: ABC/1001
101, Known Street, Known Area, Known City, Pin …. Design by: UVW
Client: Very Important Industries Ltd, Well Known City Date: 25-Aug-10
Project: XYZ Building Page No. C/101
Applied Ultimate Loads (See figures on next page) Effective Length Unsupported Column Type
Col. Axial LoadInitial Moment Muix(kN.m)Initial Moment Muiy(kN.m) lex (m) ley (m) Length l (m) Braced or
Mk. Pu (kN) M uix1(+ or -) Muix2 (+ only) M uiy1(+ or -) Muiy2 (+ only)
* *
Unbraced
C1 1500.00 -152.50 170.00 -20.00 30.00 6.000 5.000 7.000 Braced 1
C2 431.40 0.00 199.48 0.00 0.00 5.500 5.500 5.500 Braced 1
C3 2142.10 0.00 193.10 0.00 5.75 3.000 3.000 3.000 Braced 1
C4 705.10 127.00 240.00 17.00 30.00 4.000 4.000 3.000 Braced 1
C5 1068.20 -22.00 245.00 -12.00 35.00 5.300 5.300 4.000 Braced 1
C6 1262.75 110.00 260.00 10.00 60.00 4.500 4.500 3.000 Braced 1
C7 1700.00 -22.50 40.00 -22.50 140.00 5.000 5.000 3.000 2
Unbraced
C8 1860.00 0.00 215.00 0.00 0.00 3.000 3.000 3.000 Braced 1
C9 2011.12 -18.00 145.00 -15.00 110.00 4.500 4.500 3.000 2
Unbraced
Braced
Unbraced
C10 2752.30 -50.00 120.00 -50.00 120.00 3.000 6.000 3.000 Braced 1
Note: * at Muix1 and Muiy1 indicates moment is +ve for single curvature bending, and -ve for double curvature bending.
Companys' Name: ABC Consultants Job No.: ABC/1001
101, Known Street, Known Area, Known City, Pin …. Design by: UVW
Client: Very Important Industries Ltd, Well Known City Date: 25-Aug-10
Project: XYZ Building Page No. C/102
Pu
Muix2 or Initial Moments Muix & Muiy
Muiy2 Muix2 >Muix1
Muiy2 >Muiy1 +
+
+ Addn. Moments Max & May
Deflecte due to slenderness
d
- shape -
Muix1 or
Muiy1
Summary of Results:
Axial Load Final Design Moments Permissible Moments Max. Tensile Stress M ux αn αn
pi(fsi-fci)*y/(fck*D)
xu/D y1 y2 y3 y4 y5 y6
0.1 -0.01 -0.01 0 0.01 0 0.03
0.13 0 -0.01 0 0.01 0 0.03
0.15 0.01 -0.01 0 0.01 0 0.03
0.18 0.02 -0.01 0 0.01 0 0.03
0.2 0.03 -0.01 0 0.01 0 0.03
0.23 0.03 -0.01 0 0.01 0 0.03
0.25 0.03 -0.01 0 0.01 0 0.03
0.28 0.03 0 0 0.01 0 0.03
0.3 0.03 0 0 0.01 0 0.03
0.33 0.03 0 0 0.01 0 0.03
0.35 0.03 0 0 0.01 0 0.03
0.38 0.03 0 0 0.01 0 0.03
0.4 0.03 0 0 0.01 0 0.03
0.43 0.03 0 0 0 0 0.03
0.45 0.03 0 0 0 0 0.03
0.48 0.03 0 0 0 0 0.03
0.5 0.03 0 0 0 0 0.03
0.53 0.03 0 0 0 0 0.03
0.55 0.03 0 0 0 0 0.03
0.58 0.03 0 0 0 0 0.03
0.6 0.03 0 0 0 0 0.03
0.63 0.03 0 0 0 0 0.03
0.65 0.03 0 0 0 0 0.02
0.68 0.03 0 0 0 0 0.02
0.7 0.03 0 0 0 0 0.02
0.73 0.03 0 0 0 0 0.01
0.75 0.03 0 0 0 0 0.01
0.78 0.03 0 0 0 0 0.01
0.8 0.03 0 0 0 0 0.01
0.83 0.03 0.01 0 0 0 0
0.85 0.03 0.01 0 0 0 0
0.88 0.03 0.01 0 0 0 0
0.9 0.03 0.01 0 0 0 0
0.93 0.03 0.01 0 0 0 0
0.95 0.03 0.01 0 0 0 0
0.98 0.03 0.01 0 0 0 -0.01
1 0.03 0.01 0 0 0 -0.01
1.03 0.03 0.01 0 0 0 -0.01
1.05 0.03 0.01 0 0 0 -0.01
1.08 0.03 0.01 0 0 0 -0.01
1.1 0.03 0.01 0 0 0 -0.01
1.13 0.03 0.01 0 0 0 -0.01
1.15 0.03 0.01 0 0 0 -0.01
1.18 0.03 0.01 0 0 0 -0.01
1.2 0.03 0.01 0 0 0 -0.02
1.23 0.03 0.01 0 0 0 -0.02
1.25 0.03 0.01 0 0 0 -0.02
1.28 0.03 0.01 0 0 0 -0.02
1.3 0.03 0.01 0 0 0 -0.02
1.33 0.03 0.01 0 0 0 -0.02
1.35 0.03 0.01 0 0 0 -0.02
1.38 0.03 0.01 0 0 0 -0.02
1.4 0.03 0.01 0 0 0 -0.02
1.43 0.03 0.01 0 0 0 -0.02
1.45 0.03 0.01 0 0 0 -0.02
1.48 0.03 0.01 0 0 0 -0.02
1.5 0.03 0.01 0 0 0 -0.02
1.53 0.03 0.01 0 0 0 -0.02
1.55 0.03 0.01 0 0 0 -0.02
1.58 0.03 0.01 0 0 0 -0.02
1.6 0.03 0.01 0 0 0 -0.02
1.63 0.03 0.01 0 0 0 -0.02
1.65 0.03 0.01 0 0 0 -0.02
1.68 0.03 0.01 0 0 0 -0.02
1.7 0.03 0.01 0 0 0 -0.02
1.73 0.03 0.01 0 0 0 -0.02
1.75 0.03 0.01 0 0 0 -0.02
1.78 0.03 0.01 0 0 0 -0.02
1.8 0.03 0.01 0 0 0 -0.02
1.83 0.03 0.01 0 0 0 -0.03
1.85 0.03 0.01 0 0 0 -0.03
1.88 0.03 0.01 0 0 0 -0.03
1.9 0.03 0.01 0 0 0 -0.03
1.93 0.03 0.01 0 0 0 -0.03
1.95 0.03 0.01 0 0 0 -0.03
1.98 0.03 0.01 0 0 0 -0.03
2 0.03 0.01 0 0 0 -0.03
2.5 0.03 0.01 0 0 0 -0.03
3.0 0.03 0.01 0 0 0 -0.03
3.5 0.03 0.01 0 0 0 -0.03
4.0 0.03 0.01 0 -0.01 0 -0.03
Braced 15 240
Unbraced 20 250
25 415
30 500
35
40
fck=M25, fy=415, b =400mm, D =500mm, p=1.885% 45
50
Position of reinforcement - Muy case BIAXCOLUMN.xls
pi(fsi-fci)*x/(fck*b)
xu/b x1 x2 x3 x4 x5 x6
0.1 -0.03 -0.01 0 0.01 0 0.03
0.13 -0.01 -0.01 0 0.01 0 0.03
0.15 0 -0.01 0 0.01 0 0.03
0.18 0.01 -0.01 0 0.01 0 0.03
0.2 0.02 -0.01 0 0.01 0 0.03
0.23 0.02 -0.01 0 0.01 0 0.03
0.25 0.03 0 0 0.01 0 0.03
0.28 0.03 0 0 0.01 0 0.03
0.3 0.03 0 0 0.01 0 0.03
0.33 0.03 0 0 0.01 0 0.03
0.35 0.03 0 0 0.01 0 0.03
0.38 0.03 0 0 0.01 0 0.03
0.4 0.03 0 0 0 0 0.03
0.43 0.03 0 0 0 0 0.03
0.45 0.03 0 0 0 0 0.03
0.48 0.03 0 0 0 0 0.03
0.5 0.03 0 0 0 0 0.03
0.53 0.03 0 0 0 0 0.03
0.55 0.03 0 0 0 0 0.03
0.58 0.03 0 0 0 0 0.03
0.6 0.03 0 0 0 0 0.03
0.63 0.03 0 0 0 0 0.02
0.65 0.03 0 0 0 0 0.02
0.68 0.03 0 0 0 0 0.02
0.7 0.03 0 0 0 0 0.01
0.73 0.03 0 0 0 0 0.01
0.75 0.03 0 0 0 0 0.01
0.78 0.03 0 0 0 0 0.01
0.8 0.03 0 0 0 0 0
0.83 0.03 0 0 0 0 0
0.85 0.03 0 0 0 0 0
0.88 0.03 0 0 0 0 0
0.9 0.03 0 0 0 0 0
0.93 0.03 0 0 0 0 0
0.95 0.03 0 0 0 0 -0.01
0.98 0.03 0 0 0 0 -0.01
1 0.03 0 0 0 0 -0.01
1.03 0.03 0 0 0 0 -0.01
1.05 0.03 0 0 0 0 -0.01
1.08 0.03 0 0 0 0 -0.01
1.1 0.03 0 0 0 0 -0.01
1.13 0.03 0 0 0 0 -0.01
1.15 0.03 0 0 0 0 -0.01
1.18 0.03 0 0 0 0 -0.01
1.2 0.03 0 0 0 0 -0.02
1.23 0.03 0 0 0 0 -0.02
1.25 0.03 0 0 0 0 -0.02
1.28 0.03 0 0 0 0 -0.02
1.3 0.03 0 0 0 0 -0.02
1.33 0.03 0 0 0 0 -0.02
1.35 0.03 0 0 0 0 -0.02
1.38 0.03 0 0 0 0 -0.02
1.4 0.03 0 0 0 0 -0.02
1.43 0.03 0 0 0 0 -0.02
1.45 0.03 0 0 0 0 -0.02
1.48 0.03 0 0 0 0 -0.02
1.5 0.03 0 0 0 0 -0.02
1.53 0.03 0 0 0 0 -0.02
1.55 0.03 0 0 0 0 -0.02
1.58 0.03 0 0 0 0 -0.02
1.6 0.03 0 0 0 0 -0.02
1.63 0.03 0 0 0 0 -0.02
1.65 0.03 0 0 0 0 -0.02
1.68 0.03 0 0 0 0 -0.02
1.7 0.03 0 0 0 0 -0.02
1.73 0.03 0 0 0 0 -0.02
1.75 0.03 0 0 0 0 -0.02
1.78 0.03 0 0 0 0 -0.02
1.8 0.03 0 0 0 0 -0.02
1.83 0.03 0 0 0 0 -0.02
1.85 0.03 0 0 0 0 -0.02
1.88 0.03 0 0 0 0 -0.02
1.9 0.03 0 0 0 0 -0.02
1.93 0.03 0 0 0 0 -0.02
1.95 0.03 0 0 0 0 -0.02
1.98 0.03 0 0 0 0 -0.02
2 0.03 0 0 0 0 -0.02
2.5 0.03 0 0 0 0 -0.03
3.0 0.03 0 0 0 0 -0.03
3.5 0.03 0 0 0 0 -0.03
4.0 0.03 0 0 0 0 -0.03
Puz = 3423.3849 kN
Calculation of Pbx
xu/D= (.0035*d)/(.0055*D) = 0.56
Pb-conc = 1015394.55 N D= 500 mm b (mm) = 400
fy = 415 N/mm2 Es = 200000 N/mm2
Steel Strain
xu/D e1 e2 e3 e4 e5 e6
0.56 0 0 0 0 0 0
Steel Stress,fsi
xu/d fs1 fs2 fs3 fs4 fs5 fs6
0.56 351.95995 237.68037 358.275 81.64593 358.275 327.73878
Concrete Stress, fci
0.56 11.15 11.15 11.15 0 11.15 0
Ast(fsi-fci)
xu/d y1 y2 y3 y4 y5 y6
0.56 428274.42 142333.23 0 -51299.65 0 ###
Pbx = 1122.8539 kN
Calculation of Pby
xu/B= (.0035*b)/(.0055*B) = 0.54
Pb-conc = 982084.09 N D= 500 mm b (mm) = 400
fy = 415 N/mm2 Es = 200000 N/mm2
Steel Strain
xu/D e1 e2 e3 e4 e5 e6
0.54 0 0 0 0 0 0
Steel Stress,fsi
xu/B= fs1 fs2 fs3 fs4 fs5 fs6
0.54 346.84 209.47 358.28 95.75 358.28 327.74
Concrete Stress, fci
0.54 11.15 11.15 11.15 0 11.15 0
Ast(fsi-fci)
xu/d y1 y2 y3 y4 y5 y6
0.54 421845.03 124611.13 0 -60160.7 0 ###
Pby = 1056.53 kN
Additional Moments & Modified Initial Moments:
Col. Axial Load kx ky kx x M'ax ky x M'ay Iniital M'ux Intital M'uy
Mk. Pu (kN)
C1 1500 0.84 0.81 0 38.09 68 12
C2 431.4 1 1 0 16.31 87.77 0
C3 2142.1 0.56 0.54 0 0 84.96 2.53
C4 705.1 1 1 0 0 194.8 24.8
C5 1068.2 1 1 0 37.32 107.8 15.4
C6 1262.75 0.94 0.91 0 0 200 45.6
C7 1700 0.75 0.73 0 38.68 40 140
C8 1860 0.68 0.66 0 0 94.6 0
C9 2011.12 0.61 0.6 0 0 145 110
C10 2752.3 0.29 0.28 0 35.11 52 52
3750
3500
3250
3000
2750 2752
2500
2250
2142
2000 2011
Pu (kN)
1860
1750
1700
1500 1500
1250 1263
1068
1000
750
705
500
431
250
0
0
50
100
150
200
250
300
350
Mux (kN.m)
Companys' Name: ABC Consultants Job No.: ABC/1001
101, Known Street, Known Area, Known City, Pin …. Design by: UVW
Client: Very Important Industries Ltd, Well Known City Date: 25-Aug-10
Project: XYZ Building Page No. C/104
3750
3500
3250
3000
2750 2752
2500
2250
2142
2000 2011
Pu (kN)
1860
1750
1700
1500 1500
1250 1263
1068
1000
750
705
500
431
250
0
0
50
100
200
250
150
Muy (kN.m)
0
50
100
Muy (kN.m)
150
200
250
NOTES ON BIAXCOLUMN.xls
This Spreadsheet is intended to be used by qualified Civil and Structural Engineers who are
familiar with the provisions of IS:456-2000, and those who will evaluate the significance and
limitations of its contents and take responsibility for its use and application.
DISCLAIMER
No Liability is accepted by the author of the Spreadsheets for any direct, indirect, consequential or
incidental loss or damage arising out of the usage of Spreadsheets or any mistakes and
negligence
in developing the Spreadsheets. The organisation or person using the Spreadsheets bears all risks
and responsibility for the quality and performance of the Spreadsheets.
N. PRABHAKAR
BE CEng(I) MIStructE (UK) MIE (Ind)
Chartered Structural Engineer
Structural Consultant
Flat E-8 Star Residency
Location: Evershine City
Vasai (E) Pin 401 208
Thane Dist, Maharashtra, India