H2S EMERGENCY RESPONSE PLAN PROCEDURES
DRILLING RIG DATI 253 – WELL : MSBY 02 ST
In anticipating of his H2S hazardous condition , safely equipment, both H2S detection &
monitoring and self contained breathing apparatus have been installed & provided at the
drilling rig site area .
A combination of fixed H2S alarm detection system with intermittent sirens & flashing
strobe lights are also installed around the strategic locations. This equipment is very
important in order to able to alert personnel working at this area immediately in the event
of any release of H2S gas into the atmosphere
1. The installations of fixed H2S detection system are set in the following conditions
Drilling Operation are equiped with fixed point H2S monitoring system . Location of
H2S Sensors is located in the following areas :
1. Rig Floor
2. Cellar
3. Shale Shaker
4. Mud Tanks
Drilling Rig is equiped with H2S alarm System provided on combination of flashing
strobe light & siren, installed in the following areas:
1. Rig Floor
2. Mud Tank
3. SCR Engine Area
4. ILO Cabin ( Strobe Light only )
5. Accomondation area
6. Precision Drilling Unit ( Strobe Unit Only )
7. Elnusa H2S Unit
7. Precision Drilling Unit ( Strobe Unit Only )
2
H2S Emergency Response Procedure
2. At the time that H2S alarm emergency is being activated, it is very important to
determine in which direction you should be going to reach the nearest Safe
Briefing Area safely . personnel should avoid going through H2S release or leaks
to the atmosphere
3. All Personnel including any visitors upon arrival at the location should recieved
H2S Safety Briefing & Safely awareness Training prior to or immediately upon
entering the work –site . All personnel must read & understand the H2S
Emergency Response Plan Procedure for the area
4. H2S Emergency Drills / Exercises may be initiated at any time to practice for an
effective H2S Emergency Response. All effected personnel should follow the
same rules as specified in this H2S Emergency Response Plan Procedure
5. All Personnel should show intensive awareness in the event an H2S Emergency
alarm is being activated and ensure that all personnel on site informed. Stop all
operation of heavy equipment / vehicles immediately and turn off the engines .
Operators / Drivers must proceed to the up wind Safe Briefing Area
3
Personnel Duties & Responsibilities to H2S Emergency Alert
I. Essential Personnel
These are personnel who are assingned certain duties and responsibilities during
an H2S emergency alert as follows :
1. Company Man / Drilling Supervisor
2. Elnusa H2S Engineer
3. Drilling Rig Superintendent
4. ToolPusher ( On Tour )
5. Driller ( On Tour )
6. Assitant Driller ( On Tour )
7. DerrickMan ( On Tour )
8. Floor Crew ( On tour )
9. Mud Enginner ( On Tour )
10. Radio Operator ( On Tour )
11. Rig Safety Officer
12. Rig Medic
All other personnel not included in the essential personnel list above will be
considered as “ Non Essential Personnel “ during an H2S emergency situation .
All Non Essential Personnel should immediatelly to the up wind Safe briefing
area in the event of H2S emergency alarm activated
Non Essential Personnel shall assemble in orderly take an accurate head account
and report status to the safety officer upon request .
4
PERSONNEL DUTIES AND RESPONSIBILITIES
I. ESSENTIAL PERSONNEL
9 Put on 30 minute SCBA, take portable electronic monitor & tube type
detector and proceed to the area of indication.
4. TOOLPUSHER ( On Tour )
* If on rig floor
9 Mask up and assist Driller, Rig Supt & Company Man / Drilling
supervisor to control the well
5
5. DRILLER ( On Tour )
* If on rig floor
9 Mask up on the rig floor
9 Pick up off bottom , shut down mud pumps & check for flow
* If on rig floor
9 Mask up and go to shale shaker. stand by to assist as required
* If on the monkey board
9 Mask up and go to the safe briefing area. and standby to assist as
required
* If on rig floor
9 Mask up , connect into breathing airline and assist to secure well as
directed
9 When well secure, unplug & turn on escape cylinder and go to Safe
briefing Area standby wait instruction
6
9. MUD ENGINEER
* If on the pits
9 Mask up and monitor mud levels, Ph , etc
9 Then put on SCBA and check all rooms, wake drilling crew and
ensure they go to Safe Briefing Area with suitable clothing &
footwear
9 Assist to complete check of personnel log sheet v.s actual head counts
reported as both Safe Briefing Areas
9 Collect first aid kit & portable resuscitator and go to the Safe Briefing
Area
7
9 If pumping, put on SCBA & wait instruction from Company Man
2. RIG MECHANIC
3. WELDER
9 Shut down welding plant & extinguish sources then go directly to Safe
Briefing Area
9 Shut down engine, apply breakes and secure boom / fork. Proceed
quickly Safe Briefing Area
9 All non essential personnel upon hearing the H2S alarm, they must
report to the upwind Safe Briefing Area as quickly as possible
8
REMEMBER
9
PT. ELNUSA DRILLING SERVICES
JL. TB. SIMATUPANG KAV 1B. JAKARTA
12560 SBA
2
Mud Logging
Mud
mixing Pit Area S. Shaker
Pit Area
Trip
Tan Rig Floor
Pipe rack
Accumulator k
Pump Area
H2S Unit
Genset Area
LEGEND
SCBA 30”
Mechanic Warehouse LQ Office
Yard
Shop SCBA 10”
Medic LQ Non Staff
Galley
SCBA
Warehouse
Air Manifold
Staff
Galley
SBA Alarm
I
H2S Sensor
-Rig Floor
-Cellar
-S.Shaker
-Mud Pit
10