Subject : Quotation for CONSTRUCTION / EXECUTION STAGE of Permanent Feeding Arrangement to Existing Convey

SL.N0. DESCRIPTION
CONSTRUCTION/EXECUTION STAGE:

1 Civil and structural material supply and Execution of civil and structural works as per scope of
works & design dtrawings.
Installation of all mechanical equipment and execution of mechanical works as per scope of wo
2 rks and design drawings.
Installation of all electrical equipment and execution of Electrical & Instrumentation works incl
3 uding supply of control cabin, panels, all cabling, cable tray, lighting fixtures materials,
miscellaneous materials as per scope of work
Supply of instrumentation and control material for automation with cabling and execute instru
4 mentation works including DCS configuration
TOTAL LUMP SUM PRICE

Terms & Conditions


1 All Equipment’s Required to Complete the Project will be Provided by US.
2 All supporting documents should be arranged by FIRST PARTY (gate pass, work permit etc.) on ti
3 Scaffolding Provided by us.
4 Temporary Facilities on Site Like Toilet, Water, Electricity will be Provided by us.
5 15% Advance payment and remaining should be as work Progress.
6 Payment should Be within 30 days from submitting the invoice.
7 Government VAT 15% will be added in Invoice.

All other terms and conditions will be following as per Saudi Labor Law.

Please don't hesitate to contact us for further discussion. Thank you very much for your cooperation and your consid
ng Arrangement to Existing Conveyor CV-13 & 12B

QUANTITY TOTAL AMOUNT (SAR)

Lump Sum 5,778,465.00

Lump Sum 183,750.00

Lump Sum 1,681,995.00

Lump Sum 587,475.00


8,231,685.00