Ser. No.

1 Tooling arranged for FO-09 (new slitting machine)


2 Tooling arranged for BS-2 (new slitting machine)
3 Rotary trimming to be establish on all (running & development) parts
4 Training given to all welding operator for setting of new trimming m/c
5 Setting time reduction in all turning machine
(1). Tooling rack to be modified
(2). Setup change trolley to be arrange
(3) Tool arranged for setup trolley
item code of all tools
frconallenkey003 12 no.
frconallenkey004 14 no.
frconallenkey005 17 no.
frconallenkey008. 3 no
frconallenkey013. 1/4 inch.
frconallenkey017. 3/8 inch.
frconallenkey018. 3/16 inch.
frconallenkey024. 7/32 inch.
frcons000014 18-19 spanner
frcons000015 24-27 spanner
frcons000025 23-24 spanner
frconspanner0003
spanner c type 14-15
frcons000042 box spanner 13,14 with handle
NEW TRIMMING MACHINE ESTABLISH PLAN

TARGET DATE ACTIVITY RES. PERSON REMARKS

M/C SHIFTING R. C.

POWER CONECTION R. C.

MAINTAINCE ACTIVITY A.P.

TOOLING ARRANGED S.C.

TRAINING GIVEN TO OPERATOR S.C.


CYCLE TIME TURNING M/C

M/C Name Operation Activity Average time Total time Remarks

Loading time 12

O.D. & face Hammering 7


VTX-01 ( Line-01) 87
Turning Machining time 61
Separate
Unloading time 7 Operator
Loading time 12 for both
m/c
Hammering 5
I.D. & face
CNC-01(Line-01) 83
Turning Machining time 62
Unloading time 4
Loading time 8

O.D. & face Hammering 5


VTX-01 ( Line-01) 49
Turning Machining time 31
Single
Unloading time 5 operator
on both
Loading time 7 m/c
I.D. & face Hammering 5
CNC-01(Line-01) 47
Turning Machining time 30
Unloading time 5
Loading time
O.D. & face Hammering
VEX ( Line-10)
Turning Machining time
M/C
Unloading time
Under
Loading time setting
I.D. & face Hammering
COLCHESTER (Line-10)
Turning Machining time
Unloading time
Loading time
VTX DOUBLE SPINDLE
I.D.,O.D. & Hammering
(Line-10) NMT
Face Machining time
Unloading time

Note:-