FACILITIES WORK PERMIT PROCESS 1. A Facilities Work Permit must be secured from the Security Dispatch Monitoring Office located on the Main Hospital 1st floor before any work is begun. 2. Permits will not be issued without the submission of marked floor plans or if permit information is missing. 3. The top copy of the Permit and the marked floor plans will be retained at the Monitoring Office. 4. The second copy is for the workmans records. 5. The back page of the Permit is to be visibly displayed at all times at the work location. 6. Return the back page to the Monitoring Office when the work is completed or at the end of each work shift. 7. Facilities Staff will inspect all work and return the signed Permit to the Monitoring Office. 8. The contractor will be notified if the work is disapproved and must be redone. 9. Facilities Staff will re-inspect as often as needed until the work is satisfactory. 10. The back copy of the completed and approved Permit will be retained by Facilities Operations.