You are on page 1of 1

GP LABORATORIES

SOIL-ROCK-CONCRETE TESTING

11 MYKONOU STR. 15231 ATHENS

Deviator stress D=1-3 [kPa]

CD (CONSOLIDATED DRAINED)

550
500
450
400
350
300
250
200
150
100
50
0

10

12

14

16

18

20

22

100

539.303

maxD
[kPa]
260.710
383.665
539.303

[%]

WCi[%]

15.714
21.429
21.429

26.300
26.300
26.300

(bulk)
[t/m^3]
1.997
1.997
2.012

(dry)
[t/m^3]
1.581
1.581
1.593

S[%]

0.676
0.676
0.664

100.000
100.000
100.000

BISHOP & HENKEL 1962

Project: Aliveri
B1 5.50-6.00m
SoilsLab - Data Acquisition Program

850

800

750

700

650

600

550

(1'+3')/2 [kPa]

The tests were carried out in accordance with [3]


Performed by
Checked by

Files: 1900-0016 1999-0017 1999-0018

500

450

400

350

300

850

800

750

700

650

600

550

50

383.665

300

3/b
[kPa]
100/0
200/0
300/0

100

1',3' [kPa]

260.710

200

500

450

400

350

300

250

200

150

100

50

50

150

250

100

200

200

150

250

150

'

200

50

250

300

100

300

c'(s)=33.99775 (kPa)
tan['(s)]=0.41100

C'=37.29 (kPa)
' = 24.27(degrees)

(1'-3')/2 [kPa]

c' [kPa]

Axial strain [%]

Dr. George Pavlakis - Marcos Kopanos tel.+30 210 6717446,2138832 e-mail:<gmdap@hol.gr>

Approved by

You might also like