nodal
-GRG
Sh.
PP
Gupt
a
JTO
(MOB
)
nodal
-
Patud
i
Sh.
Ajay
Kuma
r
JTO
(MOB
)
nodal
-
Patud
i
Sh.
Ajay
Kuma
r
DATED 18-01-2014
Summary: Total sites=58 ( Alrdy Twr Erected with agreement done =11 + 47 new sites (4 IP +43 ) ) IP-amity,kasan,wazirpur,imt sec3
work detail of new sites -47 :: NewAgreemDone(sites hired )=24, HPC done but agreement pending =5, file sent to HPC =6,application required=8
Sr No SDCA
Total
Sites(IP/S
SA)
Hiring of
Site(NR/I
P/SSA)
Nominals
(NotRrcei
ved/OK/N
ot Ok)RF
finalizatio
n
Status of
Site hiring
by SSA
(NR/IP/Y/to
HPC/WIP)
Agreemen
t
AD/D/NR
EC status
(Y)
Tower
Foundatio
n(NR/Zte/
Civil)
Tower
Erection(
NR/SSA/Z
te)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTAT
IC
BTS
Status
Site
2G/comb
o
3G
STATUS
1 Grg Dhankot NR NR NR AD y NR NR
ALREADY
SHELTER
DONE Done Done Done OFC Done done DONE Combo
comission
ed
2 Grg Kherki Daula NR NR NR AD y NR NR
ROOM
DONE
DONE Installed Installed Installed
OFC
Done/for 3g
FE pending
done Installed Combo pending
3 Grg Binola NR NR NR AD y NR NR
Room
Already
DONE Done Done done OFC Done done Installed Combo pending
4 Grg Tikli NR NR NR AD y NR NR Outdoor Not reqd Done Done done
m/w link..far
end
Kadarpur
pending
Not reqd DONE 2G NA
5 Nuh Sudaka NR NR NR AD y NR NR Outdoor Not reqd Done Done DONE Done Not reqd DONE 2G NA
6 Nuh salamba NR NR NR
agreement
to be revised
y NR NR Done Pending ZTE Pending ZTE Pending ZTE Pending ZTE
M/Wfar
end nuh &
pcm testing
pending
Pending ZTE Pending ZTE 2G NA
7 Nuh Alduka NR NR NR AD y NR NR zte done zte done zte done zte done zte done done zte done zte done 2G NA
8 Nuh Indri NR NR NR AD
will take 7-8
days more
NR NR Done DONE Done Done Done done done DONE 2G NA
9 Fpj Jamalgarh NR NR NR AD y NR NR Outdoor Not reqd Done Done done DONE Not reqd DONE 2G NA
10 Fpj Sikrawa NR NR NR AD yes NR NR
Room
Already
Done Done Done Done OFC Done done Installed 2G pending
11 Fpj Gulalta NR NR NR AD yes NR NR Done DONE DONE Done Done DONE done DONE 2G NA
12 Nuh Sangail SSA OK done AD
check
deposited at
DHBVNL ,
work pending
at their end
DONE done Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(ZTE
)far end
Ujjina
Not reqd
Pending
ZTE
2G NA
13 Fpj Bisru SSA OK done DONE
Final payment
done,work
pending at
DHBVNL
DONE DONE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
LinkPanddin
g(zte) far
end Gulalta
Not reqd
Pending
ZTE
2G NA
14 Grg
mumtajpu
r
SSA OK Done Done
Tender will be
given for work
Done DONE outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini link For
END
HallyMandi
Not reqd
Pending
ZTE
2G NA
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT
15 Grg Sikhopur SSA
OK; also
to search
new
applicatio
n
Done done
Demand note
received , file
at AO
civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending
Sr No SDCA
Total
Sites(IP/S
SA)
Hiring of
Site(NR/I
P/SSA)
Nominals
(NotRrcei
ved/OK/N
ot Ok)RF
finalizatio
n
Status of
Site hiring
by SSA
(NR/IP/Y/to
HPC/WIP)
Agreemen
t
AD/D/NR
EC status
(Y)
Tower
Foundatio
n(NR/Zte/
Civil)
Tower
Erection(
NR/SSA/Z
te)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTAT
IC
BTS
Status
Site
2G/comb
o
3G
STATUS
16 Grg
Nahar pur
KASAN
SSA OK Done Done
Intial security
deposited.
DONE WIP Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
17 Grg
Imt Sec-8
manesar
SSA OK Done DONE
file submitted
to DHBVNL
&wip
Civil ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
18 Grg
Nawada
fatehpur
SSA OK Done DONE
Tender will be
given for work
done Civil DONE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
19 Grg
kota
khandewl
a
SSA ok Done DONE
initial
payment done
to DHBVNL
done circle outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending
20 Grg Nakhdola SSA ok Done Civil ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE) far
end IMT
MANESER
Pending
ZTE
Pending
ZTE
Combo pending
21 Grg

KakrolaI(
MT-Sec-7)
SSA OK done done
Final estimate
of electric
connection
pdg
Civil ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending
22 Grg
nsg gate
no-2
(near)/Na
vrangpur
SSA OK
final letter
pending
from NSG
Civil ZTE outdoor
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending
23 Grg
Bhangrola
/Kakrola
SSA OK Done DONE
file submitted
to DHBVNL
&WIP (trg date
12/12/13 )
Civil ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE) far
end IMT
MANESER
Not reqd
Pending
ZTE
Combo pending
24 Grg IMT sect-1 SSA OK done
in
progress
yes Civil
pole by
ZTE
OFC
Pending
ZTE
Combo pending
25 Grg
Near
GITM
SSA ok Done DONE
pending at
DHBVNL for
demand pdg
done circle outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending
26 Grg Hayatpur SSA ok
HPC Pending
in plg
Civil ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
27 Grg
Jatuli/Hali
Mandi 2
SSA ok HPC Pending Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
28 Grg
Amity(Ne
ar
Pachgaon)-
badanki
IP IP ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending
29 Grg Kasan IP/SSA
aplication
reqd
shiv mandir
Mini
link(ZTE) far
end IMT
MANESER
Pending
ZTE
Combo pending
30 Grg
Imt Sec-3
manesar
IP IP
IP (ssa
searching )
IP IP IP IP
Pending
ZTE
Combo pending
Sr No SDCA
Total
Sites(IP/S
SA)
Hiring of
Site(NR/I
P/SSA)
Nominals
(NotRrcei
ved/OK/N
ot Ok)RF
finalizatio
n
Status of
Site hiring
by SSA
(NR/IP/Y/to
HPC/WIP)
Agreemen
t
AD/D/NR
EC status
(Y)
Tower
Foundatio
n(NR/Zte/
Civil)
Tower
Erection(
NR/SSA/Z
te)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTAT
IC

Site
2G/comb
o
3G
STATUS
31 Grg
Bilaspur,
Haryana
(bilaspur
khurd )
SSA ok Done DONE
Final
estimate of
electric
connection
done
Civil M/s SKC
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending
32 Grg Hasanpur SSA ok
file sent to
HPC
HPC wip Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
PALRA
Not reqd
Pending
ZTE
Combo pending
33 Grg Palra SSA ok done DONE Civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending
34 Grg Silani SSA
revise
application
required
Civil circle
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending
35 Grg TE Sohna SSA OK done DONE y (TE xge ) done Civil
done M/s
SKC
Room
Already
Done Already Already Already FE provided done DONE Combo
material
received
36 Grg
CRPF
Camp
SSA OK done
permission
letter in
progres
Yes (CRPF
will provide
EC)EC wiring
pending
DONE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending(DE
Tx Urban)
Not reqd
Pending
ZTE
Combo pending
37 Grg Medawas SSA OK Done DONE
Demand
note
pending at
DHBVNL
DONE DONE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending
38 GRG RojkaMeo SSA OK done AD
file at AO
bsnl for
cheque
done Civil
done M/s
SKC
Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(ZTE
)
Not reqd
Pending
ZTE
Combo pending
39 Grg
Sikandarp
ur(Bada)
SSA OK Done in progres ZTE circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
40 Grg Lakhuwas ssa OK
file sent to
HPC
HPC wip circle
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Combo pending
41 Grg Sector-67 SSA ok
Aggrement
Done
HPC wip Civil circle
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending
42 Grg Wazirpur IP
site hand
over ip
(indus) by
circle office
lat/long
required
ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending
43 Grg
Sohna
DENSE
AREA
SSA Bid not recd
lat/long
required
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
44 Grg
BSF camp
bhondsi
SSA OK
Revise
application
Pending
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
45 Grg
PawalaKh
usurPur/S
ec 109
SSA OK
Revise
application
Pending
visit of det
required
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
SDCA
Total
Sites(IP/SS
A)
Hiring of
Site(NR/IP/
SSA)
Nominals
(NotReceiv
ed/OK/Not
Ok)RF
finalization
Status of
Site hiring
by SSA
(NR/IP/Y/t
o
HPC/WIP)
Agreement
AD/D/NR
EC status
(Y)
Tower
Foundation
(NR/Zte/Ci
vil)
Tower
Erection(N
R/SSA/Zte)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTATI
C
BTS Status
Site
2G/combo
3G STATUS
46 Grg Daultabad SSA ok
Revise
application
Pending
Civil circle
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
47 Grg
dharampu
r
SSA OK
Revise
application
Pending
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
48 Grg
Kherki
Majra
(Dhanwap
ur)
SSA OK HPC Pending Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
49 Grg Bajghera SSA OK done AD Yes done
done M/s
SKC
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(ZTE
)..far end p/v
Pending
ZTE
Pending
ZTE
Combo pending
50 Grg Khetawas SSA OK Done DONE
file is at CAO
for final
payment
Done Done Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)..far
end fkn
Not reqd
Pending
ZTE
Combo pending
51 Grg
SGT Medical
college near
Budera
/Chandu
SSA OK HPC Done Civil circle
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)..far
end
fkn,chandu,g
hari harsaru
Pending
ZTE
Pending
ZTE
Combo pending
52 Grg
Mussaidp
ur
SSA OK HPC Done DONE
Estimate
pending
DHBVNL,Telep
honically
informed to
XEN DHBVN
for priority
done
shifted
from
silani
circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)far
end fkn
Not reqd
Pending
ZTE
Combo pending
53 Grg sultanpur SSA OK
file sent to
HPC
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
54 Grg Baslambi SSA OK HPC Done DONE
visit
panding
at
DHBVNL
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending
55 Grg
Gawal
pahari/Bal
iawas
SSA OK HPC Done Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
56 Grg Ullawas SSA
Revise
application
Pending
Revise
application
Pending
DD
pending
Civil trg
25/12/13
shifted
from
sultanpur
circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
minilinkfar
end kendriya
vihar
/kadarpur &
ofc(bsnl)
Not reqd
Pending
ZTE
Combo pending
57 Grg
Behrampu
r
SSA ok HPC Done DONE
DD
pending
Civil trg
25/12/13
shifted
from
gawalpari
circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)far
end fkn
Not reqd
Pending
ZTE
Combo pending
58 Grg
Bandwadi
(old site--
>Kakrola
(IMT-sec-6))
SSA ok
bandwadi
application
required
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)
Not reqd
Pending
ZTE
Combo pending
work detail of new sites -47 :: NewAgreemDone(sites hired )=24
HPC done but agreement pending =5,
file sent to HPC =6,
Imt Sec-3,NSG Gate-2,AMITY,Kasan,Silani,Wazirpur,Sohna Dense,Bandwadi,Daultabad
total Tower Foundation done ssa civil = 13 (sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas, Naharpur,CRPF camp ZTE,musaidpur,near GITM,Kota Khandewla)
TE Sohna,Medawas,RojkaMeo,Bajghera,Khetawas,Mussaidpur,IMT sec-8.Nawada Fatehpur ,Naharpur Kasan,Sikohpur,Mumtajpur,Bisru,Sangail,Bhangrola, Kakrola(sec7),Near GITM, Bilaspur haryana, Kota
Khandewla,Ullawas,Behrampur
imt sec-1 ,Sikanderpur,CRPF camp, baslambi,chandu,kherki majra
hayatpur,lakhuwas,hasanpur,Gwalpahari,Dharampur,Jatauli
application required=8
Tower Erection =9 (sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas)
Concern DE Remarks Summary
DE(NWO-w)
on air on
6-11-13
on air on
6-11-13
DET(Sohna
RD)
BTS on AIR
03/05/2013
on air 03-05-
13
SDE(IMT)
BTS on AIR
01/05/2013
on air 01-05-
13
DET(Sohna
RD)
intigration
pending
READY TO
INTIGRATE
(emf sent to
circle)
DE(Mewat)
BTS on AIR
01/01/2014
On Air
01/01/2014
DE(Mewat)
work
pending at
ZTE
DE(Mewat) intigrated
DE(Mewat) intigrated
zte work
done
DE(Mewat)
BTS on AIR
16/01/2014
On Air
16/01/2014
DE(Mewat)
BTS on air
on 30-04-
13
On air 30-
04-13
DE(Mewat) intigrated
zte work
done
DE(Mewat)
DE(Mewat)
SDE(IMT)
site handed
over to circle
*total
site=2
sites
hired =2
(HPC
done with
agreemen
t)
but E/C
* total
sites=18
* sites
hired =10
(HPC done
with
agreemen
t-
mumtajpu
rKota
khandewl
a,Bhangro
la,kakrola(
sec7),sikh
opur,naha
rpur
kasan,imt
sec8,nawa
dafathepu
r,near
gitm,bilas
pur
haryana,
)
*HPC
done but
agreemen
t
pending=
1 imt sec-
1 ,)
* file sent
for
HPC=2(ha
yatpur +
jatauli )
*
applicatio
n
required=
5(sec3,nsg
2,,
nakhdaula
,imt
sec3,amit
y )

SDE(IMT)
Court case
done next
date:
27/01/14 ; to
search new
application
Concern DE Remarks
SDE(IMT)
Court case
done date
12-2-14
Comitee is
mode to
resolve
SDE(IMT)
apeal done
in higher
court
date:15 -2-
14
SDE(IMT)
site handed
over to circle
SDE(IMT)
site handed
over to circle
SDE(IMT)
revised
aplication
needed
SDE(IMT)
Agreemen
t done
SDE(IMT)
NSG ready
to give
Site
now...SDE
(IMT)
SDE(IMT)
SDE(IMT)
HPC done
butagree
ment
pending
* total
sites=18
* sites
hired =10
(HPC done
with
agreemen
t-
mumtajpu
rKota
khandewl
a,Bhangro
la,kakrola(
sec7),sikh
opur,naha
rpur
kasan,imt
sec8,nawa
dafathepu
r,near
gitm,bilas
pur
haryana,
)
*HPC
done but
agreemen
t
pending=
1 imt sec-
1 ,)
* file sent
for
HPC=2(ha
yatpur +
jatauli )
*
applicatio
n
required=
5(sec3,nsg
2,,
nakhdaula
,imt
sec3,amit
y )

SDE(IMT)
COURT
CASE ON
02-01-
2014
SDE(IMT)
HPC
Pending
SDE(IMT)
HPC
Pending
SDE(IMT)
site hand
over ip
(indus) by
circle
office
SDE(IMT)
SDE(IMT)
Concern DE Remarks
SDE(IMT)
site
handed
over to
circle
DET(South )
lat long
sent to
circle
(field
team visit
requied)
DET(South )
agreement
done
* total
sites=18
* sites
hired =10
(HPC done
with
agreemen
t-
mumtajpu
rKota
khandewl
a,Bhangro
la,kakrola(
sec7),sikh
opur,naha
rpur
kasan,imt
sec8,nawa
dafathepu
r,near
gitm,bilas
pur
haryana,
)
*HPC
done but
agreemen
t
pending=
1 imt sec-
1 ,)
* file sent
for
HPC=2(ha
yatpur +
jatauli )
*
applicatio
n
required=
5(sec3,nsg
2,,
nakhdaula
,imt
sec3,amit
y )

* total
sites=13
* Sites
Hired=4 (1
xge sites
+3 HPC
done with
agreemen
t-te
sna,crp
camp,me
dawas,roj
kameo,pal
ara,Sec-67
)
*HPC
done but
agreemen
t
pending=
1
(sikandarp
ur )
file sent
for
HPC=2(ha
sanpur,la
khuwas)
*
applicatio
n
required=
3.silani,sn
a dense
area,wazir
pur)

* so
pending
sites = 9
(file sent
for hpc +
HPC done
w/o
agreemen
t+applicat
ion
required )
E/C
pending
in hired
sites=3
DET(South )
site
visited by
sde(mp)
and
de(sohnar
d) but site
found
very far
from
nominals
DET(South )
on air on
13/12/13
DET(South )
permissio
n letter in
progres at
delhi
DET(South )
site
handed
over to
circle
DET(South )
site
handed
over to
circle
DET(South )
agreemen
t in
progres
DET(South )
HPC
Pending
DET(South )
site
handed
over to
circle
DET(South )
site hand
over ip
(indus) by
circle
office
DET(South )
DET(South )
DE(NWO-N)
Revise Lat-
long sent
to circle
* total
sites=13
* Sites
Hired=4 (1
xge sites
+3 HPC
done with
agreemen
t-te
sna,crp
camp,me
dawas,roj
kameo,pal
ara,Sec-67
)
*HPC
done but
agreemen
t
pending=
1
(sikandarp
ur )
file sent
for
HPC=2(ha
sanpur,la
khuwas)
*
applicatio
n
required=
3.silani,sn
a dense
area,wazir
pur)

* so
pending
sites = 9
(file sent
for hpc +
HPC done
w/o
agreemen
t+applicat
ion
required )
E/C
pending
in hired
sites=3
* total
sites=5
* sites
hired=1
(Bajghera
with EC
done-HPC
done with
agreemen
t ),
*HPC
done but
agreemen
t pending
=2
(daultaba
d,kherki
mazra)
*File sent
for
HPC=1(dh
armpur)
* App
Concern DE Remarks
DE(NWO-N)
agreemen
t pending
DE(NWO-N)
searching
new site
DE(NWO-N)
agreemen
t pending
DE(NWO-N)
site handed
over to circle
DE(NWO-W)
site
handed
over to
circle
DE(NWO-W)
agreemen
t pending
DE(NWO-W)
site
handover
to circle
DE(NWO-W)
file sent
to HPC
DE(NOW-W)
agreemen
t done
DE(NOW-E)
DE(NOW-E)
DE(NOW-E)
site
handover
to circle
* total
sites=4
*Sites
Hired =1
(HPC
done with
agreemen
t)
(
behrampu
r )
*file sent
for HPC=1
* total
sites=5
* sites
hired=1
(Bajghera
with EC
done-HPC
done with
agreemen
t ),
*HPC
done but
agreemen
t pending
=2
(daultaba
d,kherki
mazra)
*File sent
for
HPC=1(dh
armpur)
* App
* total
sites=5(4+
1IP)
*Sites
Hired =3
(HPC done
with
agreemen
t-
Khetavas,
Mussaidp
ur,sultanp
ur-court
case)
* hpc
done but
agreemen
t
pending=
2
DE(NOW-E) lat long ok
total Tower Foundation done ssa civil = 13 (sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas, Naharpur,CRPF camp ZTE,musaidpur,near GITM,Kota Khandewla)
TE Sohna,Medawas,RojkaMeo,Bajghera,Khetawas,Mussaidpur,IMT sec-8.Nawada Fatehpur ,Naharpur Kasan,Sikohpur,Mumtajpur,Bisru,Sangail,Bhangrola, Kakrola(sec7),Near GITM, Bilaspur haryana, Kota
Khandewla,Ullawas,Behrampur
DATED 1-02-2014
Summary: Total sites=58 ( Alrdy Twr Erected with agreement done =11 + 47 new sites (4 IP +43 ) ) IP-amity,kasan,wazirpur,imt sec3
work detail of new sites -47 :: NewAgreemDone(sites hired )=22, HPC done but agreement pending =5, file sent to HPC =6,application required=8
Sr
No
SDC
A
Total
Sites(IP/SSA
)
Hiring of
Site(NR/
IP/SSA)
Nominals
(NotRrce
ived/OK/
Not
Ok)RF
Status of
Site hiring
by SSA
(NR/IP/Y/t
o HPC/WIP)
Agreemen
t
AD/D/NR
EC status (Y)
Tower
Found
ation(
NR/Zt
e/Civi
Tower
Erection(
NR/SSA/
Zte)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concer
n DE
Remarks Summary
1 Grg Dhankot NR NR NR AD y AD AD
ALREADY
SHELTER
DONE Done Done Done OFC Done done DONE Combo
comissi
oned
DE(NW
O-w)
on air on 6-
11-13
on air on 6-11-
13
2 Grg Kherki Daula NR NR NR AD y AD AD
ROOM
DONE
DONE Installed Installed Installed
OFC Done/for
3g FE pending
done
Installe
d
Combo pending
DET(So
hna RD)
BTS on AIR
03/05/2013
on air 03-05-13
3 Grg Binola NR NR NR AD y AD AD
Room
Already
DONE Done Done done OFC Done done
Installe
d
Combo pending
SDE(IM
T)
BTS on AIR
01/05/2013
on air 01-05-13
4 Grg Tikli NR NR NR AD y AD AD Outdoor Not reqd Done Done done
ML Done (far
end KDR)
Not reqd DONE 2G NA
DET(So
hna RD)
Bts on air 31-
1-14
On Air 31-1-14
5 Nuh Sudaka NR NR NR AD y AD AD Outdoor Not reqd Done Done DONE
ML Done (far
end Ujina)
Not reqd DONE 2G NA
DE(Me
wat)
BTS on AIR
01/01/2014
On Air
01/01/2014
6 Nuh salamba NR NR NR
agrmnt to
revised(re
port
pending
from civil
y AD AD Done
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
ML (Far end
nuh) & pcm
testing pending
Pending
ZTE
Pending
ZTE
2G NA
DE(Me
wat)
work pending
at ZTE
7 Nuh Alduka NR NR NR AD y AD AD zte done zte done zte done zte done zte done
ML done (far
end GSR)
zte done
zte
done
2G NA
DE(Me
wat)
intigrated emf data sent
8 Nuh Indri NR NR NR AD
will take 7-8
days more
AD AD Done DONE Done Done Done
ML done (Far
end Rewasan)
done DONE 2G NA
DE(Me
wat)
intigrated
(emf data
sent)
zte work done
9 Fpj Jamalgarh NR NR NR AD y AD AD Outdoor Not reqd Done Done done
ML DONE (Far
end Baded )
Not reqd DONE 2G NA
DE(Me
wat)
BTS on AIR
16/01/2014
On Air
16/01/2014
10 Fpj Sikrawa NR NR NR AD yes AD AD
Room
Already
Done Done Done Done OFC Done done
Installe
d
2G pending
DE(Me
wat)
BTS on air on
30-04-13
On air 30-04-
13
11 Fpj Gulalta NR NR NR AD yes AD AD Done DONE DONE Done Done
ML DONE (Far
end Sikhrawa)
done DONE 2G NA
DE(Me
wat)
intigrated
(emf data
sent)
zte work done
12 Nuh Sangail SSA OK done AD
check
deposited at
DHBVNL ,
pending at
DONE done Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
ML pending (far
end Ujjina) Not reqd
Pending
ZTE
2G NA
DE(Me
wat)
13 Fpj Bisru SSA OK done DONE
Final
payment
done,work
pending at
DONE DONE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
ML Pnding ( far
end Gulalta)
Not reqd
Pending
ZTE
2G NA
DE(Me
wat)
14 Grg mumtajpur SSA OK Done Done
Work start
by DHBVN
Done DONE outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
2G NA
SDE(IM
T)
site handed
over to circle
15 Grg Sikhopur SSA
OK; also
to search
new
applicati
on
Done done
Demand
note
received ,
file at AO
civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending
SDE(IM
T)
Court case
done next
date:
19/02/14 ;
to search
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT
*total site=2
sites hired =2
(HPC done
with
agreement)
but E/C
pending at
both sites
* total
sites=18
* sites hired
=10 (HPC done
with
agreement-
mumtajpur,np
kasan,sec8
imt,nawada
fatepur,Kota
khandewla,Bha
ngrola/kakrola,
kakrola(sec7),si
khopur,near
gitm,bilaspur
haryana, )
*HPC done but
agreement
pending=3(imt
sec-1
,nakhdola,haya
tpur)
* file sent for
HPC=1(jatauli )
* application
required=
5(sec3,nsg2,im
t
sec3,amity,kas
an )

Sr
No
SDC
A
Total
Sites(IP/SSA
)
Hiring of
Site(NR/
IP/SSA)
Nominals
(NotRrce
ived/OK/
Not
Ok)RF
Status of
Site hiring
by SSA
(NR/IP/Y/t
o HPC/WIP)
Agreemen
t
AD/D/NR
EC status (Y)
Tower
Found
ation(
NR/Zt
e/Civi
Tower
Erection(
NR/SSA/
Zte)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concer
n DE
Remarks
16 Grg
Nahar pur
KASAN
SSA OK Done Done
Intial security
deposited.
DONE WIP Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini link(ZTE) Not reqd
Pending
ZTE
Combo pending
SDE(IM
T)
Court case
done dt 19-2-
14 Comitee
is mode to
resolve
17 Grg
Imt Sec-8
manesar
SSA OK Done DONE
file
submitted to
DHBVNL
&wip
Civil ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini link(ZTE) Not reqd
Pending
ZTE
Combo pending
SDE(IM
T)
apeal done
in higher
court dt:13-2-
14
18 Grg
Nawada
fatehpur
SSA OK Done DONE
Tender will
be given for
work
done
Civil
DONE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini link(ZTE) Not reqd
Pending
ZTE
Combo pending
SDE(IM
T)
site handed
over to circle
19 Nuh
kota
khandewla
SSA ok Done DONE
initial
payment
done to
DHBVNL
done circle outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending
SDE(IM
T)
site handed
over to circle
20 Grg Nakhdola SSA ok Done
Agreemen
t Pending
Civil ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
ML ( far end
IMT MANESER)
Pending
ZTE
Pending
ZTE
Combo pending
SDE(IM
T)
Agreement
Panding
21 Grg
Kakrola(IMT-
Sec-7)
SSA OK done done
initial
payment
done to
DHBVNL
Civil ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
ML
Pending
ZTE
Pending
ZTE
Combo pending
SDE(IM
T)
Agreement
done
22 Grg
nsg gate-2
/Navrangpur
SSA OK
final letter
pending frm
NSG
Civil ZTE outdoor
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending
SDE(IM
T)
do letter
sent to nsg
by de mewat
23 Grg
Bhangrola/K
akrola
SSA OK Done DONE
initial
payment
done to
DHBVNL
Civil ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini link(ZTE)
far end IMT
MANESER
Not reqd
Pending
ZTE
Combo pending
SDE(IM
T)
24 Grg IMT sect-1 SSA OK done in progress yes Civil
pole by
ZTE
XGE. FE port
ready.
Pending
ZTE
Combo pending
SDE(IM
T)
HPC done
butagreeme
nt pending
25 Grg Near GITM SSA ok Done DONE
Cheque
pending at
A/O
done circle outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
ML Not reqd
Pending
ZTE
Combo pending
SDE(IM
T)
COURT CASE
ON 04-02-
2014
26 Grg Hayatpur SSA ok Done
Agreemen
t Panding
Civil ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini link(ZTE) Not reqd
Pending
ZTE
Combo pending
SDE(IM
T)
Agreement
Panding
27 Grg
Jatauli/Hali
Mandi2
SSA ok
HPC
Pending
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini link(ZTE) Not reqd
Pending
ZTE
Combo pending
SDE(IM
T)
HPC Pending
28 Grg
Amity(Near
Pachgaon)-
badanki
SSA/IP ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending
SDE(IM
T)
site hand
over ip
(indus) by
circle office
29 Grg Kasan SSA/IP
aplicatio
n reqd
shiv mandir
ML (far end IMT
MANESER)
Pending
ZTE
Combo pending
SDE(IM
T)
30 Grg
Imt Sec-3
manesar
SSA/IP IP
IP (ssa
searching )
IP IP IP IP ML
Pending
ZTE
Combo pending
SDE(IM
T)
* total
sites=18
* sites hired
=10 (HPC done
with
agreement-
mumtajpur,np
kasan,sec8
imt,nawada
fatepur,Kota
khandewla,Bha
ngrola/kakrola,
kakrola(sec7),si
khopur,near
gitm,bilaspur
haryana, )
*HPC done but
agreement
pending=3(imt
sec-1
,nakhdola,haya
tpur)
* file sent for
HPC=1(jatauli )
* application
required=
5(sec3,nsg2,im
t
sec3,amity,kas
an )

Sr
No
SDC
A
Total
Sites(IP/SSA
)
Hiring of
Site(NR/
IP/SSA)
Nominals
(NotRrce
ived/OK/
Not
Ok)RF
Status of
Site hiring
by SSA
(NR/IP/Y/t
o HPC/WIP)
Agreemen
t
AD/D/NR
EC status (Y)
Tower
Found
ation(
NR/Zt
e/Civi
Tower
Erection(
NR/SSA/
Zte)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concer
n DE
Remarks
31 Grg
Bilaspur,
Haryana
(bilaspur
khurd )
SSA ok Done DONE
Cheque
pending at
A/O
Civil M/s SKC
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC(SDETX will
visit)
Pending
ZTE
Pending
ZTE
Combo pending
SDE(IM
T)
site handed
over to circle
32 Grg Hasanpur SSA
Let long
sent to
circle
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini link(ZTE)
PALRA
Not reqd
Pending
ZTE
Combo pending
DET(So
uth )
lat long sent
to circle
(field team
visit requied)
33 Grg Palra SSA ok done DONE applied Civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending
DET(So
uth )
agreement
done
34 Grg Silani SSA
revise
application
required
Civil circle
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending
DET(So
uth )
site visited
by sde(mp)
and
de(sohnard)
35 Grg TE Sohna SSA OK done DONE y (TE xge )
done
Civil
done M/s
SKC
Room
Already
Done Already Already Already
XGE. FE
provided
done DONE Combo on air
DET(So
uth )
on air on
13/12/13
36 Grg CRPF Camp SSA OK done
permission
letter in
progres
Yes (CRPF
will provide
EC)EC wiring
pending
DONE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Pending(DE
Tx Urban)
Not reqd
Pending
ZTE
Combo pending
DET(So
uth )
do letter
sent to crpf
by de south
37 Grg Medhawas SSA OK Done DONE
Demand
note pending
at DHBVNL
DONE DONE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending
DET(So
uth )
site handed
over to circle
38 GRG RojkaMeo SSA OK done AD
file at AO
bsnl for
cheque
done
Civil
done M/s
SKC
Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(ZTE)
Not reqd
Pending
ZTE
Combo pending
DET(So
uth )
site handed
over to circle
39 Grg
Sikandarpur(
Bada)
SSA
Revise
applicati
on
required
Done in progres ZTE circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini link(ZTE) Not reqd
Pending
ZTE
Combo pending
DET(So
uth )
40 Grg Lakhuwas ssa OK
file sent to
HPC
HPC wip circle
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Combo pending
DET(So
uth )
HPC Pending
41 Grg Sector-67 SSA ok Done HPC wip Civil circle
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Combo pending
DET(So
uth )
site handed
over to circle
42 Grg Wazirpur IP
site hand
over ip
(indus) by
circle office
lat/long
required
ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini link(ZTE)
Pending
ZTE
Pending
ZTE
Combo pending
DET(So
uth )
site hand
over ip
(indus) by
circle office
43 Grg
Sohna
DENSE AREA
SSA Bid not recd
lat/long
required
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini link(ZTE) Not reqd
Pending
ZTE
Combo pending
DET(So
uth )
44 Grg
BSF camp
bhondsi
SSA OK
file sent to
HPC
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini link(ZTE) Not reqd
Pending
ZTE
Combo pending
DET(So
uth )
* total
sites=18
* sites hired
=10 (HPC done
with
agreement-
mumtajpur,np
kasan,sec8
imt,nawada
fatepur,Kota
khandewla,Bha
ngrola/kakrola,
kakrola(sec7),si
khopur,near
gitm,bilaspur
haryana, )
*HPC done but
agreement
pending=3(imt
sec-1
,nakhdola,haya
tpur)
* file sent for
HPC=1(jatauli )
* application
required=
5(sec3,nsg2,im
t
sec3,amity,kas
an )

* total
sites=13
* Sites
Hired=4 (1 xge
sites +3 HPC
done with
agreement-te
sna,crp
camp,medawa
s,rojkameo,pal
ara,Sec-67 )
*HPC done but
agreement
pending=1
(sikandarpur )
file sent for
HPC=2(hasanp
ur,lakhuwas)
* application
required=
3.silani,sna
dense
area,wazirpur)

* so pending
sites = 9 (file
sent for hpc +
HPC done w/o
agreement+ap
plication
required )
E/C pending in
hired sites=3
Sr
No
SDC
A
Total
Sites(IP/SSA
)
Hiring of
Site(NR/
IP/SSA)
Nominals
(NotRrce
ived/OK/
Not
Ok)RF
Status of
Site hiring
by SSA
(NR/IP/Y/t
o HPC/WIP)
Agreemen
t
AD/D/NR
EC status (Y)
Tower
Found
ation(
NR/Zt
e/Civi
Tower
Erection(
NR/SSA/
Zte)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concer
n DE
Remarks
45 Grg Daultabad SSA ok
application
received
Civil circle
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini link(ZTE) Not reqd
Pending
ZTE
Combo pending
DE(NW
O-N)
file in
progress
46 Grg dharampur SSA OK
Revise
application
Pending
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini link(ZTE) Not reqd
Pending
ZTE
Combo pending
DE(NW
O-N)
searching
new site
47 Grg Bajghera SSA OK done AD Yes done
done M/s
SKC
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC (M/W
pending(ZTE)..fa
r end p/v))
Pending
ZTE
Pending
ZTE
Combo pending
DE(NW
O-N)
site handed
over to circle
48 Grg fazilpur
SSA(Khe
rki
Majra
soil
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini link(ZTE) Not reqd
Pending
ZTE
Combo pending
DE(NW
O-W)
agreement
pending
49 Grg Khetawas SSA OK Done DONE
final
payment
done,work
pending at
Done Done Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)..far
end fkn
Not reqd
Pending
ZTE
Combo pending
DE(NW
O-W)
site handed
over to circle
50 Grg
SGT Medical
college near
Budera
SSA OK HPC Done done
file
submitted to
DHBVNL
Civil circle
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/L(far end
fkn,chandu,ghar
i harsaru
Pending
ZTE
Pending
ZTE
Combo pending
DE(NW
O-W)
51 Grg Mussaidpur SSA OK HPC Done DONE
Estimate
pendng
DHBVNL,Tele
phonically
done
shifte
d
from
circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/L(ZTE)far
end fkn
Not reqd
Pending
ZTE
Combo pending
DE(NW
O-W)
EC stoped by
neighbour
site
handover to
52 Grg sultanpur SSA OK
file sent to
HPC
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini link(ZTE) Not reqd
Pending
ZTE
Combo pending
DE(NW
O-W)
file sent to
HPC
53 Grg Baslambi SSA OK HPC Done DONE
visit pending
at DHBVNL
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Combo pending
DE(NO
W-W)
agreement
done
54 Grg
Fazilpur /
Kherki majra
SSA
Let long
sent to
circle
civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini link(ZTE)
55 Grg
Gawal
pahari/Balia
was
SSA OK HPC Done
agreement
pending
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)(OFC)
Not reqd
Pending
ZTE
Combo pending
DE(NO
W-E)
56 Grg Ullawas SSA
Let long
sent to
circle
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
minilinkfar
end kendriya
vihar /kadarpur
& ofc(bsnl)
Not reqd
Pending
ZTE
Combo pending
DE(NO
W-E)
57 Grg Behrampur SSA ok HPC Done DONE DD pending
done
24/1/
14
circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)far
end fkn
Not reqd
Pending
ZTE
Combo pending
DE(NO
W-E)
site
handover to
circle
58 Grg
Bandwadi
(old site-IMT-
sec-6)
SSA ok
bandwadi
application
required
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini link(ZTE) Not reqd
Pending
ZTE
Combo pending
DE(NO
W-E)
lat long ok
work detail of new sites 47 ::
HPC done but agreement pending =5,
file sent to HPC =6,
court cases sites= 4 sikhopur,naharpur kasan,imt sec8,near gitm)
Imt Sec-3,NSG Gate-2,AMITY,Kasan,Silani,Wazirpur,Sohna Dense,Bandwadi,Daultabad
Tower Erection =9
* total sites=6
*Sites Hired =4
(HPC done
with
agreement-
Khetavas,Muss
aidpur,baslam
bi,sgt medical
college)
* hpc done but
agreement
pending=1
(sultanpur )
*file sent for
HPC=0
* application
required=1(fazi
lpur)
(sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas)
total Tower Foundation done ssa civil = 14 (+1 zte)
sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas, Naharpur,CRPF camp
ZTE,musaidpur,near GITM,Kota Khandewla,behrampur)
* total sites=4
*Sites Hired =1
(HPC done
with
agreement)
( behrampur )
*file sent for
HPC but
agreemnt
pending=1
Gwalpahari
* application
required= 2
Agreement Done (sites
hired) =22
TE Sohna,Medawas,RojkaMeo,Bajghera,Khetawas,Mussaidpur,IMT sec-8.Nawada Fatehpur ,Naharpur Kasan,Sikohpur,Mumtajpur,Bisru,Sangail,Bhangrola, Kakrola(sec7),Near GITM, Bilaspur haryana, Kota
Khandewla,Ullawas,Behrampur,Sec-67, SGT Medi
imt sec-1 ,Sikanderpur,CRPF camp, baslambi,
hayatpur,lakhuwas,hasanpur,Gwalpahari,Dharampur,Jatauli, BSF
application required=8
Mo
bile
JTO
nod
als
JTO
(M
OB
)
nod
al -
GR
G
Sh.
PP
Gu
pta
JTO
(M
OB
)
nod
al -
Tau
ru
Sh.
Raji
v
Ku
ma
r
Ma
rot
hia
JTO
(M
OB
)
nod
al -
Tau
ru
Sh.
Raji
v
Ku
ma
r
Ma
rot
hia
JTO
(M
OB
)
nod
al -
Tau
ru
Sh.
Raji
v
Ku
ma
r
Ma
rot
hia
JTO
(M
OB
)
nod
al -
GR
G
Sh.
PP
Gu
pta
JTO
(M
OB
)
nod
al -
Pat
udi
Sh.
Aja
y
Ku
ma
r
JTO
(M
OB
)
nod
al -
Pat
udi
Sh.
Aja
y
Ku
ma
r
DATED 07-02-2014
Summary: Total sites=58 ( Alrdy Twr Erected with agreement done =11 + 47 new sites (4 IP +43 ) ) IP-amity,kasan,wazirpur,imt sec3
work detail of new sites -47 :: NewAgreemDone(sites hired )=22, HPC done but agreement pending =5, file sent to HPC =6,application required=7
Sr
No
SDC
A
Total
Sites(IP/SSA
)
Hiring of
Site(NR/
IP/SSA)
Nominals
(NotRrceiv
ed/OK/No
t Ok)RF
finalizatio
Status of
Site hiring
by SSA
(NR/IP/Y/t
o HPC/WIP)
Agreement
AD/D/NR
EC status
(Y)
Tower
Found
ation(
NR/Zt
e/Civil
Tower
Erectio
n(NR/S
SA/Zte)
Shelter FDFA DG
BATTER
Y
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATU
S
Concer
n DE
Remarks Summary
1 Grg Dhankot NR NR NR AD y AD AD
ALREADY
SHELTER
DONE Done Done Done OFC Done done DONE
Comb
o
comis
sioned
DE(NW
O-w)
on air on 6-11-
13
on air on 6-11-
13
2 Grg Kherki Daula NR NR NR AD y AD AD
ROOM
DONE
DONE Installed Installed Installed
OFC Done/for
3g FE pending
done
Installe
d
Comb
o
pendi
ng
DET(So
hna RD)
BTS on AIR
03/05/2013
on air 03-05-13
3 Grg Binola NR NR NR AD y AD AD
Room
Already
DONE Done Done done OFC Done done
Installe
d
Comb
o
pendi
ng
SDE(IM
T)
BTS on AIR
01/05/2013
on air 01-05-13
4 Grg Tikli NR NR NR AD y AD AD Outdoor Not reqd Done Done done
ML Done (far
end KDR)
Not reqd DONE 2G NA
DET(So
hna RD)
Bts on air 31-1-
14
On Air 31-1-14
5 Nuh Sudaka NR NR NR AD y AD AD Outdoor Not reqd Done Done DONE
ML Done (far
end Ujina)
Not reqd DONE 2G NA
DE(Me
wat)
BTS on AIR
01/01/2014
On Air
01/01/2014
6 Nuh salamba NR NR NR
agrmnt to
revised(report
pending from
civil xen)
y AD AD Done
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
ML (Far end
nuh) & pcm
testing pending
Pending
ZTE
Pending
ZTE
2G NA
DE(Me
wat)
work pending at
ZTE
7 Nuh Alduka NR NR NR AD y AD AD zte done zte done zte done
zte
done
zte done
ML done (far
end GSR)
zte done
zte
done
2G NA
DE(Me
wat)
intigrated emf data sent
8 Nuh Indri NR NR NR AD
will take 7-8
days more
AD AD Done DONE Done Done Done
ML done (Far
end Rewasan)
done DONE 2G NA
DE(Me
wat)
intigrated (emf
data sent)
zte work done
9 Fpj Jamalgarh NR NR NR AD y AD AD Outdoor Not reqd Done Done done
ML DONE (Far
end Baded )
Not reqd DONE 2G NA
DE(Me
wat)
BTS on AIR
16/01/2014
On Air
16/01/2014
10 Fpj Sikrawa NR NR NR AD yes AD AD
Room
Already
Done Done Done Done OFC Done done
Installe
d
2G
pendi
ng
DE(Me
wat)
BTS on air on 30-
04-13
On air 30-04-13
11 Fpj Gulalta NR NR NR AD yes AD AD Done DONE DONE Done Done
ML DONE (Far
end Sikhrawa)
done DONE 2G NA
DE(Me
wat)
intigrated (emf
data sent)
zte work done
12 Nuh Sangail SSA OK done AD
work
panding at
dhbvnl
DONE done Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
ML pending
(far end Ujjina)
Not reqd
Pending
ZTE
2G NA
DE(Me
wat)
13 Fpj Bisru SSA OK done DONE
work
panding at
dhbvnl
DONE DONE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
ML Pnding ( far
end Gulalta)
Not reqd
Pending
ZTE
2G NA
DE(Me
wat)
14 Grg mumtajpur SSA OK Done Done
Work start
by DHBVN
Done DONE outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC (2E1
given)
Not reqd
Pending
ZTE
2G NA
SDE(IM
T)
site handed
over to circle
15 Grg Sikhopur SSA
OK; also to
search new
application
Done done
Demand
note
received ,
file at AO
civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IM
T)
Court case done
next date:
19/02/14 ; to
search new
appltn
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT
*total site=2
sites hired =2
(HPC done with
agreement)
but E/C pending
at both sites
* total sites=18
* sites hired =10
(HPC done with
agreement-
mumtajpur,npka
san,sec8
imt,nawada
fatepur,Kota
khandewla,Bhan
grola/kakrola,ka
krola(sec7),sikho
pur,near
gitm,bilaspur
haryana, )
*HPC done but
agreement
pending=3(imt
sec-1
,nakhdola,hayat
pur)
* file sent for
HPC=1(jatauli )
* application
required=
5(sec3,nsg2,imt
sec3,amity,kasa
n )

Sr
No
SDC
A
Total
Sites(IP/SSA
)
Hiring of
Site(NR/
IP/SSA)
Nominals
(NotRrceive
d/OK/Not
Ok)RF
finalization
Status of Site
hiring by SSA
(NR/IP/Y/to
HPC/WIP)
Agreement
AD/D/NR
EC status
(Y)
Tower
Found
ation(
NR/Zt
e/Civil
)
Tower
Erectio
n(NR/S
SA/Zte)
Shelter FDFA DG
BATTER
Y
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATU
S
Concer
n DE
Remarks
16 Grg
Nahar pur
KASAN
SSA OK Done Done
Intial
security
deposited.
DONE WIP Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini link(ZTE) Not reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IM
T)
Court case done
dt 19-2-14
Comitee is
mode to resolve
17 Grg
Imt Sec-8
manesar
SSA
new site
searching
Civil ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini link(ZTE) Not reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IM
T)
apeal done in
higher court
dt:13-2-14
18 Grg
Nawada
fatehpur
SSA OK Done DONE
Tender will
be given for
work.
done
Civil
DONE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini link(ZTE) Not reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IM
T)
site handed
over to circle
19 Nuh
kota
khandewla
SSA ok Done DONE
initial
payment
done to
DHBVNL
done circle outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IM
T)
site handed
over to circle
20 Grg Nakhdola SSA ok Done
Agreement
Pending
Civil ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
ML ( far end
IMT MANESER)
Pending
ZTE
Pending
ZTE
Comb
o
pendi
ng
SDE(IM
T)
Agreement
Panding
21 Grg
Kakrola(IMT-
Sec-7)
SSA OK done done
initial
payment
done to
DHBVNL
Civil ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
ML
Pending
ZTE
Pending
ZTE
Comb
o
pendi
ng
SDE(IM
T)
Agreement
done
22 Grg
nsg gate-2
/Navrangpur
SSA OK
final letter
pending frm
NSG
Civil ZTE outdoor
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Comb
o
pendi
ng
SDE(IM
T)
do letter sent to
nsg by de
mewat
23 Grg
Bhangrola/K
akrola
SSA OK Done DONE
initial
payment
done to
DHBVNL
Civil ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini link(ZTE)
far end IMT
MANESER
Not reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IM
T)
24 Grg IMT sect-1 SSA OK done in progress yes Civil
pole by
ZTE
XGE. FE port
ready.
Pending
ZTE
Comb
o
pendi
ng
SDE(IM
T)
HPC done
butagreement
pending
25 Grg Near GITM SSA ok Done DONE
Cheque
pending at
A/O
done circle outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
ML Not reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IM
T)
COURT CASE ON
04-02-2014
26 Grg Hayatpur SSA ok Done
Agreement
Panding
Civil ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini link(ZTE) Not reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IM
T)
Agreement
Panding
27 Grg
Jatauli/Hali
Mandi2
SSA ok
HPC
Pending
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini link(ZTE) Not reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IM
T)
HPC Pending
28 Grg
Amity(Near
Pachgaon)-
badanki
SSA/IP
Bid not
Receved
ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Comb
o
pendi
ng
SDE(IM
T)
site hand over ip
(indus) by circle
office
29 Grg Kasan SSA/IP
aplication
reqd
shiv mandir
ML (far end
IMT MANESER)
Pending
ZTE
Comb
o
pendi
ng
SDE(IM
T)
30 Grg
Rathiwas /
Ghos ghar/
Khod
old site
pwala
khuspur
Let Long
Sent to
Circle
* total sites=18
* sites hired =10
(HPC done with
agreement-
mumtajpur,npka
san,sec8
imt,nawada
fatepur,Kota
khandewla,Bhan
grola/kakrola,ka
krola(sec7),sikho
pur,near
gitm,bilaspur
haryana, )
*HPC done but
agreement
pending=3(imt
sec-1
,nakhdola,hayat
pur)
* file sent for
HPC=1(jatauli )
* application
required=
5(sec3,nsg2,imt
sec3,amity,kasa
n )

31 Grg
Imt Sec-3
manesar
SSA/IP IP
IP (ssa
searching )
IP IP IP IP ML
Pending
ZTE
Comb
o
pendi
ng
SDE(IM
T)
Sr
No
SDC
A
Total
Sites(IP/SSA
)
Hiring of
Site(NR/
IP/SSA)
Nominals
(NotRrceive
d/OK/Not
Ok)RF
finalization
Status of Site
hiring by SSA
(NR/IP/Y/to
HPC/WIP)
Agreement
AD/D/NR
EC status
(Y)
Tower
Found
ation(
NR/Zt
e/Civil
Tower
Erectio
n(NR/S
SA/Zte)
Shelter FDFA DG
BATTER
Y
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATU
S
Concer
n DE
Remarks
32 Grg
Bilaspur,
Haryana
(bilaspur
khurd )
SSA ok Done DONE
Cheque
pending at
A/O
Civil
M/s
SKC
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC(SDETX will
visit)
Pending
ZTE
Pending
ZTE
Comb
o
pendi
ng
SDE(IM
T)
site handed
over to circle
33 Grg Hasanpur SSA
new site
searching
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini link(ZTE)
PALRA
Not reqd
Pending
ZTE
Comb
o
pendi
ng
DET(So
uth )
lat long sent to
circle (field
team visit
requied)
34 Grg Palra SSA ok done DONE applied Civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Comb
o
pendi
ng
DET(So
uth )
agreement done
35 Grg Silani SSA ok
revise
application
required
Civil circle
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Comb
o
pendi
ng
DET(So
uth )
36 Grg TE Sohna SSA OK done DONE y (TE xge )
done
Civil
done
M/s
SKC
Room
Already
Done Already Already Already
XGE. FE
provided
done DONE
Comb
o
on air
DET(So
uth )
on air on
13/12/13
37 Grg CRPF Camp SSA OK done
permission
letter in
progres
Yes (CRPF
will provide
EC)EC
wiring
DONE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending(DE Tx
Urban)
Not reqd
Pending
ZTE
Comb
o
pendi
ng
DET(So
uth )
do letter sent to
crpf by de south
38 Grg Medhawas SSA OK Done DONE
Demand
note
pending at
DHBVNL
DONE DONE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Comb
o
pendi
ng
DET(So
uth )
site handed
over to circle
39 GRG RojkaMeo SSA OK done AD
dd
deposited
to dhbvnl
done
Civil
done
M/s
SKC
Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/W
pending(ZTE)
Not reqd
Pending
ZTE
Comb
o
pendi
ng
DET(So
uth )
site handed
over to circle
40 Grg
Sikandarpur(
Bada)
SSA
Revise
application
required
Done in progres ZTE circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini link(ZTE) Not reqd
Pending
ZTE
Comb
o
pendi
ng
DET(So
uth )
41 Grg Lakhuwas ssa OK
file sent to
HPC
HPC wip circle
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Comb
o
pendi
ng
DET(So
uth )
HPC Pending
42 Grg Sector-67 SSA ok Done HPC done
File work
start
Civil circle
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC
Pending
ZTE
Pending
ZTE
Comb
o
pendi
ng
DET(So
uth )
site handed
over to circle
43 Grg Wazirpur IP
site hand
over ip
(indus) by
circle office
lat/long
required
ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini link(ZTE)
Pending
ZTE
Pending
ZTE
Comb
o
pendi
ng
DET(So
uth )
site hand over ip
(indus) by circle
office
44 Grg
Sohna
DENSE AREA
SSA Bid not recd Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini link(ZTE) Not reqd
Pending
ZTE
Comb
o
pendi
ng
DET(So
uth )
* total sites=18
* sites hired =10
(HPC done with
agreement-
mumtajpur,npka
san,sec8
imt,nawada
fatepur,Kota
khandewla,Bhan
grola/kakrola,ka
krola(sec7),sikho
pur,near
gitm,bilaspur
haryana, )
*HPC done but
agreement
pending=3(imt
sec-1
,nakhdola,hayat
pur)
* file sent for
HPC=1(jatauli )
* application
required=
5(sec3,nsg2,imt
sec3,amity,kasa
n )

* total sites=13
* Sites Hired=4
(1 xge sites +3
HPC done with
agreement-te
sna,crp
camp,medawas,
rojkameo,palara,
Sec-67 )
*HPC done but
agreement
pending=1
(sikandarpur )
file sent for
HPC=2(hasanpur
,lakhuwas)
* application
required=
3.silani,sna
dense
area,wazirpur)

* so pending
sites = 9 (file
sent for hpc +
HPC done w/o
agreement+appl
ication required
)
E/C pending in
hired sites=3
45 Grg
BSF camp
bhondsi
SSA OK
file sent to
HPC
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini link(ZTE) Not reqd
Pending
ZTE
Comb
o
pendi
ng
DET(So
uth )
Sr
No
SDC
A
Total
Sites(IP/SSA
)
Hiring of
Site(NR/
IP/SSA)
Nominals
(NotRrceive
d/OK/Not
Ok)RF
finalization
Status of Site
hiring by SSA
(NR/IP/Y/to
HPC/WIP)
Agreement
AD/D/NR
EC status
(Y)
Tower
Found
ation(
NR/Zt
e/Civil
Tower
Erectio
n(NR/S
SA/Zte)
Shelter FDFA DG
BATTER
Y
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATU
S
Concer
n DE
Remarks
46 Grg Daultabad SSA ok
hpc
pending
Civil circle
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini link(ZTE) Not reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NW
O-N)
file in progress
47 Grg dharampur SSA OK
file sent to
HPC
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini link(ZTE) Not reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NW
O-N)
file in progress
48 Grg Bajghera SSA OK done AD Yes done
done
M/s
SKC
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC (M/W
pending(ZTE)..far
end p/v))
Pending
ZTE
Pending
ZTE
Comb
o
pendi
ng
DE(NW
O-N)
site handed
over to circle
49 Grg fazilpur
SSA(Kher
ki Majra
soil
problem
OK
Revise
application
Pending
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini link(ZTE) Not reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NW
O-W)
50 Grg Khetawas SSA OK Done DONE
final
payment
done,work
pending at
Done Done Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)..far
end fkn
Not reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NW
O-W)
site handed
over to circle
51 Grg
SGT Medical
college near
Budera
SSA OK HPC Done done
file
submitted
to DHBVNL
Civil circle
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/L(far end
fkn,chandu,ghari
harsaru
Pending
ZTE
Pending
ZTE
Comb
o
pendi
ng
DE(NW
O-W)
52 Grg Mussaidpur SSA OK HPC Done DONE
Estimate
pendng
DHBVNL,Tel
ephonically
done
shifted
from
silani
circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
M/L(ZTE)far
end fkn
Not reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NW
O-W)
EC stoped by
neighbour site
handover to circle
53 Grg sultanpur SSA OK
file sent to
HPC(old
agreemnt
cancelled)
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini link(ZTE) Not reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NW
O-W)
file sent to HPC
54 Grg Baslambi SSA OK HPC Done DONE
visit
pending at
DHBVNL
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
OFC Not reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NO
W-W)
agreement
done
55 Grg
Gawal
pahari/Balia
was
SSA OK HPC Done
agreement
pending
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini
link(ZTE)(OFC-
500 mtr
Not reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NO
W-E)
56 Grg Ullawas SSA OK
revise
application
required
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
minilinkfar end
kendriya vihar
/kadarpur &
ofc(bsnl)
Not reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NO
W-E)
57 Grg Behrampur SSA ok HPC Done DONE DD pending
done
24/1/1
4
circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini ,ofc 200 mtr
required,link(ZTE
)far end fkn
Not reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NO
W-E)
site handover to
circle
58 Grg
Bandwadi
(old site-IMT-
sec-6)
SSA ok
bandwadi
application
required
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pending
ZTE
Mini link(ZTE) Not reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NO
W-E)
lat long ok
work detail of new sites 47 ::
HPC done but agreement pending =5,
file sent to HPC =6,
court cases sites= 4 sikhopur,naharpur kasan,imt sec8,near gitm)
Imt Sec-3,NSG Gate-2,AMITY,Kasan,Silani,Wazirpur,Sohna Dense,Bandwadi,
Tower Erection =9
* total sites=13
* Sites Hired=4
(1 xge sites +3
HPC done with
agreement-te
sna,crp
camp,medawas,
rojkameo,palara,
Sec-67 )
*HPC done but
agreement
pending=1
(sikandarpur )
file sent for
HPC=2(hasanpur
,lakhuwas)
* application
required=
3.silani,sna
dense
area,wazirpur)

* so pending
sites = 9 (file
sent for hpc +
HPC done w/o
agreement+appl
ication required
)
E/C pending in
hired sites=3
* total sites=6
*Sites Hired =4
(HPC done with
agreement-
Khetavas,Mussai
dpur,baslambi,s
gt medical
college)
* hpc done but
agreement
pending=1
(sultanpur )
*file sent for
HPC=0
* application
required=1(fazil
pur)
(sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas)
* total sites=4
*Sites Hired =1
(HPC done with
agreement)
( behrampur )
*file sent for
HPC but
agreemnt
pending=1
Gwalpahari
* application
required= 2
(bandwadi and
Ullavas)
Agreement Done (sites
hired) =22
TE Sohna,Medawas,RojkaMeo,Bajghera,Khetawas,Mussaidpur,IMT sec-8.Nawada Fatehpur ,Naharpur Kasan,Sikohpur,Mumtajpur,Bisru,Sangail,Bhangrola, Kakrola(sec7),Near GITM, Bilaspur haryana, Kota
Khandewla,Ullawas,Behrampur,Sec-67, SGT Medi
imt sec-1 ,Sikanderpur,CRPF camp, baslambi,
hayatpur,lakhuwas,hasanpur,Gwalpahari,Dharampur,Jatauli, BSF
application required=7
total Tower Foundation done ssa civil = 14 (+1 zte)
sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas, Naharpur,CRPF
camp ZTE,musaidpur,near GITM,Kota Khandewla,behrampur)
Mo
bile
JTO
nod
als
JTO
(M
OB
)
nod
al -
GR
G
Sh.
PP
Gu
pta
JTO
(M
OB
)
nod
al -
Tau
ru
Sh.
Raji
v
Ku
ma
r
Ma
rot
hia
JTO
(M
OB
)
nod
al -
Tau
ru
Sh.
Raji
v
Ku
ma
r
Ma
rot
hia
JTO
(M
OB
)
nod
al -
Tau
ru
Sh.
Raji
v
Ku
ma
r
Ma
rot
hia
JTO
(M
OB
)
nod
al -
GR
G
Sh.
PP
Gu
pta
JTO
(M
OB
)
nod
al -
Pat
udi
Sh.
Aja
y
Ku
ma
r
DATED 25-01-2014
Summary: Total sites=58 ( Alrdy Twr Erected with agreement done =11 + 47 new sites (4 IP +43 ) ) IP-amity,kasan,wazirpur,imt sec3
work detail of new sites -47 :: NewAgreemDone(sites hired )=22, HPC done but agreement pending =5, file sent to HPC =6,application required=8
Sr
No
SDCA
Total
Sites(IP/SSA)
Hiring of
Site(NR/IP
/SSA)
Nominals
(NotRrceive
d/OK/Not
Ok)RF
finalization
Status of Site
hiring by SSA
(NR/IP/Y/to
HPC/WIP)
Agreement
AD/D/NR
EC status (Y)
Tower
Foundation
(NR/Zte/Ci
vil)
Tower
Erection(N
R/SSA/Zte
)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTAT
IC
BTS
Status
Site
2G/com
bo
3G
STATUS
Concern
DE
Remarks
1 Grg Dhankot NR NR NR AD y AD AD
ALREADY
SHELTER
DONE Done Done Done OFC Done done DONE
Comb
o
comissi
oned
DE(NWO-
w)
on air on 6-11-13
2 Grg Kherki Daula NR NR NR AD y AD AD
ROOM
DONE
DONE Installed Installed Installed
OFC Done/for 3g FE
pending
done Installed Combo pending
DET(Sohn
a RD)
BTS on AIR
03/05/2013
3 Grg Binola NR NR NR AD y AD AD
Room
Already
DONE Done Done done OFC Done done Installed Combo pending SDE(IMT)
BTS on AIR
01/05/2013
4 Grg Tikli NR NR NR AD y AD AD Outdoor Not reqd Done Done done
ML Done (far end
KDR)
Not reqd DONE 2G NA
DET(Sohn
a RD)
intigration
pending
5 Nuh Sudaka NR NR NR AD y AD AD Outdoor Not reqd Done Done DONE
ML Done (far end
Ujina)
Not reqd DONE 2G NA
DE(Mewa
t)
BTS on AIR
01/01/2014
6 Nuh salamba NR NR NR
agrmnt to
revised(repor
t pending
from civil
xen)
y AD AD Done
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
ML (Far end nuh) &
pcm testing
pending
Pending
ZTE
Pending
ZTE
2G NA
DE(Mewa
t)
7 Nuh Alduka NR NR NR AD y AD AD zte done zte done zte done zte done zte done
ML done (far end
GSR)
zte done zte done 2G NA
DE(Mewa
t)
intigrated
8 Nuh Indri NR NR NR AD
will take 7-8
days more
AD AD Done DONE Done Done Done
ML done (Far end
Rewasan)
done DONE 2G NA
DE(Mewa
t)
intigrated (emf
data sent)
9 Fpj Jamalgarh NR NR NR AD y AD AD Outdoor Not reqd Done Done done
ML DONE (Far end
Baded )
Not
reqd
DONE 2G NA
DE(Mewa
t)
BTS on AIR
16/01/2014
10 Fpj Sikrawa NR NR NR AD yes AD AD
Room
Already
Done Done Done Done OFC Done done
Installe
d
2G
pendin
g
DE(Mewa
t)
BTS on air on 30-
04-13
11 Fpj Gulalta NR NR NR AD yes AD AD Done DONE DONE Done Done
ML DONE (Far end
Sikhrawa)
done DONE 2G NA
DE(Mewa
t)
intigrated (emf
data sent)
12 Nuh Sangail SSA OK done AD
check deposited
at DHBVNL ,
pending at their
end
DONE done Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
ML pending (far
end Ujjina) Not
reqd
Pendin
g ZTE
2G NA
DE(Mewa
t)
13 Fpj Bisru SSA OK done DONE
Final payment
done,work
pending at
DHBVNL
DONE DONE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
ML Pnding ( far end
Gulalta)
Not
reqd
Pendin
g ZTE
2G NA
DE(Mewa
t)
14 Grg mumtajpur SSA OK Done Done
Tender will be
given for work
Done DONE outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
ML( Far end hlm)
Not
reqd
Pendin
g ZTE
2G NA SDE(IMT)
site handed over
to circle
15 Grg Sikhopur SSA
OK; also to
search
new
applicatio
n
Done done
Demand note
received , file at
AO
civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC (ML TNF)
Not
reqd
Pendin
g ZTE
Comb
o
pendin
g
SDE(IMT)
Court case done
next date:
27/01/14 ; to
search new appltn
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT
Sr
No
SDCA
Total
Sites(IP/SSA)
Hiring of
Site(NR/IP
/SSA)
Nominals
(NotRrcei
ved/OK/N
ot Ok)RF
finalizatio
n
Status of Site
hiring by SSA
(NR/IP/Y/to
HPC/WIP)
Agreement
AD/D/NR
EC status (Y)
Tower
Foundation
(NR/Zte/Ci
vil)
Tower
Erection(N
R/SSA/Zte
)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTAT
IC
BTS
Status
Site
2G/com
bo
3G
STATUS
Concern
DE
Remarks
16 Grg
Nahar pur
KASAN
SSA OK Done Done
Intial security
deposited.
DONE WIP Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pendin
g ZTE
Comb
o
pendin
g
SDE(IMT)
Court case done
dt 19-2-14
Comitee is mode
to resolve
17 Grg
Imt Sec-8
manesar
SSA OK Done DONE
file submitted to
DHBVNL &wip
Civil ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pendin
g ZTE
Comb
o
pendin
g
SDE(IMT)
apeal done in
higher court dt:15-
2-14
18 Grg
Nawada
fatehpur
SSA OK Done DONE
Tender will be
given for work
done
Civil
DONE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pendin
g ZTE
Comb
o
pendin
g
SDE(IMT)
site handed over
to circle
19 Grg
kota
khandewla
SSA ok Done DONE
initial payment
done to DHBVNL
done circle outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC
Not
reqd
Pendin
g ZTE
Comb
o
pendin
g
SDE(IMT)
site handed over
to circle
20 Grg Nakhdola SSA ok Done
Agreement
Panding
Civil ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
ML ( far end IMT
MANESER) Pending
ZTE
Pendin
g ZTE
Comb
o
pendin
g
SDE(IMT)
Agreement
Panding
21 Grg
Kakrola(IMT-
Sec-7)
SSA OK done done
initial payment
done to DHBVNL
Civil ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
ML
Pending
ZTE
Pendin
g ZTE
Comb
o
pendin
g
SDE(IMT) Agreement done
22 Grg
nsg gate-2
/Navrangpur
SSA OK
final letter
pending frm
NSG
Civil ZTE outdoor
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC
Pending
ZTE
Pendin
g ZTE
Comb
o
pendin
g
SDE(IMT)
do letter sent to
nsg by de mewat
23 Grg
Bhangrola/Kak
rola
SSA OK Done DONE
initial payment
done to DHBVNL
Civil ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE) far
end IMT MANESER
Not
reqd
Pendin
g ZTE
Comb
o
pendin
g
SDE(IMT)
24 Grg IMT sect-1 SSA OK done
in
progress
yes Civil
pole by
ZTE
XGE. FE port ready.
Pendin
g ZTE
Comb
o
pendin
g
SDE(IMT)
HPC done
butagreement
pending
25 Grg Near GITM SSA ok Done DONE
pending at
DHBVNL for
demand pdg
done circle outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
ML
Not
reqd
Pendin
g ZTE
Comb
o
pendin
g
SDE(IMT)
COURT CASE ON
02-01-2014
26 Grg Hayatpur SSA ok Done
Agreement
Panding
Civil ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pendin
g ZTE
Comb
o
pendin
g
SDE(IMT)
Agreement
Panding
27 Grg
Jatauli/Hali
Mandi2
SSA ok HPC Pending Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pendin
g ZTE
Comb
o
pendin
g
SDE(IMT) HPC Pending
28 Grg
Amity(Near
Pachgaon)-
badanki
SSA/IP ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC (ML TNF)
Pending
ZTE
Pendin
g ZTE
Comb
o
pendin
g
SDE(IMT)
site hand over ip
(indus) by circle
office
29 Grg Kasan SSA/IP
aplicatio
n reqd
shiv mandir
ML (far end IMT
MANESER)
Pendin
g ZTE
Comb
o
pendin
g
SDE(IMT)
30 Grg
Imt Sec-3
manesar
SSA/IP IP
IP (ssa
searching )
IP IP IP IP ML
Pendin
g ZTE
Comb
o
pendin
g
SDE(IMT)
Sr
No
SDC
A
Total
Sites(IP/SSA)
Hiring of
Site(NR/IP
/SSA)
Nominals
(NotRrceive
d/OK/Not
Ok)RF
finalization
Status of Site
hiring by SSA
(NR/IP/Y/to
HPC/WIP)
Agreeme
nt
AD/D/NR
EC status (Y)
Tower
Foundation
(NR/Zte/Ci
vil)
Tower
Erection
(NR/SSA
/Zte)
Shelter FDFA DG BATTERY
POWE
R
PLANT
MEDIA
ANTIST
ATIC

Site
2G/co
mbo
3G
STATU
S
Concern
DE
Remarks
31 Grg
Bilaspur,
Haryana
(bilaspur khurd )
SSA ok Done DONE
Final estimate
of electric
connection
done
Civil M/s SKC
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC(SDETX will
visit)
Pending
ZTE
Pendin
g ZTE
Comb
o
pendin
g
SDE(IMT)
site handed over
to circle
32 Grg Hasanpur SSA
Revise
application
required
file sent to
HPC
HPC wip Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
PALRA
Not
reqd
Pendin
g ZTE
Comb
o
pendin
g
DET(Sout
h )
lat long sent to
circle (field team
visit requied)
33 Grg Palra SSA ok done DONE applied Civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC (ML TNF)
Not
reqd
Pendin
g ZTE
Comb
o
pendin
g
DET(Sout
h )
agreement done
34 Grg Silani SSA
revise
application
required
Civil circle
Shelter
Pending ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC
Pending
ZTE
Pendin
g ZTE
Comb
o
pendin
g
DET(Sout
h )
site visited by
sde(mp) and
de(sohnard) but
site found very far
from nominals
35 Grg TE Sohna SSA OK done DONE y (TE xge )
done
Civil
done
M/s SKC
Room
Already
Done Already Already
Alread
y
XGE. FE provided done DONE
Comb
o
on air
DET(Sout
h )
on air on
13/12/13
36 Grg CRPF Camp SSA OK done
permission
letter in
progres
Yes (CRPF will
provide EC)EC
wiring pending
DONE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC Pending(DE Tx
Urban)
Not
reqd
Pendin
g ZTE
Comb
o
pendin
g
DET(Sout
h )
do letter sent to
crpf by de south
37 Grg Medhawas SSA OK Done DONE
Demand note
pending at
DHBVNL
DONE DONE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC
Pending
ZTE
Pendin
g ZTE
Comb
o
pendin
g
DET(Sout
h )
site handed over
to circle
38 GRG RojkaMeo SSA OK done AD
file at AO bsnl for
cheque
done
Civil
done
M/s SKC
Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
M/W pending(ZTE)
Not
reqd
Pendin
g ZTE
Comb
o
pendin
g
DET(Sout
h )
site handed over
to circle
39 Grg
Sikandarpur(B
ada)
SSA
Revise
application
required
Done in progres ZTE circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pendin
g ZTE
Comb
o
pendin
g
DET(Sout
h )
40 Grg Lakhuwas ssa OK
file sent to
HPC
HPC wip circle
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC
Pendin
g ZTE
Comb
o
pendin
g
DET(Sout
h )
HPC Pending
41 Grg Sector-67 SSA ok Done HPC wip Civil circle
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC
Pending
ZTE
Pendin
g ZTE
Comb
o
pendin
g
DET(Sout
h )
site handed over
to circle
42 Grg Wazirpur IP
site hand over
ip (indus) by
circle office
lat/long
required
ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
Pending
ZTE
Pendin
g ZTE
Comb
o
pendin
g
DET(Sout
h )
site hand over ip
(indus) by circle
office
43 Grg
Sohna DENSE
AREA
SSA Bid not recd
lat/long
required
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pendin
g ZTE
Comb
o
pendin
g
DET(Sout
h )
44 Grg
BSF camp
bhondsi
SSA OK
file sent to
HPC
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pendin
g ZTE
Comb
o
pendin
g
DET(Sout
h )
SDC
A
Total
Sites(IP/SSA)
Hiring of
Site(NR/IP
/SSA)
Nominals
(NotRece
ived/OK/
Not
Ok)RF
finalizati
on
Status of
Site hiring
by SSA
(NR/IP/Y/to
HPC/WIP)
Agreemen
t AD/D/NR
EC status (Y)
Tower
Foundatio
n(NR/Zte/
Civil)
Tower
Erection(
NR/SSA/
Zte)
Shelter FDFA DG BATTERY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Remarks
45 Grg Daultabad SSA ok
file in
progress
Civil circle
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pendin
g ZTE
Comb
o
pendin
g
DE(NWO-
N)
file in progress
46 Grg dharampur SSA OK
Revise
application
Pending
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pendin
g ZTE
Comb
o
pendin
g
DE(NWO-
N)
searching new site
47 Grg Bajghera SSA OK done AD Yes done
done
M/s SKC
Shelter
Pending ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
M/W
pending(ZTE)..far
end p/v
Pending
ZTE
Pendin
g ZTE
Comb
o
pendin
g
DE(NWO-
N)
site handed over
to circle
48 Grg fazilpur
SSA(Kherki
Majra soil
problem
(Dhanwap
ur)
OK HPC Pending Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pendin
g ZTE
Comb
o
pendin
g
DE(NWO-
W)
agreement
pending
49 Grg Khetawas SSA OK Done DONE
final payment
done,work
pending at
DHBVNL
Done Done Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)..far
end fkn
Not
reqd
Pendin
g ZTE
Comb
o
pendin
g
DE(NWO-
W)
site handed over
to circle
50 Grg
SGT Medical
college near
Budera
/Chandu
SSA OK HPC Done done
file submitted to
DHBVNL &wip
Civil circle
Shelter
Pending ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
M/L(far end
fkn,chandu,ghari
harsaru
Pending
ZTE
Pendin
g ZTE
Comb
o
pendin
g
DE(NWO-
W)
51 Grg Mussaidpur SSA OK HPC Done DONE
Estimate pendng
DHBVNL,Telepho
nically infrmed to
XEN DHBVN for
priority
done shifted
from silani
circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
M/L(ZTE)far end
fkn
Not
reqd
Pendin
g ZTE
Comb
o
pendin
g
DE(NWO-
W)
EC stoped by
neighbour site
handover to circle
52 Grg sultanpur SSA OK
file sent to
HPC
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pendin
g ZTE
Comb
o
pendin
g
DE(NWO-
W)
file sent to HPC
53 Grg Baslambi SSA OK HPC Done DONE
visit
pending at
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC
Not
reqd
Pendin
g ZTE
Comb
o
pendin
g
DE(NOW-
W)
agreement done
54 Grg
Gawal
pahari/Baliawa
s
SSA OK HPC Done
agreement
pending
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pendin
g ZTE
Comb
o
pendin
g
DE(NOW-
E)
55 Grg Ullawas SSA
Let long
sent to
circle
DD pending Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
minilinkfar end
kendriya vihar
/kadarpur &
ofc(bsnl)
Not
reqd
Pendin
g ZTE
Comb
o
pendin
g
DE(NOW-
E)
56 Grg Behrampur SSA ok HPC Done DONE DD pending
done
24/1/14
circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)far
end fkn
Not
reqd
Pendin
g ZTE
Comb
o
pendin
g
DE(NOW-
E)
site handover to
circle
57 Grg
Bandwadi (old
site-IMT-sec-6)
SSA ok
bandwadi
application
required
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pendin
g ZTE
Comb
o
pendin
g
DE(NOW-
E)
lat long ok
work detail of new sites 47 ::
HPC done but agreement pending =5,
file sent to HPC =6,
court cases sites= 4 sikhopur,naharpur kasan,imt sec8,near gitm)
Imt Sec-3,NSG Gate-2,AMITY,Kasan,Silani,Wazirpur,Sohna Dense,Bandwadi,Daultabad
Tower Erection =9
hayatpur,lakhuwas,hasanpur,Gwalpahari,Dharampur,Jatauli, BSF
application required=8
(sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas)
sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas, Naharpur,CRPF camp ZTE,musaidpur,near
GITM,Kota Khandewla,behrampur)
total Tower Foundation done ssa civil = 14 (+1 zte)
imt sec-1 ,Sikanderpur,CRPF camp, baslambi,
Agreement Done (sites hired)
=22
TE Sohna,Medawas,RojkaMeo,Bajghera,Khetawas,Mussaidpur,IMT sec-8.Nawada Fatehpur ,Naharpur Kasan,Sikohpur,Mumtajpur,Bisru,Sangail,Bhangrola, Kakrola(sec7),Near GITM, Bilaspur haryana, Kota
Khandewla,Ullawas,Behrampur,Sec-67, SGT Medi
Summary
Mob
ile
JTO
noda
ls
on air on 6-11-
13
on air 03-05-13
on air 01-05-13
READY TO
INTIGRATE (emf
sent to circle)
On Air 01/01/2014
work pending at
ZTE
emf data sent
zte work done
On Air 16/01/2014
On air 30-04-
13
zte work done
*total site=2
sites hired =2 (HPC
done with
agreement)
but E/C pending at
both sites
* total sites=18
* sites hired =10
(HPC done with
agreement-
mumtajpur,npkasan
,sec8 imt,nawada
fatepur,Kota
khandewla,Bhangro
la/kakrola,kakrola(s
ec7),sikhopur,near
gitm,bilaspur
haryana, )
*HPC done but
agreement
pending=3(imt sec-
1
,nakhdola,hayatpur)
* file sent for
HPC=1(jatauli )
* application
required=
5(sec3,nsg2,imt
sec3,amity,kasan )

JTO
(MO
B )
noda
l -
GRG
Sh.
PP
Gupt
a
JTO
(MO
B )
noda
l -
Taur
u
Sh.
Rajiv
Kum
ar
Mar
othia
* total sites=18
* sites hired =10
(HPC done with
agreement-
mumtajpur,npkasan
,sec8 imt,nawada
fatepur,Kota
khandewla,Bhangro
la/kakrola,kakrola(s
ec7),sikhopur,near
gitm,bilaspur
haryana, )
*HPC done but
agreement
pending=3(imt sec-
1
,nakhdola,hayatpur)
* file sent for
HPC=1(jatauli )
* application
required=
5(sec3,nsg2,imt
sec3,amity,kasan )

JTO
(MO
B )
noda
l -
Taur
u
Sh.
Rajiv
Kum
ar
Mar
othia
* total sites=18
* sites hired =10
(HPC done with
agreement-
mumtajpur,npkasan
,sec8 imt,nawada
fatepur,Kota
khandewla,Bhangro
la/kakrola,kakrola(s
ec7),sikhopur,near
gitm,bilaspur
haryana, )
*HPC done but
agreement
pending=3(imt sec-
1
,nakhdola,hayatpur)
* file sent for
HPC=1(jatauli )
* application
required=
5(sec3,nsg2,imt
sec3,amity,kasan )

* total
sites=13
* Sites
Hired=4 (1 xge
sites +3 HPC
done with
agreement-te
sna,crp
camp,medawa
s,rojkameo,pal
ara,Sec-67 )
*HPC done
but
agreement
pending=1
(sikandarpur )
file sent for
HPC=2(hasanp
ur,lakhuwas)
* application
required=
3.silani,sna
dense
area,wazirpur)

* so pending
sites = 9 (file
sent for hpc +
HPC done w/o
agreement+ap
plication
required )
E/C pending in
hired sites=3
JTO
(MO
B )
noda
l -
Taur
u
Sh.
Rajiv
Kum
ar
Mar
othia
JTO
(MO
B )
noda
l -
GRG
Sh.
PP
Gupt
a
JTO
(MO
B )
noda
l -
Patu
di
Sh.
Ajay
Kum
ar
sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas, Naharpur,CRPF camp ZTE,musaidpur,near
GITM,Kota Khandewla,behrampur)
imt sec-1 ,Sikanderpur,CRPF camp, baslambi,
TE Sohna,Medawas,RojkaMeo,Bajghera,Khetawas,Mussaidpur,IMT sec-8.Nawada Fatehpur ,Naharpur Kasan,Sikohpur,Mumtajpur,Bisru,Sangail,Bhangrola, Kakrola(sec7),Near GITM, Bilaspur haryana, Kota
Khandewla,Ullawas,Behrampur,Sec-67, SGT Medi
JTO
(MO
B )
noda
l -
Patu
di
Sh.
Ajay
Kum
ar
* total sites=6
*Sites Hired
=4
(HPC done
with
agreement-
Khetavas,Mus
saidpur,basla
mbi,sgt
medical
college)
* hpc done
but
agreement
pending=1
(sultanpur )
* total sites=4
*Sites Hired
=1
(HPC done
with
agreement)
( behrampur )
*file sent for
HPC but
agreemnt
pending=1
Gwalpahari
DATED 15-02-2014
Summary: Total sites=58 ( Alrdy Twr Erected with agreement done =11 + 47 new sites (4 IP +43 ) ) IP-amity,kasan,wazirpur,imt sec3
work detail of new sites -47 :: NewAgreemDone(sites hired )=22, HPC done but agreement pending =5, file sent to HPC =6,application required=7
Sr
No
SDC
A
Total
Sites(IP/SSA
)
Hiring of
Site(NR/
IP/SSA)
Nominal
s
(NotRrc
eived/O
K/Not
Status of
Site hiring
by SSA
(NR/IP/Y/t
o HPC/WIP)
Agreement
AD/D/NR
EC status (Y)
Tower
Founda
tion(NR
/Zte/Ci
vil)
Tower
Erectio
n(NR/S
SA/Zte)
Shelter FDFA DG
BATTER
Y
POWE
R
PLANT
MEDIA
ANTIST
ATIC
BTS
Status
Site
2G/co
mbo
3G
STAT
US
Concer
n DE
Remarks Summary
1-8
SITES ON AIRED
ALREADY
SITES ON
AIRED
ALREADY
9 Nuh salamba NR NR NR
agrmnt to
revised(report
pending from
civil xen)
y AD AD Done
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
ML (Far end
nuh) & pcm
testing
pending
Pendin
g ZTE
Pending
ZTE
2G NA
DE(Me
wat)
work pending
at ZTE
10 Nuh Alduka NR NR NR AD y AD AD zte done zte done zte done zte done
zte
done
ML done (far end
GSR)
zte done zte done 2G NA
DE(Mewa
t)
intigrated emf data sent
11 Nuh Indri NR NR NR AD
will take 7-8 days
more
AD AD Done DONE Done Done Done
ML done (Far end
Rewasan)
done DONE 2G NA
DE(Mewa
t)
intigrated (emf data
sent)
zte work done
12 Fpj Gulalta NR NR NR AD yes AD AD Done DONE DONE Done Done
ML DONE (Far
end Sikhrawa)
done DONE 2G NA
DE(Me
wat)
intigrated (emf data
sent)
zte work done
13 Nuh Sangail SSA OK done AD
work panding at
dhbvnl
DONE done Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
ML pending
(far end
Ujjina)
Not
reqd
Pending
ZTE
2G NA
DE(Me
wat)
14 Fpj Bisru SSA OK done DONE
work panding at
dhbvnl
DONE DONE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
ML Pnding (
far end
Gulalta)
Not
reqd
Pending
ZTE
2G NA
DE(Me
wat)
15 Grg mumtajpur SSA OK Done Done
Work start by
DHBVN
Done DONE outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC (2E1
given)
Not
reqd
Pending
ZTE
2G NA
SDE(IM
T)
site handed over to
circle
16 Grg Sikhopur SSA
OK; also
to search
new
applicatio
n
Done done
Demand note
received , file at
AO
civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC
Not
reqd
Pending
ZTE
Comb
o
pend
ing
SDE(IM
T)
Court case done
next date: 19/02/14
; to search new
appltn
17 Grg
Nahar pur
KASAN
SSA OK Done Done
Intial security
deposited.
DONE WIP Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Comb
o
pend
ing
SDE(IM
T)
Court case done dt
19-2-14 Comitee is
mode to resolve
18 Grg
Imt Sec-8
manesar
SSA
new site
searchin
g
Civil ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Comb
o
pend
ing
SDE(IM
T)
apeal done in
higher court dt:13-2-
14
19 Grg
Nawada
fatehpur
SSA OK Done DONE
Tender will be
given for work.
done
Civil
DONE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Comb
o
pend
ing
SDE(IM
T)
site handed over to
circle
20 Nuh
kota
khandewla
SSA ok Done DONE
initial payment
done to DHBVNL
done circle outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC
Not
reqd
Pending
ZTE
Comb
o
pend
ing
SDE(IM
T)
site handed over to
circle
21 Grg Nakhdola SSA ok Done
Agreement
Pending
Civil ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
ML ( far end
IMT
MANESER)
Pendin
g ZTE
Pending
ZTE
Comb
o
pend
ing
SDE(IM
T)
Agreement Panding
22 Grg
Kakrola(IMT-
Sec-7)
SSA OK done done
initial payment
done to DHBVNL
Civil ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
ML
Pendin
g ZTE
Pending
ZTE
Comb
o
pend
ing
SDE(IM
T)
Agreement done
23 Grg
nsg gate-2
/Navrangpur
SSA OK
final letter
pending frm
NSG
Civil ZTE outdoor
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC
Pendin
g ZTE
Pending
ZTE
Comb
o
pend
ing
SDE(IM
T)
do letter sent to nsg
by de mewat
24 Grg
Bhangrola/K
akrola
SSA OK Done DONE
initial payment
done to DHBVNL
Civil ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
far end IMT
MANESER
Not
reqd
Pending
ZTE
Comb
o
pend
ing
SDE(IM
T)
25 Grg IMT sect-1 SSA OK done in progress yes Civil
pole by
ZTE
XGE. FE port
ready.
Pending
ZTE
Comb
o
pend
ing
SDE(IM
T)
HPC done
butagreement
pending
26 Grg Near GITM SSA ok Done DONE
Cheque pending at
A/O
done circle outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
ML
Not
reqd
Pending
ZTE
Comb
o
pend
ing
SDE(IM
T)
COURT CASE ON 04-
02-2014
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT
1. DHANKOT (6-11-13 ) ; 2. Kherkidaula(03-05-13 ) ; 3. Binola ( 01-05-13 ) ; 4. Tikli ( 31-01-14 ) ; 5. Sudaka ( 01-01-14 ) ; 6. Sikrawa ( 30-04-13 ) ; 7. TE SOHNA (13-12-13) ;
8. JAMALGARH (16-01-14)(Temp Locked due to infra prob)
*total site=2
sites hired =2
(HPC done
with
agreement)
* total sites=18
* sites hired
=10 (HPC done
with
agreement-
mumtajpur,npk
asan,sec8
imt,nawada
fatepur,Kota
khandewla,Bha
ngrola/kakrola,
kakrola(sec7),si
khopur,near
gitm,bilaspur
haryana, )
*HPC done but
agreement
pending=3(imt
sec-1
,nakhdola,haya
tpur)
* file sent for
HPC=1(jatauli )
* application
required=
5(sec3,nsg2,imt
sec3,amity,kasa
n )

Sr
No
SDC
A
Total
Sites(IP/SSA
)
Hiring of
Site(NR/
IP/SSA)
Nominals
(NotRrcei
ved/OK/
Not
Ok)RF
finalizati
Status of Site
hiring by SSA
(NR/IP/Y/to
HPC/WIP)
Agreement
AD/D/NR
EC status (Y)
Tower
Founda
tion(NR
/Zte/Ci
vil)
Tower
Erectio
n(NR/S
SA/Zte)
Shelter FDFA DG
BATTER
Y
POWE
R
PLANT
MEDIA
ANTIST
ATIC
BTS
Status
Site
2G/co
mbo
3G
STAT
US
Concer
n DE
Remarks
27 Grg Hayatpur SSA ok Done
Agreement
Panding
Civil ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Comb
o
pend
ing
SDE(IM
T)
Agreement Panding
28 Grg
Jatauli/Hali
Mandi2
SSA ok
HPC
Pending
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Comb
o
pend
ing
SDE(IM
T)
HPC Pending
29 Grg
Amity(Near
Pachgaon)-
badanki
SSA/IP
Bid not
Receved
ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC
Pendin
g ZTE
Pending
ZTE
Comb
o
pend
ing
SDE(IM
T)
site hand over ip
(indus) by circle
office
30 Grg Kasan SSA/IP
aplicatio
n reqd
shiv mandir
ML (far end
IMT
MANESER)
Pending
ZTE
Comb
o
pend
ing
SDE(IM
T)
31 Grg
Rathiwas /
Ghos ghar/
Khod
old site
pwala
khuspur
Let Long
Sent to
Circle
civil circle Outdoor Not reqd
pendig
ZTE
pendig
ZTE
pendig
ZTE
Not
reqd
Pending
ZTE
Comb
o
pend
ing
SDE(IM
T)
32 Grg
Imt Sec-3
manesar
SSA/IP IP
IP (ssa
searching )
IP IP IP IP ML
Pending
ZTE
Comb
o
pend
ing
SDE(IM
T)
33 Grg
Bilaspur,
Haryana
(bilaspur
SSA ok Done DONE
Cheque pending at
A/O
Civil
M/s
SKC
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC(SDETX
will visit)
Pendin
g ZTE
Pending
ZTE
Comb
o
pend
ing
SDE(IM
T)
site handed over to
circle
34 Grg Hasanpur SSA
Revise
applicati
on
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
PALRA
Not
reqd
Pending
ZTE
Comb
o
pend
ing
DET(So
uth )
35 Grg Palra SSA ok done DONE applied Civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC
Not
reqd
Pending
ZTE
Comb
o
pend
ing
DET(So
uth )
agreement done
36 Grg Silani SSA ok
revise
application
required
Civil circle
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC
Pendin
g ZTE
Pending
ZTE
Comb
o
pend
ing
DET(So
uth )
37 Grg CRPF Camp SSA OK done
permission
letter in
Yes (CRPF will
provide EC)EC
DONE ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC
Pending(DE Tx
Not
reqd
Pending
ZTE
Comb
o
pend
ing
DET(So
uth )
do letter sent to
crpf by de south
38 Grg Medhawas SSA OK Done DONE
Demand note
pending at
DHBVNL
DONE DONE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC wip
Pendin
g ZTE
Pending
ZTE
Comb
o
pend
ing
DET(So
uth )
site handed over to
circle
39 GRG RojkaMeo SSA OK done AD
dd deposited to
dhbvnl
done
Civil
done
M/s
SKC
Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
M/W
pending(ZTE)
Not
reqd
Pending
ZTE
Comb
o
pend
ing
DET(So
uth )
site handed over to
circle
40 Grg
Sikandarpur(
Bada)
SSA
Revise
applicati
on
Done in progres ZTE circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Comb
o
pend
ing
DET(So
uth )
41 Grg Lakhuwas ssa OK
file sent to
HPC
HPC wip circle
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC
Pending
ZTE
Comb
o
pend
ing
DET(So
uth )
HPC Pending
42 Grg Sector-67 SSA ok Done HPC done File work start Civil circle
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC
Pendin
g ZTE
Pending
ZTE
Comb
o
pend
ing
DET(So
uth )
site handed over to
circle
43 Grg Wazirpur IP
Let Long
Sent to
Circle
site hand
over ip
(indus) by
lat/long
required
ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
Pendin
g ZTE
Pending
ZTE
Comb
o
pend
ing
DET(So
uth )
site hand over ip
(indus) by circle
office
44 Grg
Sohna
DENSE AREA
SSA Bid not recd Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Comb
o
pend
ing
DET(So
uth )
45 Grg
BSF camp
bhondsi
SSA OK
file sent to
HPC
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Comb
o
pend
ing
DET(So
uth )
46 Grg Daultabad SSA ok
hpc
pending
Civil circle
Shelter
Pending
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Comb
o
pend
ing
DE(NW
O-N)
file in progress
47 Grg dharampur SSA OK
file sent to
HPC
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Comb
o
pend
ing
DE(NW
O-N)
file in progress
* total sites=18
* sites hired
=10 (HPC done
with
agreement-
mumtajpur,npk
asan,sec8
imt,nawada
fatepur,Kota
khandewla,Bha
ngrola/kakrola,
kakrola(sec7),si
khopur,near
gitm,bilaspur
haryana, )
*HPC done but
agreement
pending=3(imt
sec-1
,nakhdola,haya
tpur)
* file sent for
HPC=1(jatauli )
* application
required=
5(sec3,nsg2,imt
sec3,amity,kasa
n )

* total sites=13
* Sites Hired=4
(1 xge sites +3
HPC done with
agreement-te
sna,crp
camp,medawas
,rojkameo,palar
a,Sec-67 )
*HPC done but
agreement
pending=1
(sikandarpur )
file sent for
HPC=2(hasanpu
r,lakhuwas)
* application
required=
3.silani,sna
dense
area,wazirpur)

* so pending
sites = 9 (file
sent for hpc +
HPC done w/o
agreement+ap
plication
required )
E/C pending in
hired sites=3
Sr
No
SDC
A
Total
Sites(IP/SSA
)
Hiring of
Site(NR/
IP/SSA)
Nominals
(NotRrcei
ved/OK/
Not
Ok)RF
finalizati
Status of Site
hiring by SSA
(NR/IP/Y/to
HPC/WIP)
Agreement
AD/D/NR
EC status (Y)
Tower
Founda
tion(NR
/Zte/Ci
vil)
Tower
Erectio
n(NR/S
SA/Zte)
Shelter FDFA DG
BATTER
Y
POWE
R
PLANT
MEDIA
ANTIST
ATIC
BTS
Status
Site
2G/co
mbo
3G
STAT
US
Concer
n DE
Remarks
48 Grg Bajghera SSA OK done AD Yes done
done
M/s
SKC
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC (M/W
pending(ZTE)..far
end p/v))
Pendin
g ZTE
Pending
ZTE
Comb
o
pend
ing
DE(NW
O-N)
site handed over to
circle
49 Grg fazilpur
SSA(Kher
ki Majra
soil
problem
OK
Revise
application
Pending
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Comb
o
pend
ing
DE(NW
O-W)
50 Grg Khetawas SSA OK Done DONE
final payment
done,work
pending at
Done Done Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini
link(ZTE)..far
end fkn
Not
reqd
Pending
ZTE
Comb
o
pend
ing
DE(NW
O-W)
site handed over to
circle
51 Grg
SGT Medical
college near
Budera
SSA OK HPC Done done
file submitted to
DHBVNL &wip
Civil circle
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
M/L(far end
fkn,chandu,gha
ri harsaru
Pendin
g ZTE
Pending
ZTE
Comb
o
pend
ing
DE(NW
O-W)
52 Grg Mussaidpur SSA OK HPC Done DONE
Estimate pendng
DHBVNL,Telephoni
cally infrmed to
XEN DHBVN for
done
shifted
from
silani
circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
M/L(ZTE)far
end fkn
Not
reqd
Pending
ZTE
Comb
o
pend
ing
DE(NW
O-W)
EC stoped by
neighbour site
handover to circle
53 Grg sultanpur SSA OK
file sent to
HPC(old
agreemnt
cancelled)
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Comb
o
pend
ing
DE(NW
O-W)
file sent to HPC
54 Grg Baslambi SSA OK HPC Done DONE
visit pending at
DHBVNL
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC
Not
reqd
Pending
ZTE
Comb
o
pend
ing
DE(NO
W-W)
agreement done
55 Grg
Gawal
pahari/Balia
was
SSA OK HPC Done
agreement
pending
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini
link(ZTE)(OFC-
500 mtr
required)
Not
reqd
Pending
ZTE
Comb
o
pend
ing
DE(NO
W-E)
56 Grg Ullawas SSA OK
revise
application
required
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
minilinkfar
end kendriya
vihar /kadarpur
& ofc(bsnl)
Not
reqd
Pending
ZTE
Comb
o
pend
ing
DE(NO
W-E)
57 Grg Behrampur SSA ok HPC Done DONE DD pending
done
24/1/1
4
circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini ,ofc 200
mtr
required,link(ZT
E)far end fkn
Not
reqd
Pending
ZTE
Comb
o
pend
ing
DE(NO
W-E)
site handover to
circle
58 Grg
Bandwadi
(old site-IMT-
sec-6)
SSA ok
bandwadi
application
required
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
Not
reqd
Pending
ZTE
Comb
o
pend
ing
DE(NO
W-E)
lat long ok
WORK DETAIL OF NEW SITES :
HPC done but agreement pending =5,
File sent to HPC =7, hayatpur,lakhuwas,Gwalpahari,Dharampur, BSF,Dharampur,Daulatabad
Court cases sites= 4 sikhopur,naharpur kasan,imt sec8,near gitm)
Imt Sec-3,NSG Gate-2,AMITY,Kasan,Silani,Wazirpur,Sohna Dense,Bandwadi,
Tower Erection =9 Sangail ,Bisru,Mumtajpur,Nawada,Fatehpur,TE sohna,Medawas,Rojkameo,Bajghera,Khetawas
* total sites=13
* Sites Hired=4
(1 xge sites +3
HPC done with
agreement-te
sna,crp
camp,medawas
,rojkameo,palar
a,Sec-67 )
*HPC done but
agreement
pending=1
(sikandarpur )
file sent for
HPC=2(hasanpu
r,lakhuwas)
* application
required=
3.silani,sna
dense
area,wazirpur)

* so pending
sites = 9 (file
sent for hpc +
HPC done w/o
agreement+ap
plication
required )
E/C pending in
hired sites=3
* total sites=6
*Sites Hired =4
(HPC done with
agreement-
Khetavas,Muss
aidpur,baslamb
i,sgt medical
college)
* hpc done but
agreement
pending=1
(sultanpur )
*file sent for
HPC=0
* application
required=1(fazil
pur)
* total sites=4
*Sites Hired =1
(HPC done with
agreement)
( behrampur )
*file sent for
HPC but
agreemnt
pending=1
Gwalpahari
* application
required= 2
(bandwadi and
Ullavas)
Agreement Done (sites
hired) =22
TE Sohna,Medawas,RojkaMeo,Bajghera,Khetawas,Mussaidpur,IMT sec-8.Nawada Fatehpur ,Naharpur Kasan,Sikohpur,Mumtajpur,Bisru,Sangail,Bhangrola, Kakrola(sec7),Near GITM, Bilaspur
haryana, Kota Khandewla,Ullawas,Behrampur,Sec-67, SGT Medical college
imt sec-1 ,Sikanderpur,CRPF camp, baslambi,
Application required=7
Total Tower Foundation done ssa civil = 14 (+1 zte)
sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas, Naharpur,CRPF
camp ZTE,musaidpur,near GITM,Kota Khandewla,behrampur)
Mo
bile
JTO
nod
als
JTO
(M
OB
)
nod
al -
GR
G
Sh.
PP
Gu
pta
JTO
(M
OB
)
nod
al -
Tau
ru
Sh.
Raji
v
Ku
ma
r
Ma
rot
hia
JTO
(M
OB
)
nod
al -
Tau
ru
Sh.
Raji
v
Ku
ma
r
Ma
rot
hia
JTO
(M
OB
)
nod
al -
GR
G
Sh.
PP
Gu
pta
JTO
(M
OB
)
nod
al -
GR
G
Sh.
PP
Gu
pta
JTO
(M
OB
)
nod
al -
Pat
udi
Sh.
Aja
y
Ku
ma
r
DATED 22-02-2014
Summary: Total sites=58 ( Alrdy Twr Erected with agreement done =11 + 47 new sites (4 IP +43 ) ) IP-amity,kasan,wazirpur,imt sec3
work detail of new sites -47 :: NewAgreemDone(sites hired )=22, HPC done but agreement pending =5, file sent to HPC =6,application required=7
Sr
No
SDC
A
Total
Sites(IP/SSA
)
Hiring of
Site(NR/
IP/SSA)
Nominals
(NotRrcei
ved/OK/
Not
Ok)RF
Status of
Site
hiring by
SSA
(NR/IP/Y
Agreeme
nt
AD/D/NR
EC status (Y)
Tower
Foundati
on(NR/Zt
e/Civil)
Tower
Erection(N
R/SSA/Zte
)
Shelter FDFA DG
BATTER
Y
POWE
R
PLANT
MEDIA
ANTIST
ATIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern DE Remarks
1 Grg Dhankot NR NR NR AD phV y AD phV AD phV
ALREADY
SHELTER
DONE Done Done Done OFC Done done DONE
Comb
o
comissio
ned
DE(NWO-w)
2 Grg Kherki Daula NR NR NR AD phV y AD phV AD phV
ROOM
DONE
DONE Installed Installed
Installe
d
OFC Done/for
3g FE pending
done
Installe
d
Comb
o
pending
DET(Sohna
RD)
3 Grg Binola NR NR NR AD phV y AD phV AD phV
Room
Already
DONE Done Done done OFC Done done
Installe
d
Comb
o
pending SDE(IMT)
4 Grg Tikli NR NR NR AD phV y AD phV AD phV Outdoor Not reqd Done Done done
ML Done (far end
KDR)
Not
reqd
DONE 2G NA
DET(Sohna
RD)
5 Nuh Sudaka NR NR NR AD phV y AD phV AD phV Outdoor Not reqd Done Done DONE
ML Done (far end
Ujina)
Not
reqd
DONE 2G NA DE(Mewat)
6 Fpj Sikrawa NR NR NR AD phV y AD phV AD phV
Room
Already
Done Done Done Done OFC Done done
Installe
d
2G pending DE(Mewat)
7 Fpj Jamalgarh NR NR NR AD phV y AD phV AD phV Outdoor Not reqd Done Done done
ML DONE (Far
end Baded )
Not
reqd
DONE 2G NA DE(Mewat)
8 Grg TE Sohna SSA OK done DONE y (TE xge ) done Civil
done M/s
SKC
Room
Already
Done Already Already
Alread
y
XGE. FE
provided
done DONE
Comb
o
on air DET(South )
9 Fpj Gulalta NR NR NR AD phV yes AD phV AD phV Done Done Done Done Done
ML done (Far end
Sikhrawa)
done Done 2G NA DE(Mewat)
10 Nuh salamba y AD phV AD phV Done
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
ML (Far end
nuh)done &
pcm testing
Pendin
g ZTE
Pending
ZTE
2G NA DE(Mewat)
11 Nuh Alduka NR NR NR AD phV y AD phV AD phV zte done zte done zte done zte done
zte
done
ML done (far end
GSR)
zte done zte done 2G NA DE(Mewat) intigrated
12 Nuh Indri NR NR NR AD phV
will take 20 days
more
AD phV AD phV Done Done Done Done Done
ML done (Far end
Rewasan)
done Done 2G NA DE(Mewat)
intigrated (emf data
sent)
13 Nuh Sangail SSA OK done AD phV
work panding at dhbvnl-
trg 050314
done31/12/
12Civil grg
done 7/5/13
SKC
Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
ML pending (far
end Ujjina)
Not
reqd
Pending
ZTE
2G NA DE(Mewat)
14 Fpj Bisru SSA OK done done
work panding at dhbvnl-
trg 050314
done 8/4/13
Civil grg
done 20/6/13
SKC
Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
ML Pnding ( far
end Gulalta)
Not
reqd
Pending
ZTE
2G NA DE(Mewat)
15 Grg mumtajpur SSA OK done done
work panding at dhbvnl-
trg 050314
done
22/3/13 Civil
grg
done
7/5/13/13
SKC
outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC done
(2E1 given)
Not
reqd
Pending
ZTE
2G NA SDE(IMT)
site handed over to
circle
16 Grg Sikhopur SSA
OK; also to
search new
application
done done
Demand note received ,
file at AO
civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC pending
Not
reqd
Pending
ZTE
Comb
o
pending SDE(IMT)
Court case done next
date: 19/02/14 ; to
search new appltn
17 Grg
Nahar pur
KASAN
SSA OK done done
work panding at dhbvnl-
trg 050314
done
23/4/13 civil
grg
WIP Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pending SDE(IMT)
Court case done dt
19-2-14 Comitee is
mode to resolve
18 Grg
Imt Sec-8
manesar
SSA
new site
searching
Civil ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pending SDE(IMT)
apeal done in
higher court dt:13-2-
14
19 Grg
Nawada
fatehpur
SSA OK done done
work panding at dhbvnl-
trg 050314
done
23/4/13Civil
grg
done
25/5/13SKC
Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pending SDE(IMT)
site handed over to
circle
20 Nuh
kota
khandewla
SSA ok done done
work panding at dhbvnl-
trg 050314
done
26/12/13Civ
il grg
circle outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC pending
Not
reqd
Pending
ZTE
Comb
o
pending SDE(IMT)
site handed over to
circle
21 Grg Nakhdola SSA Civil ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
ML pending( far
end IMT manesar
)
Pendin
g ZTE
Pending
ZTE
Comb
o
pending SDE(IMT)
lat long sent to
circle
22 Grg
Kakrola(IMT-
Sec-7)
SSA OK done done
work panding at dhbvnl-
trg 050314
Civil ZTE
Shelter
Pending ZTE
Pending ZTE Pending ZTE
Pending
ZTE
Pending
ZTE
ML pending (far
end Ujjina)
Pendin
g ZTE
Pending
ZTE
Comb
o
pending SDE(IMT) Agreement done
BTS on air 16/01/2014
BTS on air on 13/12/13
BTS on air on 6-11-13
BTS on air 01/05/2013
BTS on air 03/05/2013
BTS on air 31-1-14
BTS on air 01/01/2014
BTS on air on 30-04-13
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT
under negoation 14000 to
10000 rs
BTS on air 20/02/2014
agrmnt to revised(report pending from
civil xen)-trg 180214
lat long sent to circle
Sr
No
SDC
A
Total
Sites(IP/SSA
)
Hiring of
Site(NR/
IP/SSA)
Nominals
(NotRrceiv
ed/OK/Not
Ok)RF
finalization
Status of
Site hiring
by SSA
(NR/IP/Y/
to
HPC/WIP)
Agreeme
nt
AD/D/NR
EC status (Y)
Tower
Foundati
on(NR/Zt
e/Civil)
Tower
Erection(N
R/SSA/Zte
)
Shelter FDFA DG
BATTER
Y
POWE
R
PLANT
MEDIA
ANTIST
ATIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern DE Remarks
23 Grg
nsg gate-2
/Navrangpur
SSA OK
final letter
pending
frm NSG
Civil ZTE outdoor
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC pending
Pendin
g ZTE
Pending
ZTE
Comb
o
pending SDE(IMT)
do letter sent to nsg
by de mewat
24 Grg
Bhangrola/K
akrola
SSA OK Done Done
work panding at dhbvnl-
trg 050314
Civil ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
ML pending(ZTE)
far end IMT
manesar)
Not
reqd
Pending
ZTE
Comb
o
pending SDE(IMT)
25 Grg IMT sect-1 SSA OK done
agreemnt
pending -
signature
yes Civil
pole by
ZTE
XGE. FE port
ready.
Pending
ZTE
Comb
o
pending SDE(IMT)
HPC done
butagreement
pending
26 Grg Near GITM SSA ok done done
Cheque pending at
A/O
done 2/1/14
Civil grg
circle outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pending SDE(IMT)
stay order canceled
on 17/02/14 in
court
27 Grg Hayatpur SSA Civil ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pending SDE(IMT) Agreement Panding
28 Grg
Jatauli/Hali
Mandi2
SSA done circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pending SDE(IMT) HPC Pending
29 Grg
Amity(Near
Pachgaon)-
badanki
SSA/IP
Bid not
Receved
ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC pending
Pendin
g ZTE
Pending
ZTE
Comb
o
pending SDE(IMT)
site hand over ip
(indus) by circle
office
30 Grg Kasan SSA/IP
aplication
reqd
shiv
mandir
ML
pending(far
end IMT
Pending
ZTE
Comb
o
pending SDE(IMT)
31 Grg Rathiwas / Khod
old site
pwala
khuspur
civil circle Outdoor Not reqd
pendig
ZTE
pendig
ZTE
pendig
ZTE
Not
reqd
Pending
ZTE
Comb
o
pending SDE(IMT)
32 Grg
Imt Sec-3
manesar/Gh
SSA/IP
Mini link(ZTE)
pend
Pending
ZTE
Comb
o
pending SDE(IMT)
33 Grg
Bilaspur,
Haryana
(bilaspur
SSA ok done done
Cheque pending at
A/O
Civil M/s SKC
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC done
140214
Pendin
g ZTE
Pending
ZTE
Comb
o
pending SDE(IMT)
site handed over to
circle
34 Grg Hasanpur SSA ok
Revise
application
required
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
ML pending(far
end palra)
Not
reqd
Pending
ZTE
Comb
o
pending DET(South )
35 Grg Palra SSA ok done done applied Civil Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC pending
Not
reqd
Pending
ZTE
Comb
o
pending DET(South ) agreement done
36 Grg Silani SSA ok
revise
applicati
on
Civil circle
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC pending
Pendin
g ZTE
Pending
ZTE
Comb
o
pending DET(South )
37 Grg CRPF Camp SSA OK done
permissio
n letter in
progres
Yes (CRPF will
provide EC)EC
wiring pending
done
20/1/13 ZTE
ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC
Pending(DE
Tx Urban)
Not
reqd
Pending
ZTE
Comb
o
pending DET(South )
do letter sent to
crpf by de south
38 Grg Medhawas SSA OK Done DONE
Demand note(rs
96000) pending at
DHBVNL
done 3/5/13
Civil grg
done 20/5/13
SKC
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC wip
Pendin
g ZTE
Pending
ZTE
Comb
o
pending DET(South )
site handed over to
circle
39 GRG RojkaMeo SSA OK done AD
dd (1.42 lakh)deposited
to dhbvnl
done
30/12/12Civ
il grg
done 31/1/13
SKC
Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pending DET(South )
site handed over to
circle
40 Grg
Sikandarpur(
Bada)
SSA
Revise
application
required
done
in
progres
ZTE circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pending DET(South )
41 Grg Lakhuwas ssa/IP OK
file sent
to HPC
HPC wip circle
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC pending
Pending
ZTE
Comb
o
pending DET(South ) HPC Pending
42 Grg Sector-67 SSA ok done HPC done File work start
Civil
teder
17/02/14
circle
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC pending
Pendin
g ZTE
Pending
ZTE
Comb
o
pending DET(South )
site handed over to
circle
negotiation for 5000-6000 rs
Let Long Sent to Circle
Let Long Sent to Circle
approval received from nsg hq but
final approval pending at local level-
trg 20/2/14
new site searching
under negoation 14000 to 10000 rs
negotiation for 8000 rs
lat long sent to circle
Sr
No
SDC
A
Total
Sites(IP/SSA
)
Hiring of
Site(NR/
IP/SSA)
Nominals
(NotRrceiv
ed/OK/Not
Ok)RF
finalization
Status of
Site hiring
by SSA
(NR/IP/Y/
to
HPC/WIP)
Agreeme
nt
AD/D/NR
EC status (Y)
Tower
Foundati
on(NR/Zt
e/Civil)
Tower
Erection(N
R/SSA/Zte
)
Shelter FDFA DG
BATTER
Y
POWE
R
PLANT
MEDIA
ANTIST
ATIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern DE Remarks
43 Grg Wazirpur ssa/IP ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
pend
Pendin
g ZTE
Pending
ZTE
Comb
o
pending DET(South )
site hand over ip
(indus) by circle
office
44 Grg
Sohna
DENSE AREA
SSA
Bid not
recd
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pending DET(South )
45 Grg
BSF camp
bhondsi
SSA OK
file sent
to HPC
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pending DET(South )
46 Grg Daultabad SSA ok Civil circle
Shelter
Pending
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pending DE(NWO-N) file in progress
47 Grg dharampur SSA OK Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pending DE(NWO-N) file in progress
48 Grg Bajghera SSA OK done AD Yes done
done M/s
SKC
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
FE port ready
(MLpending(ZTE).
.far end p/v))
Pendin
g ZTE
Pending
ZTE
Comb
o
pending DE(NWO-N)
site handed over to
circle
49 Grg fazilpur
SSA(Kherki
Majra soil
problem
(Dhanwap
ur)
OK
Revise
application
Pending
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
pending
Not
reqd
Pending
ZTE
Comb
o
pending DE(NWO-W)
50 Grg Khetawas SSA OK done done
final payment
done,work pending at
DHBVNL-trg 17/02/14
done 1/6/13
Civil grg
done 10/8/13
SKC
Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Ml
pending(ZTE)..far
end fkn
Not
reqd
Pending
ZTE
Comb
o
pending DE(NWO-W)
site handed over to
circle
51 Grg
SGT Medical
college near
Budera /Chandu
SSA OK
HPC
Done
done
file submitted to
DHBVNL &wip-visit
18/02/14
Civil circle
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
M/Lpending(far
end
fkn,chandu,ghari
harsaru
Pendin
g ZTE
Pending
ZTE
Comb
o
pending DE(NWO-W)
52 Grg Mussaidpur SSA OK
HPC
Done
done
Estimate pendng DHBVNL-
submeter to be installed by
sde elect. Trg & visit
180214
done
10/12/13
civil grg
circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
M/L pending
(ZTE)far end
fkn
Not
reqd
Pending
ZTE
Comb
o
pending DE(NWO-W)
EC stoped by
neighbour(submeter
to be submitted by
sde elect.) site
53 Grg sultanpur SSA OK
file sent
to
HPC(old
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
pending
Not
reqd
Pending
ZTE
Comb
o
pending DE(NWO-W) file sent to HPC
54 Grg Baslambi SSA OK
HPC
Done
done
visit pending at
DHBVNL-trg
18/2/14
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC pending
Not
reqd
Pending
ZTE
Comb
o
pending DE(NOW-W) agreement done
55 Grg
Gawal
pahari/Balia
was
SSA OK
HPC
Done
agreeme
nt
pending
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
ML(ZTE)/OFC-
500 mtr
required
Not
reqd
Pending
ZTE
Comb
o
pending DE(NOW-E)
56 Grg Ullawas SSA
revise
applicati
on
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
MLpendingfar
end kendriya
vihar /kadarpur
Not
reqd
Pending
ZTE
Comb
o
pending DE(NOW-E)
57 Grg Behrampur SSA ok
HPC
Done
done
DD deposit to
dhbvnl
done
24/1/14 Civil
grg
circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
ML /ofc 200
mtr required
pending
Not
reqd
Pending
ZTE
Comb
o
pending DE(NOW-E)
site handover to
circle
58 Grg
Bandwadi
(old site-IMT-
sec-6)
SSA ok
bandwadi
applicatio
n required
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
pending
Not
reqd
Pending
ZTE
Comb
o
pending DE(NOW-E) lat long ok
WORK DETAIL OF NEW SITES :
HPC done but agreement pending =5,
File sent to HPC =7, hayatpur,lakhuwas,Gwalpahari,Dharampur, BSF,Dharampur,Daulatabad
Court cases sites= 4 sikhopur,naharpur kasan,imt sec8,near gitm)
Imt Sec-3,NSG Gate-2,AMITY,Kasan,Silani,Wazirpur,Sohna Dense,Bandwadi,
Tower Erection =9 Sangail ,Bisru,Mumtajpur,Nawada,Fatehpur,TE sohna,Medawas,Rojkameo,Bajghera,Khetawas
sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas, Naharpur,CRPF camp
ZTE,musaidpur,near GITM,Kota Khandewla,behrampur)
Lat Long Sent to Circle
Agreement Done (sites
hired) =22
TE Sohna,Medawas,RojkaMeo,Bajghera,Khetawas,Mussaidpur,IMT sec-8.Nawada Fatehpur ,Naharpur Kasan,Sikohpur,Mumtajpur,Bisru,Sangail,Bhangrola, Kakrola(sec7),Near GITM, Bilaspur haryana, Kota
Khandewla,Ullawas,Behrampur,Sec-67, SGT Medical college
imt sec-1 ,Sikanderpur,CRPF camp, baslambi,
Application required=7
Total Tower Foundation done ssa civil = 14 (+1 zte)
hpc pending-
signature
hpc pending-
signature
Summary
work pending at
ZTE
emf data sent
zte work done
BTS on air 16/01/2014
BTS on air on 13/12/13
BTS on air on 6-11-13
BTS on air 01/05/2013
BTS on air 03/05/2013
BTS on air 31-1-14
BTS on air 01/01/2014
BTS on air on 30-04-13
*total site=2
sites hired =2
(HPC done with
agreement)
but E/C pending
* total sites=18
* sites hired =10
(HPC done with
agreement-
mumtajpur,npka
san,sec8
imt,nawada
fatepur,Kota
khandewla,Bhan
grola/kakrola,kak
rola(sec7),sikhop
ur,near
gitm,bilaspur
haryana, )
*HPC done but
agreement
pending=3(imt
sec-1
,nakhdola,hayatp
ur)
* file sent for
HPC=1(jatauli )
* application
required=
5(sec3,nsg2,imt
sec3,amity,kasan
)

JT
O
(M
OB
)
no
dal
-
Ta
ur
u

Sh.
Raj
iv
Ku
ma
r
Ma
rot
hia
BTS on air 20/02/2014
* total sites=18
* sites hired =10
(HPC done with
agreement-
mumtajpur,npka
san,sec8
imt,nawada
fatepur,Kota
khandewla,Bhan
grola/kakrola,kak
rola(sec7),sikhop
ur,near
gitm,bilaspur
haryana, )
*HPC done but
agreement
pending=3(imt
sec-1
,nakhdola,hayatp
ur)
* file sent for
HPC=1(jatauli )
* application
required=
5(sec3,nsg2,imt
sec3,amity,kasan
)

JT
O
(M
OB
)
no
dal
-
Ta
ur
u

Sh.
Raj
iv
Ku
ma
r
Ma
rot
hia
* total sites=13
* Sites Hired=4
(1 xge sites +3
HPC done with
agreement-te
sna,crp
camp,medawas,r
ojkameo,palara,S
ec-67 )
*HPC done but
agreement
pending=1
(sikandarpur )
file sent for
HPC=2(hasanpur,
lakhuwas)
* application
required=
3.silani,sna
dense
area,wazirpur)

* so pending
sites = 9 (file sent
for hpc + HPC
done w/o
agreement+appli
cation required )
E/C pending in
hired sites=3
sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas, Naharpur,CRPF camp
ZTE,musaidpur,near GITM,Kota Khandewla,behrampur)
JT
O
(M
OB
)
no
dal
-
Ta
ur
u

Sh.
Raj
iv
Ku
ma
r
Ma
rot
hia
* total sites=13
* Sites Hired=4
(1 xge sites +3
HPC done with
agreement-te
sna,crp
camp,medawas,r
ojkameo,palara,S
ec-67 )
*HPC done but
agreement
pending=1
(sikandarpur )
file sent for
HPC=2(hasanpur,
lakhuwas)
* application
required=
3.silani,sna
dense
area,wazirpur)

* so pending
sites = 9 (file sent
for hpc + HPC
done w/o
agreement+appli
cation required )
E/C pending in
hired sites=3
JT
O
(M
OB
)
no
dal
-
GR
G

Sh.
PP
Gu
pta
* total sites=6
*Sites Hired =4
(HPC done with
agreement-
Khetavas,Mussai
dpur,baslambi,sg
t medical
college)
* hpc done but
agreement
pending=1
(sultanpur )
*file sent for
HPC=0
* application
required=1(fazilp
ur)
* total sites=4
*Sites Hired =1
(HPC done with
agreement)
( behrampur )
*file sent for HPC
but agreemnt
pending=1
Gwalpahari
* application
required= 2
JT
O
(M
OB
)
no
dal
-
Pat
udi
Sh.
DATED 01-03-2014
Summary: Total sites=58 ( Alrdy Twr Erected with agreement done =11 + 47 new sites (4 IP +43 ) ) IP-amity,kasan,wazirpur,imt sec3
work detail of new sites -47 :: NewAgreemDone(sites hired )=22, HPC done but agreement pending =5, file sent to HPC =6,application required=7
Sr
No
SDC
A
Total
Sites(IP/SSA
)
Hiring of
Site(NR/
IP/SSA)
Nominal
s
(NotRrce
ived/OK
/Not
Status of
Site
hiring by
SSA
(NR/IP/Y
Agreeme
nt
AD/D/NR
EC status (Y)
Tower
Foundati
on(NR/Zt
e/Civil)
Tower
Erection(N
R/SSA/Zte
)
Shelter FDFA DG
BATTER
Y
POWE
R
PLANT
MEDIA
ANTIST
ATIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern DE
H/over
to circle
Remarks
1 Grg Dhankot NR NR NR AD phV y AD phV AD phV
ALREADY
SHELTER
done done done done OFC Done done DONE
Comb
o
comissio
ned
DE(NWO-w)
2 Grg Kherki Daula NR NR NR AD phV y AD phV AD phV
ROOM
DONE
done
Installe
d
Installed
Installe
d
OFC Done/for
3g FE pending
done
Installe
d
Comb
o
pending
DET(Sohna
RD)
3 Grg Binola NR NR NR AD phV y AD phV AD phV
Room
Already
done done done done OFC Done done
Installe
d
Comb
o
pending SDE(IMT)
4 Grg Tikli NR NR NR AD phV y AD phV AD phV Outdoor Not reqd Done done done
ML Done (far end
KDR)
Not
reqd
DONE 2G NA
DET(Sohna
RD)
5 Nuh Sudaka NR NR NR AD phV y AD phV AD phV Outdoor Not reqd Done done done
ML Done (far end
Ujina)
Not
reqd
DONE 2G NA DE(Mewat)
6 Fpj Sikrawa NR NR NR AD phV y AD phV AD phV
Room
Already
done done done done OFC Done done
Installe
d
2G pending DE(Mewat)
7 Fpj Jamalgarh NR NR NR AD phV y AD phV AD phV Outdoor Not reqd Done done done
ML DONE (Far
end Baded )
Not
reqd
DONE 2G NA DE(Mewat)
8 Grg TE Sohna SSA OK done DONE y (TE xge ) done Civil
done M/s
SKC
Room
Already
done Already Already
Alread
y
XGE. FE
provided
done DONE
Comb
o
on air DET(South )
9 Fpj Gulalta NR NR NR AD phV yes AD phV AD phV Done done done done done
ML done (Far end
Sikhrawa)
done Done 2G NA DE(Mewat)
10 Nuh salamba y AD phV AD phV Done
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
ML (Far end
nuh)done &
pcm testing
Pendin
g ZTE
Pending
ZTE
2G NA DE(Mewat)
11 Nuh Alduka NR NR NR AD phV y AD phV AD phV zte done zte done zte done zte done
zte
done
ML done (far end
GSR)
zte done zte done 2G NA DE(Mewat) intigrated
12 Nuh Indri NR NR NR AD phV
will take 20 days
more
AD phV AD phV done done done done done
ML done (Far end
Rewasan)
done Done 2G NA DE(Mewat)
intigrated (emf data
sent)
13 Nuh Sangail SSA OK done AD phV
work panding at
dhbvnl-trg 050314
done31/12/
12Civil grg
done 7/5/13
SKC
Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
ML pending (far
end Ujjina)
Not
reqd
Pending
ZTE
2G NA DE(Mewat) HO
14 Fpj Bisru SSA OK done done
work panding at
dhbvnl-trg 050314
done 8/4/13
Civil grg
done 20/6/13
SKC
Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
ML Pnding ( far
end Gulalta)
Not
reqd
Pending
ZTE
2G NA DE(Mewat) HO
15 Grg mumtajpur SSA OK done done
work panding at
dhbvnl-trg 050314
done
22/3/13 Civil
grg
done
7/5/13/13
SKC
outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC done
(2E1 given)
Not
reqd
Pending
ZTE
2G NA SDE(IMT)
site handed over to
circle
16 Grg Sikhopur SSA
OK; also to
search new
application
done done
Demand note received
, file at AO
civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC pending
Not
reqd
Pending
ZTE
Comb
o
pending SDE(IMT) HO
Court case done next
date: 19/02/14 ; to
search new appltn
17 Grg
Nahar pur
KASAN
SSA OK done done
work panding at
dhbvnl-trg 050314
done
23/4/13 civil
grg
WIP Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pending SDE(IMT) HO
Court case done dt
19-2-14 Comitee is
mode to resolve
18 Grg
Imt Sec-8
manesar
SSA OK
Revise
aplctn rqd
Civil ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pending SDE(IMT) HO
19 Grg
Nawada
fatehpur
SSA OK done done
work panding at
dhbvnl-trg 050314
done
23/4/13Civil
grg
done
25/5/13SKC
Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pending SDE(IMT) HO
site handed over to
circle
20 Nuh
kota
khandewla
SSA ok done done
work panding at
dhbvnl-trg 050314
done
26/12/13Civ
il grg
WIP outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC pending
Not
reqd
Pending
ZTE
Comb
o
pending SDE(IMT) HO
site handed over to
circle
21 Grg Nakhdola SSA ok
Revise
aplctn rqd
Civil ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
ML pending( far
end IMT manesar
)
Pendin
g ZTE
Pending
ZTE
Comb
o
pending SDE(IMT)
22 Grg
Kakrola(IMT-
Sec-7)
SSA OK done done
work panding at
dhbvnl-trg 050314
Civil ZTE
Shelter
Pending ZTE
Pending ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
ML pending (far
end Ujjina)
Pendin
g ZTE
Pending
ZTE
Comb
o
pending SDE(IMT) HO Agreement done
BTS on air 20/02/2014
agrmnt to revised(report pending from
civil xen)-trg 180214
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT
BTS on air on 6-11-13
BTS on air 03/05/2013
BTS on air 01/05/2013
BTS on air 31-1-14
BTS on air 01/01/2014
BTS on air on 30-04-13
BTS on air 16/01/2014
BTS on air on 13/12/13
Sr
No
SDC
A
Total
Sites(IP/SSA
)
Hiring of
Site(NR/
IP/SSA)
Nominals
(NotRrcei
ved/OK/N
ot Ok)RF
finalizatio
n
Status of
Site hiring
by SSA
(NR/IP/Y/
to
HPC/WIP)
Agreeme
nt
AD/D/NR
EC status (Y)
Tower
Foundati
on(NR/Zt
e/Civil)
Tower
Erection(N
R/SSA/Zte
)
Shelter FDFA DG
BATTER
Y
POWE
R
PLANT
MEDIA
ANTIST
ATIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern DE Remarks
23 Grg
nsg gate-2
/Navrangpur
SSA OK
final letter
pending
frm NSG
Civil ZTE outdoor
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC pending
Pendin
g ZTE
Pending
ZTE
Comb
o
pending SDE(IMT)
do letter sent to nsg
by de mewat
24 Grg
Bhangrola/K
akrola
SSA OK Done Done
work panding at
dhbvnl-trg 050314
Civil ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
ML pending(ZTE)
far end IMT
manesar)
Not
reqd
Pending
ZTE
Comb
o
pending SDE(IMT) HO
25 Grg IMT sect-1 SSA OK done
agreemnt
pending -
signature
yes Civil
pole by
ZTE
XGE. FE port
ready.
Pending
ZTE
Comb
o
pending SDE(IMT) HO
HPC done
butagreement
pending
26 Grg Near GITM SSA ok done done
Cheque pending
at A/O
done 2/1/14
Civil grg
circle outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pending SDE(IMT)
stay order canceled
on 17/02/14 in
court
27 Grg Hayatpur SSA Civil ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pending SDE(IMT) Agreement Panding
28 Grg
Jatauli/Hali
Mandi2
SSA done circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pending SDE(IMT) HPC Pending
29 Grg
Amity(Near
Pachgaon)-
badanki
SSA/IP
Bid not
Receved
ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC pending
Pendin
g ZTE
Pending
ZTE
Comb
o
pending SDE(IMT)
site hand over ip
(indus) by circle
office
30 Grg Kasan SSA/IP
aplicatio
n reqd
shiv
mandir
ML
pending(far
end IMT
Pending
ZTE
Comb
o
pending SDE(IMT)
31 Grg Rathiwas / Khod
old site
pwala
khuspur
Let Long
Sent to
Circle
civil circle Outdoor Not reqd
pendig
ZTE
pendig
ZTE
pendig
ZTE
Not
reqd
Pending
ZTE
Comb
o
pending SDE(IMT)
32 Grg
Imt Sec-3
manesar/Gh
SSA/IP
Let Long
Sent to
Circle
Mini link(ZTE)
pend
Pending
ZTE
Comb
o
pending SDE(IMT)
33 Grg
Bilaspur,
Haryana
(bilaspur
SSA ok done done
final amt
deposited at
dhbvnl
Done DONE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC done
140214
Pendin
g ZTE
Pending
ZTE
Comb
o
pending SDE(IMT)
site handed over to
circle
Grg Hasanpur SSA ok
Revise
appctn rqd
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
ML pending(far
end palra)
Not
reqd
Pending
ZTE
Comb
o
pending DET(South )
35 Grg Palra SSA ok done done applied Civil(visit) Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC pending
Not
reqd
Pending
ZTE
Comb
o
pending DET(South ) HO agreement done
36 Grg Silani SSA ok
revise
applicati
on
Civil(visit) circle
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC pending
Pendin
g ZTE
Pending
ZTE
Comb
o
pending DET(South )
37 Grg CRPF Camp SSA OK done
permissio
n letter in
progres
Yes (CRPF will
provide EC)EC
wiring pending
done
20/1/13 ZTE
ZTE Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC
Pending(DE
Tx Urban)
Not
reqd
Pending
ZTE
Comb
o
pending DET(South ) HO
do letter sent to
crpf by de south
38 Grg Medhawas SSA OK Done DONE
Demand note(rs
96000) pending at
DHBVNL
done 3/5/13
Civil grg
done 20/5/13
SKC
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC wip
Pendin
g ZTE
Pending
ZTE
Comb
o
pending DET(South ) HO
site handed over to
circle
39 GRG RojkaMeo SSA OK done AD
dd (1.42
lakh)deposited to
dhbvnl
done
30/12/12Civ
il grg
done 31/1/13
SKC
Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pending DET(South ) HO
site handed over to
circle
40 Grg
Sikandarpur(
Bada)
SSA
Let Long
Sent to
Circle
done
in
progres
Civil(visit) circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pending DET(South )
41 Grg Lakhuwas ssa/IP OK
file sent
to HPC
HPC wip Civil(visit) circle
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC pending
Pending
ZTE
Comb
o
pending DET(South ) HPC Pending
42 Grg Sector-67 SSA ok done HPC done File work start
Civil
tender
17/02/14
circle
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC pending
Pendin
g ZTE
Pending
ZTE
Comb
o
pending DET(South ) HO
site handed over to
circle
under negoation 14000 to 10000 rs
negotiation for 5000-6000 rs
approval received from nsg hq but
final approval pending at local level-
trg 20/2/14
new site searching
Sr
No
SDC
A
Total
Sites(IP/SSA
)
Hiring of
Site(NR/
IP/SSA)
Nominals
(NotRrcei
ved/OK/N
ot Ok)RF
finalizatio
n
Status of
Site hiring
by SSA
(NR/IP/Y/
to
HPC/WIP)
Agreeme
nt
AD/D/NR
EC status (Y)
Tower
Foundati
on(NR/Zt
e/Civil)
Tower
Erection(N
R/SSA/Zte
)
Shelter FDFA DG
BATTER
Y
POWE
R
PLANT
MEDIA
ANTIST
ATIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern DE Remarks
43 Grg Wazirpur ssa/IP ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
pend
Pendin
g ZTE
Pending
ZTE
Comb
o
pending DET(South )
site hand over ip
(indus) by circle
office
44 Grg
Sohna
DENSE AREA
SSA
Let Long
Sent to
Circle
Civil(visit) circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pending DET(South )
45 Grg
BSF camp
bhondsi
SSA OK
file sent
to HPC
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pending DET(South )
46 Grg Daultabad SSA ok
HPC
Done
Civil circle
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pending DE(NWO-N) file in progress
47 Grg dharampur SSA OK
HPC
Done
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pending DE(NWO-N) file in progress
48 Grg Bajghera SSA OK done AD Yes done
done M/s
SKC
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
FE port ready
(MLpending(ZTE).
.far end p/v))
Pendin
g ZTE
Pending
ZTE
Comb
o
pending DE(NWO-N)
site handed over to
circle
49 Grg fazilpur
SSA(Kherki
Majra soil
problem
(Dhanwap
ur)
OK
file sent
to HPC
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
pending
Not
reqd
Pending
ZTE
Comb
o
pending DE(NWO-W)
50 Grg Khetawas SSA OK done done
final payment
done,work pending at
DHBVNL-trg 17/02/14
done 1/6/13
Civil grg
done 10/8/13
SKC
Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Ml
pending(ZTE)..far
end fkn
Not
reqd
Pending
ZTE
Comb
o
pending DE(NWO-W) HO
site handed over to
circle
51 Grg
SGT Medical
college near
Budera /Chandu
SSA OK
HPC
Done
done file pending at AO Civil circle
Shelter
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
M/Lpending(far
end
fkn,chandu,ghari
harsaru
Pendin
g ZTE
Pending
ZTE
Comb
o
pending DE(NWO-W) HO
52 Grg Mussaidpur SSA OK
HPC
Done
done
Estimate pendng DHBVNL-
submeter to be installed
by sde elect. Trg & visit
180214
done
10/12/13
civil grg
WIP Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
M/L pending
(ZTE)far end
fkn
Not
reqd
Pending
ZTE
Comb
o
pending DE(NWO-W) HO
EC stoped by
neighbour(submeter
to be submitted by
sde elect.) site
53 Grg sultanpur SSA OK done done Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
pending
Not
reqd
Pending
ZTE
Comb
o
pending DE(NWO-W)
54 Grg Baslambi SSA OK
HPC
Done
done file pending at AO Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
OFC pending
Not
reqd
Pending
ZTE
Comb
o
pending DE(NOW-W) HO agreement done
55 Grg
Gawal
pahari/Balia
was
SSA
new site
searchin
g
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
ML(ZTE)/OFC-
500 mtr
required
Not
reqd
Pending
ZTE
Comb
o
pending DE(NOW-E)
56 Grg Ullawas SSA
revise
applicati
on
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
MLpendingfar
end kendriya
vihar /kadarpur
Not
reqd
Pending
ZTE
Comb
o
pending DE(NOW-E)
57 Grg Behrampur SSA ok
HPC
Done
done
DD deposit to
dhbvnl
done
24/1/14 Civil
grg
DONE(23-2-
14)
Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
ML /ofc 200
mtr required
pending
Not
reqd
Pending
ZTE
Comb
o
pending DE(NOW-E)
site handover to
circle
58 Grg
Bandwadi
(old site-IMT-
sec-6)
SSA ok
bandwadi
applicatio
n required
Civil circle Outdoor Not reqd
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Mini link(ZTE)
pending
Not
reqd
Pending
ZTE
Comb
o
pending DE(NOW-E) lat long ok
WORK DETAIL OF NEW SITES :
HPC done but agreement pending =5, 4
File sent to HPC =7,
Court cases sites= 4 sikhopur,naharpur kasan,imt sec8,near gitm)
Imt Sec-3,NSG Gate-2,AMITY,Kasan,Silani,Wazirpur,Sohna Dense,Bandwadi,
Tower Erection =9 Sangail ,Bisru,Mumtajpur,Nawada-Fatehpur,TE sohna,Medawas,Rojkameo,Bajghera,Khetawas
Agreement Done (sites
hired) =23
TE Sohna,Medawas,RojkaMeo,Bajghera,Khetawas,Mussaidpur,IMT sec-8.Nawada Fatehpur ,Naharpur Kasan,Sikohpur,Mumtajpur,Bisru,Sangail,Bhangrola, Kakrola(sec7),Near GITM, Bilaspur haryana, Kota
Khandewla,Ullawas,Behrampur,Sec-67, SGT Medical college Sultanpur
imt sec-1 ,Sikanderpur,CRPF camp,
Application required=7
Total Tower Foundation done ssa civil = 15 (+1 zte)
sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas,Naharpur,CRPF camp ZTE,musaidpur,near GITM,Kota
Khandewla,behrampur,Bilaspur )
hayatpur,lakhuwas,Gwalpahari,Dharampur, BSF,Daulatabad, Fajilpur
Lat Long Sent to Circle
Summary
work
pending at
ZTE
emf data
sent
zte work
done
BTS on air 20/02/2014
*total
site=2
sites hired
=2 (HPC
done with
* total
sites=18
* sites
hired =10
(HPC done
with
agreement-
mumtajpur
,npkasan,se
c8
imt,nawad
a
fatepur,Kot
a
khandewla,
Bhangrola/
kakrola,kak
rola(sec7),s
ikhopur,ne
ar
gitm,bilasp
ur haryana,
)
*HPC done
but
agreement
pending=3(
imt sec-1
,nakhdola,
hayatpur)
* file sent
for
HPC=1(jata
uli )
*
application
required=
5(sec3,nsg
2,imt
sec3,amity,
kasan )

JT
O
(M
OB
)
no
dal
-
Ta
ur
u

Sh.
Raj
iv
Ku
ma
r
Ma
rot
hia
BTS on air on 6-11-13
BTS on air 03/05/2013
BTS on air 01/05/2013
BTS on air 31-1-14
BTS on air 01/01/2014
BTS on air on 30-04-13
BTS on air 16/01/2014
BTS on air on 13/12/13
* total
sites=18
* sites
hired =10
(HPC done
with
agreement-
mumtajpur
,npkasan,se
c8
imt,nawad
a
fatepur,Kot
a
khandewla,
Bhangrola/
kakrola,kak
rola(sec7),s
ikhopur,ne
ar
gitm,bilasp
ur haryana,
)
*HPC done
but
agreement
pending=3(
imt sec-1
,nakhdola,
hayatpur)
* file sent
for
HPC=1(jata
uli )
*
application
required=
5(sec3,nsg
2,imt
sec3,amity,
kasan )

JT
O
(M
OB
)
no
dal
-
Ta
ur
u

Sh.
Raj
iv
Ku
ma
r
Ma
rot
hia
* total
sites=13
* Sites
Hired=4 (1
xge sites +3
HPC done
with
agreement-
te sna,crp
camp,med
awas,rojka
meo,palara
,Sec-67 )
*HPC done
but
agreement
pending=1
(sikandarp
ur )
file sent for
HPC=2(has
anpur,lakh
uwas)
*
application
required=
3.silani,sna
dense
area,wazirp
ur)

* so
pending
sites = 9
(file sent
for hpc +
HPC done
w/o
agreement
+applicatio
n required
)
E/C
pending in
hired
sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas,Naharpur,CRPF camp ZTE,musaidpur,near GITM,Kota
Khandewla,behrampur,Bilaspur )
* total
sites=4
*Sites
Hired =1
(HPC done
with
agreement)
(
behrampur
)
*file sent
for HPC but
JT
O
(M
OB
)
no
dal
-
Pat
udi
Sh.
Aja
JT
O
(M
OB
)
no
dal
-
GR
G

Sh.
PP
Gu
pta
* total
sites=6
*Sites
Hired =4
(HPC done
with
agreement-
Khetavas,
Mussaidpu
r,baslambi,
sgt medical
college)
* hpc done
but
agreement
pending=1
(sultanpur )
*file sent
JT
O
(M
OB
)
no
dal
-
Ta
ur
u

Sh.
Raj
iv
Ku
ma
r
Ma
rot
hia
* total
sites=13
* Sites
Hired=4 (1
xge sites +3
HPC done
with
agreement-
te sna,crp
camp,med
awas,rojka
meo,palara
,Sec-67 )
*HPC done
but
agreement
pending=1
(sikandarp
ur )
file sent for
HPC=2(has
anpur,lakh
uwas)
*
application
required=
3.silani,sna
dense
area,wazirp
ur)

* so
pending
sites = 9
(file sent
for hpc +
HPC done
w/o
agreement
+applicatio
n required
)
E/C
pending in
hired
DATED 14-03-2014
Summary: Total sites=58 ( Alrdy Twr Erected with agreement done =11 + 47 new sites (4 IP +43 ) ) IP-amity,kasan,wazirpur,imt sec3
work detail of new sites -47 :: NewAgreemDone(sites hired )=23, HPC done but agreement pending =5, file sent to HPC =6,application required=7
Sr
No
SDCA
Total
Sites(IP/SSA
)
Hiring of
Site(NR/I
P/SSA)
Nominals
(NotRrcei
ved/OK/N
ot Ok)RF
finalizatio
n
Status of
Site hiring
by SSA
(NR/IP/Y/
to
HPC/WIP)
Agreement
AD/D/NR
EC status (Y)
Tower
Foundatio
n(NR/Zte/
Civil)
Tower
Erection(N
R/SSA/Zte)
Shelter FDFA DG
BATTE
RY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Concer
n DE
TX
H/o
ver
to
circl
e
Remarks
1 Grg Dhankot NR NR NR AD phV y AD phV AD phV
ALREADY
SHELTER
done done done done OFC Done done DONE Combo
comissi
oned
DE(NWO-
w)
TX2
2 Grg Kherki Daula NR NR NR AD phV y AD phV AD phV
ROOM
DONE
done
Installe
d
Installe
d
Installed
OFC Done/for 3g FE
pending
done Installed Combo pending
DET(Soh
na RD)
TX1
3 Grg Binola NR NR NR AD phV y AD phV AD phV
Room
Already
done done done done OFC Done done Installed Combo pending SDE(IMT) TX2
4 Grg Tikli NR NR NR AD phV y AD phV AD phV Outdoor Not reqd Done done done ML Done (far end KDR)
Not
reqd
DONE 2G NA
DET(SHN
RD)
TX2
5 Nuh Sudaka NR NR NR AD phV y AD phV AD phV Outdoor Not reqd Done done done ML Done (far end Ujina)
Not
reqd
DONE 2G NA
DE(MWT
)
TX
MWT
6 Fpj Sikrawa NR NR NR AD phV y AD phV AD phV
Room
Already
done done done done OFC Done done Installed 2G pending
DE(MWT
)
TX
MWT
7 Fpj Jamalgarh NR NR NR AD phV y AD phV AD phV Outdoor Not reqd Done done done
ML DONE (Far end Baded
)
Not
reqd
DONE 2G NA
DE(MWT
)
TX
MWT
8 Grg TE Sohna SSA OK done DONE y (TE xge ) done Civil
done M/s
SKC
Room
Already
done
Alread
y
Already Already XGE. FE provided done DONE Combo on air
DET(Sout
h )
TX2
9 Fpj Gulalta NR NR NR AD phV yes AD phV AD phV Done done done done done
ML done (Far end
Sikhrawa)
done Done 2G NA
DE(MWT
)
TX
MWT
10 Nuh salamba y AD phV AD phV Done
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
ML (Far end nuh)done &
pcm testing pending
Pending
ZTE
Pending
ZTE
2G NA
DE(MWT
)
TX
MWT
7 Nuh Alduka NR NR NR AD y AD phV AD phV zte done zte done
zte
done
zte
done
zte
done
ML done (far end GSR) zte done zte done 2G NA
DE(MWT
)
TX1 intigrated
8 Nuh Indri NR NR NR AD
will take 7-8 days
more
AD phV AD phV Done DONE Done Done Done
ML done (Far end
Rewasan)
done DONE 2G NA
DE(MWT
)
TX2
intigrated (emf data
sent)
9 Fpj Jamalgarh NR NR NR AD y AD phV AD phV Outdoor Not reqd Done Done done
ML DONE (Far end Baded
)
Not
reqd
DONE 2G NA
DE(MWT
)
TX2
BTS on AIR
16/01/2014
11 Nuh Alduka NR NR NR AD phV y AD phV AD phV zte done zte done
zte
done
zte
done
zte
done
ML done (far end GSR) zte done zte done 2G NA
DE(MWT
)
TX
MWT
intigrated
12 Nuh Indri NR NR NR AD phV will take 20 days more AD phV AD phV done done done done done
ML done (Far end
Rewasan)
done Done 2G NA
DE(MWT
)
TX
MWT
intigrated (emf data
sent)
13 Nuh Sangail SSA OK done AD phV
work panding at
dhbvnl-trg 050314
done31/12
/12Civil
done
7/5/13 SKC
Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
ML pending (far end
Ujjina)
Not
reqd
Pending
ZTE
2G NA
DE(MWT
)
TX
MWT
HO
14 Fpj Bisru SSA OK done done
work panding at
dhbvnl-trg 050314
done
8/4/13
Civil grg
done
20/6/13
SKC
Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
ML Pnding ( far end
Gulalta)
Not
reqd
Pending
ZTE
2G NA
DE(MWT
)
TX
MWT
HO
15 Grg mumtajpur SSA OK done done
work panding at
dhbvnl-trg 050314
done
22/3/13
Civil grg
done
7/5/13/13
SKC
outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC done (2E1 given)
Not
reqd
Pending
ZTE
2G NA SDE(IMT) TX2
site handed over to
circle
16 Grg Sikhopur SSA
OK; also
to search
new
done done
Demand note
received , file at AO
civil circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC pending
Not
reqd
Pending
ZTE
Combo pending SDE(IMT) TX2 HO
Court case done next
date: 19/02/14 ; to
search new appltn
17 Grg
Nahar pur
KASAN
SSA OK done done
work panding at
dhbvnl-trg 050314
done
23/4/13
civil grg
WIP Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Combo pending SDE(IMT) TX2 HO
Court case done dt 19-
2-14 Comitee is mode
to resolve
18 Grg
Imt Sec-8
manesar
SSA OK
Revise
aplctn rqd
Civil ZTE Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Combo pending SDE(IMT) TX1 HO
19 Grg
Nawada
fatehpur
SSA OK done done
work panding at
dhbvnl-trg 050314
done
23/4/13Ci
vil grg
done
25/5/13SK
C
Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Combo pending SDE(IMT) TX1 HO
site handed over to
circle
20 Nuh
kota
khandewla
SSA ok done done
work panding at
dhbvnl-trg 050314
done
26/12/13C
ivil grg
done ( 6-3-
14)
outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC pending
Not
reqd
Pending
ZTE
Combo pending SDE(IMT) TX2 HO
site handed over to
circle
21 Grg Nakhdola SSA ok
Revise
aplctn rqd
Civil ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
ML pending( far end IMT
manesar )
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT) TX1
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT
BTS on air on 6-11-13
BTS on air 03/05/2013
BTS on air 01/05/2013
BTS on air 31-1-14
BTS on air 01/01/2014
BTS on air on 30-04-13
agrmnt to revised(report pending from civil
xen)-trg 180214
BTS on air 20/02/2014
BTS on air 16/01/2014
BTS on air on 13/12/13
22 Grg
Kakrola(IMT-
Sec-7) SSA OK done done
work panding at
dhbvnl-trg 050314
Civil ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
ML pending (far end
Ujjina)
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT) TX1 HO site handover to circle
Sr
No
SDCA
Total
Sites(IP/SSA
)
Hiring of
Site(NR/I
P/SSA)
Nominals
(NotRrcei
ved/OK/N
ot Ok)RF
finalizatio
n
Status of
Site hiring
by SSA
(NR/IP/Y/
to
HPC/WIP)
Agreement
AD/D/NR
EC status (Y)
Tower
Foundatio
n(NR/Zte/
Civil)
Tower
Erection(N
R/SSA/Zte)
Shelter FDFA DG
BATTE
RY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Concer
n DE
TX
H/o
ver
to
circl
e
Remarks
23 Grg
nsg gate-2
/Navrangpu
r
SSA OK
final letter
pending
frm NSG
Civil ZTE outdoor
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC pending
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT) TX1
do letter sent to nsg
by de mewat
24 Grg
Bhangrola/K
akrola
SSA OK Done Done
work panding at
dhbvnl-trg 050314
Civil ZTE Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
ML pending(ZTE) far end
IMT manesar)
Not
reqd
Pending
ZTE
Combo pending SDE(IMT) TX1 HO
25 Grg IMT sect-1 SSA
OK
done
agreemnt
pending -
signature
yes Civil pole by ZTE XGE. FE port ready.
Pending
ZTE
Combo pending SDE(IMT) TX1 HO
HPC done
butagreement
pending
26 Grg Near GITM SSA ok done done
Cheque pending at
A/O
done
2/1/14
Civil grg
circle outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Combo pending SDE(IMT) TX2
stay order canceled
on 12/03/14 in court
27 Grg Hayatpur SSA ok Civil ZTE Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Combo pending SDE(IMT) TX2 Agreement Panding
28 Grg
Jatauli/Hali
Mandi2
SSA ok
aplication
reqd
done circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Combo pending SDE(IMT) TX2 HPC Pending
29 Grg
Amity(Near
Pachgaon)-
badanki
SSA/IP
Bid not
Receved
aplication
reqd
ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC pending
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT) TX2
site hand over ip
(indus) by circle office
30 Grg Kasan SSA/IP
aplication
reqd
shiv
mandir
ML pending(far end IMT
manesar)
Pending
ZTE
Combo pending SDE(IMT) TX1
31 Grg
Rathiwas /
Khod
old site
pwala
khuspur
Let Long
Sent to
Circle
civil circle Outdoor Not reqd
pendig
ZTE
pendig
ZTE
pendig
ZTE
Not
reqd
Pending
ZTE
Combo pending SDE(IMT) TX2
32 Grg
Imt Sec-3
manesar/Gh
osghar
SSA/IP ok
Revise
appctn
rqd
Mini link(ZTE) pend
Pending
ZTE
Combo pending SDE(IMT) TX1
33 Grg
Bilaspur,
Haryana
(bilaspur
khurd )
SSA ok done done
final amt deposited at
dhbvnl
Done DONE
Shelter
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC done 140214
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT) TX2
site handed over to
circle
Grg Hasanpur SSA ok
Revise
appctn
rqd
Civil circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
ML pending(far end palra)
Not
reqd
Pending
ZTE
Combo pending
DET(Sout
h )
TX2
35 Grg Palra SSA ok done done applied Civil(visit) Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC pending
Not
reqd
Pending
ZTE
Combo pending
DET(Sout
h )
TX2 HO site handover to circle
36 Grg Silani SSA ok
revise
applicatio
n required
Civil(visit) circle
Shelter
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC pending
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sout
h )
TX2
37 Grg CRPF Camp SSA OK done
permission
letter in
progres
Yes (CRPF will provide
EC)EC wiring pending
done
20/1/13
ZTE
ZTE Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC Pending(DE Tx Urban)
Not
reqd
Pending
ZTE
Combo pending
DET(Sout
h )
TX2 HO
do letter sent to crpf
by de south
38 Grg Medhawas SSA OK Done DONE
Demand note(rs
96000) pending at
DHBVNL
done
3/5/13
Civil grg
done
20/5/13
SKC
Shelter
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC wip
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sout
h )
TX2 HO
site handed over to
circle
39 GRG RojkaMeo SSA OK done AD
dd (1.42
lakh)deposited to
dhbvnl
done
30/12/12C
ivil grg
done
31/1/13
SKC
Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Combo pending
DET(Sout
h )
TX
MWT
HO
site handed over to
circle
40 Grg
Sikandarpur
(Bada)
SSA
Let Long
Sent to
Circle
done in progres Civil(visit) circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Combo pending
DET(Sout
h )
TX2
41 Grg Lakhuwas ssa/IP OK
file sent to
HPC
HPC wip aggrement pending Civil(visit) circle
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC pending
Pending
ZTE
Combo pending
DET(Sout
h )
TX2 HPC Pending
approval received from nsg hq but
final approval pending at local level-
trg 20/2/14
under negoation 14000 to 10000 rs
negotiation for 5000-6000 rs
42 Grg Sector-67 SSA ok done HPC done File work start wip circle
Shelter
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC pending
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sout
h )
TX2 HO
site handed over to
circle
Sr
No
SDCA
Total
Sites(IP/SSA
)
Hiring of
Site(NR/I
P/SSA)
Nominals
(NotRrcei
ved/OK/N
ot Ok)RF
finalizatio
n
Status of
Site hiring
by SSA
(NR/IP/Y/
to
HPC/WIP)
Agreement
AD/D/NR
EC status (Y)
Tower
Foundatio
n(NR/Zte/
Civil)
Tower
Erection(N
R/SSA/Zte)
Shelter FDFA DG
BATTE
RY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Concer
n DE
TX
H/o
ver
to
circl
e
Remarks
43 Grg Wazirpur ssa/IP Not Ok aggrement pending ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sout
h )
TX2 aggrement pending
44 Grg
Sohna
DENSE AREA
SSA
Let Long
Sent to
Circle
not ok aggrement pending Civil(visit) circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Combo pending
DET(Sout
h )
TX2 aggrement pending
45 Grg
BSF camp
bhondsi
SSA OK
file sent to
HPC
Civil circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Combo pending
DET(Sout
h )
TX2
46 Grg Daultabad SSA ok HPC Done
aggrement
pending
Civil circle
Shelter
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
TX1 file in progress
47 Grg dharampur SSA OK HPC Done
aggrement
pending
Civil circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
TX1 file in progress
48 Grg Bajghera SSA OK done AD Yes done
done M/s
SKC
Shelter
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
FE port ready
(MLpending(ZTE)..far end
p/v))
Pending
ZTE
Pending
ZTE
Combo pending
DE(NWO-
N)
TX1
site handed over to
circle
49 Grg fazilpur
SSA(Kher
ki Majra
soil
problem
OK
file sent to
HPC
Civil circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pending
Not
reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
TX2
50 Grg Khetawas SSA OK done done
final payment
done,work pending at
DHBVNL-trg 17/02/14
done
1/6/13
Civil grg
done
10/8/13
SKC
Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Ml pending(ZTE)..far end
fkn
Not
reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
TX2 HO
site handed over to
circle
51 Grg
SGT Medical
college near
Budhera
/Chandu
SSA OK HPC Done done file pending at AO Civil circle
Shelter
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
M/Lpending(far end
fkn,chandu,ghari harsaru
Pending
ZTE
Pending
ZTE
Combo pending
DE(NWO-
W)
TX2 HO
52 Grg Mussaidpur SSA OK HPC Done done
Estimate pendng
DHBVNL-submeter to
be installed by sde
elect. Trg & visit
done
10/12/13
civil grg
done(06-03-
14)
Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
M/L pending (ZTE)far
end fkn
Not
reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
TX2 HO
EC stoped by
neighbour(submeter
to be submitted by
sde elect.) site
53 Grg sultanpur SSA OK done done Initial amt deposited Civil circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pending
Not
reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
TX2
54 Grg Baslambi SSA OK HPC Done done Initial amt deposited Civil circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC pending
Not
reqd
Pending
ZTE
Combo pending
DE(NOW-
W)
TX2 HO site handover to circle
55 Grg
Gawal
pahari/Balia
was
SSA
new site
searching
Civil circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
ML(ZTE)/OFC-500 mtr
required
Not
reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
TX1
56 Grg Ullawas SSA ok
revise
appln
required
Civil circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
MLpendingfar end
kendriya vihar /kadarpur
& ofc(bsnl)
Not
reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
TX1
57 Grg Behrampur SSA ok HPC Done done DD deposit to dhbvnl
done
24/1/14
Civil grg
DONE(23-2-
14)
Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
ML /ofc 200 mtr required
pending
Not
reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
TX1 site handover to circle
58 Grg
Bandwadi
(old site-
IMT-sec-6
SSA ok
b/wadi
appln
required
Civil circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pending
Not
reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
TX1 lat long ok
WORK DETAIL OF NEW SITES :
HPC done but agreement pending =5, 5
File sent to HPC =5,
Court cases sites= 4 sikhopur,naharpur kasan,imt sec8,near gitm)
Imt Sec-3,NSG Gate-2,AMITY,Kasan,Silani,Wazirpur,Sohna Dense,Bandwadi,Ullawas
Tower Erection =9 Sangail ,Bisru,Mumtajpur,Nawada-Fatehpur,TE sohna,Medawas,Rojkameo,Bajghera,Khetawas
Agreement Done (sites hired)
=22
TE Sohna,Medawas,RojkaMeo,Bajghera,Khetawas,Mussaidpur,IMT sec-8.Nawada Fatehpur ,Naharpur Kasan,Sikohpur,Mumtajpur,Bisru,Sangail,Bhangrola, Kakrola(sec7),Near GITM, Bilaspur haryana, Kota Khandewla,,Behrampur,Sec-67, SGT
Medical college, Sultanpur
imt sec-1 ,Sikanderpur,CRPF camp, Daulatabad,Dharampur
hayatpur,lakhuwas,Gwalpahari, BSF, Fajilpur
Application required=8
Total Tower Foundation done ssa civil = 15 (+1 zte)
sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas,Naharpur,CRPF camp ZTE,musaidpur,near GITM,Kota Khandewla,behrampur,Bilaspur )
Summary
work
pending
at ZTE
emf data
sent
zte work
done
On Air
16/01/20
emf data
sent
zte work
done
BTS on air on 6-11-13
BTS on air 03/05/2013
BTS on air 01/05/2013
BTS on air 31-1-14
BTS on air 01/01/2014
BTS on air on 30-04-13
*total
site=2
sites
hired =2
(HPC
done with
* total
sites=18
* sites
hired =10
(HPC
done with
agreemen
t-
mumtajp
ur,npkasa
n,sec8
imt,nawa
da
fatepur,K
ota
khandewl
a,Bhangro
la/kakrola
,kakrola(s
ec7),sikho
pur,near
gitm,bilas
pur
haryana,
)
*HPC
done but
agreemen
t
pending=
3(imt sec-
1
,nakhdola
,hayatpur
)
* file sent
for
HPC=1(jat
auli )
*
applicatio
n
required=
5(sec3,ns
g2,imt
sec3,amit
y,kasan )

JTO
(M
OB
)
nod
al -
Tau
ru
Sh.
Raji
v
Ku
ma
r
Ma
rot
hia
BTS on air 20/02/2014
BTS on air 16/01/2014
BTS on air on 13/12/13
* total
sites=18
* sites
hired =10
(HPC
done with
agreemen
t-
mumtajp
ur,npkasa
n,sec8
imt,nawa
da
fatepur,K
ota
khandewl
a,Bhangro
la/kakrola
,kakrola(s
ec7),sikho
pur,near
gitm,bilas
pur
haryana,
)
*HPC
done but
agreemen
t
pending=
3(imt sec-
1
,nakhdola
,hayatpur
)
* file sent
for
HPC=1(jat
auli )
*
applicatio
n
required=
5(sec3,ns
g2,imt
sec3,amit
y,kasan )

JTO
(M
OB
)
nod
al -
Tau
ru
Sh.
Raji
v
Ku
ma
r
Ma
rot
hia
* total
sites=13
* Sites
Hired=4
(1 xge
sites +3
HPC done
with
agreemen
t-te
sna,crp
camp,me
dawas,roj
kameo,pa
lara,Sec-
67 )
*HPC
done but
agreemen
t
pending=
1
(sikandar
pur )
file sent
for
HPC=2(ha
sanpur,la
khuwas)
*
applicatio
n
required=
3.silani,sn
a dense
area,wazi
rpur)

* so
pending
sites = 9
(file sent
for hpc +
HPC done
w/o
agreemen
t+applicat
ion
required )
JTO
(M
OB
)
nod
al -
Tau
ru
Sh.
Raji
v
Ku
ma
r
Ma
rot
hia
* total
sites=13
* Sites
Hired=4
(1 xge
sites +3
HPC done
with
agreemen
t-te
sna,crp
camp,me
dawas,roj
kameo,pa
lara,Sec-
67 )
*HPC
done but
agreemen
t
pending=
1
(sikandar
pur )
file sent
for
HPC=2(ha
sanpur,la
khuwas)
*
applicatio
n
required=
3.silani,sn
a dense
area,wazi
rpur)

* so
pending
sites = 9
(file sent
for hpc +
HPC done
w/o
agreemen
t+applicat
ion
required )
* total
sites=6
*Sites
Hired =4
(HPC
done with
agreemen
t-
Khetavas,
Mussaidp
ur,baslam
bi,sgt
medical
college)
* hpc
done but
agreemen
t
pending=
1
* total
sites=4
*Sites
Hired =1
(HPC
done with
agreemen
t)
(
behramp
ur )
*file sent
for HPC
JTO
(M
OB
)
nod
al -
Pat
udi
Sh.
Aja
y
Ku
ma
JTO
(M
OB
)
nod
al -
GR
G
Sh.
PP
Gu
pta
sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas,Naharpur,CRPF camp ZTE,musaidpur,near GITM,Kota Khandewla,behrampur,Bilaspur )
DATED 22-03-2014
Summary: Total sites=58 ( Alrdy Twr Erected with agreement done =11 + 47 new sites (4 IP +43 ) ) IP-amity,kasan,wazirpur,imt sec3
work detail of new sites -47 :: NewAgreemDone(sites hired )=23, HPC done but agreement pending =5, file sent to HPC =6,application required=7
Sr
No
SDCA
Total
Sites(IP/SSA
)
Hiring of
Site(NR/I
P/SSA)
Nominals
(NotRrcei
ved/OK/N
ot Ok)RF
finalizatio
n
Status of
Site hiring
by SSA
(NR/IP/Y/
to
HPC/WIP)
Agreement
AD/D/NR
EC status (Y)
Tower
Foundatio
n(NR/Zte/
Civil)
Tower
Erection(N
R/SSA/Zte)
Shelter FDFA DG
BATTE
RY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Concer
n DE
TX
H/o
ver
to
circl
e
Remarks
1 Grg Dhankot NR NR NR AD phV y AD phV AD phV
ALREADY
SHELTER
done done done done OFC Done done DONE Combo
comissi
oned
DE(NWO-
w)
TX2
2 Grg Kherki Daula NR NR NR AD phV y AD phV AD phV
ROOM
DONE
done
Installe
d
Installe
d
Installed
OFC Done/for 3g FE
pending
done Installed Combo pending
DET(Soh
na RD)
TX1
3 Grg Binola NR NR NR AD phV y AD phV AD phV
Room
Already
done done done done OFC Done done Installed Combo pending SDE(IMT) TX2
4 Grg Tikli NR NR NR AD phV y AD phV AD phV Outdoor Not reqd Done done done ML Done (far end KDR)
Not
reqd
DONE 2G NA
DET(SHN
RD)
TX2
5 Nuh Sudaka NR NR NR AD phV y AD phV AD phV Outdoor Not reqd Done done done ML Done (far end Ujina)
Not
reqd
DONE 2G NA
DE(MWT
)
TX
MWT
6 Fpj Sikrawa NR NR NR AD phV y AD phV AD phV
Room
Already
done done done done OFC Done done Installed 2G pending
DE(MWT
)
TX
MWT
7 Fpj Jamalgarh NR NR NR AD phV y AD phV AD phV Outdoor Not reqd Done done done
ML DONE (Far end Baded
)
Not
reqd
DONE 2G NA
DE(MWT
)
TX
MWT
8 Grg TE Sohna SSA OK done DONE y (TE xge ) done Civil
done M/s
SKC
Room
Already
done
Alread
y
Already Already XGE. FE provided done DONE Combo on air
DET(Sout
h )
TX2
9 Fpj Gulalta NR NR NR AD phV yes AD phV AD phV Done done done done done
ML done (Far end
Sikhrawa)
done Done 2G NA
DE(MWT
)
TX
MWT
10 Nuh salamba y AD phV AD phV Done
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
ML (Far end nuh)done &
pcm testing pending
Pending
ZTE
Pending
ZTE
2G NA
DE(MWT
)
TX
MWT
7 Nuh Alduka NR NR NR AD y AD phV AD phV zte done zte done
zte
done
zte
done
zte
done
ML done (far end GSR) zte done zte done 2G NA
DE(MWT
)
TX1 intigrated
8 Nuh Indri NR NR NR AD
will take 7-8 days
more
AD phV AD phV Done DONE Done Done Done
ML done (Far end
Rewasan)
done DONE 2G NA
DE(MWT
)
TX2
intigrated (emf data
sent)
9 Fpj Jamalgarh NR NR NR AD y AD phV AD phV Outdoor Not reqd Done Done done
ML DONE (Far end Baded
)
Not
reqd
DONE 2G NA
DE(MWT
)
TX2
BTS on AIR
16/01/2014
11 Nuh Alduka NR NR NR AD phV y AD phV AD phV zte done zte done
zte
done
zte
done
zte
done
ML done (far end GSR) zte done zte done 2G NA
DE(MWT
)
TX
MWT
intigrated
12 Nuh Indri NR NR NR AD phV will take 20 days more AD phV AD phV done done done done done
ML done (Far end
Rewasan)
done Done 2G NA
DE(MWT
)
TX
MWT
intigrated (emf data
sent)
13 Nuh Sangail SSA OK done AD phV
work panding at
dhbvnl-trg 050314
done31/12
/12Civil
done
7/5/13 SKC
Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
ML pending (far end
Ujjina)
Not
reqd
Pending
ZTE
2G NA
DE(MWT
)
TX
MWT
HO
14 Fpj Bisru SSA OK done done
work panding at
dhbvnl-trg 050314
done
8/4/13
Civil grg
done
20/6/13
SKC
Outdoor Not reqd done done done wip
Not
reqd
Pending
ZTE
2G NA
DE(MWT
)
TX
MWT
HO
15 Grg mumtajpur SSA OK done done
work panding at
dhbvnl-trg 050314
done
22/3/13
Civil grg
done
7/5/13/13
SKC
outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC done (2E1 given)
Not
reqd
Pending
ZTE
2G NA SDE(IMT) TX2
site handed over to
circle
16 Grg Sikhopur SSA
OK; also
to search
new
done done
Demand note
received , file at AO
civil circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC pending
Not
reqd
Pending
ZTE
Combo pending SDE(IMT) TX2 HO
Court case done next
date: 19/02/14 ; to
search new appltn
17 Grg
Nahar pur
KASAN
SSA OK done done
work panding at
dhbvnl-trg 050314
done
23/4/13
civil grg
WIP Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Combo pending SDE(IMT) TX2 HO
Court case done dt 19-
2-14 Comitee is mode
to resolve
18 Grg
Imt Sec-8
manesar
SSA OK
Revise
aplctn rqd
Civil ZTE Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Combo pending SDE(IMT) TX1 HO
19 Grg
Nawada
fatehpur
SSA OK done done
work panding at
dhbvnl-trg 050314
done
23/4/13Ci
vil grg
done
25/5/13SK
C
Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Combo pending SDE(IMT) TX1 HO
site handed over to
circle
20 Nuh
kota
khandewla
SSA ok done done
work panding at
dhbvnl-trg 050314
done
26/12/13C
ivil grg
done ( 6-3-
14)
outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC pending
Not
reqd
Pending
ZTE
Combo pending SDE(IMT) TX2 HO
site handed over to
circle
21 Grg Nakhdola SSA ok
Revise
aplctn rqd
Civil ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
ML pending( far end IMT
manesar )
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT) TX1
BTS on air on 30-04-13
BTS on air 01/01/2014
BTS on air 01/05/2013
BTS on air 16/01/2014
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT
BTS on air on 6-11-13
BTS on air 03/05/2013
agrmnt to revised(report pending from civil
xen)-trg 180214
BTS on air 31-1-14
BTS on air on 13/12/13
BTS on air 20/02/2014
22 Grg
Kakrola(IMT-
Sec-7) SSA OK done done
work panding at
dhbvnl-trg 050314
wip ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
ML pending (far end
Ujjina)
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT) TX1 HO site handover to circle
Sr
No
SDCA
Total
Sites(IP/SSA
)
Hiring of
Site(NR/I
P/SSA)
Nominals
(NotRrcei
ved/OK/N
ot Ok)RF
finalizatio
n
Status of
Site hiring
by SSA
(NR/IP/Y/
to
HPC/WIP)
Agreement
AD/D/NR
EC status (Y)
Tower
Foundatio
n(NR/Zte/
Civil)
Tower
Erection(N
R/SSA/Zte)
Shelter FDFA DG
BATTE
RY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Concer
n DE
TX
H/o
ver
to
circl
e
Remarks
23 Grg
nsg gate-2
/Navrangpu
r
SSA OK
final letter
pending
frm NSG
Civil ZTE outdoor
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC pending
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT) TX1
do letter sent to nsg
by de mewat
24 Grg
Bhangrola/K
akrola
SSA OK Done Done
work panding at
dhbvnl-trg 050314
Civil ZTE Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
ML pending(ZTE) far end
IMT manesar)
Not
reqd
Pending
ZTE
Combo pending SDE(IMT) TX1 HO
25 Grg IMT sect-1 SSA
OK
done
agreemnt
pending -
signature
yes Civil pole by ZTE XGE. FE port ready.
Pending
ZTE
Combo pending SDE(IMT) TX1 HO
HPC done
butagreement
pending
26 Grg Near GITM SSA ok done done
Cheque pending at
A/O
done
2/1/14
Civil grg
circle outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Combo pending SDE(IMT) TX2
stay order canceled
on 12/03/14 in court
27 Grg Hayatpur SSA ok Civil ZTE Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Combo pending SDE(IMT) TX2 Agreement Panding
28 Grg
Jatauli/Hali
Mandi2
SSA ok
aplication
reqd
done circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Combo pending SDE(IMT) TX2 HPC Pending
29 Grg
Amity(Near
Pachgaon)-
badanki
SSA/IP
Bid not
Receved
aplication
reqd
ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC pending
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT) TX2
site hand over ip
(indus) by circle office
30 Grg Kasan SSA/IP
aplication
reqd
shiv
mandir
ML pending(far end IMT
manesar)
Pending
ZTE
Combo pending SDE(IMT) TX1
31 Grg
Rathiwas /
Khod
old site
pwala
khuspur
Let Long
Sent to
Circle
civil circle Outdoor Not reqd
pendig
ZTE
pendig
ZTE
pendig
ZTE
Not
reqd
Pending
ZTE
Combo pending SDE(IMT) TX2
32 Grg
Imt Sec-3
manesar/Gh
osghar
SSA/IP ok
Revise
appctn
rqd
Mini link(ZTE) pend
Pending
ZTE
Combo pending SDE(IMT) TX1
33 Grg
Bilaspur,
Haryana
(bilaspur
khurd )
SSA ok done done
final amt deposited at
dhbvnl
Done
DONE M/s
KRB
Shelter
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC done 140214
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT) TX2
site handed over to
circle
Grg Hasanpur SSA ok
Revise
appctn
rqd
Civil circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
ML pending(far end palra)
Not
reqd
Pending
ZTE
Combo pending
DET(Sout
h )
TX2
35 Grg Palra SSA ok done done applied wip Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC pending
Not
reqd
Pending
ZTE
Combo pending
DET(Sout
h )
TX2 HO site handover to circle
36 Grg Silani SSA ok
revise
applicatio
n required
Civil(visit) circle
Shelter
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC pending
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sout
h )
TX2
37 Grg CRPF Camp SSA OK done
permission
letter in
progres
Yes (CRPF will provide
EC)EC wiring pending
done
20/1/13
ZTE
ZTE Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC Pending(DE Tx Urban)
Not
reqd
Pending
ZTE
Combo pending
DET(Sout
h )
TX2 HO
do letter sent to crpf
by de south
38 Grg Medhawas SSA OK Done DONE
Demand note(rs
96000) pending at
DHBVNL
done
3/5/13
Civil grg
done
20/5/13
SKC
Shelter
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC wip
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sout
h )
TX2 HO
site handed over to
circle
39 GRG RojkaMeo SSA OK done AD
dd (1.42
lakh)deposited to
dhbvnl
done
30/12/12C
ivil grg
done
31/1/13
SKC
Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Combo pending
DET(Sout
h )
TX
MWT
HO
site handed over to
circle
40 Grg
Sikandarpur
(Bada)
SSA
Let Long
Sent to
Circle
done in progres Civil(visit) circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Combo pending
DET(Sout
h )
TX2
41 Grg Lakhuwas ssa/IP OK
file sent to
HPC
HPC wip aggrement pending Civil(visit) circle
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC pending
Pending
ZTE
Combo pending
DET(Sout
h )
TX2 HPC Pending
approval received from nsg hq but
final approval pending at local level-
trg 20/2/14
under negoation 14000 to 10000 rs
negotiation for 5000-6000 rs
42 Grg Sector-67 SSA ok done HPC done File work start
done (19-3-
314)
circle
Shelter
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC pending
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sout
h )
TX2 HO
site handed over to
circle
Sr
No
SDCA
Total
Sites(IP/SSA
)
Hiring of
Site(NR/I
P/SSA)
Nominals
(NotRrcei
ved/OK/N
ot Ok)RF
finalizatio
n
Status of
Site hiring
by SSA
(NR/IP/Y/
to
HPC/WIP)
Agreement
AD/D/NR
EC status (Y)
Tower
Foundatio
n(NR/Zte/
Civil)
Tower
Erection(N
R/SSA/Zte)
Shelter FDFA DG
BATTE
RY
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Concer
n DE
TX
H/o
ver
to
circl
e
Remarks
43 Grg Wazirpur ssa/IP Not Ok aggrement pending ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sout
h )
TX2 aggrement pending
44 Grg
Sohna
DENSE AREA
SSA
Let Long
Sent to
Circle
not ok aggrement pending Civil(visit) circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Combo pending
DET(Sout
h )
TX2 aggrement pending
45 Grg
BSF camp
bhondsi
SSA OK
file sent to
HPC
Civil circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Combo pending
DET(Sout
h )
TX2
46 Grg Daultabad SSA ok HPC Done
aggrement
pending
Civil circle
Shelter
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
TX1 file in progress
47 Grg dharampur SSA OK HPC Done
aggrement
pending
Civil circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
TX1 file in progress
48 Grg Bajghera SSA OK done AD Yes done
done M/s
SKC
Shelter
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
FE port ready
(MLpending(ZTE)..far end
p/v))
Pending
ZTE
Pending
ZTE
Combo pending
DE(NWO-
N)
TX1
site handed over to
circle
49 Grg fazilpur
SSA(Kher
ki Majra
soil
problem
OK
file sent to
HPC
Civil circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pending
Not
reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
TX2
50 Grg Khetawas SSA OK done done
final payment
done,work pending at
DHBVNL-trg 17/02/14
done
1/6/13
Civil grg
done
10/8/13
SKC
Outdoor Not reqd done done done wip
Not
reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
TX2 HO
site handed over to
circle
51 Grg
SGT Medical
college near
Budhera
/Chandu
SSA OK HPC Done done file pending at AO Civil circle
Shelter
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
M/Lpending(far end
fkn,chandu,ghari harsaru
Pending
ZTE
Pending
ZTE
Combo pending
DE(NWO-
W)
TX2 HO
52 Grg Mussaidpur SSA OK HPC Done done
Estimate pendng
DHBVNL-submeter to
be installed by sde
elect. Trg & visit
done
10/12/13
civil grg
done(06-03-
14)
Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
M/L pending (ZTE)far
end fkn
Not
reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
TX2 HO
EC stoped by
neighbour(submeter
to be submitted by
sde elect.) site
53 Grg sultanpur SSA OK done done Initial amt deposited Civil circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pending
Not
reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
TX2
54 Grg Baslambi SSA OK HPC Done done Initial amt deposited Civil circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC pending
Not
reqd
Pending
ZTE
Combo pending
DE(NOW-
W)
TX2 HO site handover to circle
55 Grg
Gawal
pahari/Balia
was
SSA
new site
searching
Civil circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
ML(ZTE)/OFC-500 mtr
required
Not
reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
TX1
56 Grg Ullawas SSA ok
revise
appln
required
Civil circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
MLpendingfar end
kendriya vihar /kadarpur
& ofc(bsnl)
Not
reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
TX1
57 Grg Behrampur SSA ok HPC Done done DD deposit to dhbvnl
done
24/1/14
Civil grg
DONE(23-2-
14)
Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
ML /ofc 200 mtr required
pending
Not
reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
TX1 site handover to circle
58 Grg
Bandwadi
(old site-
IMT-sec-6
SSA ok
b/wadi
appln
required
Civil circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pending
Not
reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
TX1 lat long ok
WORK DETAIL OF NEW SITES :
HPC done but agreement pending =5, 5
File sent to HPC =5,
Court cases sites= 4 sikhopur,naharpur kasan,imt sec8,near gitm)
Imt Sec-3,NSG Gate-2,AMITY,Kasan,Silani,Wazirpur,Sohna Dense,Bandwadi,Ullawas
Tower Erection =9 Sangail ,Bisru,Mumtajpur,Nawada-Fatehpur,TE sohna,Medawas,Rojkameo,Bajghera,Khetawas
sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas,Naharpur,CRPF camp ZTE,musaidpur,near GITM,Kota Khandewla,behrampur,Bilaspur sec-67
imt sec-1 ,Sikanderpur,CRPF camp, Daulatabad,Dharampur
Total Tower Foundation done ssa civil = 16 (+1 zte)
Agreement Done (sites hired)
=22
TE Sohna,Medawas,RojkaMeo,Bajghera,Khetawas,Mussaidpur,IMT sec-8.Nawada Fatehpur ,Naharpur Kasan,Sikohpur,Mumtajpur,Bisru,Sangail,Bhangrola, Kakrola(sec7),Near GITM, Bilaspur haryana, Kota Khandewla,,Behrampur,Sec-67, SGT
Medical college, Sultanpur
Application required=8
hayatpur,lakhuwas,Gwalpahari, BSF, Fajilpur
Summary
work
pending
at ZTE
emf data
sent
zte work
done
On Air
16/01/20
emf data
sent
zte work
done
BTS on air on 30-04-13
JTO
(M
OB
)
nod
al -
Tau
ru
Sh.
Raji
v
Ku
ma
r
Ma
rot
hia
BTS on air 01/01/2014
BTS on air 01/05/2013
BTS on air 16/01/2014
* total
sites=18
* sites
hired =10
(HPC
done with
agreemen
t-
mumtajp
ur,npkasa
n,sec8
imt,nawa
da
fatepur,K
ota
khandewl
a,Bhangro
la/kakrola
,kakrola(s
ec7),sikho
pur,near
gitm,bilas
pur
haryana,
)
*HPC
done but
agreemen
t
pending=
3(imt sec-
1
,nakhdola
,hayatpur
)
* file sent
for
HPC=1(jat
auli )
*
applicatio
n
required=
5(sec3,ns
g2,imt
sec3,amit
y,kasan )

*total
site=2
sites
hired =2
(HPC
done with
BTS on air on 6-11-13
BTS on air 03/05/2013
BTS on air 31-1-14
BTS on air on 13/12/13
BTS on air 20/02/2014
JTO
(M
OB
)
nod
al -
Tau
ru
Sh.
Raji
v
Ku
ma
r
Ma
rot
hia
* total
sites=13
* Sites
Hired=4
(1 xge
sites +3
HPC done
with
agreemen
t-te
sna,crp
camp,me
dawas,roj
kameo,pa
lara,Sec-
67 )
*HPC
done but
agreemen
t
pending=
1
(sikandar
pur )
file sent
for
HPC=2(ha
sanpur,la
khuwas)
*
applicatio
n
required=
3.silani,sn
a dense
area,wazi
rpur)

* so
pending
sites = 9
(file sent
for hpc +
HPC done
w/o
agreemen
t+applicat
ion
required )
* total
sites=18
* sites
hired =10
(HPC
done with
agreemen
t-
mumtajp
ur,npkasa
n,sec8
imt,nawa
da
fatepur,K
ota
khandewl
a,Bhangro
la/kakrola
,kakrola(s
ec7),sikho
pur,near
gitm,bilas
pur
haryana,
)
*HPC
done but
agreemen
t
pending=
3(imt sec-
1
,nakhdola
,hayatpur
)
* file sent
for
HPC=1(jat
auli )
*
applicatio
n
required=
5(sec3,ns
g2,imt
sec3,amit
y,kasan )

sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas,Naharpur,CRPF camp ZTE,musaidpur,near GITM,Kota Khandewla,behrampur,Bilaspur sec-67
JTO
(M
OB
)
nod
al -
Pat
udi
Sh.
Aja
y
Ku
ma
JTO
(M
OB
)
nod
al -
GR
G
Sh.
PP
Gu
pta
JTO
(M
OB
)
nod
al -
Tau
ru
Sh.
Raji
v
Ku
ma
r
Ma
rot
hia
* total
sites=13
* Sites
Hired=4
(1 xge
sites +3
HPC done
with
agreemen
t-te
sna,crp
camp,me
dawas,roj
kameo,pa
lara,Sec-
67 )
*HPC
done but
agreemen
t
pending=
1
(sikandar
pur )
file sent
for
HPC=2(ha
sanpur,la
khuwas)
*
applicatio
n
required=
3.silani,sn
a dense
area,wazi
rpur)

* so
pending
sites = 9
(file sent
for hpc +
HPC done
w/o
agreemen
t+applicat
ion
required )
* total
sites=4
*Sites
Hired =1
(HPC
done with
agreemen
t)
(
behramp
ur )
*file sent
for HPC
* total
sites=6
*Sites
Hired =4
(HPC
done with
agreemen
t-
Khetavas,
Mussaidp
ur,baslam
bi,sgt
medical
college)
* hpc
done but
agreemen
t
pending=
1
DATED 29-03-2014
Summary: Total sites=58 ( Alrdy Twr Erected with agreement done =11 + 47 new sites (4 IP +43 ) ) IP-amity,kasan,wazirpur,imt sec3
work detail of new sites -47 :: NewAgreemDone(sites hired )=23, HPC done but agreement pending =5, file sent to HPC =6,application required=7
Sr
No
SDCA
Total
Sites(IP/SS
A)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrceiv
ed/OK/Not
Ok)RF
finalization
Status of
Site
hiring by
SSA
(NR/IP/Y
Agreeme
nt
AD/D/NR
EC status (Y)
Tower
Foundatio
n(NR/Zte/
Civil)
Tower
Erection(N
R/SSA/Zte)
Shelter FDFA DG
BATTER
Y
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Conce
rn DE
TX
H/o
ver
to
circl
e
Remarks
1 Grg Dhankot NR NR NR AD phV y AD phV AD phV ALREADY done done done done OFC Done done DONE Combo
comissi
oned
DE(NWO-
w)
TX2
2 Grg
Kherki
Daula
NR NR NR AD phV y AD phV AD phV
ROOM
DONE
done
Installe
d
Installe
d
Installed
OFC Done/for 3g FE
pending
done Installed Combo pending
DET(Sohn
a RD)
TX1
3 Grg Binola NR NR NR AD phV y AD phV AD phV
Room
Already
done done done done OFC Done done Installed Combo pending SDE(IMT) TX2
4 Grg Tikli NR NR NR AD phV y AD phV AD phV Outdoor Not reqd Done done done
ML Done (far end
KDR)
Not reqd DONE 2G NA
DET(SHN
RD)
TX2
5 Nuh Sudaka NR NR NR AD phV y AD phV AD phV Outdoor Not reqd Done done done
ML Done (far end
Ujina)
Not reqd DONE 2G NA DE(MWT)
TX
MWT
6 Fpj Sikrawa NR NR NR AD phV y AD phV AD phV
Room
Already
done done done done OFC Done done Installed 2G pending DE(MWT)
TX
MWT
7 Fpj Jamalgarh NR NR NR AD phV y AD phV AD phV Outdoor Not reqd Done done done
ML DONE (Far end
Baded )
Not reqd DONE 2G NA DE(MWT)
TX
MWT
8 Grg TE Sohna SSA OK done DONE y (TE xge ) done Civil
done M/s
SKC
Room
Already
done Already Already Already XGE. FE provided done DONE Combo on air
DET(Sout
h )
TX2
9 Alduka NR NR NR AD y AD phV AD phV zte done zte done
zte
done
zte
done
zte
done
ML done (far end
GSR)
zte done zte done 2G NA DE(MWT) TX1
9 Fpj Gulalta NR NR NR AD phV yes AD phV AD phV Done done done done done
ML done (Far end
Sikhrawa)
done Done 2G NA DE(MWT)
TX
MWT
10 Nuh salamba y AD phV AD phV Done
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
ML (Far end nuh)done
& pcm testing pending
Pending
ZTE
Pending
ZTE
2G NA DE(MWT)
TX
MWT
12 Nuh Indri NR NR NR AD
work started,to
complete in 3-4
days
AD phV AD phV Done DONE Done Done Done
ML done (Far end
Rewasan)
done DONE 2G NA DE(MWT) TX2
intigrated (emf
data sent)
13 Nuh Sangail SSA OK done AD phV
work pending
at dhbvnl-trg
done31/12
/12Civil grg
done
7/5/13 SKC
Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
ML pending (far end
Ujjina)
Not reqd
Pending
ZTE
2G NA DE(MWT)
TX
MWT
HO
14 Fpj Bisru SSA OK done done wip
done
8/4/13
Civil grg
done
20/6/13
SKC
Outdoor Not reqd done done done wip Not reqd
Pending
ZTE
2G NA DE(MWT)
TX
MWT
HO
15 Grg mumtajpur SSA OK done done
work panding
at dhbvnl-trg
050314
done
22/3/13
Civil grg
done
7/5/13/13
SKC
outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC done (2E1 given) Not reqd
Pending
ZTE
2G NA SDE(IMT) TX2
site handed over
to circle
16 Grg Sikhopur SSA
OK; also to
search new
application
done done
Demand note
received , file
at AO
civil circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC pending Not reqd
Pending
ZTE
Combo pending SDE(IMT) TX2 HO
Court case done
next date:
111/4/14 ; to
17 Grg
Nahar pur
KASAN
SSA OK done done
work panding
at dhbvnl-trg
050314
done
23/4/13
civil grg
WIP Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend Not reqd
Pending
ZTE
Combo pending SDE(IMT) TX2 HO
Court case done dt
12-4-14 Comitee is
mode to resolve
18 Grg
Imt Sec-8
manesar
SSA Civil ZTE Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend Not reqd
Pending
ZTE
Combo pending SDE(IMT) TX1 HO
19 Grg
Nawada
fatehpur
SSA OK done done
work panding
at dhbvnl-trg
050314
done
23/4/13Civ
il grg
done
25/5/13SKC
Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend Not reqd
Pending
ZTE
Combo pending SDE(IMT) TX1 HO
site handed over
to circle
20 Nuh
kota
khandewla
SSA ok done done
work panding
at dhbvnl-trg
050314
done
26/12/13Ci
vil grg
done ( 6-3-
14)
outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC pending Not reqd
Pending
ZTE
Combo pending SDE(IMT) TX2 HO
site handed over
to circle
21 Grg Nakhdola SSA ok
Revise
aplctn
rqd
Civil ZTE
Pending
ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
ML pending( far end
IMT manesar )
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT) TX1
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT
BTS on air 31-1-14
BTS on air on 30-04-13
agrmnt to revised(report pending from
civil xen)-trg 180214
BTS on air 20/02/2014
sde(civil) visit pending
mob team/dgm cm visit
pending as per sde imt
BTS on air 28/03/2014
BTS on air on 6-11-13
BTS on air 03/05/2013
BTS on air 01/05/2013
BTS on air 01/01/2014
BTS on air 16/01/2014
BTS on air on 13/12/13
22 Grg
Kakrola(IM
T-Sec-7) SSA OK done done
work panding
at dhbvnl-trg
050314
done ZTE
Shelter
Pending ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
ML pending (far end
Ujjina)
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT) TX1 HO
site handover to
circle
Sr
No
SDCA
Total
Sites(IP/SS
A)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrceiv
ed/OK/Not
Ok)RF
finalization
Status of
Site
hiring by
SSA
(NR/IP/Y
/to
Agreeme
nt
AD/D/NR
EC status (Y)
Tower
Foundatio
n(NR/Zte/
Civil)
Tower
Erection(N
R/SSA/Zte)
Shelter FDFA DG
BATTER
Y
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Conce
rn DE
TX
H/o
ver
to
circl
e
Remarks
23 Grg
nsg gate-2
/Navrangp
ur
SSA OK
final
letter
pending
Civil ZTE outdoor
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC/fe pending
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT) TX1
do letter sent to
nsg by de mewat
24 Grg
Bhangrola/
Kakrola
SSA OK Done Done
work panding
at dhbvnl-trg
050314
WIP ZTE Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
ML pending(ZTE) far
end IMT
manesar)..estimate
Not reqd
Pending
ZTE
Combo pending SDE(IMT) TX1 HO
25 Grg IMT sect-1 SSA OK done
agreemnt
pending -
signature
yes Civil pole by ZTE XGE. FE port ready.
Pending
ZTE
Combo pending SDE(IMT) TX1 HO
HPC done
butagreement
pending
26 Grg Near GITM SSA ok done done
Cheque
pending at A/O
..trgt 5/4/13
done
2/1/14
Civil grg
circle outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend Not reqd
Pending
ZTE
Combo pending SDE(IMT) TX2
stay order
canceled on
12/03/14 in court
27 Grg Hayatpur SSA Civil ZTE Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend Not reqd
Pending
ZTE
Combo pending SDE(IMT) TX2
Agreement
Panding
28 Grg
Jatauli/Hali
Mandi2
SSA ok done circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend Not reqd
Pending
ZTE
Combo pending SDE(IMT) TX2 HPC Pending
29 Grg
Amity(Near
Pachgaon)-
badanki
SSA/IP
Bid not
Receved
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC pending
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT) TX2
site hand over ip
(indus) by circle
office
30 Grg Kasan SSA/IP
aplication
reqd
shiv
mandir
ML pending(far end
IMT manesar)
Pending
ZTE
Combo pending SDE(IMT) TX1
31 Grg
Rathiwas /
Khod
old
site
pwala
Let Long
Sent to
Circle
civil circle Outdoor Not reqd
pendig
ZTE
pendig
ZTE
pendig
ZTE
Not reqd
Pending
ZTE
Combo pending SDE(IMT) TX2
32 Grg
Imt Sec-3
manesar/G
hosghar
SSA/IP ok Mini link(ZTE) pend
Pending
ZTE
Combo pending SDE(IMT) TX1
33 Grg
Bilaspur,
Haryana
(bilaspur
khurd )
SSA ok done done
final amt
deposited at
dhbvnl
Done
DONE M/s
KRB
Shelter
Pending ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC done 140214
Pending
ZTE
Pending
ZTE
Combo pending SDE(IMT) TX2
site handed over
to circle
Grg Hasanpur SSA ok
Revise
appctn
rqd
Civil circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
ML pending(far end
palra) Not reqd
Pending
ZTE
Combo pending
DET(Sout
h )
TX2
35 Grg Palra SSA ok done done applied wip Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC pending Not reqd
Pending
ZTE
Combo pending
DET(Sout
h )
TX2 HO
site handover to
circle
36 Grg Silani SSA ok
revise
applicatio
n
required
Civil(visit) circle
Shelter
Pending ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC pending
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sout
h )
TX2
37 Grg CRPF Camp SSA OK done
permissio
n letter in
progres
Yes (CRPF will
provide EC)EC
wiring pending
done
20/1/13
ZTE
ZTE Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC Pending(DE Tx
Urban)
Not reqd
Pending
ZTE
Combo pending
DET(Sout
h )
TX2 HO
do letter sent to
crpf by de south
38 Grg Medhawas SSA OK Done DONE
dd deposit to
DHBVNL
done
3/5/13
Civil grg
done
20/5/13
SKC
Shelter
Pending ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC wip
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sout
h )
TX2 HO
site handed over
to circle
39 GRG RojkaMeo SSA OK done AD
dd (1.42
lakh)deposited
to dhbvnl..trgt
done
30/12/12Ci
vil grg
done
31/1/13
SKC
Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend Not reqd
Pending
ZTE
Combo pending
DET(Sout
h )
TX
MWT
HO
site handed over
to circle
40 Grg
Sikandarpu
r(Bada)
SSA Civil(visit) circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend Not reqd
Pending
ZTE
Combo pending
DET(Sout
h )
TX2
2 new sites serching
aplication
reqd..negotiation on
rent
aplication reqd..site
not final
under negoation 14000 to
10000 rs
approval received from
nsg hq but final approval
pending at local level-trg
negotiation for 5000-6000
rs
Revise appctn
rqd..site searching
civil visit pending
application pending
41 Grg Lakhuwas ssa/IP OK
file sent
to HPC
HPC wip
aggrement
pending
Civil(visit) circle
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC pending
Pending
ZTE
Combo pending
DET(Sout
h )
TX2 HPC Pending
42 Grg Sector-67 SSA ok done HPC done File work start
done (19-3-
314)
circle
Shelter
Pending ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC pending
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sout
h )
TX2 HO
site handed over
to circle
Sr
No
SDCA
Total
Sites(IP/SS
A)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrceiv
ed/OK/Not
Ok)RF
finalization
Status of
Site
hiring by
SSA
(NR/IP/Y
Agreeme
nt
AD/D/NR
EC status (Y)
Tower
Foundatio
n(NR/Zte/
Civil)
Tower
Erection(N
R/SSA/Zte)
Shelter FDFA DG
BATTER
Y
POWER
PLANT
MEDIA
ANTISTA
TIC
BTS
Status
Site
2G/co
mbo
3G
STATUS
Concern
DE
Conce
rn DE
TX
H/o
ver
to
circl
e
Remarks
43 Grg Wazirpur
aggrement
pending
ZTE ZTE
Shelter
Pending ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend
Pending
ZTE
Pending
ZTE
Combo pending
DET(Sout
h )
TX2
aggrement
pending
44 Grg
Sohna
DENSE
AREA
SSA
Let Long
Sent to
Circle
not ok
aggrement
pending
Civil(visit) circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend Not reqd
Pending
ZTE
Combo pending
DET(Sout
h )
TX2
aggrement
pending
45 Grg
BSF camp
bhondsi
SSA Civil circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend Not reqd
Pending
ZTE
Combo pending
DET(Sout
h )
TX2
46 Grg Daultabad SSA ok
HPC
Done
aggreme
nt done
Civil circle
Shelter
Pending ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend Not reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
TX1
47 Grg dharampur SSA OK
HPC
Done
aggreme
nt
pending
Civil circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pend Not reqd
Pending
ZTE
Combo pending
DE(NWO-
N)
TX1 file in progress
48 Grg Bajghera SSA OK done AD Yes done
done M/s
SKC
Shelter
Pending ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
FE port ready
(MLpending(ZTE)..far
end p/v))
Pending
ZTE
Pending
ZTE
Combo pending
DE(NWO-
N)
TX1
site handed over
to circle/zte for bts
installation
49 Grg fazilpur SSA OK
HPC
done
Civil circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pending Not reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
TX2
50 Grg Khetawas SSA OK done done
final payment
done,work
pending at
DHBVNL-trg
done
1/6/13
Civil grg
done
10/8/13
SKC
Outdoor Not reqd done done done wip Not reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
TX2 HO
site handed over
to circle
51 Grg
SGT
Medical
college
near
SSA OK
HPC
Done
done
Initial amt
deposited
Civil circle
Shelter
Pending ZTE
Pending
ZTE
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
M/Lpending(far end
fkn,chandu,ghari
harsaru
Pending
ZTE
Pending
ZTE
Combo pending
DE(NWO-
W)
TX2 HO
52 Grg
Mussaidpu
r
SSA OK
HPC
Done
done
Estimate
pendng
DHBVNL-
submeter to be
done
10/12/13
civil grg
done(06-03-
14)
Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
M/L pending
(ZTE)far end fkn
Not reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
TX2 HO
53 Grg sultanpur SSA OK done done
file pending at
AO
Civil circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pending Not reqd
Pending
ZTE
Combo pending
DE(NWO-
W)
TX2
54 Grg Baslambi SSA OK
HPC
Done
done Civil circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
OFC pending Not reqd
Pending
ZTE
Combo pending
DE(NOW-
W)
TX2 HO
site handover to
circle
55 Grg
Gawal
pahari/Bali
awas
SSA
new site
searching
file pending at
AO
Civil circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
ML(ZTE)/OFC-500 mtr
required
Not reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
TX1
56 Grg Ullawas SSA
revise
appln
required
Civil circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
MLpendingfar end
kendriya vihar
/kadarpur & ofc(bsnl)
Not reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
TX1
57 Grg Behrampur SSA ok
HPC
Done
done
DD deposit to
dhbvnl
done
24/1/14
Civil grg
DONE(23-2-
14)
Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
ML /ofc 200 mtr
required pending
Not reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
TX1
site handover to
circle
58 Grg
Bandwadi
(old -IMT-
sec-6
SSA
b/wadi
appln
required
Civil circle Outdoor Not reqd
Pendin
g ZTE
Pendin
g ZTE
Pending
ZTE
Mini link(ZTE) pending Not reqd
Pending
ZTE
Combo pending
DE(NOW-
E)
TX1 lat long ok
WORK DETAIL OF NEW SITES :
TE Sohna,Medawas,RojkaMeo,Bajghera,Khetawas,Mussaidpur,IMT sec-8.Nawada Fatehpur ,Naharpur Kasan,Sikohpur,Mumtajpur,Bisru,Sangail,Bhangrola, Kakrola(sec7),Near GITM, Bilaspur haryana, Kota
Khandewla,,Behrampur,Sec-67, SGT Medical college, Sultanpur
Let Long Sent to Circle
IP (Indus)..confirmation
pending at circle team
Agreement Done (sites
hired) =22
HPC done but agreement pending =5, 5
File sent to HPC =5,
Court cases sites= 4 sikhopur,naharpur kasan,imt sec8,near gitm)
Imt Sec-3,NSG Gate-2,AMITY,Kasan,Silani,Wazirpur,Sohna Dense,Bandwadi,Ullawas
Tower Erection =9 Sangail ,Bisru,Mumtajpur,Nawada-Fatehpur,TE sohna,Medawas,Rojkameo,Bajghera,Khetawas
sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas,Naharpur,CRPF camp ZTE,musaidpur,near GITM,Kota
Khandewla,behrampur,Bilaspur sec-67
Total Tower Foundation done ssa civil = 16 (+1 zte)
Application required=8
imt sec-1 ,Sikanderpur,CRPF camp, Daulatabad,Dharampur
hayatpur,lakhuwas,Gwalpahari, BSF, Fajilpur
Sum
mary
work
pend
ing
zte
work
done
BTS on air 31-1-14
BTS on air on 30-04-13
JTO
(M
OB
)
nod
al -
Tau
ru
Sh.
Raji
v
Ku
ma
r
Ma
rot
hia
BTS on air 20/02/2014
*
total
sites
=18
*
sites
hired
=10
(HPC
done
with
agre
eme
nt-
mum
tajpu
r,npk
asan,
sec8
imt,n
awa
da
fatep
ur,K
ota
khan
dewl
a,Bh
angr
ola/k
akrol
a,kak
rola(
sec7)
,sikh
opur
,near
gitm,
bilas
pur
hary
ana,
)
*HP
C
done
but
agre
eme
nt
pend
ing=
3(im
t sec-
1
,nak
hdol
a,ha
yatp
ur)
* file
*tot
al
site=
2
sites
hire
BTS on air 28/03/2014
BTS on air on 6-11-13
BTS on air 03/05/2013
BTS on air 01/05/2013
BTS on air 01/01/2014
BTS on air 16/01/2014
BTS on air on 13/12/13
JTO
(M
OB
)
nod
al -
Tau
ru
Sh.
Raji
v
Ku
ma
r
Ma
rot
hia
*
total
sites
=13
*
Sites
Hire
d=4
(1
xge
sites
+3
HPC
done
with
agre
eme
nt-te
sna,c
rp
cam
p,me
daw
as,ro
jkam
eo,p
alara
,Sec-
67 )
*HP
C
done
but
agre
eme
nt
pend
ing=
1
(sika
ndar
pur )
file
sent
for
HPC
=2(h
asan
*
total
sites
=18
*
sites
hired
=10
(HPC
done
with
agre
eme
nt-
mum
tajpu
r,npk
asan,
sec8
imt,n
awa
da
fatep
ur,K
ota
khan
dewl
a,Bh
angr
ola/k
akrol
a,kak
rola(
sec7)
,sikh
opur
,near
gitm,
bilas
pur
hary
ana,
)
*HP
C
done
but
agre
eme
nt
pend
ing=
3(im
t sec-
1
,nak
hdol
a,ha
yatp
ur)
* file
JTO
(M
OB
)
nod
al -
Tau
ru
Sh.
Raji
v
Ku
ma
r
Ma
rot
hia
*
total
sites
=4
*Site
s
Hire
d =1
(HPC
done
with
agre
*
total
sites
=13
*
Sites
Hire
d=4
(1
xge
sites
+3
HPC
done
with
agre
eme
nt-te
sna,c
rp
cam
p,me
daw
as,ro
jkam
eo,p
alara
,Sec-
67 )
*HP
C
done
but
agre
eme
nt
pend
ing=
1
(sika
ndar
pur )
file
sent
for
HPC
=2(h
asan
*
total
sites
=6
*Site
s
Hire
d =4
(HPC
done
with
agre
eme
nt-
Khet
avas,
Muss
aidp
ur,ba
JTO
(M
OB
)
nod
al -
Pat
udi
Sh.
Aja
y
Ku
JTO
(M
OB
)
nod
al -
GR
G
Sh.
PP
Gu
pta
sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas,Naharpur,CRPF camp ZTE,musaidpur,near GITM,Kota
Khandewla,behrampur,Bilaspur sec-67
DATED 03-05-14
Summary: Total sites=58 ( Alrdy Twr Erected with agreement done =11 + 47 new sites (4 IP +43 ) ) IP-amity,kasan,wazirpur,imt sec3
work detail of new sites -47 :: NewAgreemDone(sites hired )=23, HPC done but agreement pending =5, file sent to HPC =6,application required=7
Sr
No
SDCA
Total
Sites(IP/SSA)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrcei
ved/OK/
Not
Ok)RF
Status of
Site
hiring by
SSA
(NR/IP/Y
Agreeme
nt
AD/D/NR
EC status (Y)
Tower
Foundation
(NR/Zte/Civ
il)
Tower
Erection(
NR/SSA/Z
te)
Shelter FDFA DG
BATTER
Y
POWE
R
PLAN
T
MEDIA
ANTIST
ATIC
BTS
Status
Site
2G/co
mbo
3G
STAT
US
Concern
DE
Conce
rn DE
TX
H/o
ver
to
circl
e
Remarks
1
1 Grg Dhankot NR NR NR AD phV y AD phV AD phV ALREADY done done done done OFC Done done done
Comb
o
on air
DE(NWO-
w)
TX2
2
2 Grg Kherki Daula NR NR NR AD phV y AD phV AD phV
ROOM
DONE
done
Install
ed
Installe
d
Install
ed
OFC Done/for 3g
FE pending
done done
Comb
o
on air
DET(Sohn
a RD)
TX1
3
3 Grg Binola NR NR NR AD phV y AD phV AD phV
Room
Already
done done done done OFC Done done done
Comb
o
pendi
ng
SDE(IMT) TX2
4
4 Grg Tikli NR NR NR AD phV y AD phV AD phV Outdoor
Not
reqd
Done done done mini link Done
Not
reqd
done 2G NA
DET(SHN
RD)
TX2
5
5 Nuh Sudaka NR NR NR AD phV y AD phV AD phV Outdoor
Not
reqd
Done done done
ML Done (far
end Ujina)
Not
reqd
done 2G NA DE(MWT)
TX
MWT
6
6 Fpj Sikrawa NR NR NR AD phV y AD phV AD phV
Room
Already
done done done done OFC Done done done
Comb
o
pendi
ng
DE(MWT)
TX
MWT
7
7 Fpj Jamalgarh NR NR NR AD phV y AD phV AD phV Outdoor
Not
reqd
Done done done
ML DONE (Far
end Baded )
Not
reqd
done 2G NA DE(MWT)
TX
MWT
8
8 Grg TE Sohna SSA OK done DONE y (TE xge ) done Civil
done M/s
SKC
Room
Already
done
Alread
y
Already
Alread
y
XGE. FE provided done done
Comb
o
on air
DET(Sout
h )
TX2
9
9 Nuh Alduka NR NR NR AD y AD phV AD phV zte done zte done
zte
done
zte
done
zte
done
ML done (far
end GSR)
zte
done
zte done 2G NA DE(MWT) TX1
10
10 Fpj Gulalta NR NR NR AD phV yes AD phV AD phV Done done done done done
ML done (Far
end Sikhrawa)
done done 2G NA
DE(MWT
)
TX
MWT
11
1 Nuh Indri NR NR NR AD trg 050514 AD phV AD phV Done done done done done
ML done (Far
end Rewasan)
done done 2G NA DE(MWT) TX2
intigrated
(emf data
sent)
12
2 Fpj Bisru SSA OK done done wip
done
8/4/13 Civil
grg
done
20/6/13
SKC
Outdoor
Not
reqd
done done done wip
Not
reqd
Pending
ZTE
2G NA DE(MWT)
TX
MWT
HO
site handed
over to circle
13
3 Grg Khetawas SSA OK done done
final payment
done,work pending at
DHBVNL-trg 15/04/14
done
1/6/13 Civil
grg
done
10/8/13
SKC
Outdoor
Not
reqd
done done done FE port ready
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NWO-
W)
TX2 HO
site handed
over to circle
14
4 Grg Mussaidpur SSA OK
HPC
Done
done
Estimate pendng
DHBVNL-submeter to
be installed by sde
done
10/12/13
civil grg
done(06-
03-14)
Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
M/L pending
(ZTE)far end
fkn
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NWO-
W)
TX2 HO
site handed
over to circle
15
5 Grg Bajghera SSA OK done AD Yes done
done M/s
SKC
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
FE port ready
(MLpending(ZTE)
..far end p/v))
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
DE(NWO-
N)
TX1
site handed
over to circle
16
6 Grg IMT sect-1 SSA OK done
agreemnt
pending -
signature
trgt 10/4/14
yes NR
pole by
ZTE
Pendin
g ZTE
Pendi
ng ZTE
XGE. FE port
ready.
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX1 HO
HPC done
butagreemen
t pending
17
7 Grg mumtajpur SSA OK done done
work panding at
dhbvnl-trg 150414
done
22/3/13
Civil grg
done
7/5/13/13
SKC
outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC done (2E1
given)
Not
reqd
Pending
ZTE
2G NA SDE(IMT) TX2
site handed
over to circle
18
8 Grg
Bilaspur,
Haryana
(bilaspur
SSA ok done done
final amt deposited at
dhbvnl
Done
DONE M/s
KRB
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC done
140214
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX2
site handed
over to circle
19
9 Nuh Sangail SSA OK done AD phV
complete due on 10-5-
14
done
31/12/12
Civil grg
done
7/5/13
SKC
Outdoor
Not
reqd
Pendin
g ZTE
Pendin
g ZTE
Pendi
ng ZTE
ML pending (far
end Ujjina)
Not
reqd
Pending
ZTE
2G NA DE(MWT)
TX
MWT
HO
site handed
over to circle
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT Meeting no. 65
BTS on air on 6-11-13
BTS (2g)on air 03/05/2013
3(g) on air 2/4/14
BTS on air 01/05/2013
BTS on air 31-1-14
BTS on air 01/01/2014
BTS on air on 30-04-13
BTS on air 16/01/2014
BTS on air on 13/12/13
BTS on air 28/03/2014
BTS on air 20/02/2014
Sr
No
SDCA
Total
Sites(IP/SSA)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrcei
ved/OK/
Not
Ok)RF
finalizati
Status of
Site
hiring by
SSA
(NR/IP/Y
/to
Agreeme
nt
AD/D/NR
EC status (Y)
Tower
Foundation
(NR/Zte/Civ
il)
Tower
Erection(
NR/SSA/Z
te)
Shelter FDFA DG
BATTER
Y
POWE
R
PLAN
T
MEDIA
ANTIST
ATIC
BTS
Status
Site
2G/co
mbo
3G
STAT
US
Concern
DE
Conce
rn DE
TX
H/o
ver
to
circl
e
Remarks
20
10 Grg Medhawas SSA OK Done DONE
Final Payment
done,work pending at
DHBVNL
done
3/5/13 Civil
grg
done
20/5/13
SKC
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC done
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2 HO
site handed
over to circle
21
11 Grg RojkaMeo SSA OK done AD
dd (1.42
lakh)deposited to
dhbvnl..trgt 9/4/14
done
30/12/12Civ
il grg
done
31/1/13
SKC
Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX
MWT
HO
site handed
over to circle
22
12 Nuh
kota
khandewla
SSA ok done done
work panding at
dhbvnl-trg 050414
done
26/12/13Civ
il grg
done ( 6-3-
14)
outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC pending
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX2 HO
site handed
over to circle
23
13 Grg
Nawada
fatehpur
SSA OK done done
work panding at
dhbvnl-trg 050414
done
23/4/13Civil
grg
done
25/5/13SK
C
Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX1 HO
site handed
over to circle
24
14 Grg Behrampur SSA ok
HPC
Done
done
DD deposit to dhbvnl
(new transformer
issue)
done
24/1/14
Civil grg
DONE(23-
2-14)
Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
ML /ofc 200 mtr
required pending
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NOW-
E)
TX1
site handover
to circle
25
15 Grg
Imt Sec-8
manesar
SSA
hpc done
1/5/14
Civil ZTE Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX1 HO
26
16 Grg Sector-67 SSA ok done pending File work start
done (19-3-
314)
circle
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC pending (PE
submitted)
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2 HO
site handed
over to circle
27
17 Grg Palra SSA ok done done applied Done Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC pending (PE
submitted)
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2 HO
site handover
to circle
28
18 Grg
Kakrola(IMT-
Sec-7) SSA OK done
done(owner
dispute)
work panding at
dhbvnl-trg 050314
done
01/04/14
ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
ML pending (far
end Ujjina)
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX1 HO
site handover
to circle
29
19 Grg
Bhangrola/Ka
krola
SSA OK Done Done
work panding at
dhbvnl-trg 050314
WIP ZTE Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
ML pending(ZTE)
far end IMT
manesar)..estim
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX1 HO
site handover
to circle
30
20 Grg Daultabad SSA ok
HPC
Done
done EC applied Civil circle
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NWO-
N)
TX1
site handover
to circle
31
21 Grg sultanpur SSA OK done done
Initial amt
deposited..trgt
15/4/14
Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE)
pending
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NWO-
W)
TX2
site handover
to circle
32
22 Grg
SGT Medical
college near
Budhera
SSA OK
HPC
Done
done demand note pending Civil circle
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
M/Lpending(far
end
fkn,chandu,ghari
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
DE(NWO-
W)
TX2 HO
site handover
to circle
33
23 Grg Baslambi SSA OK
HPC
Done
done Initial amt deposite Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC pending(PE
submitted)
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NOW-
W)
TX2 HO
site handover
to circle
34
24 Grg dhrampur SSA OK
HPC
Done
done Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NWO-
N)
TX1
site handover
to circle
35
25 Grg
Fazilpur-
badli(old
Dhanwapur)
SSA OK
HPC
done
done Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE)
pending
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NWO-
W)
TX2
site handover
to circle
36
1 Nuh salamba y AD phV AD phV Done
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
ML (Far end
nuh)done &
pcm testing
pending
Pendin
g ZTE
Pending
ZTE
2G NA DE(MWT)
TX
MWT
revert back
due to E/C
37
2 Grg Sikhopur SSA
OK; also
to search
new
applicati
done done
work order issued by
dhvbnl
civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC pending
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX2 HO
(work not stop
bycourt)Court
case done next
date: 11/4/14 ;
to search new
38
3 Grg
Nahar pur
KASAN
SSA OK done done
work panding at
dhbvnl-trg 050314
done
23/4/13
civil grg
WIP Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX2 HO
Court case may
be setteld
on030514
agrmnt to revised(report pending
from civil xen)-trg 180214
SDCA
Total
Sites(IP/SSA)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrcei
ved/OK/
Not
Ok)RF
finalizati
on
Status of
Site
hiring by
SSA
(NR/IP/Y
/to
HPC/WI
P)
Agreeme
nt
AD/D/NR
EC status (Y)
Tower
Foundation
(NR/Zte/Civ
il)
Tower
Erection(
NR/SSA/Z
te)
Shelter FDFA DG
BATTER
Y
POWE
R
PLAN
T
MEDIA
ANTIST
ATIC
BTS
Status
Site
2G/co
mbo
3G
STAT
US
Concern
DE
Conce
rn DE
TX
H/o
ver
to
circl
e
Remarks
39
4 Grg Nakhdola SSA ok
hpc done
1/5/14
Civil ZTE
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
ML pending( far
end IMT
manesar )
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX1
40
5 Grg
nsg gate-2
/Navrangpur
SSA OK
final
letter
pending
frm NSG
Civil ZTE outdoor
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC/fe pending
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX1
do letter sent
to nsg by de
mewat
41
6 Grg Near GITM SSA ok done done
Cheque pending at A/O
..trgt 5/4/13
done
2/1/14 Civil
grg
circle outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX2
stay order
canceled on
12/03/14 in
court
42
7 Grg Hayatpur SSA ok
hpc done
1/5/14
Civil ZTE Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX2
43
8 Grg
Jatauli/Hali
Mandi2
SSA ok civil visit pending done circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX2 HPC Pending
44
9 Grg
Amity (Near
Pachgaon)-
badanki
SSA/IP
Bid not
Receved
ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC pending
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX2
site hand
over ip
(indus) by
45
10 Grg Kasan SSA/IP
aplicatio
n reqd
shiv
mandir
ML pending(far
end IMT
manesar)
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX1
46
11 Grg
Rathiwas (old
Pawala
Khusrupur)
old
site
pwala
khusp
ok
hpc done
1/5/14
civil circle Outdoor
Not
reqd
pendi
g ZTE
pendig
ZTE
pendi
g ZTE
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX2
47
13 Grg
Imt Sec-3
manesar/Gh
osghar
SSA/IP ok
Mini link(ZTE)
pend
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX1
48
14 Grg Hasanpur SSA ok
hpc done
1/5/14
Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
ML pending(far
end palra)
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2
49
15 Grg Silani SSA ok
hpc done
1/5/14
Civil(visit)
PANDING
circle
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC pending
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2
50
16 Grg CRPF Camp SSA OK done
permission
letter in
progres trgt
9/4/14
Yes (CRPF will provide
EC)EC wiring pending
done
20/1/13 ZTE
ZTE Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC Pending(DE
Tx Urban)
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2 HO
do letter sent
to crpf by de
south
51
17 Grg
Sikandar pur
(Bada)
SSA Civil(visit) circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2
52
18 Grg Lakhuwas ssa/IP OK
hpc done
1/5/14
HPC wip civil visit pending Civil(visit) circle
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC pending
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2 HPC Pending
approval received from nsg hq
but final approval pending at local
level-trg 20/2/14
file sent for hpc
aplication reqd..site
not final
under negoation 14000 to 10000
rs
Revise appctn
rqd..site searching
negotiation for 5000-6000 rs
civil visit pending
application pending
SDCA
Total
Sites(IP/SSA)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrcei
ved/OK/
Not
Ok)RF
Status of
Site
hiring by
SSA
(NR/IP/Y
Agreeme
nt
AD/D/NR
EC status (Y)
Tower
Foundation
(NR/Zte/Civ
il)
Tower
Erection(
NR/SSA/Z
te)
Shelter FDFA DG
BATTER
Y
POWE
R
PLAN
T
MEDIA
ANTIST
ATIC
BTS
Status
Site
2G/co
mbo
3G
STAT
US
Concern
DE
Conce
rn DE
TX
H/o
ver
to
circl
e
Remarks
53
19 Grg Wazirpur
rent demanded INR
20000 to 25000
ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE)
pend
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2
54
20 Grg
Sohna DENSE
AREA
SSA
new site
searching
not ok Civil(visit) circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2
55
21 Grg
BSF camp
bhondsi
SSA Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2
56
22 Grg
Gawal
pahari/Balia
was
SSA file pending at AO Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
ML(ZTE)/OFC-
500 mtr required
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NOW-
E)
TX1
57
23 Grg Ullawas SSA Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
MLpendingfar
end kendriya
vihar /kadarpur
& ofc(bsnl)
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NOW-
E)
TX1
58
24 Grg
Bandwadi
(old -IMT-sec-
6
SSA Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE)
pending
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NOW-
E)
TX1 lat long ok
WORK DETAIL OF NEW SITES :
HPC done but agreement pending 3
File sent to HPC =4,
Court cases sites= 4
Imt Sec-3,NSG Gate-2,AMITY,Kasan,Silani,Wazirpur,Sohna Dense,Bandwadi,Ullawas
Tower Erection =9 Sangail ,Bisru,Mumtajpur,Nawada-Fatehpur,TE sohna,Medawas,Rojkameo,Bajghera,Khetawas
IP (Indus)..confirmation
pending at circle team
new bid required
new site searchingtrgt in
april14
sikhopur,naharpur kasan,imt sec8,near gitm)
Application required=8
Total Tower Foundation done ssa civil = 17 (+1 zte)
sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas,Naharpur,CRPF camp ZTE,musaidpur,near GITM,Kota
Khandewla,behrampur,Bilaspur sec-67,IMT Sec-7,kakrola
revise appln required..trgt in
april 14
b/wadi appln required..trgt in
april 14
Agreement Done (sites
hired) =24
TE Sohna,Medawas,RojkaMeo,Bajghera,Khetawas,Mussaidpur,IMT sec-8.Nawada Fatehpur ,Naharpur Kasan,Sikohpur,Mumtajpur,Bisru,Sangail,Bhangrola, Kakrola(sec7),Near GITM, Bilaspur haryana, Kota
Khandewla,,Behrampur,Sec-67, SGT Medical college, Sultanpur,Fazilpur,Dharampur,daultabad
imt sec-1 ,Sikanderpur,CRPF camp,
hayatpur,lakhuwas,Gwalpahari, BSF,
Summary
pp
gup
ta
pp
gup
ta
pp
gup
ta
pp
gup
ta
pp
gup
ta
pp
gup
ta
pp
gup
ta
raji
v
jto
zte work
done,on air trgt
15/05/14
pp
gup
ta
on air trgt
15/05/14
raji
v
jto
on air trgt
15/05/14
pp
gup
ta
on air trgt
15/05/14
pp
gup
ta
on air trgt
15/05/14
pp
gup
ta
on air trgt
15/05/14
pp
gup
ta
on air trgt
30/05/14
pp
gup
ta
on air trgt
30/05/14
pp
gup
ta
on air trgt
30/05/14
pp
gup
ta
BTS on air on 6-11-13
BTS (2g)on air 03/05/2013
3(g) on air 2/4/14
BTS on air 01/05/2013
BTS on air 31-1-14
BTS on air 01/01/2014
BTS on air on 30-04-13
raji
v
jto
BTS on air 16/01/2014
BTS on air on 13/12/13
BTS on air 28/03/2014
BTS on air 20/02/2014
Summary
on air trgt
30/05/14
pp
gup
ta
on air trgt
30/05/14
pp
gup
ta
on air trgt
30/05/14
pp
gup
ta
on air trgt
30/05/14
pp
gup
ta
on air trgt
30/05/14
pp
gup
ta
on air trgt
30/05/14
pp
gup
ta
foundation
done tower
pending
pp
gup
ta
foundation
done tower
pending
pp
gup
ta
foundation
done tower
pending
pp
gup
ta
foundation
done tower
pending
pp
gup
ta
foundation
pending
pp
gup
ta
foundation
pending
pp
gup
ta
foundation
pending
pp
gup
ta
foundation
pending
pp
gup
ta
foundation
pending
pp
gup
ta
foundation
pending
pp
gup
ta
work pending
at ZTE
pp
gup
ta
pp
gup
ta
pp
gup
ta
Summary
pp
gup
ta
pp
gup
ta
pp
gup
ta
pp
gup
ta
pp
gup
ta
pp
gup
ta
pp
gup
ta
pp
gup
ta
pp
gup
ta
pp
gup
ta
pp
gup
ta
pp
gup
ta
pp
gup
ta
pp
gup
ta
Summary
pp
gup
ta
pp
gup
ta
pp
gup
ta
pp
gup
ta
pp
gup
ta
pp
gup
ta
sikhopur,naharpur kasan,imt sec8,near gitm)
TE Sohna,Medawas,RojkaMeo,Bajghera,Khetawas,Mussaidpur,IMT sec-8.Nawada Fatehpur ,Naharpur Kasan,Sikohpur,Mumtajpur,Bisru,Sangail,Bhangrola, Kakrola(sec7),Near GITM, Bilaspur haryana, Kota
Khandewla,,Behrampur,Sec-67, SGT Medical college, Sultanpur,Fazilpur,Dharampur,daultabad
imt sec-1 ,Sikanderpur,CRPF camp,
hayatpur,lakhuwas,Gwalpahari, BSF,
DATED 29-04-2014
Summary: Total sites=58 ( Alrdy Twr Erected with agreement done =11 + 47 new sites (4 IP +43 ) ) IP-amity,kasan,wazirpur,imt sec3
work detail of new sites -47 :: NewAgreemDone(sites hired )=23, HPC done but agreement pending =5, file sent to HPC =6,application required=7
Sr
No
SDCA
Total
Sites(IP/SSA
)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrcei
ved/OK/
Not
Ok)RF
Status of
Site
hiring by
SSA
(NR/IP/Y
Agreeme
nt
AD/D/NR
EC status (Y)
Tower
Foundation
(NR/Zte/Civ
il)
Tower
Erection(
NR/SSA/Z
te)
Shelter FDFA DG
BATTER
Y
POWE
R
PLAN
T
MEDIA
ANTIST
ATIC
BTS
Status
Site
2G/co
mbo
3G
STAT
US
Concern
DE
Conce
rn DE
TX
H/o
ver
to
circl
e
Remarks
1 Grg Dhankot NR NR NR AD phV y AD phV AD phV ALREADY done done done done OFC Done done done
Comb
o
comis
sioned
DE(NWO-
w)
TX2
2 Grg Kherki Daula NR NR NR AD phV y AD phV AD phV
ROOM
DONE
done
Install
ed
Installe
d
Install
ed
OFC Done/for 3g FE
pending
done done
Comb
o
on air
DET(Sohn
a RD)
TX1
3 Grg Binola NR NR NR AD phV y AD phV AD phV
Room
Already
done done done done OFC Done done done
Comb
o
pendi
ng
SDE(IMT) TX2
4 Grg Tikli NR NR NR AD phV y AD phV AD phV Outdoor
Not
reqd
Done done done mini link Done
Not
reqd
done 2G NA
DET(SHN
RD)
TX2
5 Nuh Sudaka NR NR NR AD phV y AD phV AD phV Outdoor
Not
reqd
Done done done
ML Done (far end
Ujina)
Not
reqd
done 2G NA DE(MWT)
TX
MWT
6 Fpj Sikrawa NR NR NR AD phV y AD phV AD phV
Room
Already
done done done done OFC Done done done
Comb
o
pendi
ng
DE(MWT)
TX
MWT
7 Fpj Jamalgarh NR NR NR AD phV y AD phV AD phV Outdoor
Not
reqd
Done done done
ML DONE (Far end
Baded )
Not
reqd
done 2G NA DE(MWT)
TX
MWT
8 Grg TE Sohna SSA OK done DONE y (TE xge ) done Civil
done M/s
SKC
Room
Already
done
Alread
y
Already
Alread
y
XGE. FE provided done done
Comb
o
on air
DET(Sout
h )
TX2
9 Alduka NR NR NR AD y AD phV AD phV zte done zte done
zte
done
zte
done
zte
done
ML done (far end
GSR)
zte
done
zte done 2G NA DE(MWT) TX1
10 Fpj Gulalta NR NR NR AD phV yes AD phV AD phV Done done done done done
ML done (Far end
Sikhrawa)
done done 2G NA DE(MWT)
TX
MWT
11 Nuh salamba y AD phV AD phV Done
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
ML (Far end nuh)done
& pcm testing pending
Pendin
g ZTE
Pending
ZTE
2G NA DE(MWT)
TX
MWT
12 Nuh Indri NR NR NR AD
complete due on 10-5-
14
AD phV AD phV Done DONE Done Done Done
ML done (Far end
Rewasan)
done done 2G NA DE(MWT) TX2
intigrated
(emf data
sent)
13 Nuh Sangail SSA OK done AD phV
complete due on 10-5-
14
done
31/12/12
Civil grg
done
7/5/13
SKC
Outdoor
Not
reqd
Pendin
g ZTE
Pendin
g ZTE
Pendi
ng ZTE
ML pending (far end
Ujjina)
Not
reqd
Pending
ZTE
2G NA DE(MWT)
TX
MWT
HO
14 Fpj Bisru SSA OK done done wip
done
8/4/13 Civil
grg
done
20/6/13
SKC
Outdoor
Not
reqd
done done done wip
Not
reqd
Pending
ZTE
2G NA DE(MWT)
TX
MWT
HO
15 Grg mumtajpur SSA OK done done
work panding at
dhbvnl-trg 150414
done
22/3/13
Civil grg
done
7/5/13/13
SKC
outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC done (2E1 given)
Not
reqd
Pending
ZTE
2G NA SDE(IMT) TX2
site handed
over to circle
16 Grg Sikhopur SSA
OK; also
to search
new
applicati
done done
work order issued by
dhvbnl
civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC pending
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX2 HO
(work not stop
bycourt)Court
case done next
date: 11/4/14 ;
to search new
17 Grg
Nahar pur
KASAN
SSA OK done done
work panding at
dhbvnl-trg 050314
done
23/4/13
civil grg
WIP Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX2 HO
Court case may
be setteld
on030514
BTS on air on 13/12/13
BTS on air 28/03/2014
BTS on air 20/02/2014
agrmnt to revised(report pending
from civil xen)-trg 180214
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT Meeting no. 64
BTS on air on 6-11-13
BTS (2g)on air 03/05/2013
3(g) on air 2/4/14
BTS on air 01/05/2013
BTS on air 31-1-14
BTS on air 01/01/2014
BTS on air on 30-04-13
BTS on air 16/01/2014
Sr
No
SDCA
Total
Sites(IP/SSA
)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrcei
ved/OK/
Not
Ok)RF
finalizati
on
Status of
Site
hiring by
SSA
(NR/IP/Y
/to
HPC/WI
Agreeme
nt
AD/D/NR
EC status (Y)
Tower
Foundation
(NR/Zte/Civ
il)
Tower
Erection(
NR/SSA/Z
te)
Shelter FDFA DG
BATTER
Y
POWE
R
PLAN
T
MEDIA
ANTIST
ATIC
BTS
Status
Site
2G/co
mbo
3G
STAT
US
Concern
DE
Conce
rn DE
TX
H/o
ver
to
circl
e
Remarks
18 Grg
Imt Sec-8
manesar
SSA Civil ZTE Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX1 HO
19 Grg
Nawada
fatehpur
SSA OK done done
work panding at
dhbvnl-trg 050414
done
23/4/13Civil
grg
done
25/5/13SK
C
Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX1 HO
site handed
over to circle
20 Nuh
kota
khandewla
SSA ok done done
work panding at
dhbvnl-trg 050414
done
26/12/13Civ
il grg
done ( 6-3-
14)
outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC pending
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX2 HO
site handed
over to circle
21 Grg Nakhdola SSA ok
file sent
for HPC
Civil ZTE
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
ML pending( far end
IMT manesar )
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX1
22 Grg
Kakrola(IMT-
Sec-7)
SSA OK done
done(owner
dispute)
work panding at
dhbvnl-trg 050314
done
01/04/14
ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
ML pending (far end
Ujjina)
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX1 HO
site handover
to circle
23 Grg
nsg gate-2
/Navrangpur
SSA OK
final
letter
pending
frm NSG
Civil ZTE outdoor
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC/fe pending
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX1
do letter sent
to nsg by de
mewat
24 Grg
Bhangrola/K
akrola
SSA OK Done Done
work panding at
dhbvnl-trg 050314
WIP ZTE Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
ML pending(ZTE) far
end IMT
manesar)..estimate
given
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX1 HO
25 Grg IMT sect-1 SSA OK done
agreemnt
pending -
signature
trgt 10/4/14
yes NR
pole by
ZTE
XGE. FE port ready.
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX1 HO
HPC done
butagreemen
t pending
26 Grg Near GITM SSA ok done done
Cheque pending at A/O
..trgt 5/4/13
done
2/1/14 Civil
grg
circle outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX2
stay order
canceled on
12/03/14 in
court
27 Grg Hayatpur SSA ok
file sent
for hpc
Civil ZTE Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX2
28 Grg
Jatauli/Hali
Mandi2
SSA ok civil visit pending done circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX2 HPC Pending
29 Grg
Amity (Near
Pachgaon)-
badanki
SSA/IP
Bid not
Receved
ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC pending
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX2
site hand
over ip
(indus) by
30 Grg Kasan SSA/IP
aplicatio
n reqd
shiv
mandir
ML pending(far end
IMT manesar)
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX1
31 Grg
Rathiwas
(old Pawala
Khusrupur)
old
site
pwala
khusp
ok civil circle Outdoor
Not
reqd
pendi
g ZTE
pendig
ZTE
pendi
g ZTE
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX2 file ready for hpc
approval received from nsg hq
but final approval pending at local
level-trg 20/2/14
file sent for hpc
aplication reqd..site
not final
under negoation 14000 to 10000
rs
sde(civil)/zte visit pending
letter to zte on 50414
32 Grg
Imt Sec-3
manesar/Gh
osghar
SSA/IP ok Mini link(ZTE) pend
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX1
Sr
No
SDCA
Total
Sites(IP/SSA
)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrcei
ved/OK/
Not
Ok)RF
finalizati
on
Status of
Site
hiring by
SSA
(NR/IP/Y
/to
HPC/WI
P)
Agreeme
nt
AD/D/NR
EC status (Y)
Tower
Foundation
(NR/Zte/Civ
il)
Tower
Erection(
NR/SSA/Z
te)
Shelter FDFA DG
BATTER
Y
POWE
R
PLAN
T
MEDIA
ANTIST
ATIC
BTS
Status
Site
2G/co
mbo
3G
STAT
US
Concern
DE
Conce
rn DE
TX
H/o
ver
to
circl
e
Remarks
33 Grg
Bilaspur,
Haryana
(bilaspur
khurd )
SSA ok done done
final amt deposited at
dhbvnl
Done
DONE M/s
KRB
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC done 140214
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX2
site handed
over to circle
34 Grg Hasanpur SSA ok Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
ML pending(far end
palra)
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2
35 Grg Palra SSA ok done done applied Done Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC pending (PE
submitted)
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2 HO
site handover
to circle
36 Grg Silani SSA ok
Civil(visit)
PANDING
circle
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC pending
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2
37 Grg CRPF Camp SSA OK done
permission
letter in
progres trgt
9/4/14
Yes (CRPF will provide
EC)EC wiring pending
done
20/1/13 ZTE
ZTE Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC Pending(DE Tx
Urban)
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2 HO
do letter sent
to crpf by de
south
38 Grg Medhawas SSA OK Done DONE
Final Payment
done,work pending at
DHBVNL
done
3/5/13 Civil
grg
done
20/5/13
SKC
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC done
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2 HO
site handed
over to circle
39 GRG RojkaMeo SSA OK done AD
dd (1.42
lakh)deposited to
dhbvnl..trgt 9/4/14
done
30/12/12Civ
il grg
done
31/1/13
SKC
Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX
MWT
HO
site handed
over to circle
40 Grg
Sikandar pur
(Bada)
SSA Civil(visit) circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2
41 Grg Lakhuwas ssa/IP OK
HPC
wip..trgt
09/04/14
HPC wip civil visit pending Civil(visit) circle
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC pending
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2 HPC Pending
42 Grg Sector-67 SSA ok done pending File work start
done (19-3-
314)
circle
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC pending (PE
submitted)
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2 HO
site handed
over to circle
43 Grg Wazirpur
rent demanded INR
20000 to 25000
ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE) pend
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2
44 Grg
Sohna
DENSE AREA
SSA
new site
searching
not ok Civil(visit) circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2
45 Grg
BSF camp
bhondsi
SSA Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2
46 Grg Daultabad SSA ok
HPC
Done
done EC applied Civil circle
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NWO-
N)
TX1
civil visit pending..trgt 28/4/14
negotiation for 5000-6000 rs
civil visit pending
application pending
IP (Indus)..confirmation
pending at circle team
new bid required
Revise appctn
rqd..site searching
47 Grg dhrampur SSA OK
HPC
Done
done Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NWO-
N)
TX1
file in
progress
48 Grg Bajghera SSA OK done AD Yes done
done M/s
SKC
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
FE port ready
(MLpending(ZTE)..far
end p/v))
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
DE(NWO-
N)
TX1
site handed
over to circle
Sr
No
SDCA
Total
Sites(IP/SSA)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrceiv
ed/OK/No
t Ok)RF
finalizatio
n
Status of
Site hiring
by SSA
(NR/IP/Y/
to
HPC/WIP)
Agreemen
t AD/D/NR
EC status (Y)
Tower
Foundation(
NR/Zte/Civil)
Tower
Erection(N
R/SSA/Zte)
Shelter FDFA DG
BATTER
Y
POWE
R
PLANT
MEDIA
ANTISTA
TIC
BTS Status
Site
2G/co
mbo
3G
STATU
S
Concern
DE
Concer
n DE
TX
H/o
ver
to
circl
e
Remarks
49 Grg
Fazilpur-
badli(old
Dhanwapur)
SSA OK
HPC
done
done Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE) pending
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NWO-
W)
TX2
50 Grg Khetawas SSA OK done done
final payment
done,work pending at
DHBVNL-trg 15/04/14
done
1/6/13 Civil
grg
done
10/8/13
SKC
Outdoor
Not
reqd
done done done FE port ready
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NWO-
W)
TX2 HO
site handed
over to circle
51 Grg
SGT Medical
college near
Budhera
/Chandu
SSA OK
HPC
Done
done demand note pending Civil circle
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
M/Lpending(far end
fkn,chandu,ghari
harsaru
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
DE(NWO-
W)
TX2 HO
52 Grg Mussaidpur SSA OK
HPC
Done
done
Estimate pendng
DHBVNL-submeter to
be installed by sde
done
10/12/13
civil grg
done(06-
03-14)
Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
M/L pending
(ZTE)far end fkn
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NWO-
W)
TX2 HO
53 Grg sultanpur SSA OK done done
Initial amt
deposited..trgt
15/4/14
Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE) pending
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NWO-
W)
TX2
54 Grg Baslambi SSA OK
HPC
Done
done Initial amt deposite Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC pending(PE
submitted)
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NOW-
W)
TX2 HO
site handover
to circle
55 Grg
Gawal
pahari/Balia
was
SSA file pending at AO Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
ML(ZTE)/OFC-500 mtr
required
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NOW-
E)
TX1
56 Grg Ullawas SSA Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
MLpendingfar end
kendriya vihar
/kadarpur & ofc(bsnl)
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NOW-
E)
TX1
57 Grg Behrampur SSA ok
HPC
Done
done
DD deposit to dhbvnl
(new transformer
issue)
done
24/1/14
Civil grg
DONE(23-
2-14)
Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
ML /ofc 200 mtr
required pending
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NOW-
E)
TX1
site handover
to circle
58 Grg
Bandwadi
(old -IMT-
sec-6
SSA Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE) pending
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NOW-
E)
TX1 lat long ok
WORK DETAIL OF NEW SITES :
HPC done but agreement pending 3
File sent to HPC =4,
Court cases sites= 4
Imt Sec-3,NSG Gate-2,AMITY,Kasan,Silani,Wazirpur,Sohna Dense,Bandwadi,Ullawas
Tower Erection =9 Sangail ,Bisru,Mumtajpur,Nawada-Fatehpur,TE sohna,Medawas,Rojkameo,Bajghera,Khetawas
hayatpur,lakhuwas,Gwalpahari, BSF,
Application required=8
b/wadi appln required..trgt in
april 14
sikhopur,naharpur kasan,imt sec8,near gitm)
new site searchingtrgt in
april14
Agreement Done (sites
hired) =24
TE Sohna,Medawas,RojkaMeo,Bajghera,Khetawas,Mussaidpur,IMT sec-8.Nawada Fatehpur ,Naharpur Kasan,Sikohpur,Mumtajpur,Bisru,Sangail,Bhangrola, Kakrola(sec7),Near GITM, Bilaspur haryana, Kota
Khandewla,,Behrampur,Sec-67, SGT Medical college, Sultanpur,Fazilpur,Dharampur,daultabad
imt sec-1 ,Sikanderpur,CRPF camp,
revise appln required..trgt in
april 14
Total Tower Foundation done ssa civil = 17 (+1 zte)
sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas,Naharpur,CRPF camp ZTE,musaidpur,near GITM,Kota
Khandewla,behrampur,Bilaspur sec-67,IMT Sec-7,kakrola
Summary
work pending
at ZTE
zte work done
BTS on air on 13/12/13
BTS on air 28/03/2014
BTS on air 20/02/2014
*total site=2
sites hired =2
(HPC done
with
agreement)
but E/C
pending at
* total
sites=18
* sites hired
=10 (HPC done
with
agreement-
mumtajpur,np
kasan,sec8
imt,nawada
fatepur,Kota
khandewla,Bha
ngrola/kakrola,
kakrola(sec7),s
ikhopur,near
gitm,bilaspur
haryana, )
*HPC done but
agreement
pending=3(imt
sec-1
,nakhdola,haya
tpur)
* file sent for
HPC=1(jatauli )
* application
required=
5(sec3,nsg2,im
t
sec3,amity,kas
an )

BTS on air on 6-11-13
BTS (2g)on air 03/05/2013
3(g) on air 2/4/14
BTS on air 01/05/2013
BTS on air 31-1-14
BTS on air 01/01/2014
BTS on air on 30-04-13
BTS on air 16/01/2014
JTO
(M
OB
)
nod
al -
Tau
ru
Sh.
Raji
v
Ku
ma
r
Ma
rot
hia
* total
sites=18
* sites hired
=10 (HPC done
with
agreement-
mumtajpur,np
kasan,sec8
imt,nawada
fatepur,Kota
khandewla,Bha
ngrola/kakrola,
kakrola(sec7),s
ikhopur,near
gitm,bilaspur
haryana, )
*HPC done but
agreement
pending=3(imt
sec-1
,nakhdola,haya
tpur)
* file sent for
HPC=1(jatauli )
* application
required=
5(sec3,nsg2,im
t
sec3,amity,kas
an )

JTO
(M
OB
)
nod
al -
Tau
ru
Sh.
Raji
v
Ku
ma
r
Ma
rot
hia
* total
sites=13
* Sites
Hired=4 (1 xge
sites +3 HPC
done with
agreement-te
sna,crp
camp,medawa
s,rojkameo,pal
ara,Sec-67 )
*HPC done but
agreement
pending=1
(sikandarpur )
file sent for
HPC=2(hasanp
ur,lakhuwas)
* application
required=
3.silani,sna
dense
area,wazirpur)

* so pending
sites = 9 (file
sent for hpc +
HPC done w/o
agreement+ap
plication
required )
E/C pending in
hired sites=3
* total
sites=18
* sites hired
=10 (HPC done
with
agreement-
mumtajpur,np
kasan,sec8
imt,nawada
fatepur,Kota
khandewla,Bha
ngrola/kakrola,
kakrola(sec7),s
ikhopur,near
gitm,bilaspur
haryana, )
*HPC done but
agreement
pending=3(imt
sec-1
,nakhdola,haya
tpur)
* file sent for
HPC=1(jatauli )
* application
required=
5(sec3,nsg2,im
t
sec3,amity,kas
an )

* total sites=4
*Sites Hired =1
(HPC done
with
agreement)
( behrampur )
*file sent for
HPC but
agreemnt
pending=1
JTO
(M
OB
)
nod
al -
Pat
udi
Sh.
Aja
JTO
(M
OB
)
nod
al -
GR
G
Sh.
PP
Gu
pta
* total sites=6
*Sites Hired =4
(HPC done
with
agreement-
Khetavas,Muss
aidpur,baslam
bi,sgt medical
college)
* hpc done but
agreement
pending=1
(sultanpur )
*file sent for
HPC=0
* application
required=1(fazi
lpur)
JTO
(M
OB
)
nod
al -
Tau
ru
Sh.
Raji
v
Ku
ma
r
Ma
rot
hia
* total
sites=13
* Sites
Hired=4 (1 xge
sites +3 HPC
done with
agreement-te
sna,crp
camp,medawa
s,rojkameo,pal
ara,Sec-67 )
*HPC done but
agreement
pending=1
(sikandarpur )
file sent for
HPC=2(hasanp
ur,lakhuwas)
* application
required=
3.silani,sna
dense
area,wazirpur)

* so pending
sites = 9 (file
sent for hpc +
HPC done w/o
agreement+ap
plication
required )
E/C pending in
hired sites=3
DATED19-04-2014
Summary: Total sites=58 ( Alrdy Twr Erected with agreement done =11 + 47 new sites (4 IP +43 ) ) IP-amity,kasan,wazirpur,imt sec3
work detail of new sites -47 :: NewAgreemDone(sites hired )=23, HPC done but agreement pending =5, file sent to HPC =6,application required=7
Sr
No
SDCA
Total
Sites(IP/SSA
)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrcei
ved/OK/
Not
Ok)RF
Status of
Site
hiring by
SSA
(NR/IP/Y
Agreeme
nt
AD/D/NR
EC status (Y)
Tower
Foundation
(NR/Zte/Civ
il)
Tower
Erection(
NR/SSA/Z
te)
Shelter FDFA DG
BATTER
Y
POWE
R
PLAN
T
MEDIA
ANTIST
ATIC
BTS
Status
Site
2G/co
mbo
3G
STAT
US
Concern
DE
Conce
rn DE
TX
H/o
ver
to
circl
e
Remarks
1 Grg Dhankot NR NR NR AD phV y AD phV AD phV ALREADY done done done done OFC Done done done
Comb
o
comis
sioned
DE(NWO-
w)
TX2
2 Grg Kherki Daula NR NR NR AD phV y AD phV AD phV
ROOM
DONE
done
Install
ed
Installe
d
Install
ed
OFC Done/for 3g FE
pending
done done
Comb
o
on air
DET(Sohn
a RD)
TX1
3 Grg Binola NR NR NR AD phV y AD phV AD phV
Room
Already
done done done done OFC Done done done
Comb
o
pendi
ng
SDE(IMT) TX2
4 Grg Tikli NR NR NR AD phV y AD phV AD phV Outdoor
Not
reqd
Done done done mini link Done
Not
reqd
done 2G NA
DET(SHN
RD)
TX2
5 Nuh Sudaka NR NR NR AD phV y AD phV AD phV Outdoor
Not
reqd
Done done done
ML Done (far end
Ujina)
Not
reqd
done 2G NA DE(MWT)
TX
MWT
6 Fpj Sikrawa NR NR NR AD phV y AD phV AD phV
Room
Already
done done done done OFC Done done done
Comb
o
pendi
ng
DE(MWT)
TX
MWT
7 Fpj Jamalgarh NR NR NR AD phV y AD phV AD phV Outdoor
Not
reqd
Done done done
ML DONE (Far end
Baded )
Not
reqd
done 2G NA DE(MWT)
TX
MWT
8 Grg TE Sohna SSA OK done DONE y (TE xge ) done Civil
done M/s
SKC
Room
Already
done
Alread
y
Already
Alread
y
XGE. FE provided done done
Comb
o
on air
DET(Sout
h )
TX2
9 Alduka NR NR NR AD y AD phV AD phV zte done zte done
zte
done
zte
done
zte
done
ML done (far end
GSR)
zte
done
zte done 2G NA DE(MWT) TX1
10 Fpj Gulalta NR NR NR AD phV yes AD phV AD phV Done done done done done
ML done (Far end
Sikhrawa)
done done 2G NA DE(MWT)
TX
MWT
11 Nuh salamba y AD phV AD phV Done
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
ML (Far end nuh)done
& pcm testing pending
Pendin
g ZTE
Pending
ZTE
2G NA DE(MWT)
TX
MWT
12 Nuh Indri NR NR NR AD complete on 10-5-14 AD phV AD phV Done DONE Done Done Done
ML done (Far end
Rewasan)
done done 2G NA DE(MWT) TX2
intigrated
(emf data
sent)
13 Nuh Sangail SSA OK done AD phV complete on 10-5-14
done31/12/
12Civil grg
done
7/5/13
SKC
Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
ML pending (far end
Ujjina)
Not
reqd
Pending
ZTE
2G NA DE(MWT)
TX
MWT
HO
14 Fpj Bisru SSA OK done done wip
done
8/4/13 Civil
grg
done
20/6/13
SKC
Outdoor
Not
reqd
done done done wip
Not
reqd
Pending
ZTE
2G NA DE(MWT)
TX
MWT
HO
15 Grg mumtajpur SSA OK done done
work panding at
dhbvnl-trg 150414
done
22/3/13
Civil grg
done
7/5/13/13
SKC
outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC done (2E1 given)
Not
reqd
Pending
ZTE
2G NA SDE(IMT) TX2
site handed
over to circle
16 Grg Sikhopur SSA
OK; also
to search
new
applicati
done done
Demand note received
, file at AO
civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC pending
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX2 HO
Court case
done next
date: 11/4/14
; to search
17 Grg
Nahar pur
KASAN
SSA OK done done
work panding at
dhbvnl-trg 050314
done
23/4/13
civil grg
WIP Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX2 HO
Court case
done dt 12-4-
14 Comitee is
made to
Meeting no. 63 STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT
BTS on air on 6-11-13
BTS (2g)on air 03/05/2013
3(g) on air 2/4/14
BTS on air 01/05/2013
BTS on air 31-1-14
BTS on air 01/01/2014
BTS on air on 30-04-13
BTS on air 16/01/2014
BTS on air on 13/12/13
BTS on air 28/03/2014
BTS on air 20/02/2014
agrmnt to revised(report pending
from civil xen)-trg 180214
Sr
No
SDCA
Total
Sites(IP/SSA
)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrcei
ved/OK/
Not
Ok)RF
finalizati
on
Status of
Site
hiring by
SSA
(NR/IP/Y
/to
HPC/WI
Agreeme
nt
AD/D/NR
EC status (Y)
Tower
Foundation
(NR/Zte/Civ
il)
Tower
Erection(
NR/SSA/Z
te)
Shelter FDFA DG
BATTER
Y
POWE
R
PLAN
T
MEDIA
ANTIST
ATIC
BTS
Status
Site
2G/co
mbo
3G
STAT
US
Concern
DE
Conce
rn DE
TX
H/o
ver
to
circl
e
Remarks
18 Grg
Imt Sec-8
manesar
SSA Civil ZTE Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX1 HO
19 Grg
Nawada
fatehpur
SSA OK done done
work panding at
dhbvnl-trg 050414
done
23/4/13Civil
grg
done
25/5/13SK
C
Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX1 HO
site handed
over to circle
20 Nuh
kota
khandewla
SSA ok done done
work panding at
dhbvnl-trg 050414
done
26/12/13Civ
il grg
done ( 6-3-
14)
outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC pending
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX2 HO
site handed
over to circle
21 Grg Nakhdola SSA ok
file sent
for HPC
Civil ZTE
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
ML pending( far end
IMT manesar )
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX1
22 Grg
Kakrola(IMT-
Sec-7)
SSA OK done
done(owner
dispute)
work panding at
dhbvnl-trg 050314
done
01/04/14
ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
ML pending (far end
Ujjina)
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX1 HO
site handover
to circle
23 Grg
nsg gate-2
/Navrangpur
SSA OK
final
letter
pending
frm NSG
Civil ZTE outdoor
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC/fe pending
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX1
do letter sent
to nsg by de
mewat
24 Grg
Bhangrola/K
akrola
SSA OK Done Done
work panding at
dhbvnl-trg 050314
WIP ZTE Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
ML pending(ZTE) far
end IMT
manesar)..estimate
given
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX1 HO
25 Grg IMT sect-1 SSA OK done
agreemnt
pending -
signature
trgt 10/4/14
yes NR
pole by
ZTE
XGE. FE port ready.
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX1 HO
HPC done
butagreemen
t pending
26 Grg Near GITM SSA ok done done
Cheque pending at A/O
..trgt 5/4/13
done
2/1/14 Civil
grg
circle outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX2
stay order
canceled on
12/03/14 in
court
27 Grg Hayatpur SSA Civil ZTE Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX2
28 Grg
Jatauli/Hali
Mandi2
SSA ok civil visit pending done circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX2 HPC Pending
29 Grg
Amity(Near
Pachgaon)-
badanki
SSA/IP
Bid not
Receved
ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC pending
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX2
site hand
over ip
(indus) by
30 Grg Kasan SSA/IP
aplicatio
n reqd
shiv
mandir
ML pending(far end
IMT manesar)
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX1
31 Grg
Rathiwas
(old Pawala
Khusrupur)
old
site
pwala
khusp
ok civil circle Outdoor
Not
reqd
pendi
g ZTE
pendig
ZTE
pendi
g ZTE
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX2
32 Grg
Imt Sec-3
manesar/Gh
osghar
SSA/IP ok Mini link(ZTE) pend
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX1
aplication
reqd..negotiation
on rent
aplication reqd..site
not final
sde(civil)/zte visit pending
letter to zte on 50414
approval received from nsg hq
but final approval pending at local
level-trg 20/2/14
new sites serching
under negoation 14000 to 10000
rs
Revise appctn
rqd..site searching
Sr
No
SDCA
Total
Sites(IP/SSA
)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrcei
ved/OK/
Not
Ok)RF
finalizati
on
Status of
Site
hiring by
SSA
(NR/IP/Y
/to
HPC/WI
P)
Agreeme
nt
AD/D/NR
EC status (Y)
Tower
Foundation
(NR/Zte/Civ
il)
Tower
Erection(
NR/SSA/Z
te)
Shelter FDFA DG
BATTER
Y
POWE
R
PLAN
T
MEDIA
ANTIST
ATIC
BTS
Status
Site
2G/co
mbo
3G
STAT
US
Concern
DE
Conce
rn DE
TX
H/o
ver
to
circl
e
Remarks
33 Grg
Bilaspur,
Haryana
(bilaspur
khurd )
SSA ok done done
final amt deposited at
dhbvnl
Done
DONE M/s
KRB
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC done 140214
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX2
site handed
over to circle
34 Grg Hasanpur SSA ok
Revise
appctn
rqd
Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
ML pending(far end
palra)
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2
35 Grg Palra SSA ok done done applied Done Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC pending
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2 HO
site handover
to circle
36 Grg Silani SSA ok
revise
applicati
on
required
Civil(visit)
PANDING
circle
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC pending
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2
37 Grg CRPF Camp SSA OK done
permission
letter in
progres trgt
9/4/14
Yes (CRPF will provide
EC)EC wiring pending
done
20/1/13 ZTE
ZTE Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC Pending(DE Tx
Urban)
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2 HO
do letter sent
to crpf by de
south
38 Grg Medhawas SSA OK Done DONE
Final Payment
done,work pending at
DHBVNL
done
3/5/13 Civil
grg
done
20/5/13
SKC
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC done
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2 HO
site handed
over to circle
39 GRG RojkaMeo SSA OK done AD
dd (1.42
lakh)deposited to
dhbvnl..trgt 9/4/14
done
30/12/12Civ
il grg
done
31/1/13
SKC
Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX
MWT
HO
site handed
over to circle
40 Grg
Sikandarpur(
Bada)
SSA Civil(visit) circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2
41 Grg Lakhuwas ssa/IP OK
HPC
wip..trgt
09/04/14
HPC wip aggrement pending Civil(visit) circle
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC pending
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2 HPC Pending
42 Grg Sector-67 SSA ok done DONE File work start
done (19-3-
314)
circle
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC pending (PE
submitted)
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2 HO
site handed
over to circle
43 Grg Wazirpur ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE) pend
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2
44 Grg
Sohna
DENSE AREA
SSA
new site
searching
not ok Civil(visit) circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2
45 Grg
BSF camp
bhondsi
SSA Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2
46 Grg Daultabad SSA ok
HPC
Done
aggreme
nt done
EC applied Civil circle
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NWO-
N)
TX1
47 Grg dharampur SSA OK
HPC
Done
Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE) pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NWO-
N)
TX1
file in
progress
48 Grg Bajghera SSA OK done AD Yes done
done M/s
SKC
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
FE port ready
(MLpending(ZTE)..far
end p/v))
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
DE(NWO-
N)
TX1
site handed
over to circle
aggrement pending..trgt 9/4/14
civil visit pending..trgt 9/4/14
negotiation for 5000-6000 rs
application pending
IP (Indus)..confirmation
pending at circle team
new bid required
Sr
No
SDCA
Total
Sites(IP/SSA)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrceiv
ed/OK/No
t Ok)RF
finalizatio
n
Status of
Site hiring
by SSA
(NR/IP/Y/
to
HPC/WIP)
Agreemen
t AD/D/NR
EC status (Y)
Tower
Foundation(
NR/Zte/Civil)
Tower
Erection(N
R/SSA/Zte)
Shelter FDFA DG
BATTER
Y
POWE
R
PLANT
MEDIA
ANTISTA
TIC
BTS Status
Site
2G/co
mbo
3G
STATU
S
Concern
DE
Concer
n DE
TX
H/o
ver
to
circl
e
Remarks
49 Grg
Fazilpur-
badli(old
Dhanwapur)
SSA OK
HPC
done
Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE) pending
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NWO-
W)
TX2
50 Grg Khetawas SSA OK done done
final payment
done,work pending at
DHBVNL-trg 15/04/14
done
1/6/13 Civil
grg
done
10/8/13
SKC
Outdoor
Not
reqd
done done done FE port ready
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NWO-
W)
TX2 HO
site handed
over to circle
51 Grg
SGT Medical
college near
Budhera
/Chandu
SSA OK
HPC
Done
done
Initial amt
deposited..trgt
15/4/14
Civil circle
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
M/Lpending(far end
fkn,chandu,ghari
harsaru
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
DE(NWO-
W)
TX2 HO
52 Grg Mussaidpur SSA OK
HPC
Done
done
Estimate pendng
DHBVNL-submeter to
be installed by sde
done
10/12/13
civil grg
done(06-
03-14)
Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
M/L pending
(ZTE)far end fkn
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NWO-
W)
TX2 HO
53 Grg sultanpur SSA OK done done
Initial amt
deposited..trgt
15/4/14
Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE) pending
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NWO-
W)
TX2
54 Grg Baslambi SSA OK
HPC
Done
done Initial amt deposite Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC pending(PE
submitted)
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NOW-
W)
TX2 HO
site handover
to circle
55 Grg
Gawal
pahari/Balia
was
SSA file pending at AO Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
ML(ZTE)/OFC-500 mtr
required
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NOW-
E)
TX1
56 Grg Ullawas SSA Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
MLpendingfar end
kendriya vihar
/kadarpur & ofc(bsnl)
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NOW-
E)
TX1
57 Grg Behrampur SSA ok
HPC
Done
done DD deposit to dhbvnl
done
24/1/14
Civil grg
DONE(23-
2-14)
Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
ML /ofc 200 mtr
required pending
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NOW-
E)
TX1
site handover
to circle
58 Grg
Bandwadi
(old -IMT-
sec-6
SSA Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE) pending
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NOW-
E)
TX1 lat long ok
WORK DETAIL OF NEW SITES :
HPC done but agreement pending =5, 5
File sent to HPC =5,
Court cases sites= 4 sikhopur,naharpur kasan,imt sec8,near gitm)
Imt Sec-3,NSG Gate-2,AMITY,Kasan,Silani,Wazirpur,Sohna Dense,Bandwadi,Ullawas
Tower Erection =9 Sangail ,Bisru,Mumtajpur,Nawada-Fatehpur,TE sohna,Medawas,Rojkameo,Bajghera,Khetawas
agreement ..trgt 9/4/14
new site searchingtrgt in
april14
revise appln required..trgt in
april 14
b/wadi appln required..trgt in
april 14
Application required=8
Total Tower Foundation done ssa civil = 17 (+1 zte)
sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas,Naharpur,CRPF camp ZTE,musaidpur,near GITM,Kota
Khandewla,behrampur,Bilaspur sec-67,IMT Sec-7,kakrola
Agreement Done (sites
hired) =22
TE Sohna,Medawas,RojkaMeo,Bajghera,Khetawas,Mussaidpur,IMT sec-8.Nawada Fatehpur ,Naharpur Kasan,Sikohpur,Mumtajpur,Bisru,Sangail,Bhangrola, Kakrola(sec7),Near GITM, Bilaspur haryana, Kota
Khandewla,,Behrampur,Sec-67, SGT Medical college, Sultanpur
imt sec-1 ,Sikanderpur,CRPF camp, Daulatabad,Dharampur
hayatpur,lakhuwas,Gwalpahari, BSF, Fajilpur
Summary
work pending
at ZTE
zte work done
BTS on air on 6-11-13
BTS (2g)on air 03/05/2013
3(g) on air 2/4/14
BTS on air 01/05/2013
BTS on air 31-1-14
BTS on air 01/01/2014
BTS on air on 30-04-13
BTS on air 16/01/2014
BTS on air on 13/12/13
BTS on air 28/03/2014
BTS on air 20/02/2014
*total site=2
sites hired =2
(HPC done
with
agreement)
but E/C
pending at
* total
sites=18
* sites hired
=10 (HPC done
with
agreement-
mumtajpur,np
kasan,sec8
imt,nawada
fatepur,Kota
khandewla,Bha
ngrola/kakrola,
kakrola(sec7),s
ikhopur,near
gitm,bilaspur
haryana, )
*HPC done but
agreement
pending=3(imt
sec-1
,nakhdola,haya
tpur)
* file sent for
HPC=1(jatauli )
* application
required=
5(sec3,nsg2,im
t
sec3,amity,kas
an )

* total
sites=18
* sites hired
=10 (HPC done
with
agreement-
mumtajpur,np
kasan,sec8
imt,nawada
fatepur,Kota
khandewla,Bha
ngrola/kakrola,
kakrola(sec7),s
ikhopur,near
gitm,bilaspur
haryana, )
*HPC done but
agreement
pending=3(imt
sec-1
,nakhdola,haya
tpur)
* file sent for
HPC=1(jatauli )
* application
required=
5(sec3,nsg2,im
t
sec3,amity,kas
an )

JTO
(M
OB
)
nod
al -
Tau
ru
Sh.
Raji
v
Ku
ma
r
Ma
rot
hia
* total
sites=18
* sites hired
=10 (HPC done
with
agreement-
mumtajpur,np
kasan,sec8
imt,nawada
fatepur,Kota
khandewla,Bha
ngrola/kakrola,
kakrola(sec7),s
ikhopur,near
gitm,bilaspur
haryana, )
*HPC done but
agreement
pending=3(imt
sec-1
,nakhdola,haya
tpur)
* file sent for
HPC=1(jatauli )
* application
required=
5(sec3,nsg2,im
t
sec3,amity,kas
an )

JTO
(M
OB
)
nod
al -
Tau
ru
Sh.
Raji
v
Ku
ma
r
Ma
rot
hia
* total
sites=13
* Sites
Hired=4 (1 xge
sites +3 HPC
done with
agreement-te
sna,crp
camp,medawa
s,rojkameo,pal
ara,Sec-67 )
*HPC done but
agreement
pending=1
(sikandarpur )
file sent for
HPC=2(hasanp
ur,lakhuwas)
* application
required=
3.silani,sna
dense
area,wazirpur)

* so pending
sites = 9 (file
sent for hpc +
HPC done w/o
agreement+ap
plication
required )
E/C pending in
hired sites=3
JTO
(M
OB
)
nod
al -
GR
G
Sh.
PP
Gu
pta
* total sites=6
*Sites Hired =4
(HPC done
with
agreement-
Khetavas,Muss
aidpur,baslam
bi,sgt medical
college)
* hpc done but
agreement
pending=1
(sultanpur )
*file sent for
HPC=0
* application
required=1(fazi
lpur)
* total
sites=13
* Sites
Hired=4 (1 xge
sites +3 HPC
done with
agreement-te
sna,crp
camp,medawa
s,rojkameo,pal
ara,Sec-67 )
*HPC done but
agreement
pending=1
(sikandarpur )
file sent for
HPC=2(hasanp
ur,lakhuwas)
* application
required=
3.silani,sna
dense
area,wazirpur)

* so pending
sites = 9 (file
sent for hpc +
HPC done w/o
agreement+ap
plication
required )
E/C pending in
hired sites=3
* total sites=4
*Sites Hired =1
(HPC done
with
agreement)
( behrampur )
*file sent for
HPC but
agreemnt
pending=1
Gwalpahari
* application
JTO
(M
OB
)
nod
al -
Pat
udi
Sh.
Aja
y
Ku
DATED 09-05-14
Summary: Total sites=58 ( Alrdy Twr Erected with agreement done =11 + 47 new sites (4 IP +43 ) ) IP-amity,kasan,wazirpur,imt sec3
work detail of new sites -47 :: NewAgreemDone(sites hired )=24, HPC done but agreement pending =7, file sent to HPC =0,application required=8
Sr
No
SDCA
Total
Sites(IP/SSA)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrcei
ved/OK/
Not
Ok)RF
Status of
Site
hiring by
SSA
(NR/IP/Y
Agreeme
nt
AD/D/NR
EC status (Y)
Tower
Foundation
(NR/Zte/Civ
il)
Tower
Erection(
NR/SSA/Z
te)
Shelter FDFA DG
BATTER
Y
POWE
R
PLAN
T
MEDIA
ANTIST
ATIC
BTS
Status
Site
2G/co
mbo
3G
STAT
US
Concern
DE
Conce
rn DE
TX
H/o
ver
to
circl
e
Remarks
1
1 Grg Dhankot NR NR NR AD phV y AD phV AD phV ALREADY done done done done OFC Done done done
Comb
o
on air
DE(NWO-
w)
TX2
2
2 Grg Kherki Daula NR NR NR AD phV y AD phV AD phV
ROOM
DONE
done
Install
ed
Installe
d
Install
ed
OFC Done/for 3g
FE pending
done done
Comb
o
on air
DET(Sohn
a RD)
TX1
3
3 Grg Binola NR NR NR AD phV y AD phV AD phV
Room
Already
done done done done OFC Done done done
Comb
o
pendi
ng
SDE(IMT) TX2
4
4 Grg Tikli NR NR NR AD phV y AD phV AD phV Outdoor
Not
reqd
Done done done mini link Done
Not
reqd
done 2G NA
DET(SHN
RD)
TX2
5
5 Nuh Sudaka NR NR NR AD phV y AD phV AD phV Outdoor
Not
reqd
Done done done
ML Done (far
end Ujina)
Not
reqd
done 2G NA DE(MWT)
TX
MWT
6
6 Fpj Sikrawa NR NR NR AD phV y AD phV AD phV
Room
Already
done done done done OFC Done done done
Comb
o
pendi
ng
DE(MWT)
TX
MWT
7
7 Fpj Jamalgarh NR NR NR AD phV y AD phV AD phV Outdoor
Not
reqd
Done done done
ML DONE (Far
end Baded )
Not
reqd
done 2G NA DE(MWT)
TX
MWT
8
8 Grg TE Sohna SSA OK done DONE y (TE xge ) done Civil
done M/s
SKC
Room
Already
done
Alread
y
Already
Alread
y
XGE. FE provided done done
Comb
o
on air
DET(Sout
h )
TX2
9
9 Nuh Alduka NR NR NR AD y AD phV AD phV zte done zte done
zte
done
zte
done
zte
done
ML done (far
end GSR)
zte
done
zte done 2G NA DE(MWT) TX1
10
10 Fpj Gulalta NR NR NR AD phV yes AD phV AD phV Done done done done done
ML done (Far
end Sikhrawa)
done done 2G NA
DE(MWT
)
TX
MWT
11
1 Grg Indri NR NR NR AD
mtr pending,trg
050514
AD phV AD phV Done done done done done
ML done (Far
end Rewasan)
done done 2G NA
DET(Sout
h )
TX2
intigrated
(emf data
sent)
12
2 Fpj Bisru SSA OK done done trgt 10/5/14
done
8/4/13 Civil
grg
done
20/6/13
SKC
Outdoor
Not
reqd
done done done wip
Not
reqd
Pending
ZTE
2G NA DE(MWT)
TX
MWT
HO
site handed
over to circle
13
3 Grg Khetawas SSA OK done done
final payment
done,work pending at
DHBVNL-trg 15/04/14
done
1/6/13 Civil
grg
done
10/8/13
SKC
Outdoor
Not
reqd
done done done FE port ready
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NWO-
W)
TX2 HO
site handed
over to circle
14
4 Grg Mussaidpur SSA OK
HPC
Done
done
Estimate pendng
DHBVNL-submeter to
be installed by sde
done
10/12/13
civil grg
done(06-
03-14)
Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
M/L pending
(ZTE)far end
fkn
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NWO-
W)
TX2 HO
site handed
over to circle
15
5 Grg Bajghera SSA OK done AD Yes done
done M/s
SKC
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
FE port ready
(MLpending(ZTE)
..far end p/v))
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
DE(NWO-
N)
TX1
site handed
over to circle
16
6 Grg IMT sect-1 SSA OK done
agreemnt
pending -
signature
trgt 10/4/14
yes NR
pole by
ZTE
Pendin
g ZTE
Pendi
ng ZTE
XGE. FE port
ready.
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX1 HO
HPC done
butagreemen
t pending
17
7 Grg mumtajpur SSA OK done done
work pending at
dhbvnl-trg 150414
done
22/3/13
Civil grg
done
7/5/13/13
SKC
outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC done (2E1
given)
Not
reqd
Pending
ZTE
2G NA SDE(IMT) TX2
site handed
over to circle
18
8 Grg
Bilaspur,
Haryana
(bilaspur
SSA ok done done
final amt deposited at
dhbvnl
Done
DONE M/s
KRB
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC done
140214
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX2
site handed
over to circle
19
9 Nuh Sangail SSA OK done AD phV
complete due on 10-5-
14
done
31/12/12
Civil grg
done
7/5/13
SKC
Outdoor
Not
reqd
Pendin
g ZTE
Pendin
g ZTE
Pendi
ng ZTE
ML pending (far
end Ujjina)
Not
reqd
Pending
ZTE
2G NA DE(MWT)
TX
MWT
HO
site handed
over to circle
STATUS OF PRIORITY P1.1 OF PHASE 7 GSM PROJECT Meeting no. 66
BTS(2g) on air on 11-6-13
BTS (3g) on air on 19/7/13
BTS (2g)on air 03/05/2013
3(g) on air 2/4/14
BTS on air 01/05/2013
BTS on air 31-1-14
BTS on air 01/01/2014
BTS on air on 30-04-13
BTS on air 16/01/2014
BTS(2g&3g) on air on
13/12/13
BTS on air 28/03/2014
BTS on air 20/02/2014
Sr
No
SDCA
Total
Sites(IP/SSA)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrcei
ved/OK/
Not
Ok)RF
finalizati
Status of
Site
hiring by
SSA
(NR/IP/Y
/to
Agreeme
nt
AD/D/NR
EC status (Y)
Tower
Foundation
(NR/Zte/Civ
il)
Tower
Erection(
NR/SSA/Z
te)
Shelter FDFA DG
BATTER
Y
POWE
R
PLAN
T
MEDIA
ANTIST
ATIC
BTS
Status
Site
2G/co
mbo
3G
STAT
US
Concern
DE
Conce
rn DE
TX
H/o
ver
to
circl
e
Remarks
20
10 Grg Medhawas SSA OK Done DONE
Final Payment
done,work pending at
DHBVNL
done
3/5/13 Civil
grg
done
20/5/13
SKC
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC done
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2 HO
site handed
over to circle
21
11 Grg RojkaMeo SSA OK done AD
dd (1.42
lakh)deposited to
dhbvnl..trgt 9/4/14
done
30/12/12Civ
il grg
done
31/1/13
SKC
Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX
MWT
HO
site handed
over to circle
22
12 Nuh
kota
khandewla
SSA ok done done
work panding at
dhbvnl-trg 050414
done
26/12/13Civ
il grg
done ( 6-3-
14)
outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC pending
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX2 HO
site handed
over to circle
23
13 Grg
Nawada
fatehpur
SSA OK done done
work panding at
dhbvnl-trg 050414
done
23/4/13Civil
grg
done
25/5/13SK
C
Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX1 HO
site handed
over to circle
24
14 Grg Behrampur SSA ok
HPC
Done
done
DD deposit to dhbvnl
(new transformer
issue)
done
24/1/14
Civil grg
DONE(23-
2-14)
Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
ML /ofc 200 mtr
required pending
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NOW-
E)
TX1
site handover
to circle
25
15 Grg
Imt Sec-8
manesar
SSA
hpc done
1/5/14
pending
EC will arrange by
owner
Civil
ZTE(RTT
suitabilty
report
pending)
Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX1 HO
26
16 Grg Sector-67 SSA ok done pending File work start
done (19-3-
314)
circle
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC pending (PE
submitted)
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2 HO
site handed
over to circle
27
17 Grg Palra SSA ok done done applied Done Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC pending (PE
submitted)
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2 HO
site handover
to circle
28
18 Grg
Kakrola(IMT-
Sec-7) SSA OK done
done(owner
dispute)
work panding at
dhbvnl-trg 050314
done
01/04/14
ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
ML pending (far
end Ujjina)
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX1 HO
site handover
to circle
29
19 Grg
Bhangrola/Ka
krola
SSA OK Done Done
work panding at
dhbvnl-trg 050314
WIP ZTE Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
ML pending(ZTE)
far end IMT
manesar)..estim
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX1 HO
site handover
to circle
30
20 Grg Daultabad SSA ok
HPC
Done
done EC applied Civil circle
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NWO-
N)
TX1
site handover
to circle
31
21 Grg sultanpur SSA OK done done
Initial amt
deposited..trgt
15/4/14
Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE)
pending
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NWO-
W)
TX2
site handover
to circle
32
22 Grg
SGT Medical
college near
Budhera
SSA OK
HPC
Done
done
demand note
reved,DDpending
Civil circle
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
M/Lpending(far
end
fkn,chandu,ghari
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
DE(NWO-
W)
TX2 HO
site handover
to circle
33
23 Grg Baslambi SSA OK
HPC
Done
done Initial amt deposite Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC pending(PE
submitted)
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NOW-
W)
TX2 HO
site handover
to circle
34
24 Grg dhrampur SSA OK
HPC
Done
done File work start Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NWO-
N)
TX1
site handover
to circle
35
25 Grg
Fazilpur-
badli(old
Dhanwapur)
SSA OK
HPC
done
done File work start Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE)
pending
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NWO-
W)
TX2
site handover
to circle
36
1 Nuh salamba y AD phV AD phV Done
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
ML (Far end
nuh)done &
pcm testing
pending
Pendin
g ZTE
Pending
ZTE
2G NA DE(MWT)
TX
MWT
revert back
due to E/C
37
2 Grg Sikhopur SSA
OK; also
to search
new
applicati
done done
work order issued by
dhvbnl,TRGT 6/5/14
civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC pending
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX2 HO
(work not stop
bycourt)Court
case done next
date: 11/4/14 ;
to search new
38
3 Grg
Nahar pur
KASAN
SSA OK done done
work panding at
dhbvnl-trg 050314
done
23/4/13
civil grg
WIP Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX2 HO
Court case may
be setteld
on030514
agrmnt to revised(report pending
from civil xen)-trg 180214
SDCA
Total
Sites(IP/SSA)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrcei
ved/OK/
Not
Ok)RF
finalizati
on
Status of
Site
hiring by
SSA
(NR/IP/Y
/to
HPC/WI
P)
Agreeme
nt
AD/D/NR
EC status (Y)
Tower
Foundation
(NR/Zte/Civ
il)
Tower
Erection(
NR/SSA/Z
te)
Shelter FDFA DG
BATTER
Y
POWE
R
PLAN
T
MEDIA
ANTIST
ATIC
BTS
Status
Site
2G/co
mbo
3G
STAT
US
Concern
DE
Conce
rn DE
TX
H/o
ver
to
circl
e
Remarks
39
4 Grg Nakhdola SSA ok
hpc done
1/5/14
in
progress
Civil ZTE
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
ML pending( far
end IMT
manesar )
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX1
40
5 Grg
nsg gate-2
/Navrangpur
SSA OK
final
letter
pending
frm NSG
Civil ZTE outdoor
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC/fe pending
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX1
do letter sent
to nsg by de
mewat
41
6 Grg Near GITM SSA ok done done
Cheque pending at A/O
..trgt 5/4/13
done
2/1/14 Civil
grg
circle outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX2
stay order
canceled on
12/03/14 in
court,next
date:13/5/14
42
7 Grg Hayatpur SSA ok
hpc done
1/5/14
in
progress
Civil ZTE Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX2
43
8 Grg
Jatauli/Hali
Mandi2
SSA ok civil visit pending Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX2 HPC Pending
44
9 Grg
Amity (Near
Pachgaon)-
badanki
SSA/IP
Bid not
Receved
ZTE ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC pending
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX2
site hand
over ip
(indus) by
45
10 Grg Kasan SSA/IP
aplicatio
n reqd
shiv
mandir
ML pending(far
end IMT
manesar)
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX1
46
11 Grg
Rathiwas (old
Pawala
Khusrupur)
old
site
pwala
khusp
ok
hpc done
1/5/14
in
progress
civil circle Outdoor
Not
reqd
pendi
g ZTE
pendig
ZTE
pendi
g ZTE
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX2
47
13 Grg
Imt Sec-3
manesar/Gh
osghar
SSA/IP ok
Mini link(ZTE)
pend
Pending
ZTE
Comb
o
pendi
ng
SDE(IMT) TX1
48
14 Grg Hasanpur SSA ok
hpc done
1/5/14
Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
ML pending(far
end palra)
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2
49
15 Grg Silani SSA ok
hpc done
1/5/14
Civil(visit)
PANDING
circle
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC pending
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2
50
16 Grg CRPF Camp SSA OK done
permission
letter in
progres trgt
9/4/14
Yes (CRPF will provide
EC)EC wiring pending
done
20/1/13 ZTE
ZTE Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC Pending(DE
Tx Urban)
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2 HO
do letter sent
to crpf by de
south
51
17 Grg
Sikandar pur
(Bada)
SSA Civil(visit) circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2
52
18 Grg Lakhuwas ssa/IP OK
hpc done
1/5/14
pending civil visit pending Civil(visit) circle
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
OFC pending
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2 HPC Pending
approval received from nsg hq
but final approval pending at local
level-trg 20/2/14
file sent for hpc
aplication reqd..site
not final
under negoation 14000 to 10000
rs
Revise appctn
rqd..site searching
negotiation for 5000-6000 rs
civil visit pending
application pending
SDCA
Total
Sites(IP/SSA)
Hiring
of
Site(N
R/IP/S
SA)
Nominals
(NotRrcei
ved/OK/
Not
Ok)RF
Status of
Site
hiring by
SSA
(NR/IP/Y
Agreeme
nt
AD/D/NR
EC status (Y)
Tower
Foundation
(NR/Zte/Civ
il)
Tower
Erection(
NR/SSA/Z
te)
Shelter FDFA DG
BATTER
Y
POWE
R
PLAN
T
MEDIA
ANTIST
ATIC
BTS
Status
Site
2G/co
mbo
3G
STAT
US
Concern
DE
Conce
rn DE
TX
H/o
ver
to
circl
e
Remarks
53
19 Grg Wazirpur
rent demanded INR
20000 to 25000
ZTE
Shelter
Pending
ZTE
Pending
ZTE
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE)
pend
Pendin
g ZTE
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2
54
20 Grg
Sohna DENSE
AREA
SSA
new site
searching
not ok Civil(visit) circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2
55
21 Grg
BSF camp
bhondsi
SSA Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE)
pend
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DET(Sout
h )
TX2
56
22 Grg
Gawal
pahari/Balia
was
SSA file pending at AO Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
ML(ZTE)/OFC-
500 mtr required
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NOW-
E)
TX1
57
23 Grg Ullawas SSA Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
MLpendingfar
end kendriya
vihar /kadarpur
& ofc(bsnl)
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NOW-
E)
TX1
58
24 Grg
Bandwadi
(old -IMT-sec-
6
SSA Civil circle Outdoor
Not
reqd
Pendi
ng ZTE
Pendin
g ZTE
Pendi
ng ZTE
Mini link(ZTE)
pending
Not
reqd
Pending
ZTE
Comb
o
pendi
ng
DE(NOW-
E)
TX1 lat long ok
WORK DETAIL OF NEW SITES :
HPC done but agreement pending 7
File sent to HPC =0
Court cases sites= 4
Imt Sec-3,NSG Gate-2,AMITY,Kasan,Wazirpur,Sohna Dense,Bandwadi,Ullawas
Tower Erection =13
IP (Indus)..confirmation
pending at circle team
new bid required
new site searchingtrgt in
april14
sikhopur,naharpur kasan,near gitm,Behrampur
Total Tower Foundation done ssa civil = 18 (+1 zte) sanghail, Bisru,Mumtajpur, Nawada Fatehpur,TE sohna,Medawas,Rojka Meo, Bajghera, Khetawas,Naharpur,CRPF camp ZTE,musaidpur,near GITM,Kota
Khandewla,behrampur,Bilaspur, sec-67,IMT Sec-7(kakrola),Palra
Sangail ,Bisru,Mumtajpur,Nawada-Fatehpur,TE sohna,Medawas,Rojkameo,Bajghera,Khetawas,Kota
khendewala,Behrampur,Mussaidpur,Bilaspur haryana
Application required=8
revise appln required..trgt in
april 14
b/wadi appln required..trgt in
april 14
Agreement Done (sites
hired) =24
TE Sohna,Medawas,RojkaMeo,Bajghera,Khetawas,Mussaidpur,IMT sec-8.Nawada Fatehpur ,Naharpur Kasan,Sikohpur,Mumtajpur,Bisru,Sangail,Bhangrola, Kakrola(sec7),Near GITM, Bilaspur haryana, Kota
Khandewla,,Behrampur,Sec-67, SGT Medical college, Sultanpur,Fazilpur,Dharampur,daultabad
imt sec-1 , hayatpur,Nakhdola,rathivas,Hasanpur,Silani,,lakhuwas
Summary
pp
gup
ta
pp
gup
ta
pp
gup
ta
pp
gup
ta
pp
gup
ta
pp
gup
ta
pp
gup
ta
raji
v
jto
zte work
done,on air trgt
15/05/14
pp
gup
ta
on air trgt
15/05/14
raji
v
jto
on air trgt
15/05/14
pp
gup
ta
on air trgt
15/05/14
pp
gup
ta
on air trgt
15/05/14
pp
gup
ta
on air trgt
15/05/14
pp
gup
ta
on air trgt
30/05/14
pp
gup
ta
on air trgt
30/05/14
pp
gup
ta
on air trgt
30/05/14
pp
gup
ta
BTS(2g) on air on 11-6-13
BTS (3g) on air on 19/7/13
BTS (2g)on air 03/05/2013
3(g) on air 2/4/14
BTS on air 01/05/2013
BTS on air 31-1-14
BTS on air 01/01/2014
BTS on air on 30-04-13
raji
v
jto
BTS on air 16/01/2014
BTS(2g&3g) on air on
13/12/13
BTS on air 28/03/2014
BTS on air 20/02/2014
Summary
on air trgt
30/05/14
pp
gup
ta
on air trgt
30/05/14
pp
gup
ta
on air trgt
30/05/14
pp
gup
ta
on air trgt
30/05/14
pp
gup
ta
on air trgt
30/05/14
pp
gup
ta
on air trgt
30/05/14
pp
gup
ta
foundation
done tower
pending
pp
gup
ta
foundation
done tower
pending
pp
gup
ta
foundation
done tower
pending
pp
gup
ta
foundation
done tower
pending
pp
gup
ta
foundation
pending
pp
gup
ta
foundation
pending
pp
gup
ta
foundation
pending
pp
gup
ta
foundation
pending
pp
gup
ta
foundation
pending
pp
gup
ta
foundation
pending
pp
gup
ta
work pending
at ZTE
pp
gup
ta
pp
gup
ta
pp
gup
ta
Summary
pp
gup
ta
pp
gup
ta
pp
gup
ta
pp
gup
ta
pp
gup
ta
pp
gup
ta
pp
gup
ta
pp
gup
ta
pp
gup
ta
pp
gup
ta
pp
gup
ta
pp
gup
ta
pp
gup
ta
pp
gup
ta
Summary
pp
gup
ta
pp
gup
ta
pp
gup
ta
pp
gup
ta
pp
gup
ta
pp
gup
ta
sikhopur,naharpur kasan,near gitm,Behrampur
TE Sohna,Medawas,RojkaMeo,Bajghera,Khetawas,Mussaidpur,IMT sec-8.Nawada Fatehpur ,Naharpur Kasan,Sikohpur,Mumtajpur,Bisru,Sangail,Bhangrola, Kakrola(sec7),Near GITM, Bilaspur haryana, Kota
Khandewla,,Behrampur,Sec-67, SGT Medical college, Sultanpur,Fazilpur,Dharampur,daultabad
imt sec-1 , hayatpur,Nakhdola,rathivas,Hasanpur,Silani,,lakhuwas