Comprehensive List of Projects at the Martin Luther King, Jr.
Memorial Library Febuary 15, 2011
Project Name Project Description or Project Notes Timeframe Estimated Budget
This includes carpet in the restoration, New Carpet in various areas of building $100,000 1 rehabilitation and renovation zones 2 Relamping of A-level, 2nd, 3rd and 4th Floors Project would be similar to work on 1st floor $785,500 Project will replace hard to clean carpet with New tile floor on A-level $85,000 3 appropiate composite tile At a mininum the building 2 12-ton chillers will HVAC System - Overhaul $150,000 4 needed to be overhauled 5 Coil Replacements in Stairwells Project is scheduled to commence $35,000 This project will commence after the Ceiling Replacement in Stairwells $36,000 6 completion of the coil replacment Current hand rails in the stairwells to do not Modification of stairwell handrails $660,000 7 meet building codes for fall hazards 8 Replace all blinds Installation of Micro-shades $250,000 Painting various areas each year for the next General Painting $50,000 9 5 years 10 Glass Replacement On-going $150,000 11 Instant Hot (4th Floor) Installation of supplemental hot water device $6,000 These controls are original to the building and Motor Control Center $250,000 12 have far exceeded their useful life. These 8 units are original to the building and Air Handlers, replacement motors/bearings $480,000 13 need major rehabilitation work. 5 pumps are reaching the end of their useful Distribution pumps $50,000 14 life cycle 15 Asbestos Abatment Will be needed if in building over 5-years $1,500,000 16 New Cooling Tower Will be needed if in building over 5-years $89,000
77th Conference on Glass Problems: A Collection of Papers Presented at the 77th Conference on Glass Problems, Greater Columbus Convention Center, Columbus, OH, November 7-9, 2016