You are on page 1of 6

Unit

SR Task Description UOM QTY


Price

Replacment of 3 Flush fittings of HandiCap Toilet &


1 Lot 9 1,620
6 Flush fittings of toilet

Supply and replacment of LED lamp Class Room


LED Lamps- 34 Nos Lights Coridoor - 11 Nos Lights
2 Lot 1 6,900
Toilet-5 No Light Sensors - 12 Nos light Switch - 18
Nos

Expansion joints to be cleaned, sealed & fixed


3 Lot 1 1,800
where missing
Ceiling tiles to be aligned & any dented or damaged
4 Lot 1 4,500
tiles replaced throughout
▪FAHU 1
    LOCATION- PRINCIPAL CORRIDOOR
         1. SUPPLY FAN IS NOT WORKING IN AUTO
MODE
         2. DAMAGE ON DUCT
         3. COMPRESSOR B2 AND CONTACTOR IS
NOT WORKING

         4. THERE IS ISSUE WITH DISPLAY PANNEL

▪ FAHU 2

     LOCATION- GF

         1. FILTER DOOR HANDLE DAMAGE


▪FAHU 3

     LOCATION- FF

         1. SUPPLY FAN AND RETURN FAN IS NOT


WORKING IN AUTO MODE (VFD PROBLEM)

         2.CONDENSOR B1 AND B2 IS HAVING GAS


LEAKAGE.
5 Lot 1 42,000
▪FAHU 4
    LOCATION- FF AND GF ADMON AREA
          1. SUPPLY FAN IS NOT WORKING AUTO
MODE (VFD PROBLEM)
          2. FILTER DOOR HANDLE
DAMAGE                                               * Supply
and replacment of FAHU back filters
▪PACU 1

    LOCATION- MAIN RECEPTION

           1. SUPPLY FAN AND COMPRESSOR IS NOT


WORKING.
▪PACU 2
     LOCATION- INDOOR PLAY AREA
           1. SHORT OF GAS NEED TOP
UP                                                *Replacment of
Split unit compressor - 1 no & repairing of 2 split
units leakage
Replace damaged wall tileswhere cracks and holes
6 Lot 1 2,900
are presnet all areas
Ensure blinds clean & in working order,replace
7 Lot 1 6,900
damaged & ensure chain is fixed to wall
Covers required on network cable holes in all
8 Lot 1 300
classrooms
9 Any damaged skirting to be replaced Lot 1 1,900
10 Any damaged grout to be redone for tiling Lot 1 500
Proper corner guards to be applied throughout all
11 Lot 1000 35
corners 
Supply and replacment of Faulty Control Panel of
12 Lot 1 1,500
Genset
Supply and replacment of Faulty Display of
13 Lot 1 1,500
Capacitor Bank
Supply and replacment of Faulty Access Control of
14 Each 2 590
doors - 2 Nos
Removal of ASCS Signage in the Swimming Pool
15 Lot 1 990
Area
Re painting of the external -road
16 Lot 1 19,900
markings,arrows/curb stones etc.
Levelling of all interlocks where trip hazards are
17 Lot 1 7,900
presented
Dead trees to replace with new one- 3 Nos Palm
18 Nos 3 3,712
Tree
Security cabin door to be replaced with Aluminium
19 Nos 2 2,490
door with Half Glass - 2 Nos
Security cabin Kitchen cabinets to be replaced - 2
20 Nos 2 1,090
Nos
Supply and fixing of Pole protector in the Play Area
21 Lot 1 9,900
- Wherever Damaged 
22 Expansion joint cover required LM 1 1,900
23 Cable entries opening requires sealing  Lot 1 1,900
24 All cracks on roofs requires repair Lot 1 1,900
25 All shaft openings to seal  Lot 1 900
All ac and electrical cables requires proper foster
26 RM 1000 10
insulation- Repaint with Oil paint- Approx 1000 RM

27 Damaged insulation needs replacement Lot 1 1,900


Damaged GI trunking to be replaced and secured
28 Lot 1 4,950
properly
29 Replace rusted deluge system fittings & paint Lot 1 1,900
*Swimming pool Filteration pump system
replacment - 1 No - 2 HP, Filter Lid with O ring -
30 Europa Filter                                                     Lot 1 2,950
*Replacment of Sump pump- Submersible pump KP
250- Grundfos with PVC fittings- 1 No

Domestic Water -Booster pumps on roof not


31 Lot 1 4,900
working to be fixed along with required repair work

32 Damaged ducts on roof to be repaired Lot 1 5,900


Repair of the Canopies & Pole with Paint Touch Up
33 Lot 1 1,900
wherever Applicable & rusted Area
Supply steel wooden outdoor garbage bin. Size: 100
34 Nos 4 1,250
* 200 cm.
Amount

1,620

6,900

1,800

4,500

42,000
2,900

6,900

300

1,900
500

35,000

1,500

1,500

1,180

990

19,900

7,900

11,136

4,980

2,180

9,900

1,900
1,900
1,900
900
9,500

1,900

4,950

1,900

2,950

4,900

5,900

1,900

5,000