US Regional Airport Cost Model Benchmarks: (USA Mid-West location): 2016 Cost Basis:

I N T E R N AT I O N A L I N C .
Open Shop Construction:
This cost model itemizes +/- 15% cost estimating data on the costs of constructing and or upgrading / revamping airport runways, taxiways and aircraft parking stands and
ramps. The cost benchmark model also includes square foot / square meter unit costs for constructing new terminals and departure gates and costs associated with , escala-
ctors for Two Story College Add On Project:
tors, baggage carousels, aircraft fueling systems & waste disposal systems. The cost model is based on a (6) gate(s) 650,000 to 850,000 passengers per year terminal operating
in the order of 15 to 25 departures per day.
n with 16 Laboratory Work Areas
ound Floor
# & 23,400 SF on 2nd Floor
Description U of M $ Low $ High Remarks
hs; Construction - 12 months Union Construction
New commercial main runway 7,000 Lineal Foot (LF) to Construction costs include 12” to 18” of excavation, imported engineered fill, 95%
Located in
1 Central New
10,000 Lineal Jersey,
Foot (LF), 10” USA
deep on 4” deep asphalt / tar- LF 2,100 2,600 compaction of fill and necessary grading, lighting, signs and marking, complete with
mac and 6”deep of reinforced concrete. associated drainage systems. (To determine a meter value multiply $ value by 3.28).
GORY New secondary runway 3,500 LinealSF
Foot (LF) toCOST
7,000PER SF TOTAL $ COST Construction costs include 12” to 18” of excavation, imported engineered fill, 95%
2 Lineal Foot (LF), 8” deep on 2” deep asphalt
n place, not part of this project) 59,800
/ tarmac and
6.06
LF
362,657
1,550 2,050 compaction of fill and necessary grading, lighting, signs and marking, complete with
minaries / Division6”deep
1 of reinforced concrete. 59,800 13.59 812,515 associated drainage systems. (To determine a meter value multiply $ value by 3.28).
59,800 3.76 225,057 Construction costs include 9” to 12” of excavation, imported engineered fill, 95% com-
New taxiway construction 8” deep on 2” deep asphalt
59,800 2.01/ 120,416
3 SF 20 30 paction of fill and necessary grading, lighting, signs and marking, complete with associ-
s tarmac and 6”deep of reinforced concrete.
59,800 6.71 401,138
ated drainage systems. (To determine a square meter value multiply $ value by 10.76).
59,800 4.67 279,281
59,800 6.46 386,562 Construction costs include 9” to 12” of excavation, imported engineered fill, 95%
59,800
New ramps/ aircraft stands / apron construction 6”5.03
deep on 300,854 compaction of fill and necessary grading, lighting, signs and marking, complete with
ural Floors 4 2” deep asphalt / tarmac and 4”deep59,800 12.51
of reinforced concrete.
SF
748,053 15 25
associated drainage systems. (To determine a square meter value multiply $ value by
59,800 4.08 243,715 10.76).
in interior partitions) 59,800 $6.47 $387,145
k & P.C.C. Wall5 Panels)
Scarify and resurfacing (2” asphalt / 59,800
tarmac) $15.27 SF
$913,056 5 10 (To determine a square meter value multiply $ value by 10.76).
59,800 $6.80 $406,386
59,800 $0.58 $34,400 Construction costs include 6” to 12” of excavation, imported engineered fill, 95%
nt Canopy 6 New concrete hard
standings
4” thick reinforced
59,800 concrete
$1.65 $98,535
SF 10 15
compaction of fill and necessary grading, lighting, signs and marking, complete with
on 6” imported stone / hardcore base. 59,800 $4.52 $270,535 associated drainage systems. (To determine a square meter value multiply $ value by
59,800 $3.30 $197,071 10.76).
59,800 $3.27 $195,322
s / Handicap needs 59,800 Construction costs include 6” to 12” of excavation, imported engineered fill, 95% com-
Scarify and resurfacing concrete hard standings 4” $1.94thick $116,027
7 59,800/ hardcore $0.77 SF
$46,061 5 10 paction of fill and necessary grading, lighting, signs and marking, complete with associ-
reinforced concrete on 6” imported stone base.
59,800 $4.88 $292,108 ated drainage systems. (To determine a square meter value multiply $ value by 10.76).
ooms / Lunch Room Cabinets 59,800 $3.46 $206,983
Demolish and remove 4” thick slab on grade reinforced
8 59,800 $0.25 SF
$15,159 2.75 3.75 (To determine a square meter value multiply $ value by 10.76).
rdwood & Tile)
with mesh 59,800 $6.80 $406,386
Boards Demolish and remove 6” thick slab on 59,800
grade reinforced $0.40 $23,905
9 59,800 $4.17 SF
$249,294 3.15 4.15 (To determine a square meter value multiply $ value by 10.76).
with mesh
1 # Freight) 59,800 $2.16 $129,437
& Downspouts 10 / Roof
Concrete cleaning
Equipment Padsusing sandblasting
& Walkways equipment $1.70
59,800 SF
$101,451 2.35 2.85 (To determine a square meter value multiply $ value by 10.76).
ng) 59,800 $5.41 $323,593
11 Tarmac cleaning using sandblasting59,800
s - Extinguisher’s equipment $4.02 SF
$240,217 2.15 2.65 (To determine a square meter value multiply $ value by 10.76).
New Terminal Building (2 story building59,800
70,000 SF to $19.38 $1,159,103
ems 12 59,800 $2.86 SF
$170,834 190 240 (To determine a square meter value multiply $ value by 10.76).
140,000 SF)
rgency Generator 59,800 $18.41 $1,100,798
ard readers 59,800 – New$2.85
Revamp Terminal Building Minimal upgrade $170,251
Rooms / Benches / Seating/ &
13 Flooring Stage Painting,
Carpet, Area / Upgrade59,800
MEP Systems /$14.51 New $867,578 25
SF 50 (To determine a square meter value multiply $ value by 10.76).
ghting Ceilings & Signage.
electric, water, gas 59,800 $18.17 $1,086,805
w lab equipment, case work, gases, sinks, 59,800 23.38 $1,398,154

/ Lockers 59,800 $5.44 $325,342


US Regional Airport Cost Model Benchmarks: (USA Mid-West location): 2016 Cost Basis:
I N T E R N AT I O N A L I N C .
Open Shop Construction:

# Description U of M $ Low $ High Remarks

ctors 14forRevamp
Two Story
Terminal Building College
Medium upgrade Add
– New On Project:
Flooring / Carpet, Painting, Upgrade MEP Systems / New SF 50 100 (To determine a square meter value multiply $ value by 10.76).
n with 16 Laboratory Work Areas
Ceilings & Signage.
ound Floor & 23,400 SF on 2nd Floor
Revamp Terminal Building Major upgrade – New Flooring
hs; Construction
15 / Carpet,- Re-Configure
12 months Union
internal Construction
walls, Painting, New MEP SF 75 150 (To determine a square meter value multiply $ value by 10.76).
Located in Central New Jersey, USA Ceilings & Signage.
Systems / New Bathrooms, F/P, New
16 Baggage Carousel c/w with electrical work EACH 375,000 850,000 Cost range.
GORY SF COST PER SF TOTAL $ COST
17 Escalator 30’ – 60’ length EACH 175,000 470,000 $5,850 to $7,833 per LF
n place, not part of this project) 59,800 6.06 362,657
18 Moving Walkway 100’ – 250’ length EACH 125,000 375,000 $1,250 to $1,750 per LF
minaries / Division 1 59,800 13.59 812,515
19 Elevator 10 passenger (2 stops) 59,800 3.76 225,057 75,000
EACH 175,000 Cost range.
59,800 2.01 120,416
s 20 New Jet Bridge
Similar building as above constructed in following Countries:
59,800
59,800
6.71
4.67
EACH
401,138 610,000
279,281
960,000 Cost range.
21 Used – 2nd hand Jet Bridge 59,800 6.46
EACH
386,562
380,000 650,000 Cost range.
# COUNTRY
59,800 CITY
5.03 LOCATION FACTOR
300,854 $ COST PER SQUARE FOOT $ COST PER M2
Construction costs includes: excavation, sand base, foundations, tank steel material,
ural Floors 22 100,000 Gallon Tank 1 Brazil59,800 12.51
Uberaba 748,053
EACH 0.88320,000 470,000 tank
$248erection, piping, pumps, electrical $2,670
systems, metering system, insulation and
2 China59,800 4.08
Wuhan 243,715
0.85 painting
$240 & testing. $2,579
in interior partitions) 3 France59,800 $6.47
Nantes $387,145
0.97 $274 $2,943
k & P.C.C. Wall Panels) 4 59,800
Germany $15.27
Bremen $913,056
0.98 Construction
$276 costs includes: excavation,$2,974
sand base, foundations, tank steel material,
23 250,000 Gallon Tank 5 India59,800 $6.80
Jamshedpur $406,386
EACH 0.86510,000 660,000 tank
$243erection, piping, pumps, electrical $2,610
systems, metering system, insulation and
6 Italy 59,800 $0.58
Turin $34,400
0.94 painting
$265 & testing. $2,852
nt Canopy 7 Mexico59,800 $1.65
Tampico $98,535
0.85 $240 $2,579
8 Norway59,800 $4.52
Bergen $270,535
1.05
Construction
$296
costs includes: excavation,$3,186
sand base, foundations, tank steel material,
24 500,000 Gallon Tank 9 Spain59,800 $3.30
Bilbao EACH 0.92800,000
$197,071 950,000 tank
$259erection, piping, pumps, electrical $2,792
systems, metering system, insulation and
10 Sweden59,800 $3.27
Malmo $195,322
1.05 painting
$296 & testing. $3,186
s / Handicap needs 11 59,800
Switzerland $1.94
Fribourg $116,027
1.06 $299 $3,216
59,800 $0.77 $46,061 Construction costs include 3” to 6” of excavation, imported stone, 95% compaction of
12 Turkey Izmir 0.90 $254 $2,731
stone and necessary grading, lighting, signs and marking, complete with associated
25 Passenger Parking Areas 13 UK 59,800 $4.88
Bristol $292,108
SF 1.02 2.5 4.5 $288 $3,095
ooms / Lunch Room Cabinets 14 USA 59,800 $3.46
Trenton, NJ $206,983
1.00
drainage
$282
systems and 2” deep asphalt / tarmac
$3,036
top coat. (To determine a square meter
59,800 $0.25 $15,159 value multiply $ value by 10.76).
rdwood & Tile) 59,800 $6.80 $406,386
Boards
For additional
26 Architectural / Engineering location factors
Scope &59,800
Fees $0.40
refer to$23,905
%Compass International’s
6.25% 8.50% 2015 GlobalofConstruction
Percentage Construction CostYearbook (15th Edition)
or visit http://www.compassinternational.net/product/2015-global-construction-costs-yearbook/
59,800 $4.17 $249,294
27 Construction ManagementPlease send us an e mail if$2.16 %
you would $129,437 3.75% spreadsheet
like an excel 5.50% for
Percentage
this costofmodel.
Construction Cost
1 # Freight) 59,800
& Downspouts / RoofGeneral Conditions
Equipment Pads/&
Preliminaries
Walkways / 59,800
Division 1 costs$1.70
are $101,451
28 % 5% 9.50% Percentage of Construction Cost: For guidance purposes only.
ng) included in above construction values59,800 $5.41 $323,593
s - Extinguisher’s 59,800 $4.02 $240,217
59,800 $19.38 $1,159,103
ems 59,800 $2.86 $170,834
rgency Generator 59,800 $18.41 View our annual cost
$1,100,798 COMPASS INTERNATIONAL
ard readers 59,800 $2.85 estimating
$170,251 yearbooks at (215) 504 9777
Rooms / Benches / Seating & Stage Area / 59,800 $14.51 $867,578 www.compassinternational.net
www.compassinternational.net
ghting sales@compassinternational.net
electric, water, gas 59,800 $18.17 $1,086,805
w lab equipment, case work, gases, sinks, 59,800 23.38 $1,398,154

/ Lockers 59,800 $5.44 $325,342