Name of work CONSTRUCTION OF HILSA BYPASS (EAST) ROAD AT HILSA (KM 0.00 TO
:- 6.575, TOTAL LENGTH 6.575KM) INCLUDING CONSTRUCTION OF
BRIDGES & CULVERTS FOR THE YEAR 2012-13
Date of Tender :- 18.12.2020
Estimated Cost :- 42,21,17,589.00
Earnest Money :- 52,22,000.00
Time of Complition :- 24 Months
Cost of B.O.Q. :- 10000.00
Bid Processing Fee :- 5900.00
1 2 3 4 5 6
Earth Work
1 3.19 Case - II (i) Compacting original ground
Compacting original ground supporting subgrade (Loosening of the ground
upto a level of 500 mm below the subgrade level, watered, graded and
m3 15348.00 52.00 798096.00
compacted in layers to meet requirement of table 300-2 for subgrade
construction.)
2 3.16 (i) Construction of embankment
Construction of embankment with approved material obtained from borrow
pits with all lifts and leads, transporting to site, spreading, grading to m3 170525.532 271.00 46212419.00
vibratory roller to achieve the desired density, complete as per clause 401
6 4.12 (i) WMM
Wet Mix Macadam (Providing, laying, spreading and compacting graded
stone aggregate to wet mix macadam specification including premixing the
Material with water at OMC in mechanical mix plant carriage of mixed
m3 12576.750 2506.59 31524756.00
Material by tipper to site, laying in uniform layers with paver in sub- base /
base course on well prepared surface and compacting with vibratory roller
to achieve the desired density.)
7 5.1 Primar Coat
Prime coat (Providing and applying primer coat with bitumen emulsion on
prepared surface of granular Base including clearing of road surface and m2 48554.00 30.21 1466816.00
spraying primer at the rate of 0.60 kg/sqm using mechanical means.)
8 5.2 Tack Coat
Providing and applying tack coat with bitumen emulsion using emulsion
pressure distributor at the rate of 0.20 kg per sqm on the prepared m2 52343.00 11.10 581007.00
bituminous/granular surface cleaned with mechanical broom.
9 5.6 A(ii) DBM
Providing and laying dense graded bituminous macadam with 100-120 TPH
batch type HMP producing an average output of 75 tonnes per hour using
crushed aggregates of specified grading, premixed with bituminous binder
@ 4.0 to 4.5 per cent by weight of total mix and filler, transporting the hot
m3 3567.175 8249.13 29426090.00
mix to work site, laying with a hydrostatic paver finisher with sensor control
to the required grade, level and alignment, rolling with smooth wheeled,
vibratory and tandem rollers to achieve the desired compaction as per
MoRTH specification clause No. 507 complete in all respects.
10 5.8 A (ii) B.C.
Providing and laying bituminous concrete with 100-120 TPH batch type hot
mix plant producing an average output of 75 tonnes per hour using crushed
aggregates of specified grading, premixed with bituminous binder @ 5.4 to
5.6 per cent of mix and filler, transporting the hot mix to work site, laying
m3 1257.87 9096.19 11441825.00
with a hydrostatic paver finisher with sensor control to the required grade,
level and alignment, rolling with smooth wheeled, vibratory and tandem
rollers to achieve the desired compaction as per MORTH specification
clause No. 509 complete in all respects
11 8.14
Kilo Metre Stone (Reinforced cement concrete M15grade kilometre stone of
standard design as per IRC:8-1980, fixing in position including painting and
printing etc)
(i) 5th Km Post Nos. 2.00 3701.30 7403.00
standard design as per IRC:25-1967, fixed in position including finishing Nos. 544.00 736.09 400433.00
resistant to corrosive effect of salt and grit, fitted with lense reflectors,
installed in concrete or asphaltic surface by drilling hole 30 mm upto a depth Nos. 2500.00 223.00 557500.00
Technical specifications.As per MORTH specifications clause 1300 & 2200 m2 260.28 104.81 27280.00
30 / 12.25A as per drawing and technical specifications and removal of excavated earth m 2259.20 15120.69 34160663.00
with all lifts and lead upto 1000 m. (Pile diameter-1200 mm)
Providing & laying PCC M15 in Levelling course below Pile cap
31/12.39 m3 68.144 4782.81 325920.00
Cement concrete for reinforced concrete M35 in pile cap complete as per
32/12.38D(i) m3 1754.93 6131.17 10759774.00
drawing and Technical Specification
Supplying, fitting and placing un-coated HYSD bar reinforcement in
33/12.40 MT 242.02 53987.79 13066125.00
foundation complete as per drawing and technical specifications
Plain/Reinforced cement concrete in sub-structure complete as per drawing
34/13.5G(p)
m3 494.06 6266.49 3096022.00
Case-I
and technical specifications Abutment & pier shaft
Plain/Reinforced cement concrete M25 in sub-structure complete as per
35/13.5G(q)
drawing and technical specifications m3 180.59 6404.58 1156603.00
case-I
Abutment cap, Hammer Head & Dirtwall , Returnwall
Supplying, fitting and fixing in position true to line and level elastomeric
exceeding 12 mm, true to line and grade, tolurence of vertical RCC post
45/14.6 not to exceed 1 in 500, centre to centre spacing between vertical post not to m 667.74 1569.85 1048252.00
exceed 2000 mm, leaving adequate space between vertical post for
PCC M15 Grade leveling course below approach slab complete as per
47/14.10 m3 47.08 5047.50 237636.00
drawing and Technical specification
Reinforced cement concrete M-30 in approach slab including reinforcement
48/14.11 m3 371.38 8532.74 3168889.00
and formwork complete as per drawing and Technical specification
Providing and laying of a strip seal expansion joint catering to maximum
horizontal movement upto 70 mm, complete as per approved drawings and
49/14.22 standard specifications to be installed by the manufacturer/supplier or their RM 43.60 11287.43 492132.00
authorised representative ensuring compliance to the manufacturer's
instructions for installation.
Providing and laying of asphaltic plug joint to provide for horizontal
movement of 25 mm and vertical movement of 2 mm, depth of joint
varying from 75 mm to 100 mm, width varying from 500 mm to 750 mm
(in traffic direction), covered with a closure plate of 200mm x 6mm of
50/14.19 RM 87.20 1051.32 91675.00
wieldable structural steel conforming to IS: 2062, asphaltic plug to consist
of polymer modified bitumen binder, carefully selected single size
aggregate of 12.5 mm nominal size and a heat resistant foam
caulking/backer rod, all as per approved drawings and specifications.
Providing and applying 2 coats of water based cement paint to unplastered
51/14.16 concrete surface after cleaning the surface of dirt, dust, oil, grease, m2 4000.00 96.86 387440.00
efflorescence and applying paint @ of 1 litre for 2 Sq.m.
Providing and erecting direction and place identification retro-reflectorised
sign asper IRC:67 made of encapsulated lens type reflective sheeting vide
52/8.5 m2 7.20 10907.00 78530.00
clause 801.3, fixed over aluminium sheeting, 2 mm thick with area not
53/15.1A scour with stone boulders weighing not less than 40 kg each complete as per m3 4277.12 2434.59 10413034.00