KIRNATH FABRICATOR
DIST-PURI, ORISSA

QUOTATION FOR FABRICATION AND ERECTION WORK (With tools and tackles) GENERAL TERMS:

Related tools and tackles are in our scope which includes welding machine (as per requirement), electrodes, Gas-cutter & grinding machines (as per need). Execution of work as per drawing or as per your need including fabrication and erection. Machinery like hydra and crane are in your scope as per our or site requirement. Temporary arrangement of labor hutment, drinking water, water for general purpose, power supply is in your scope. Supply of manpower as per your need (approx. up to 100 nos.) along with site supervisor with the team for fabrication and erection are in our scope.

FABRICATION AND ERECTION:


Combined rate for fabrication and erection is Rs. 10,600/ MT

IMPORTANT NOTE:
The supply of manpower required a period of one week after the finalization between the parties to mobilize the manpower at the desired site. The strength of manpower may be increased or decreased as per your requirement and also as per site requirements. Weekly payable amount per person Rs. 700/- for their use is necessary. Rising of R.A. Bills will be done monthly or half monthly as per your requirement. The weekly payable amount may be debited to the raised R.A. Bills.

You might also like