Comprehensive List of Projects at the Martin Luther King, Jr.

Memorial Library Febuary 15, 2011

Project Name Project Description or Project Notes Timeframe Estimated Budget


This includes carpet in the restoration,
New Carpet in various areas of building $100,000
1 rehabilitation and renovation zones
2 Relamping of A-level, 2nd, 3rd and 4th Floors Project would be similar to work on 1st floor $785,500
Project will replace hard to clean carpet with
New tile floor on A-level $85,000
3 appropiate composite tile
At a mininum the building 2 12-ton chillers will
HVAC System - Overhaul $150,000
4 needed to be overhauled
5 Coil Replacements in Stairwells Project is scheduled to commence $35,000
This project will commence after the
Ceiling Replacement in Stairwells $36,000
6 completion of the coil replacment
Current hand rails in the stairwells to do not
Modification of stairwell handrails $660,000
7 meet building codes for fall hazards
8 Replace all blinds Installation of Micro-shades $250,000
Painting various areas each year for the next
General Painting $50,000
9 5 years
10 Glass Replacement On-going $150,000
11 Instant Hot (4th Floor) Installation of supplemental hot water device $6,000
These controls are original to the building and
Motor Control Center $250,000
12 have far exceeded their useful life.
These 8 units are original to the building and
Air Handlers, replacement motors/bearings $480,000
13 need major rehabilitation work.
5 pumps are reaching the end of their useful
Distribution pumps $50,000
14 life cycle
15 Asbestos Abatment Will be needed if in building over 5-years $1,500,000
16 New Cooling Tower Will be needed if in building over 5-years $89,000

Total Estimated Costs $4,676,500