Energy Efficiency
Technologies for Clean energy production
Environment Management
Renewable Energy
PIE…. Efficiency-improvement strategy promising
success
CenPEEP
O & M : Gearing up for future challenges
Conclusion
NATIONAL THERMAL POWER
NTPC Ltd .… Overview
CORPORATION LTD.
- A PROFILE
NTPC - Vision and Mission
Our Vision
A world class integrated power major, powering
India’s growth, with increasing global presence
Our Mission
Develop and provide reliable power, related products
and services at competitive prices, integrating multiple
energy sources with innovative and eco-friendly
technologies and contribute to society”
NTPC- Today
20.18% 28.5%
NTPC
NTPC 188.67*
26350* MW - NTPC BUs - NTPC
20.18 % 28.5%
of of
All All REST
India REST
India OF
OF INDIA
130,539 INDIA 662.43
MW BUs
87
92
97
02
06
07
12
17
• LNG value chain
19
19
19
19
20
20
20
20
20
• Consultancy services
Capacities under execution – 13,860 MW
• Globalization
¾ Setting up of power plants
• Hydel Power abroad • Power trading
~9,000 MW by 2017
¾ International Consultancy • Power
• Nuclear Power Distribution
2000 MW by 2017
LATERAL FORWARD
• Non-conventional INTEGRATION INTEGRATION
1000 MW by 2017
BACKWARD RELATED
INTEGRATION DIVERSIFICATION
70
65
60
Source : AT Kearney NTPC stations are regular recipients of
CEA’s meritorious performance awards.
0 50,000 100,000 150,000 200,000 250,000
12
12 NTPC
NTPC Stations
Stations achieved
achieved PLF
PLF
11
11 NTPC
NTPC Stations
Stations amongst
amongst top
top
of
of above
above 85%
85% during
during 2005-06, 33
2005-06,
20
20 in
in the
the country
country in
in 2005-06
2005-06
of
of these
these stations
stations achieved
achieved PLF
PLF of
of
including
including 33 taken
taken over
over plants.
plants.
above
above 90%.
90%.
High Capacity Utilization (PLF)
93 91.2
89.91
88.7 88.79
90 86.54
86.2 87.51 87.54
87 84.38 84.41
83.6
84 80.4 81.8 81.1
PLF(%)
81
78
74.3 73.6
75 72.7
72.2
72 69 69.9
69
67.3
66
63
60
1999-2000 2000-2001 2001-2002 2002-2003 2003-2004 2004-2005 2005-2006
%
%
60
* 40
40 18.7
18.0
20 20
0 0
Take n over in 1992 2006 Tak e n ove r in 1995 2006
40 40 31.94
14.9
20 20
0 0
Take n over in 2000 2006 Managed Since 2006
1978
Man-Mw Ratio Over the Years
1.27*
1.4
1.10*
1.07* 1.02*
1.2 0.98*
Man-Mw Ratio
0.91*
1 0.56
0.49 0.47
0.8 0.46 0.41
0.38 0.38
0.6
0.4 0.71
0.61 0.6 0.56 0.57 0.53 0.53
0.2
0
1996- 2000- 2001- 2002- 2003- 2004- 2005-
97 01 02 03 04 05 06
O&M Non-O&M
*Total (O&M and Non-O&M)
Man MW Ratio excluding Badarpur and JVs/Subsidiaries
Energy Efficiency
43%
42%
Gross Efficiency, GCV Basis
320/600/620
(800-1000 MW)
41% 280/600/620
(800-1000 MW)
247/565/593
‘00 ‘02 Xth ‘07 XIth ‘12 XIIth ‘17 XIIIth ‘22
Plan Plan Plan Plan
Lower Plant Efficiency in India
P = 247 ata
14 MST = 565
P = 247 ata
RHT = 593
MST = 537
12 RHT = 565
P = 170 ata
P = 170 ata MST = 537
10 MST = 537
P = 170 ata RHT = 565
RHT = 537
8 MST = 537
P = 150 ata RHT = 537
6 MST = 537
RHT = 537
4 P = 130 ata
MST = 537
2 RHT = 537
200 LMZ 200 KWU 500 KWU 500 KWU 500 High 660 SC 660/800
(1978) (1979) (1982) Mod RH (2006) (2004) SC (2008)
(1998)
Technologies For
Clean Energy Production
NATIONAL THERMAL POWER
CORPORATION LTD.
- A PROFILE
Adoption of new technologies
NTPC has been a pioneer in introducing new technologies in the
country.
Currently, super critical technology, advanced class GTs are some of
the technologies under induction
NTPC has worked on development of Integrated Coal Gasification
Combined Cycle (IGCC) technology suitable to Indian coal through its
collaborative effort with USAID . Further developments are continuing.
Our Energy Technologies Centre is working in both fundamental and
applied fields and has a well-defined mandate to develop various
technologies which will enhance plant reliability, efficiency etc. Setting
up of this centre by NTPC meets a long-term need of such a centre in
Indian power sector.
MGR, DDCMIS, HVDC transmission, Sliding Pressure Operation of
boilers, Combined Cycle power generation, 765 KV transmission are
some of the technologies introduced by NTPC fot the first time in
India.
Technologies… for cleaner
environment
Online Systems
SOFTWARES
• Typical Indian coal has 3300 kcal/kg GCV with 45 % ash content
• Four/Six pass ESPs with 10/9 fields each for 500/660 MW unit
• NTPC’s ESPs are amongst the world’s largest. The largest in NTPC will
be at BarhI project with collection area of 364,000 m2 and foot print
size of 66 metres x 112 metres
Highlights
Performance of older ESPs are also being improved by using some of the following
technologies:
NTPC has undertaken following two feasibility studies for 100 MW IGCC plant based
on Indian coal (Raw as well as washed):
¾ feasibility of 100 MW IGCC plant based on indigenous fluidised bed gasifier technology
¾ feasibility of 100 MW IGCC plant based on international technology.
Gasifier Efficiency lower due to high ash Indian Coal and air blown operation
Adoption of IGCC: Techno-economic
barriers
BIL levels have been increased, (Typ. Values for 400kV System):
1300kVp to 1425kVp and Switching Impulse Voltage increased from
:1050kVp to 1180kVp
Temperature rise levels have been reduced for oil from 50 deg C to
35 Deg C and winding from 55 Deg C- to 40 Deg C.
Type of oil has been changed from Paraffinic to Napthenic type which
has a better oxidation stability and thus better life.
Online DGA. FRA recordings for speedy analysis, identification and
rectification of problem.
For 765kV Class of Transformer, On line Gas Monitoring system &
Provision of Dry-keep has been adopted.
EQUIPMENTS… Continued
SINGRAULI (1982)
SIPAT II (2006)
LATEST TECHNOLOGICAL
ADOPTION IN C&I
25
22.3
Ash Utilisation in Million tonnes
19.6
20
15
12.7
10
7.5
5.7
5 3.0 3.7
0.3
0
1991-92 2000-01 2001-02 2002-03 2003-04 2004-05 2005-06 2006-07
Afforestation …
SN Renewable Energy
Capacity
o Sources
1. Wind energy farms 650 MW
2. Small Hydro Project 300 MW
3. Solar PV Power Project 5 MWe
4. Solar Thermal 10 MW
Foray into Renewable Energy
5. Biomass Power Project 15 MW
Geothermal Power 9 100 MW wind farm
6. 30 MW
Project 9 8 MW hydro based plant at Singrauli
9 4 MW hydro based plant at Rihand
9 5 MW biomass based power plant
9 1 MW bio-diesel based power plant
(in cluster of villages)
9 Identification of potential site (s) for
geothermal based power plant
Renewable Power & Distributed
Generation
The traditional model of centralized grid extension could not achieve the
goal as :
Grid extension not viable for remote areas due to low demand &
high distribution network cost.
Kerosene Oil still preferred source as villagers get light when they
need it.
Rural Feeders remain neglected by utilities due to low revenue
realization. Importance given to urban feeders for commercial
reasons.
9 Gap analysis
9 Formation of Counter Teams
9 Up front improvement in generation through optimization of
operation parameters, vacuum improvement, Mill maintenance,
combustion optimization and focus on water chemistry.
Introduction of O &M Systems and Procedures & Initiate practice of
opportunity Maintenance
Planned Major overhauls
PIE Program … an Impact analysis
Million
Units
23800
25000 19566
18477
20000
2050 8500
10000 Million
Million
Rupees Rupees
5000
0
2004-05 2005-06 2006-2007
The Turnaround
The Turn around was based on NTPC practices and procedures with
customization of needs for each Individual Station and utility.
CenPEEP - Symbol of NTPC’s
Commitment for
NATIONAL THERMAL POWER
CORPORATION
Sustainable Development LTD.
-&
A PROFILE
Successful International Cooperation
CenPEEP - Centre for Power Efficiency
& Environmental Protection
Sustainable Development
&
Successful International Cooperation
Centre for Power Efficiency &
Environmental Protection
• NTPC
CenPEEP • USDOE
• Guj. Gen Co • NETL
• Maha Gen CO • EPRI
• AP Gen CO • TVA
• PSEB • GAI
• UPRVUN GEP • Southern
• WBPDCL Research
• Jharkhand
Partners • Structural Int.
• IPGCL • Domain Experts
Guided by
Advisory Board & Executive Committee
Members from NTPC, USAID and Govt of India,
State & Private Power Utilities, industry, research institutes, etc.
Utility Challenges for Efficiency
Improvement
Technology Sustainability
Selection & through implementation
Acquisition of
Systems & Procedures
Technology
Transfer
Training &
Technology
Technology
Demonstration Dissemination
Grass Root Interventions
Candidate Interventions
• Boiler Performance Optimization
• Air heater tests and gap analysis
• Burner to burner PF balance tests Benefits
• Steam Turbine measurements
• Significant GHG
• Condenser Water Pressure Cleaners reduction
• Condenser Helium leak detector
• Fuel Savings in
• CW flow measurement - dye dilution power sector
• Cooling Tower tests
• Reliability Centered Maintenance
• New overhaul practices
CenPEEP is a resource center for Plant performance optimization, Diagnostics & Solutions
Performance Gaps (Typical Heat
Rate Losses)
RH Spray (7%)
Unaccountable (20%)
Training
Plans
& r ve y
Tools
s
Su
dit
Au
Pe
rf
or
n
m
tio
an
ta
ce
cu m
en
Los
Do ste
Te
m
s Are
Sy
sts
as & n t
dev Pla
iati e w s.
on N ec
Monitoring
Sp
PdM Improvements
Risk Mitigation
Availability
Improvement
Initiatives
RCM-Living Program
Risk Screening
Widespread Dissemination
(Million Tones)
1.5
Emission
Tons in NTPC 1
• Institutionalization 0.5
through EMC 0
97- 98- 99- 00- 01- 02- 03- 04- 05- 06-
98 99 00 01 02 03 04 05 06 07
Ye ar
Evaluation Dimensions
Competency Upgradation The interventions
Institution Scalability have been quite
effective to elevate
Roll out potential the contemporary
Sectoral Benefits sectoral conditions
but there is surely
Public benefits
scope to make the
Knowledge creation, impact deeper and
management & optimisation wider
IT Enablement
CenPEEP has made a good beginning, improvements to be sustained for a large fleet
CTI’s World Climate
Technology Award 2002
USEPA
CLIMATE
PROTECTION
AWARD 2003
0
100
200
300
400
500
600
210 MW
559
(Vindyachal)
500 MW
406
(Ramagundum)
Established O&M Practices
GAS TURBINE
448
(Dadri-Gas)
STEAM
TURBINE
480
CCGT( Auraiya)
Maintenance Optimisation
Project REAP
Rihand
Unchahar
Tanda
Dadri
Badarpur
Korba
Maintenance Marvel
Vindyachal
Ramagundum
Simhadri
Significant Reduction in
Farakka
Forced Outage of Coal stations
Kahalgaon
Talcher (H)
Talcher
2005-06
2006-07
NTPC
O&M Practices
Knowledge teams
– Aims to strengthen technical resources
– Members selected on expertise, knowledge and
experience
– Functional in areas of Turbine, Boiler, Electrical,
C&I and Offsite
– Involvement in overhauls, troubleshooting, fact
finding, problem analysis
Specialized training programs
– Identified members are trained in specific areas
Overhaul Quality
Minimise forced outage from overhaul to overhaul
Prepare comprehensive scope of work
– Inputs from past experiences, knowledge teams, RLA
analysis, failure history analysis, performance
assessments, etc.
– Finalised 2 yrs before overhaul
– Reviewed regularly
Operation Preparedness Index - OPI
– Assess preparedness of spares & service contracts for
overhaul
– OPI calculation, monitoring and corrective action is
through monthly ORT and quarterly review in ROPR
Emphasis on modular replacements to increase
performance and reliability
NATIONAL THERMAL
Conclusion POWER
CORPORATION LTD.
- A PROFILE
Summing Up
• Dry collection of fly ash and incentivization of entrepreneurs to make use of ash
• Ash water recirculation system to recycle decanted water from ash dykes
• Adoption of high concentration ash slurry disposal system
• Promote biomass/solar/wind based Distributed Generation in remote villages for
rural electrification
Summing Up
Thank you